Amendment_0001_HSCG87-14-B-PJT648_Bldg54.pdf

PDF 222 KB Posted

Attached to
Construction Services for Building 54 at USCG Base Kodiak, Alaska
Solicitation number
HSCG87-14-B-PJT648
Issued by

View the file

Other files

File Type Posted
QA_HSCG87-14-B-PJT672_-_Updated_Responses.pdf PDF
Abstract_of_Offerors_HSCG87-14-B-PJT648.pdf PDF
Abstract_of_Offerors_HSCG87-14-B-PJT648.pdf PDF
Amendment_0002_HSCG87-14-B-PJT648.pdf PDF
33-Q5154_(Building_54_Drawings)-06A_MECHANICAL-3.pdf PDF
Bar54final_EHS_Survey_results_full_report1.pdf PDF
Bar54final__EHS_Survey_results_extract.pdf PDF
Bldg_54_NW_ACM_Prelim_Sample_Results.pdf PDF
Building_54_NW_TO_2_ACM_Abatement_Report_March_2013.pdf PDF
Exterior_Felt_Results_SKMBT_42113050111040.pdf PDF
ECH_acm_survey_results.pdf PDF
Final_Building_54_NW_TO_1_ACM..._Report_-with_appendices2.pdf PDF
DD1149_toHWSB.pdf PDF
BR549_Kodiak_Siding_Manual_FINAL_130704.pdf PDF
SOP-ExemptSolidWasteLandfill-28Oct2010.pdf PDF
Contractors_UEG-withChartsandForms-2003.pdf PDF
20131124__BASE_KODIAK_STANDARD__CONSTRUCTION_SPEC_MASTER.pdf PDF
33-Q5154_(Building_54_Drawings)-08_ELECTRICAL-2.pdf PDF
33-Q5154_(Building_54_Drawings)-07_ELECTRICAL-1.pdf PDF
33-Q5154_(Building_54_Drawings)-09_FIRE_PROTECTION.pdf PDF
33-Q5154_(Building_54_Drawings)-03_ARCHITECTURAL-2.pdf PDF
33-Q5154_(Building_54_Drawings)-06_MECHANICAL-2.pdf PDF
33-Q5154_(Building_54_Drawings)-05_MECHANICAL-1.pdf PDF
33-Q5154_(Building_54_Drawings)-02_ARCHITECTURAL-1.pdf PDF
33-Q5154_(Building_54_Drawings)-01_GENERAL-CIVIL.pdf PDF
33-Q5154_(Building_54_Drawings)-04_STRUCTURAL.pdf PDF
HSCG87-14-B-PJT648_1442_ _IFB.pdf PDF
AK140001_02.07.14_AK1.pdf PDF
33Q5154_USCGKodiakBldg54RenovFINALSpecs.pdf PDF
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES

87 1 2

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)

00001 March 28, 2014 2114874PJT648

6. ISSUED BY 7. ADMINISTRATED BY (If other than Item 6)

USCG Civil Engineering Unit-Juneau PO Box 21747 Juneau AK 99802-1747

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

9A. AMENDMENT OF SOLICITATION NO.

HSCG87-14-B-PJT648

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NO.

* 10B DATED (SEE ITEM 13)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended is not extended.

NOTE: Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Item 8 and 15, and returning 1 copies of the amendment; (b) acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hours and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

N/A

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS, IT MODIFIES THE CONTRACT/ORDER NO.

AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT/ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

CONSTRUCTION SERVICES BUILDING 54 AT USCG BASE KODIAK, ALASKA.

AMEND SOLICITATION HSCG87-14-B-PJT648 AS FOLLOWS:

SEE CONTINUATION PAGE

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

BY

(Signature of person authorized to sign)

BY

(Signature of Contracting Officer)

1. IFB Section L.9, and the following:

(b) Site visits may be arranged during normal duty hours by contacting:

Eric Zeimer at 907-487-5320 (ext. 2266).

2. See attached Questions and Answers.

3. See attached Site Visit Sign-in Sheet and Agenda.

END OF AMENDMENT 0001

HSCG87-14-B-PJT648 Questions & Answers

Q1. The roof appears to be leaking in several locations. Are leaks to be repaired and if so can a scope be specified?

A. Repair of leaks (most likely evidenced by staining from previous/old leaks) or re-roofing is NOT included in the scope of work.

Q2. Sheetrock damage in the attic is greater than the amount shown on the drawings. Do you want to increase the scope of repair work in the attic?

A. The final result is determined by the scope of work; specifically to improve the smoke /fire barrier separation. The extent of repairs and extent of existing damage shall be considered by the contractor in their bid.

Refer to Spec Section 010100 which states in part, the following:

1.0.3.1 Performance Based Statement of Work:

1.0.3.2 The Contractor will be required to typically perform construction from a performance-based Statement of Work. The contractor is responsible for interpreting the performance based requirements from the specifications, plans and reference documents, including the “Kodiak Standard Specifications” to provide a complete and useable end product. The Statement of Work and reference documents, including the “Kodiak Standard Specifications” may not provide complete instructions on how to perform the work, or detail/integrate all associated components of the work. The contractor shall apply their experience and judgment in performing typical commercial construction practices to complete the work with limited additional Government guidance.

Q4. On sheet A3.06 the wood decks for the AHU’s are shown and are dimensioned just a few inches bigger that the units that are setting on them. This does not appear to consider room for maintenance personnel to access these units. Would you like the decks to be enlarged and if so, please provide new dimensions?

A. Extend the wood deck adjacent to the AHU to provide maintenance access.

Coordinate with existing construction and the specific requirements of the AHU selected/installed by the contractor.

Refer to Spec Section 010100 which states in part, the following:

1.0.4 Where exact locations are not given for the positioning of equipment, devices, and work; they shall be positioned to permit easy access for maintenance and for removal and replacement of component parts. The Contractor is responsible for the coordination and proper relation of the work with the existing surroundings.

Q9. At detail # 1/7.01 no building heights from second floor to top plate shown. Please provide.

A. The top plate is approximately 10’-10”+/- above the second floor. Contractor to field verify.

Q11. In some locations no wall removal is noted in order to install new one piece tub units. Also will possibly need to remove walls for existing tub demo?

A. The extent of removal shall be considered by the contractor in their bid.

See Specification Section 015700, which states in part: The contractor shall coordinate all work to include Abatement, Demolition and Removal of materials as required to result in a complete project as described. Demolition is generally described on the drawings, however, the drawings are generic and do not depict exact locations or quantities of removed items. The contractor shall perform all required demolition as required to install new materials and surfaces as shown.

Q13. Is the intent to replace all exterior wall insulation with new, if so please provide an R value for new insulation? During site visit there was visible water damage to most of the exterior walls and insulation.

A. When the exterior walls are opened to facilitate other construction; replace missing or severely damaged, exterior wall cavity insulation with R-21 fiberglass batting. It is NOT the intent to replace all existing exterior wall insulation with new. The existing exterior wall insulation is typically loose rock wool or fiberglass batting inside the existing wall cavity. The new work required, includes adding a layer of insulation outboard of the new exterior sheathing. The R value of the new exterior insulation is specified in Section 072113 “Semi- Rigid Stone Wool: R-4.2/inch, minimum (see drawings for thickness or total R value required)”.

Q14. During the site visit it was apparent that all the sheetrock had mold/mildew on it.

Is the intent to remove ALL sheetrock in building?

A. Refer to Spec Section 010100 which describes the Performance Based Statement of Work intent.

Also see Section 010120; 1.4 EXISTING CONSTRUCTION AND REUSE OF

MATERIALS

The construction required includes rehab of an existing facility. As such, some features of the existing facility will be retained during/upon completion of the work.

Existing building components (such as drywall, cabinets, plumbing, etc) may be retained and incorporated into the finished product if serviceable, and consistent with the new components specified. Perform repairs as required to incorporate existing building components into the finished product.

Q15. Has the Coast Guard considered doing any roofing upgrades to building 54? This may want to be considered as the roof had many signs of leakage during the site investigation.

A. See Question/Answer #1 above.

Q16. Will the area above building 54 be able to be used as a staging area? There was talks of this during site visit, but no confirmation?

A. The primary staging area is at the Bldg 54 site. Additional areas on Base may be provided to the contractor at government convenience during construction.

Coordinate with the COR.

Q17. Is builders risk required? If so what are the limitations?

A. Bonding, insurance, and surety requirements are as indicated in the IFB, with appropriate reference contract clauses.

Q18. Is there any liquidated damages for this project?

A. No.

Q19. Is there any retainage on this project?

A. No.

Q20. Is it safe to assume that all the ACM abatement has taken place on the interior of the building?

A. No. ACM and other hazards may still exist. Prior/previous HAZMAT reports and analysis have been provided as reference documents with the IFB documents, and the specifications require contractor performance of additional survey(s) and all compliance activities to execute the work.

Q21. Is it possible to extend the bid date?

A. No.

Q22. The plans call for 1” x 3 ½” rabbeted PVC trim. Is this a nominal dimension or do you want 5/4 x 3 ½? The 1” is too thin to allow the siding to tuck into and we strongly advise that all trim be 5/4 for this project. All other barracks buildings have 5/4 material throughout. Note that Azek 4/4 or 1 x is actually ¾ and 5/4 or 1 ¼ is 1 inch. Please advise.

A. Dimensions shown are correct actual size (1” x 3 1/2”), not nominal. We understand Azek nominal sizes are larger than actual product, and we agree the appropriate Azek material size for the trim is 5/4.

Q23. The plans, detail 10/A9.01 calls for a strip of siding material to trim inside soffit.

The other barracks all have 3 ½ PVC trim at this location. Do you want to change this detail to PVC?

A. Install 3 ½” PVC trim at this location, but leave gap as shown to allow rainscreen cavity to breathe.

Q24. The plans call for 1 ¼ at fascia and rake and rake to wall. We suggest the detail be changed to 6/4 which will be a dimensional 1 ¼. Please advise.

A. Dimensions shown are correct actual size (1 ¼”), not nominal. Yes, Azek 6/4 is the appropriate sized product.

Q25. There doesn’t appear to be any exterior signage shown. Are there any exterior signs? If so, please provide quantity and scope of each sign required.

A. New signs are not required. Remove and reinstall the building number and building inventory ID signs.

Remaining Questions will be posted on FBO on or about 03 APRIL 2014.

OSR PREBID AGENDA

LAKE LOUISE HOUSING

BLDG 54 REHAB.

1) GENERAL PLAN

a) COMBINED MEETING (TWO PROJECTS)

i) KO (PHONE) TO DISCUSS CONTRACTING ISSUES, INCLUDING

HOW TO ASK QUESTIONS

ii) VERY BRIEF DISCUSSION OF TECHNICAL HIGHLIGHTS

b) SITE VISITS [ARE ALL PRIMES INTERESTED IN BOTH PROJECTS?]

2) INTRODUCTIONS

a) MEETING LEADER: ERIC ZEIMER

b) KO: HEATHER BRUBECK (JUNEAU; BY PHONE)

c) LAKE LOUISE PM/COR: KEVIN COLEMAN (JUNEAU; BY PHONE)

d) BLDG 54 PM/COR: BOB BELLAGH (JUNEAU; IN PERSON)

e) LAKE LOUISE OSR: ERIC ZEIMER (COAST GUARD EMPLOYEED;

KODIAK)

f) BLDG 54 OSR: DAVE HEUMAN (COAST GUARD CONTRACTOR;

KODIAK)

g) SIGN-IN SHEET --- I’LL SUBMIT TO KO…

3) CONTRACTING OFFICER DISCUSSION

a) GETTING QUESTIONS ANSWERED

b) IFB CLOSING DATES

c) CONTRACT COMPLETION DATES

d) BID TYPES/EVALUATIONS

e) ANNOUNCEMENTS

f) ADDITIONAL SITE VISITS(?)

4) TECHNICAL HIGHLIGHTS

a) PURPOSE OF HIGHLIGHTS

b) LAKE LOUISE

i) ALL QUESTIONS SHOULD BE SUBMITTED IN WRITING TO KO

ii) SCOPE

(1) GENERAL BLDG REHAB

(a) DECK/STOOP REPLACEMENT (SYNTHETIC MATERIALS)

(b) CLEANING & PAINTING

(c) DRYER VENTS

(d) ROOFING (CERTAIN UNITS – SEE SPEC)

(e) CEILING PENETRATIONS (BETWEEN ATTIC AND

OCCUPIED SPACES)

(f) BATHROOM FAN DUCTS

(g) SOFFIT VENTS

(2) SITE/CIVIL,

(a) GRADING, ESP. TO IMPROVE SURFACE WATER

DRAINAGE

(i) CONSTANT GRADE CHECK RECOMMENDED

(b) PARKING PADS

(c) PAVING/MARKING

(d) SIDEWALK, CURB, AND GUTTER

(e) FUEL TANK REPLACEMENT

(f) FENCING

(i) DETAILS, ESP. EMBEDMENT CRITICAL

(3) ENVIRONMENTAL/PERMITTING:

(a) READ SPEC RE: ASSUMPTIONS REGARDING

CONTAMINATED SOIL

(b) SWPPP AND APPROVALS – READ SPEC CAREFULLY.

THIS IS A BIG DEAL TO COAST GUARD

(4) TOPO SURVEY/AS-BUILTS

(5) MISC.

(a) HOUSING PROJECTS ARE A PAIN; CONSIDERATION, COOPERATION, AND COMMUNICATION WITH RESIDENTS

WILL GO FAR TO REDUCE PROBLEMS. OSR HAS A ROLE,

BUT BURDEN IS ON THE CONTRACTOR.

(b) KEEP SITE CLEAN AND SAFE – UNITS WILL BE OCCUPIED;

KIDS; PETS; NOSEY TENANTS. POWER TOOLS SHOULD

REMAIN UNPLUGGED UNLESS BEING USED.

(c) NO WORKERS THAT SHOULDN’T BE IN A FAMILY

HOUSING AREA – LIST OF EMPLOYEES WILL BE

REQUIRED AND MILPOL MAY DO BACKGROUND

INVESTIGATIONS.

(d) HOUSING MONITOR – SEE SPEC.

(e) PARKING COULD BE AN ISSUE

(f) LAYDOWN AREA – NOT SECURE – FENCING REQUIRED; A

COUPLE OF OPTIONS IN THE AREA

(g) NEEDS TO GET DONE THIS YEAR – SEE IFB FOR

MILESTONES/SCHEDULE

(i) GRASS GROWING BY 15 AUGUST

(II) PAVING BY 1 OCTOBER

(h) SEE CQC SPEC FOR QUALIFICATIONS AND LIMITATIONS

OF DUTIES FOR VARIOUS PERSONNEL. EXPECT THIS TO

BE ENFORCED.

c) BLDG 54 REHAB

i) ALL QUESTIONS SHOULD BE SUBMITTED IN WRITING TO KO

ii) SCOPE

(1) SITE/CIVIL

(2) INTERIOR REHAB

(3) EXTERIOR REHAB

(4) MISC.

(a) LEAD PAINT AND ACM

(i) READ SPEC CAREFULLY

(ii) LOTS OF DATA FROM PREVIOUS TESTING AVAILABLE

(iii) A LOT OF ABATEMENT WAS COMPLETED LAST YEAR

(iv) LOTS OF “EXPERTS” ON BASE – FOLLOW PROPER

PROCEDURES AND HAVE CONFIDENCE

d)

5) SITE VISITS

a) CAN EVERYONE FIND THE SITES?

b) MY PLAN IS TO STAY LONG ENOUGH THAT PEOPLE CAN FIRST GO

TO BLDG 54.

c) UNITS ARE OCCUPIED; BUT RESIDENTS (SHOULD) HAVE BEEN

WARNED. FEEL FREE TO WANDER AROUND THE UNITS INVOLVED

IN THE PROJECT, BUT TRY TO STAY AWAY FROM OTHER UNITS.

d) AMENDMENT SHOULD CLARIFY ABILITY TO MAKE ADDITIONAL SITE

VISITS. HOWEVER, DO NOT VISIT SITE AT OTHER TIMES WITHOUT

COORDINATING WITH ME AT LEAST ONE WORKING DAY IN

ADVANCE.