HSCG85-17-R-P45245_Attachment_2_Pricing_Work_Sheets_(1.24.17).xls
XLS spreadsheet 42 KB Posted
- Attached to
- Drydock and Ship Repair of USCGC POLAR STAR
- Solicitation number
- HSCG85-17-R-P45213
About this file
HSCG85-17-R-P45245 Attachment 2 Pricing Work Sheets (1.24.17)
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Price Schedule
| 19 | 20 | 21 | 22 | 23 | 24 |
| ITEM NO. | SCHEDULE OF SUPPLIES/SERVICES | QUANTITY | UNIT | UNIT PRICE | AMOUNT |
| 0001 | WI-1 Hull Plating (U/W Body), Inspect [accounting line to be filled in at award] | 1 | JB | $ - 0 | |
| 0002 | WI-2Hull Plating (U/W Body), Ultrasonic Testing [accounting line to be filled in at award] | 1 | JB | $ - 0 | |
| 0003 | WI-3 U/W Body, Preserve (Partial) [accounting line to be filled in at award] | 1 | JB | $ - 0 | |
| 0004 | WI-4 Voids (Non-Accessible), Leak Test [accounting line to be filled in at award] | 1 | JB | $ - 0 | |
| 0005 | WI-5 Voids (Non-Accessible), Internal Surfaces, Preserve [accounting line to be filled in at award] | 1 | JB | $ - 0 | |
| 0006 | WI-6 Propulsion Shaft - Strain Gage and Air Gap Readings (All) [accounting line to be filled in at award] | 1 | JB | $ - 0 | |
| 0007 | WI-7 Centerline Propulsion Hub Removal and Reinstallation [accounting line to be filled in at award] | 1 | JB | $ - 0 | |
| 0008 | WI-8 Port Propulsion Hub Removal and Reinstallation [accounting line to be filled in at award] | 1 | JB | $ - 0 | |
| 0009 | WI-9 Starboard Propulsion Hub Removal and Reinstallation [accounting line to be filled in at award] | 1 | JB | $ - 0 | |
| 0010 | WI-10 Centerline Propulsion Shafting Removal and Reinstallation [accounting line to be filled in at award] | 1 | JB | $ - 0 | |
| 0011 | WI-11 Port Propulsion Shafting Removal and Reinstallation [accounting line to be filled in at award] | 1 | JB | $ - 0 | |
| 0012 | WI-12 Stbd Propulsion Shafting Removal and Reinstallation [accounting line to be filled in at award] | 1 | JB | $ - 0 | |
| 0013 | WI- 13 Propulsion Shaft Bearings (External), Check Clearances [accounting line to be filled in at award] | 1 | JB | $ - 0 | |
| 0014 | WI-14 Fathometer Transducer, General Maintenance [accounting line to be filled in at award] | 1 | JB | $ - 0 | |
| 0015 | WI-15 Speed Log, Overhaul Gate Valve, Renew Transducer Hull Collar Bushing [accounting line to be filled in at award] | 1 | JB | $ - 0 | |
| 0016 | WI-16 Sea Strainers (Hayward) Open, Clean, and Inspect [accounting line to be filled in at award] | 1 | JB | $ - 0 | |
| 0017 | WI-17 Steering Gear (General), Overhaul [accounting line to be filled in at award] | 1 | JB | $ - 0 | |
| 0018 | WI-18 Rudder, Remove and Reinstall [accounting line to be filled in at award] | 1 | JB | $ - 0 | |
| 0019 | WI-19 Anchor Windlass, Level 1 Service and Inspect, Minor Repairs, Perform [accounting line to be filled in at award] | 1 | JB | $ - 0 | |
| 0020 | WI-20 Anchor Chains and Ground Tackle, Inspect and Repair [accounting line to be filled in at award] | 1 | JB | $ - 0 | |
| 0021 | WI-21 Miranda Davit, Annual Inspect [accounting line to be filled in at award] | 1 | JB | $ - 0 | |
| 0022 | WI-22 Allied K280-70 Crane, Starboard, Annual Inspect and Repair [accounting line to be filled in at award] | 1 | JB | $ - 0 | |
| 0023 | WI-23 Allied K280-70 Crane, Port, Annual Inspect and Repair [accounting line to be filled in at award] | 1 | JB | $ - 0 | |
| 0024 | WI-24 Allied T60-60 Crane, Annual Inspect and Repair [accounting line to be filled in at award] | 1 | JB | $ - 0 | |
| 0025 | WI-25 Flight Deck Nets, Overhaul, 5 Year [accounting line to be filled in at award] | 1 | JB | $ - 0 | |
| 0026 | WI-26 Decks - Exterior, Preserve (“MIL-Spec/Flight Deck” System) [accounting line to be filled in at award] | 1 | JB | $ - 0 | |
| 0027 | WI-27 Cathodic Protection / Zinc Anodes, Renew [accounting line to be filled in at award] | 1 | JB | $ - 0 | |
| 0028 | WI-28 Drydock [accounting line to be filled in at award] | 1 | JB | $ - 0 | |
| 0029 | WI-29 Temporary Services Provide [accounting line to be filled in at award] | 1 | JB | $ - 0 | |
| 0030 | WI-30 Dock and Sea Trial Performance, Support, Provide [accounting line to be filled in at award] | 1 | JB | $ - 0 | |
| 0031 | WI-31 Flex Hose Assemblies, Renew [accounting line to be filled in at award] | 1 | JB | $ - 0 | |
| 0032 | WI-32 Sea Valves and Waster Pieces [accounting line to be filled in at award] | 1 | JB | $ - 0 | |
| 0033 | WI-33 Sewage Pipe Renewal [accounting line to be filled in at award] | 1 | JB | $ - 0 | |
| 0034 | WI-34 Shaft Handling Equipment, Maintenance [accounting line to be filled in at award] | 1 | JB | $ - 0 | |
| 0035 | WI-35 Temporary Fuel Oil Offload and Storage Drydock [accounting line to be filled in at award] | 1 | JB | $ - 0 | |
| 0036 | WI-36 Tanks (Boiler Feedwater), Preserve, 100% [accounting line to be filled in at award] | 1 | JB | $ - 0 | |
| 0037 | WI-37 Tanks (Dirty Oil and Waste), Preserve 100% [accounting line to be filled in at award] | 1 | JB | $ - 0 | |
| 0038 | WI-38 Starboard Shaft OD Box, Open, Clean, Inspect, Repair, and Report [accounting line to be filled in at award] | 1 | JB | $ - 0 | |
| 0039 | WI-39 Propulsion Shaft Seal, Clean, Inspect, and Overhaul [accounting line to be filled in at award] | 1 | JB | $ - 0 | |
| 0040 | WI-40 Oil Water Separator, 5 Year Overhaul [accounting line to be filled in at award] | 1 | JB | $ - 0 | |
| 0041 | WI-41 Firemain Valve (>=2.5 Inches) Inspection and Overhaul [accounting line to be filled in at award] | 1 | JB | $ - 0 | |
| 0042 | WI-42 Vent Ducting Renewal, Fan Room 1-95-1-Q [accounting line to be filled in at award] | 1 | JB | $ - 0 | |
| 0043 | WI-43 Flight Deck Nozzle, Maintenance [accounting line to be filled in at award] | 1 | JB | $ - 0 | |
| 0044 | WI-44 No 2A MPDE Cooling Water Piping, Repairs [accounting line to be filled in at award] | 1 | JB | $ - 0 | |
| 0045 | WI-28 Dry Dock Extension (optional item) (can be exercised multiple time for a total WI-28 extension of 45 days) | 45 | DA | $ - 0 | |
| 0046 | WI-29 Temporary Services Provide Extension (optional item) (can be exercised multiple time for a total WI-29 extension of 45 days) | 45 | DA | $ - 0 | |
| Total of Definite and Optional Items | $ - 0 | ||||
| Rates for all changes to the contract (growth work and voyage repairs) | |||||
| Description | Unit | Unit Price | |||
| Composite Labor Rate: In accordance with "Composite Labor Rate" in FAR 52.212-4, amended, Terms and Conditions 14. | HR | $ - 0 | |||
| Loading Rate: All inclusive loading rate to be added to materials and subcontracts | % | $ - 0 | |||
| Lay Days: In accordance with HSAR 3052.217-94 | DA | $ - 0 | |||
| Temporary Services. The price for day consists of a daily rate for all services in the "Temporary Services" Work Item except Heavy Lift and Hazardous Waste | DA | $ - 0 | |||
| Crane Hour: Price for crane service per hour including operator and riggers | HR | $ - 0 | |||
| Forklift Hour: Forklift service per hour including operator and riggers | HR | $ - 0 | |||
| Oily Rag Disposal | LB | $ - 0 | |||
| Filter Disposal | EA | $ - 0 | |||
| Bilge Water/Oily Waste Disposal | GA | $ - 0 | |||
| Jacket Water Disposal | GA | $ - 0 | |||
| Lead Testing | EA | $ - 0 | |||
| Asbestos Testing | EA | $ - 0 |
&C&"Times New Roman,Regular"HSCG85-17-R-P45213
SCHEDULE OF SUPPLIES/SERVICES CONTINUED
&C&"Times New Roman,Regular"5
Rates for Contract Changes
| Description | Estimated Quantity* | Unit | Unit Price | Extended Amount |
| Composite Labor Rate: In accordance with "Composite Labor Rate" in FAR 52.212-4, amended, Terms and Conditions 14. | 20000 | HR | $ - 0 | |
| Loading Rate: All inclusive loading rate to be added to materials and subcontracts** | $750,000 | % | $ 750,000.00 | |
| Lay Days: In accordance with HSAR 3052.217-94 | 15 | DA | $ - 0 | |
| Temporary Services. The price for day consists of a daily rate for all services in the "Temporary Services" Work Item except Heavy Lift and Hazardous Waste | 15 | DA | $ - 0 | |
| Crane Hour: Price for crane service per hour including operator and riggers | 300 | HR | $ - 0 | |
| Forklift Hour: Forklift service per hour including operator and riggers | 200 | HR | $ - 0 | |
| Oily Rags Disposal | 200 | LB | $ - 0 | |
| Filter Disposal | 75 | EA | $ - 0 | |
| Bilge Water/Oily Waste Disposal | 15000 | GL | $ - 0 | |
| Jacket Water Disposal | 1000 | GL | $ - 0 | |
| Lead Testing | 100 | EA | $ - 0 | |
| Asbestos Testing | 100 | EA | $ - 0 | |
| *NOTE: The estimated quantity and extended amount indicated above are for evaluation of offers only. The proposed rate incorporated into the contract will apply to all changes involving additional work under this contract regardless of the actual total hours required. | ||||
| **The extended amount for the loading rate is calcuated by adding $750,000 to the estimated quantity * unit price |
&CHSCG85-17-R-P45213
Rates for Contract Changes
File details come from the government source that posted it. Updated .