HSCG85-17-R-P45213_Attachment_1_USCGC_POLAR_STAR_(WAGB-400)_Dry_Dock_Repairs_FY_2017_(Rev2,_06_February_2017).pdf
PDF 2 MB Posted
- Attached to
- Drydock and Ship Repair of USCGC POLAR STAR
- Solicitation number
- HSCG85-17-R-P45213
About this file
HSCG85-17-R-P45213 Attachment 1 USCGC POLAR STAR (WAGB-400) Dry Dock Repairs FY 2017 (Rev-2)
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
USCGC POLAR STAR (WAGB 10)
SPECIFICATION FOR DRYDOCK REPAIRS
FY2017
Developed By: David E Kent
(Rev 2, 06 February 2017)
USCGC POLAR STAR (WAGB-400) DRYDOCK AVAILABILITY FY2017
ii (Rev-2)
TABLE OF CONTENTS
Revisions Record .......................................................................................................................................... iv Consolidated List of References ................................................................................................................. vii Consolidated List of Government-furnished Property ................................................................................ xv Consolidated List of Critical Inspection Items ......................................................................................... xvii Principal Characteristics General Requirements WORK ITEM 1: Hull Plating (U/W Body), Inspect WORK ITEM 2: Hull Plating (U/W Body), Ultrasonic Testing WORK ITEM 3: U/W Body, Preserve (Partial) WORK ITEM 4: Voids (Non-Accessible), Leak Test WORK ITEM 5: Voids (Non-Accessible), Internal Surfaces, Preserve WORK ITEM 6: Propulsion Shafting, Strain Gauge Alignment Check WORK ITEM 7: Centerline Propulsion Hub Removal and Reinstallation WORK ITEM 8: Port Propulsion Hub Removal and Reinstallation WORK ITEM 9: Starboard Propulsion Hub Removal and Reinstallation WORK ITEM 10: Centerline Propulsion Shafting Removal and Reinstallation WORK ITEM 11: Port Propulsion Shafting Removal and Reinstallation WORK ITEM 12: Starboard Propulsion Shafting Removal and Reinstallation WORK ITEM 13: Propulsion Shaft Bearings (External), Check Clearances WORK ITEM 14: Fathometer Transducer, General Maintenance WORK ITEM 15: Speed Log, Overhaul Gate Valve, Renew Transducer Hull Collar
Bushing WORK ITEM 16: Sea Strainers (Hayward) Open, Clean, and Inspect WORK ITEM 17: Steering System, Groom WORK ITEM 18: Rudder And Rudder Stock, Remove and Inspect WORK ITEM 19: Anchor Windlass, Level 1 Service and Inspect, Minor Repairs, Perform WORK ITEM 20: Anchor Chain(s) and Ground Tackle, Inspect and Repair WORK ITEM 21: Miranda Davit, Annual Inspect WORK ITEM 22: Allied K280-70 Crane, Starboard, Annual Inspect and Repair WORK ITEM 23: Allied K280-70 Crane, Port, Annual Inspect and Repair WORK ITEM 24: Allied T60-60 Crane, Annual Inspect and Repair WORK ITEM 25: Flight Deck Nets, Overhaul, 5 Year WORK ITEM 26: Decks - Exterior, Preserve (“MIL-Spec/Flight Deck” System) WORK ITEM 27: Cathodic Protection / Zinc Anodes, Renew WORK ITEM 28: Drydock WORK ITEM 29: Temporary Services, Dockside Contractor Facility, Provide WORK ITEM 30: Sea Trial Performance, Support, Provide WORK ITEM 31: Flex Hose Assemblies, Renew WORK ITEM 32: Sea Valves and Waster Pieces, Overhaul or Renew WORK ITEM 33: Sewage Shoretie Piping, Renew WORK ITEM 34: Shaft Handling Equipment, Maintenance WORK ITEM 35: Temporary Fuel Oil Offload and Storage Drydock WORK ITEM 36: Tanks (Boiler Feedwater), Preserve “100%” WORK ITEM 37: Tanks (Dirty Oil and Waste), Preserve “100%” WORK ITEM 38: Starboard Shaft OD Box, Open, Clean, Inspect, Repair, and Report iii (Rev-2)
WORK ITEM 39: Propulsion Shaft Seal, Clean, Inspect, and Overhaul WORK ITEM 40: Oil Water Separators, 5 Year Overhaul WORK ITEM 41: Firemain Valve (>=2.5 Inches) Inspection And Overhaul WORK ITEM 42: Vent Ducting Various Systems, Renewal WORK ITEM 43: Flight Deck Nozzle, Maintenance WORK ITEM 44: No 2A MPDE Cooling Water Piping, Repairs iv (Rev-2)
REVISIONS RECORD
This page is used to record specification revisions, which may have occurred subsequent to a Revision 0 (Rev-0) package. Information listed is intended to provide Contractors and field unit personnel a means to ensure all the current specification revision pages are present when reviewing or utilizing this specification package.
DATE REV# WORK
ITEM#
CHANGES MADE
13JAN2017 1 Global Corrected Drawing Titles.
13JAN2017 1 Global Made corrections to spelling, grammar, formatting.
13JAN2017 1 Global Removed specific requirements for CFR submittals. Submittals shall be submitted IAW
SFLC Std Spec 0000.
13JAN2017 1 Global Removed requirements to perform touch-up painting IAW SFLC Std Spec 0000.
13JAN2017 1 Global Corrected dates on SSPC standards.
13JAN2017 1 n/a Updated Reference Table.
13JAN2017 1 n/a Corrected quantities in GFP Table.
13JAN2017 1 6 Clarified Air Gap Post-Reassembly Drydock Measurement Requirements.
13JAN2017 1 6 Clarified timing for afloat air gap measurements.
13JAN2017 1 7, 8, 9 Clarified propeller flange bolt removal requirements.
13JAN2017 1 8, 9 Clarified time Coast Guard will require to purify all three shafts upon completion of repairs.
13JAN2017 1 8, 9 Added Sea Trial Applicability.
13JAN2017 1 8, 9 Deleted requirement to ship propellers to overhaul facility w/in two weeks of undocking.
13JAN2017 1 9 Clarified that U-11 is a RH Propeller.
v (Rev-2)
DATE REV# WORK
ITEM#
CHANGES MADE
13JAN2017 1 10, 11, 12 Clarified exterior paint touch-up references.
Changed Consulting Engineer (CE) to Technical
Representative (Tech Rep). Removed reference to
SSPC-SP 12.
13JAN2017 1 11, 12 Removed references to 400-WAGB 4302-001.
13JAN2017 1 11, 12 Removed reference to Cooper Bearing.
13JAN2017 1 13 Revised references. Added 400-WAGB 4302- 004, removed 400-WAGB 4302-001.
13JAN2017 1 16, 32 Revised references to remove POLAR SEA drawings. Added 400-WAGB 0103-3, POLAR
STAR, Booklet of Plans.
13JAN2017 1 21 Corrected Drawing Revision for 400-WAGB 1105-059.
13JAN2017 1 22 Added requirement to flush hydraulic fluid and renew oil in the reservoir.
13JAN2017 1 23 Corrected Tech Manual reference and test weights.
13JAN2017 1 29 Deleted exceptions to pier services prior to drydocking.
13JAN2017 1 30 Clarified sewage offload requirement is per day, and not total.
13JAN2017 1 32 Added one additional valve to list. Valve will be provided as GFP.
13JAN2017 1 35 Clarified amount of fuel POLAR STAR would arrive with.
13JAN2017 1 35 Revised references to remove POLAR SEA drawings. Added 400-WAGB 2901-2, POLAR
STAR, Tank Capacity Curves.
13JAN2017 1 41 Corrected drawing revision for 400-WAGB-4803- 7.
13JAN2017 1 41, 42 Clarified interference requirements.
vi (Rev-2)
DATE REV# WORK
ITEM#
CHANGES MADE
13JAN2017 1 42 Corrected Drawing Revision of 400-WAGB 3803-18.
13JAN2017 1 43, 44 Added additional work items.
06FEB2017 2 21 Added requirement to overhaul and preserve hydraulic pumps & motors.
06FEB2017 2 33 Corrected reference drawing.
NOTE : All work item and paragraph numbers listed above for a given revision correspond to same numbers in the previous revision. This revised specification is self-contained with all of the above listed changes incorporated.
vii (Rev-2)
CONSOLIDATED LIST OF REFERENCES
The below-listed documents form a part of this specification to the extent specified herein.
Approval/publication dates or revision dates/numbers are also identified, to ensure that same document versions are used at time of specification writing and during contract execution.
All Coast Guard drawings, technical publications, and standard specifications will be provided to Contractors by the Coast Guard at an appropriate time, or upon request, free of charge. Other Government documents may be accessed – free of charge – as follows:
MIL/DOD/CID Specifications: http://quicksearch.dla.mil/
Commandant Instruction Manuals: http://www.uscg.mil/directives/default.asp
Public Laws, Code of Federal Regulations, U.S Codes, and other Federal Government laws:: https://www.gpo.gov/fdsys/
The Government is aware of the following internet web links where Contractors may procure commercial specifications:
American Welding Society (AWS): http://www.awspubs.com/index.php
ANSI, ASTM, IEEEE, NFPA, ASME, SAE Standards: http://www.techstreet.com/
NFPA: http://www.nfpa.org
SSPC Standards and pictorial guides: http://www.sspc.org/
COAST GUARD DRAWINGS
Coast Guard Drawing 6713-203, Rev -, CRP-V850 Transducer (SS505) Adapter Assembly
Coast Guard Drawing 400-WAGB 0700-1, Rev L, POLAR STAR Docking Plan
Coast Guard Drawing 400 WAGB 0103-3, Rev AC, Booklet of General Plans (POLAR
STAR)
Coast Guard Drawing 400 WAGB 0103-011, Rev J, Outboard Profile
Coast Guard Drawing 400 WAGB 103-030, Rev C, General Arrangement Modifications Incidental to Fwd Crane Replacement
Coast Guard Drawing 400 WAGB 103-032, Rev D, General Arrangement Modifications Incidental to Aft Crane Replacements
Coast Guard Drawing 400 WAGB 185-110, Rev-, Centerline CPP Hyd Sys Reservoir Tank Fabrication
Coast Guard Drawing 400 WAGB 185-120, Rev-, Port CPP Hydraulic Reservoir Tank Fabrication Details
Coast Guard Drawing 400 WAGB 185-152, Rev-, Stbd CPP Hyd Sys Reservoir Tank Fabrication
Coast Guard Drawing 400 WAGB 1101-2, Rev R, Shell Plating Fwd FR 143 1/2
Coast Guard Drawing 400 WAGB 1101-3, Rev P, Shell Plating Aft FR 143 1/2
Coast Guard Drawing 400 WAGB 1105-059, Rev B, Miranda Davit Relocation Installation General Arrangement and Structural viii (Rev-2)
Coast Guard Drawing 400-WAGB 1106-10, Rev M, 01 Level Plating Fwd FR 143 1/2
Coast Guard Drawing 400 WAGB 1202-3, Rev J, Helicopter Safety Net
Coast Guard Drawing 400 WAGB 1202-5, Rev -, New Safety Nets for Aft Edge of Flight Deck
Coast Guard Drawing 400 WAGB 1205-4, Rev D, Lifting Pads for Rudder & Propellers Arrangement and Details
Coast Guard Drawing 400 WAGB 1205-006, Rev -, Dets of Padeyes for Lifting Gear
Coast Guard Drawing 400 WAGB 1602-2, Rev V, Arrangement & Detail Floor Plate Lower Level Mach’y Spaces
Coast Guard Drawing 400 WAGB 1901-1, Rev AC, Painting Schedule
Coast Guard Drawing 400 WAGB 1906-001, Rev K, Zinc Protectors A&D
Coast Guard Drawing 400 WAGB 2200-2, Rev D, Rudder Arrg’t & Det
Coast Guard Drawing 400 WAGB 2200-4, Rev M, Rudder Stock – Arrangement & Details
Coast Guard Drawing 400 WAGB 2200-8, Rev F, Rudder Stock Removal A/D
Coast Guard Drawing 400 WAGB 2200-9, Rev K, Arr Steering Gear Rm
Coast Guard Drawing 400 WAGB 2200-10, Rev -, Rudder Stock Upper & Lower Bearings
Coast Guard Drawing 400 WAGB 245-002, Rev E, CPP Hydraulic Schematic Open Loop
Coast Guard Drawing 400 WAGB 2601-1, Rev R, Anchor Handling Arrangement & Details
Coast Guard Drawing 400 WAGB 2901-2, Rev H, Tank Capacity Curves
Coast Guard Drawing 400 WAGB 2901-3, Rev E, Tank Capacity Tables -- POLAR
STAR
Coast Guard Drawing 400 WAGB 2901-13, Rev C, Intact Trim & Stability Booklet
Coast Guard Drawing 400-WAGB 2906-1, Rev E, Structural Welding Design and Sequence
Coast Guard Drawing 400-WAGB 3301-3, Rev X, Joiner General Arrangement Main Deck
Coast Guard Drawing 400-WAGB 3301-6, Rev P, Typical Joiner Details
Coast Guard Drawing 400-WAGB 3301-7, Rev Z, Joiner Bulkhead Layout
Coast Guard Drawing 400-WAGB 3803-1, Rev M, Ventilation and A.C. Diagram
Coast Guard Drawing 400-WAGB 3803-5, Rev M, Ventilation & A/C Fan Room Arr Mn Dk FR 113 Fwd
Coast Guard Drawing 400-WAGB 3803-10, Rev M, Vent. & A/C Arrgt. 01 Lev. FR 67-
Coast Guard Drawing 400-WAGB 3803-18, Rev E, Vent & A/C Arr Mn Dk 85-113 (S)
Coast Guard Drawing 400-WAGB 3803-32, Rev N, Ventilation & A/C Standard Dets
Coast Guard Drawing 400 WAGB 3901-1, Rev Z, Insulation Arrgt. & Det.
Coast Guard Drawing 400 WAGB 4000-2, Rev F, Machinery and Piping Standard Details
Coast Guard Drawing 400-WAGB 4112-5, Rev AE, Arr S.W. Cool Diesel Gen ix (Rev-2)
Coast Guard Drawing 400 WAGB 4301-1, Rev Y, Arrgt of Shafting
Coast Guard Drawing 400 WAGB 4301-2, Rev F, Bulkhead Seal Arrgt & Details
Coast Guard Drawing 400 WAGB 4301-3, Rev J, Shaft Tubes – Arr. & Dets C/L & P/S
Coast Guard Drawing 400 WAGB 4301-4, Rev 12, Center Tailshaft
Coast Guard Drawing 400 WAGB 4301-5, Rev 10, Wing Tailshaft
Coast Guard Drawing 400 WAGB 4301-11, Rev 4, Propeller Tailshaft Assy
Coast Guard Drawing 400 WAGB 4301-12, Rev 6, Oil Transfer Shaft Assembly
Coast Guard Drawing 400 WAGB 4301-13, Rev 3, Outer Oil Pipe Assy (Center Shaft)
Coast Guard Drawing 400 WAGB 4301-14, Rev 3, Outer Oil Pipe Assy (Wing Shaft)
Coast Guard Drawing 400 WAGB 4301-17, Rev 1, Iner Oil Pipe Assy (Wing Shaf)
Coast Guard Drawing 400 WAGB 4301-23, Rev D, Static Shaft Alignment Analysis
Coast Guard Drawing 400 WAGB 4302-001, Rev R, Stern Tube Bearg & Shaft Seal Arrg
Coast Guard Drawing 400 WAGB 4302-004, Rev B, Stern Tube Bearings and Shaft Seals (With Modified Aft Bearing) Arrgt and Details
Coast Guard Drawing 400 WAGB 4400-18, Rev -, Connecting Procedure for Operating Rod and Oil Tube
Coast Guard Drawing 400 WAGB 4400-034, Rev -, CPP 69 Inch Dia Lh Prop Hub Assy (Elev Sect)
Coast Guard Drawing 400 WAGB 4400-041, Rev -, CPP Hub Cylinder (Common to LH
& RH)
Coast Guard Drawing 400 WAGB 4800-10, Rev U, Arr Hyd Interconnecting Piping Fwd Fr 150
Coast Guard Drawing 400 WAGB 4800-17, Rev F, Steering Gear Inter Hyd Piping Arr & Det
Coast Guard Drawing 400-WAGB 4801-25, Rev A, RIP Arrangement of Oil Water Separator Sys Installation
Coast Guard Drawing 400 WAGB 4803-1, Rev AA, Arr. Firemain 3rd Dk & Below
Coast Guard Drawing 400-WAGB 4803-2, Rev P, Arr. Firemain 2nd Dk Fwd FR 113
Coast Guard Drawing 400-WAGB 4803-7, Rev U Arr. Firemain 2nd Dk Aft FR 113
Coast Guard Drawing 400-WAGB 4803-17, Rev -, AFFF Piping System Diagrammatic
Coast Guard Drawing 400-WAGB 4803-18, Rev B, AFFF Piping System Schematic
Coast Guard Drawing 400-WAGB 4805-2, Rev U, Diagram S.W. Cooling System 400-WAGB 4808-3, Rev AE Arr. Of Plumbing and Interior Deck Drains Main Deck Aft.
Coast Guard Drawing 400-WAGB 4808-17, Rev C, Operating Diagram for Plumbing and Interior Deck Drains
Coast Guard Drawing 400-WAGB 4823-1, Rev D, Seachest & Strainer Compts Fwd 113
Coast Guard Drawing 400-WAGB 4823-2, Rev H, Seachest & Strainer Compt Aft FR
Coast Guard Drawing 400-WAGB 5101-6, Rev N, Arrangement & Details Boiler Feedwater Tank
Coast Guard Drawing 400-WAGB 556-150, Rev A, Stbd CPP Hydraulic Sys Piping Arrangement & Hose List x (Rev-2)
Coast Guard Drawing 400-WAGB 556-151, Rev -, Stbd CPP Hyd Flushing Diagram
Coast Guard Drawing 400-WAGB 6202-40, Rev N, Central Hydraulic System E & IWD
COAST GUARD PUBLICATIONS
Coast Guard Commandant Instruction (COMDTINST) M10360.3, Jan 2014, Coatings and Colors Manual
Coast Guard Commandant Instruction (COMDTINST) M9000.6, Mar 2011, Naval Engineering Manual
Coast Guard Technical Publication (TP) 2029, Jan 2003, Manufacturer's Instruction Book
- SWBS Group(s) 242-262
Coast Guard Technical Publication (TP) 2035, Aug 2005, Manufacturer's Instruction Book - SWBS Group(s) 516-521
Coast Guard Technical Publication (TP) 2038, Manufacturer's Instruction Book - SWBS Group(s) 625-651
Coast Guard Technical Publication (TP) 2042, Feb 2000, Manufacturer's Instruction Book - SWBS Group(s) 665-985
Coast Guard Technical Manual (TP) 3223, May 1985, SWBS 420, Section G, Doppler Service Manual
Coast Guard Technical Publication (TP) 3975, Aug 2005, Installation, Operation, Maintenance & Repair Manual
Coast Guard Technical Publication (TP) 4391, Feb 2016, Propulsion Generator and Main Motor
Coast Guard Technical Publication (TP) 4395, Propulsion Shafting and CPP System
Coast Guard Technical Publication (TP) 4411, Manufacturer's Instruction Book-SWBS
Coast Guard Technical Publication (TP) 4415, Manufacturer's Instruction Book-SWBS Group(s) 581-582
Coast Guard Technical Publication (TP) 4668, Mar 2012, Miranda Davit - Model Mrt
Coast Guard Technical Publication (TP) 4978, Jun 2015, Telescoping Boom Crane, Model TB60-60
Coast Guard Technical Publication (TP) 4979, Jul 2015, Knuckle Boom Crane - Model K280-70
Coast Guard Technical Publication (TP) 4986, Modified Controllable Pitch Propeller System
Surface Forces Logistics Center Standard Specification (SFLC Std Spec) 0000, 2014, General Requirements
Surface Forces Logistics Center Standard Specification (SFLC Std Spec) 0740, 2014, Welding and Allied Processes
Surface Forces Logistics Center Standard Specification (SFLC Std Spec) 0850, 2014, General Requirements for Drawing Preparation
Surface Forces Logistics Center Standard Specification (SFLC Std Spec) 3020, 2014, Overhaul AC Electrical Motors
Surface Forces Logistics Center Standard Specification (SFLC Std Spec) 5000, 2014, Auxiliary Machine Systems xi (Rev-2)
Surface Forces Logistics Center Standard Specification (SFLC Std Spec) 6310, 2014, Requirements for Preservation of Ship Structures
Surface Forces Logistics Center Standard Specification (SFLC Std Spec) 6341, 2014, Install Interior Deck Covering Systems
Surface Forces Logistics Center Standard Specification (SFLC Std Spec) 8634, 2014, Drydocking
Surface Forces Logistics Center Standard Specification (SFLC Std Spec) 8635, 2014, Temporary Services
Surface Forces Logistics Center Standard Specification (SFLC Std Spec) 8636, 2014, Temporary Hull Accesses
Surface Forces Logistics Center Technical Standard (SFLC Tech Std) 583-2, Jul 2013, Shipboard Boat Hoisting Systems
Surface Forces Logistics Center Technical Standard (SFLC Tech Std) 583-3, Jul 2013, Boat Cradles and Lifting Appliances
Surface Forces Logistics Center Technical Standard (SFLC Tech Std) 589, Jan 2014, Cranes
Surface Forces Logistics Center Technical Standard (SFLC Tech Std) 613, Jun 2013, Wire rope, Synthetic Rope, and Rigging
OTHER REFERENCES
Allis Chalmers Corporation (DWG) 9016-T-3; Dowel Pin
Allis Chalmers Corporation (DWG) 9024-F-1; Outer Oil Pipe Detail (Center Shaft)
Allis Chalmers Corporation (DWG) 9024-H-1, Outer Oil Pipe Detail (Wing Shaft)
Allis Chalmers Corporation (DWG) 9024-J-2, Outer Oil Pipe Assy (Center Shaft)
Allis-Chalmers Corporation (DWG) 9025-AG-3, Spacer Ring Rev.( 02)
Allis-Chalmers Corporation (DWG) 9025-AG-3, Spacer Ring Rev.( 02)
American National Standards Institute (ANSI/ISO) 17025, 2005, General Requirements for the Competence of Testing and Calibration Laboratories
American National Standards Institute (ANSI/NCSL) Z540.3, 2006, General Requirements for Calibration and Measuring and Test Equipment
American Society of Mechanical Engineers (ASME) B16.34, 2004, Valves-Flanged, Threaded, and Welding End
ANSI/ASME B40.100-2013, November 2013, Pressure Gauges and Gauge Attachments
ANSI/MSS SP-58-2009, January 2009, Pipe Hangers and Supports - Materials, Design, Manufacture, Selection, Application, and Installation
ASTM International (ASTM) A449, 2007, Standard Specification for Hex Cap Screws, Bolts and Studs, Steel, Heat Treated, 120/105/90 Ksi Minimum Tensile Strength, General Use
ASTM International (ASTM) A563-07a, 2007, Standard Specification for Carbons and Alloy Steel Nuts
ASTM International (ASTM) D3359, 2009, Standard Test Methods for Measuring Adhesion by Tape Test xii (Rev-2)
ASTM International (ASTM) D4138, 2013, Standard Practices for Measurement of Dry Film Thickness of Protective Coating Systems by Destructive, Cross-Sectioning Means
ASTM International (ASTM) D5363, 2008; Standard Specification for Anaerobic Single- Component Adhesives (An)
ASTM International (ASTM) F683, 2010, Standard Practice for Selection and Application of Thermal Insulation for Piping and Machinery
ASTM International (ASTM) F992, 2006, Standard Specification for Valve Label Plates
Code of Federal Regulations (CFR) Title 29, Part 1915, Section 15, 2007, Shipyard Employment
Commercial Item Description (CID) A-A-59313, Nov 2003, Thread Compound;
Antiseize, Zinc Dust-Petrolatum
DE - 319 (DWG), Shaft Handling Gear Concept
DE - 320 (DWG), Propeller Handling Gear Concept
DE - 321 (DWG), Outline of Tractor
Elwell-Parker GM4VH, Operating Instruction and Service Manual
Elwell-Parker Operating Maintenance Manual_Part1 & Part 2
Elwell-Parker, Information and Troubleshooting Guide
Elwell-Parker, Operating and Maintenance Manual Vols. I & II
Federal Specification (Fed Spec) HH-P-151, Mar 1991, Rubber-Sheet, Cloth Insert
Federal Specification (Fed Spec) QQ-N-281, Oct 1985, Nickel-Copper-Aluminum Alloy Bar, Rod, Plate, Sheet, Strip, WIRE, Forgings, And Structural and Special Shaped Sections
Federal Specification (Fed Spec) RR-C-271, Rev E, Dec 2010, Chain and Attachments, Welded and Weldless
Hayward Industrial Products, Inc. Operating Instructions Model 570 Pipeline Strainer, 4/14/09
International Standard Organization (ISO) 4406, 7/13/2004; Hydraulic Fluid Power -- Fluids -- Method for Coding the Level of Contamination by Solid Particles
Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-58, 2009, Pipe Hangers and Supports – Materials, Design, Manufacture, Selection, Application and Installation
Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-61, 2003 Edition, Pressure Testing Of Steel Valves
Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-67, 2002 Edition, Butterfly Valves
Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-72, 1999 Edition, Ball Valves with Flanged or Butt-Welding Ends for General Service
Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-80, 2008 Edition, Bronze Gate, Globe, Angle and Check Valves
MIL PRF-16173, Sep 2006, Corrosion Prevention Compound, Solvent Cut Back, Cold Application
MIL-A-18001, May 2005, Anodes, Sacrificial Zinc Alloy (Commercially Accepted -
ASTM B418)
xiii (Rev-2)
MIL-C-24633, Apr 1998, Chain, Stud Link, Anchor, Low Alloy Steel, Flash Butt Welded
MIL-DTL-23549, Dec 2011, Grease, General Purpose
MIL-G-6032D(1), Grease, Plug Valve, Gasoline and Oil Resistant, NATO Code #G-636
MIL-PRF-1149, Jun 1998, Gasket Materials, Synthetic Rubber, 50 and 65 Durometer Hardness
MIL-PRF-24667, Jun 2005, Coating system, Non-Skid, for Roll or Spray Application
MIL-S-45180, 1998; Sealing Compound, Gasket, Hydrocarbon Fluid and Water Resistant
MIL-S-8660C(2), Silicone Compound, NATO Code # S-736
MIL-STD-271 Rev F, June 1986, Military Standard: Requirements for Nondestructive Testing Methods
MIL-STD-419 E, 2010, Cleaning and Protecting Piping, Tubing, and Fittings for Hydraulic Power Transmission Equipment
MIL-STD-777, March 2012, Schedule of Piping, Valves, Fittings, and Associated Piping Components for Naval Surface Ships
Naval Air Warfare Center (NAVAIR) NAEC ENG 7576, Shipboard Aviation Facilities Resume, Jan 2009
Naval Air Warfare Center (NAVAIR) Drawing 627927, Rev -, Visual Landing Aids
Naval Sea Systems Command (NAVSEA) T9074-AS-GIB-010/271, Apr 1997, Requirements for Nondestructive Testing Methods
Naval Sea Systems Command (NAVSEA) Technical Directive S6430-AE-TED-010 Piping Devices, Flexible Hose Assemblies
Naval Ship's Technical Manual (NSTM) 243, May 2006, Propulsion Shafting
Naval Ship's Technical Manual (NSTM) 505, Dec 2006, Piping Systems
Naval Ship's Technical Manual (NSTM) 541, 2007, Ship Fuel and Fuel Systems
Naval Ship's Technical Manual, Chapter 556, Hydraulic Equipment Power Transmission and Control
NAVSEA Drawing 803-1385828, Rev P, Nozzles AFFF and Washdown Systems
NAVSEA Dwg 804-5773931, Acoustic & Thermal Insulation for Compartments
NAVSEA Dwg 804-5773932, Acoustic & Thermal Insulation for Ducts
NAVSEA Dwg 804-5959214, Insulation, Piping
NAVSEA T9074-AS-GIB-010/271, Requirements for Non-Destructive Testing Methods
Public Law 101-391, 1990, Hotel and Motel Fire Safety Act
QPL-24667, May 2006, Qualified Product List of Products Qualified under Performance Specification MIL-PRF-24667, Coating system, Non-Skid, for Roll or Spray Application
S9086-S4-STM-010/CH-556R4 Hydraulic Equipment Power Transmission And Control
S9AAO-AB-GOS-010, General Specifications for Overhaul of Surface Ships (GSO)
SNT-TC-1A, 2016, Recommended Practice for Personnel Qualification and Certification in Nondestructive Testing
Society of Automotive Engineers (SAE) Aerospace Material Specification (AMS) C6183, 2013, Cork and Rubber Composition Sheet; For Aromatic Fuel and Oil Resistant Gaskets xiv (Rev-2)
Society of Automotive Engineers (SAE) J2280, 1996, Ships Systems and Equipment - Fasteners - Selection and Identification Requirements
Society Of Naval Architects and Marine Engineers (SNAME) T&R 3-39; "Guide for Shop and Installation Tests”3. REQUIREMENTS
Society Of Naval Architects and Marine Engineers (SNAME) T&R 3-47; "Guide for Sea Trials"
STANDARD SERVICE MODULE 131-106-004 Polar Class Re-installation of Hayward Strainers
The Society for Protective Coatings (SSPC) Surface Preparation Specification No.1 (SSPC-SP 1), 2016, Solvent Cleaning
The Society for Protective Coatings (SSPC) Surface Preparation Specification No.15 (SSPC-SP 15), 2013, Commercial Grade Power Tool Cleaning
The Society for Protective Coatings (SSPC) Surface Preparation Specification No.2 (SSPC-SP 2), 2004, Hand Tool Cleaning
The Society for Protective Coatings (SSPC) Surface Preparation Specification No.3 (SSPC-SP 3), 2004, Power Tool Cleaning
The Society for Protective Coatings (SSPC), August 2016, Paint Application Specification No. 2 (PA-2), Procedure for Determining Conformance to Dry Coating Thickness Requirements
The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation Standard SSPC-SP 10/NACE No.2, 2007, Near-White Metal Blast Cleaning
The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation Standard SSPC-SP 6/NACE No. 3, 2007, Commercial Blast Cleaning
The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation Standard SSPC-SP WJ-2/NACE WJ-2, 2016, Waterjet Cleaning of Metals – Very Thorough Cleaning
The Society for Protective Coatings SSPC-SP 11, Nov 2013, Power Tool Cleaning to Bare Metal
The Society for Protective Coatings (SSPC) VIS 1, 2002, Guide and Reference Photographs for Steel Surfaces Prepared by Dry Abrasive Blast Cleaning
The Society for Protective Coatings (SSPC) VIS 3, 2004, Guide and Reference Photographs for Steel Surfaces Prepared by Power and Hand Tool Cleaning
The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Standard VIS 4 /NACE VIS 7, 2001, Guide and Reference Photographs for Steel Surfaces Prepared by Waterjetting
The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Standard VIS 5 /NACE Vis 9, 2001, Guide and Reference Photographs for Steel Surfaces Prepared by Wet Abrasive Blast Cleaning (SSPC-SP 6/NACE No. 3) and Near- White Blast Cleaning (SSPC-SP 10/NACE No. 2)
Thordon Double Key XL Bearing Installation Manual 10 May 2006
Thordon XL Double Key Bearing Assembly DWG No. TG-17321 (Thordon Bearing Inc.)
Thordon XL Double Key Bearing Carrier DWG No. TG-17344 (Thordon Bearing Inc.)
xv (Rev-2)
CONSOLIDATED LIST OF GOVERNMENT-FURNISHED
PROPERTY
The following is a list of property, which the Government will furnish. This list supersedes any other material obligations indicated or implied by referenced drawings.
WORK
ITEM
MTI ITEM DESCRIPTION NSN/PN QTY
ESTIMATED
COST
($/UNIT)
7 Y POLAR Propeller Flange-end Lifting Fixture, including 6(ea) 4in x 6in bolts
N/A 1 5,000
7 Y POLAR Propeller Shipping Cradles: 38,800 lbs, 12'W x 17' L N/A 1 4,250
7 Y POLAR Propeller Cylinder-end Lifting Fixture, including 8(ea) 1.5in x 4in bolts
N/A 1 5,000
7 Y POLAR Righthand Controllable Pitch
Propeller: 60,000 lbs Escher Wyss 1 3,500,000
7 Y Oil Distribution Box Seal Vulcanizing Tool Escher Wyss 1 10,250
7 Y **Centrax Bulkhead Carbon sealing
Elements Tyton Div Fematics, Canada 2 10,250
7 Y **Half Cage and Roller Assembly (Lower) Cooper Bearing Co. 2 120,000
7 Y **Bottom Half Outer Race Cooper Bearing Co. 2 90,000
7 Y **Inner Race Halves (Lower) Cooper Bearing Co. 2 40,000
7 Y **Inner Race Halves (Upper) Cooper Bearing Co. 2 400,000
7 Y **Half Cage and Roller Assembly (Upper) Cooper Bearing Co. 2 10,250
7 Y **Top Half Outer Race Cooper Bearing Co. 2 10,250
8 Y POLAR Propeller Flange-end Lifting Fixture, including 6(ea) 4in x 6in bolts
N/A 1 5,000
8 Y POLAR Propeller Shipping Cradles: 38,800 lbs, 12'W x 17' L N/A 1 4,250
8 Y POLAR Propeller Cylinder-end Lifting Fixture, including 8(ea) 1.5in x 4in bolts
N/A 1 5,000
8 Y POLAR Lefthand Controllable Pitch
Propeller: 60,000 lbs Escher Wyss 1 3,500,000
8 Y **Centrax Bulkhead Carbon sealing
Elements Tyton Div Fematics, Canada 1 10,250.00
9 Y POLAR Propeller Flange-end Lifting Fixture, including 6(ea) 4in x 6in bolts
N/A 1 5,000
9 Y POLAR Propeller Shipping Cradles: 38,800 lbs, 12'W x 17' L N/A 1 4,250
9 Y POLAR Propeller Cylinder-end Lifting Fixture, including 8(ea) 1.5in x 4in bolts
N/A 1 5,000 xvi (Rev-2)
9 Y POLAR Righthand Controllable Pitch
Propeller: 60,000 lbs Escher Wyss 1 3,500,000
9 Y **Centrax Bulkhead Carbon sealing
Elements Tyton Div Fematics, Canada 1 10,250.00
14 Y ***Fathometer Transducer, Shallow Water, 50-200 kHz 5845-01-518-7245
/FL-6713-203
1 ea. 500.00
Y
***CELZ-SRD-331
Doppler speed log
5845-01-302-4161
1 ea.
3,500.00
32 N Turbine Room Eductor Overboard Valve N/A 1 500
34 Y Shaft Trailer: 91,500 lbs, 15'W x 55'L x
16'H Elwell Parker 1 1,000,000
34 Y Shaft and Propeller Handler: 73,800 lbs, 8'W x 22'L x 12'H Elwell Parker 1 1,000,000
34 Y Propeller Pallet: 38,800 lbs, 12'W x 12'L x
16.75H Elwell Parker 1 1,000,000
38 N Oil Distribution Box End Seal N/A 2 6600
39 N Sealing Elements 5330-01-076- 7646/B144242
6 1,023
39 N Inflatable Ring 5330-01-326-
4574/D144241 3 2,721
39 N Garter Spring 5360-01-077-
8192/B132069-A 6 245
39 N Barbed Staple 5315-00-812- 0142/A44244
6 10
44 N Replacement Flange N/A 1 500
44 N Replacement Elbow N/A 1 500
*Government-loaned property, which shall be returned to the vessel upon completion of the availability.
**New or refurbished equipment that the Government may provide for installation in place of existing equipment.
***Government-furnished property, which is to be supplied by either the vessel or the C4IT Service Center xvii (Rev-2)
CONSOLIDATED LIST OF CRITICAL INSPECTION ITEMS
The following is a list of work items, which contain Critical Inspection reports, which the Contractor must complete within the first 25% of the availability contract period (see SFLC Std Spec 0000):
Work Item
Title
1 Hull Plating (U/W Body), Inspect
2 Hull Plating (U/W Body), Ultrasonic Testing
4 Voids (Non-Accessible), Leak Test
6 Propulsion Shafting, Strain Gauge Alignment Check
7 Centerline Propulsion Hub Removal and Reinstallation
8 Port Propulsion Hub Removal and Reinstallation
9 Starboard Propulsion Hub Removal And Reinstallation
13 Propulsion Shaft Bearings (External), Check Clearances
17 Steering System, Groom
18 Rudder And Rudder Stock, Remove and Inspect
20 Anchor Chain(s) and Ground Tackle, Inspect and Repair
21 Miranda Davit, Annual Inspect
22 Allied K280-70 Crane, Starboard, Annual Inspect and Repair
23 Allied K280-70 Crane, Port, Annual Inspect and Repair
Allied T60-60 Crane, Annual Inspect and Repair
Sea Trial Agenda and Memoranda
34 Shaft Handling Equipment, Maintenance
39 Propulsion Shaft Seal Clean, Inspect, and Overhaul
1 (Rev-2)
PRINCIPAL CHARACTERISTICS
400' WAGB
PHYSICAL
Length overall 399' 0" Length between perpendiculars 352' 0" Beam, extreme 83' 7" Depth amidships to main deck 43' 2-7/8" Draft to bottom of keel @ full load
31.81'
Full load displacement 12,844 long tons Effective keel length 273' Mast height above DWL @ 28' draft
138' 1-1/8"
HULL
Frame spacing 16" Material Hull CG A537 M Flight deck HY 80 Superstructure AS-A-131
MACHINERY
Propulsion, diesel 6 ALCO 16-251 diesels Propulsion, gas turbines 3 FT4A GT Pratt & Whitney gas turbines Propellers 3 Escher-Wyss CP propellers 16' diameter Generators 3 ALCO Diesel, 750 KW, 440V AC, 3 phase
1 GM diesel, 400 KW, 440V AC, 3 phase (emergency) Sewage equipment 4 holding tanks with pumps
4 (2 P & 2 S) deck discharge stations Rudder One Anchor & chain Two 9,000 lb navy stockless, 165 fathom chain each
TANKS
Diesel Oil or JP-5 (@95%) 1,359,739 gal.
JP-5 (helo) (@ 95%) 45,983 gal.
9250 lube oil (@ 95%) 23,000 gal.
Fresh water (@ 95%) 26,000 gal.
2 (Rev-2)
00000_0315_FLT
REC_00000_FLT_ Commercial Project @ Contractor’ Facility (1212)
General Requirements
1. SCOPE
1.1 Intent. This standard specification invokes general requirements for conducting vessel repairs performed at a commercial Contractor’s facility for Coast Guard vessels.
1.2 Term interchangeability. The terms 'Contractor' and 'shipyard' are used interchangeably in this specification.
2. REFERENCES
COAST GUARD DRAWINGS
None
COAST GUARD PUBLICATIONS
Coast Guard Commandant Instruction (COMDTINST) M10360.3 (series), Coatings and Color Manual
Surface Forces Logistics Center Standard Specification (SFLC Std Spec) 0000, 2014, General Requirements
Surface Forces Logistics Center Standard Specification (SFLC Std Spec) 0740, 2014, Welding and Allied Processes
Surface Forces Logistics Center Standard Specification (SFLC Std Spec) 6310, 2014, Requirements for Preservation of Ship Structures
OTHER REFERENCES
None
3. REQUIREMENTS
3.1 General. The Contractor shall conform to all requirements specified in SFLC Std Spec 0000 and in this item, as applicable, during the performance of this availability. The requirements set forth in Section 3 of the General Requirements apply to all work under the scope of this contract, whether explicitly stated in work items or not, and to all other work subsequently authorized by changes, modifications, or extensions to the contract.
3.2 Fire watch requirements. The Contractor shall provide all fire watches IAW SFLC Std Spec 0000. Where the COR is referred to in Paragraphs 3.3.1.3.1 and 3.3.1.3.2 of SFLC Std Spec 0000, 3 (Rev-2) replace COR with Fire Watch Coordinator.
3.3 Preservation requirements. The Contractor shall accomplish all preservation tasks, including touch-ups, in accordance with SFLC Std Spec 6310.
3.3.1 Preservation Plan. The Contractor shall submit a preservation plan in accordance with SFLC Std Spec 6310 at the arrival conference.
3.3.2 Brand name approval. Ensure that all Contractor-furnished coatings are in accordance with SFLC Std Spec 6310, Appendix C (Cutter and Boat Authorized Coatings).
3.3.3 Coating colors and system color schemes. Ensure that all colors and color coat/paint schemes are in accordance with COMDTINST M10360.3, Chapter 6 (Cutter and Boat Colors Exterior and Interior).
3.4 Environmental protection requirements. The Contractor shall adhere to the following environmental protection requirements in accordance with the SFLC Stand Spec 0000:
3.4.1 Contractor operated (non USCG) facilities. The Contractor shall provide and maintain environmental protection as defined in SFLC Std Spec 0000 Appendix A, Requirements for Environmental Protection at Contractor Operated (Non USCG) Facilities, as applicable, during the performance of this availability. Contractor shall plan for and provide environmental protective measures to control pollution that develops during normal practice, as well as plan for and provide environmental protective measures required to correct conditions that develop during the project. Contractor shall comply with applicable Federal, State, and Local laws, codes, ordinances, and regulations in their entirety. Any reference to a specific portion of a Federal, State, or Local law, code, ordinance, or regulation in this or any other item shall not be construed to mean that relief is provided from any other sections of the law, code, ordinance, or regulation.
3.4.2 Test and procedures. The Contractor shall be required to promptly conduct tests and procedures for the purpose of assessing whether operations are in compliance with applicable Environmental Laws. Analytical work shall be done by qualified laboratories; and where required by law, the laboratories shall be certified.
3.4.3 Regulatory notifications. The Contractor shall be responsible for all regulatory notification requirements in accordance with Federal, State and Local regulations. In cases where the Coast Guard must also provide public notification, such as storm water permitting, the Contractor must coordinate with the Contracting Officer or COR, and if work is being performed at a USCG Facility, the local Facility Engineer or Engineer Officer. The Contractor shall submit copies of all regulatory notifications to the Contracting Officer and the local Facility Engineer or Engineer Officer prior to commencement of work activities. Regulatory notifications shall be provided, including but not limited to, demolition, renovation, National Pollutant Discharge Elimination System (NPDES) defined site work, and remediation of controlled substances such as asbestos, hazardous waste, and lead paint.
3.4.4 Environmental manager. The Contractor shall appoint in writing an Environmental Manager for the project, and shall be responsible for coordinating Contractor compliance with Federal, State, Local, and station environmental requirements. The Environmental Manager shall ensure compliance with Hazardous Waste Program requirements, including hazardous waste handling, storage, manifesting, and disposal; implement the Contractors’ Environmental Management Plan;
4 (Rev-2) ensure that all environmental permits are obtained, maintained, and closed out; ensure compliance with Storm Water Program Management requirements; ensure compliance with Hazardous Materials including storage, handling, and reporting requirements; as well as coordinate any remediation of regulated substances such as lead, asbestos, and polychlorinated biphenyl (PCB).
This may be a collateral position; however the individual must be trained to adequately accomplish the following duties; ensure waste segregation and storage compatibility requirements are met; inspect and manage Satellite Accumulation areas; ensure only authorized personnel add wastes to containers; ensure all Contractor personnel are trained in 40 CFR requirements and individual position requirements; coordinate removal of waste containers; and maintain the Environmental Records binder and required documentation, including environmental permits compliance and close-out.
3.4.5 Hazardous Waste (HW) disposal. Contractor shall comply with SFLC Std Spec 0000 Appendix A, Requirements For Environmental Protection At Contractor Operated (Non USCG) Facilities for HW disposal.
3.5 Schedule and Progress. The Contractor shall provide a Gantt chart IAW SFLC Std Spec 0000 and hold a weekly progress meeting for all stakeholders. The Contractor shall also hold a daily production meeting. Dates and times shall be mutually agreed upon with the Coast Guard at the Arrival Conference.
3.6 Instrument/Tooling Calibration. The requirement for instrument/tooling calibration called out in SFLC Std Spec 0000 Paragraph 3.2.6.1.2 shall be modified to the following: The Contractor shall ensure that all measurements and readings are taken with calibrated measurement and test instruments/equipment. The Contractor shall document calibration information for all applicable instruments on QA forms at the time of the inspection. The Contractor shall be able to provide calibration information for any applicable instrument at COR or KO request.
3.7 Valves: The Contractor shall provide adequate containment (flanging, etc) to facilitate performance of work contained herein. The Contractor shall assume all valves on the cutter leak by.
3.8 The Contractor shall clean as required to obtain initial gas free certifications for hot work required in the specification.
3.9 The Contractor shall notify the Coast Guard by email 24 hours in advance of all operational tests or work requiring a Coast Guard Operator.
3.10 All QA inspections/check points shall be called out via email.
4. NOTES
None.
5 (Rev-2)
11000_0814_FLT
REC_11000_UWHIB_FLT_400’ WAGB (10 CGC POLAR STAR) (1211)
WORK ITEM 1: Hull Plating (U/W Body), Inspect
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to inspect/survey the vessel’s Underwater (U/W) hull plating, including U/W appendages and coating system.
1.2 Government-furnished property.
None.
2. REFERENCES
COAST GUARD DRAWINGS
Coast Guard Drawing 400 WAGB 1101-2, Rev R; Shell Plating Fwd FR 143 1/2
Coast Guard Drawing 400 WAGB 1101-3, Rev P; Shell Plating Aft FR 143 1/2
Coast Guard Drawing 400 WAGB 0700-1, Rev L; POLAR STAR Docking Plan
Coast Guard Drawing 400 WAGB 2200-2, Rev D; Rudder Arrg’t & Det
COAST GUARD PUBLICATIONS
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General Requirements
OTHER REFERENCES
ASTM International (ASTM) D4138, 2013, Standard Practices for Measurement of Dry Film Thickness of Protective Coating Systems by Destructive, Cross-Sectioning Means
MIL-STD-271 Rev F, June 1986, Military Standard: Requirements for Nondestructive Testing Methods
SNT-TC-1A, 2016, Recommended Practice for Personnel Qualification and Certification in Nondestructive Testing
NAVSEA T9074-AS-GIB-010/271, Requirements for Non-Destructive Testing Methods
The Society for Protective Coatings (SSPC), August 2016, Paint Application Specification No. 2 (PA-2), Procedure for Determining Conformance to Dry Coating Thickness Requirements
6 (Rev-2)
3. REQUIREMENTS
3.1 General.
3.1.1 CIR. The Contractor shall submit a CIR for the inspections listed in the following paragraph(s):
3.4 Underwater Body Inspection Report.
3.1.2 Tech Rep.
Not applicable.
3.1.3 Protective measures - general. The Contractor shall furnish and install suitable covering to seal off and protect all non-affected surfaces/equipment and spaces in the vicinity of the work area against contamination during the performance of work. Upon completion of work, remove protective material and inspect for the presence of contamination. Clean all equipment and spaces, contaminated due to improper protection, to original condition of cleanliness.
3.1.4 Interferences. The Contractor shall handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences).
3.2 Inspection. The Contractor shall accompany the Underwater Hull Inspection Board (UWHIB) in the performance of the below inspection tasks, as applicable, using the drawings listed in Section 2 (References) as guidance. The Contractor shall provide the following, to facilitate the UWHIB in assessing the condition of the designated U/W hull components and systems:
A hull repair supervisor and a marker.
Temporary staging and other necessary equipment, as applicable, for ensuring safe access to all areas of the U/W hull.
NOTES
The COR will convene the UWHIB as soon as possible after the vessel has been dry-docked and before any work (except U/W hull cleaning/wash down) is performed on the U/W hull and appendages.
3.2.1 Hull plating.
3.2.1.1 The Contractor shall inspect the condition of the hull plating for the presence of marine growth, deformation, and any evidence of major corrosion or electrolytic action.
3.2.1.2 The Contractor shall inspect the hull and keel areas, report on the condition of butt-welded seams, doubler plates, lap seams, and for any signs of damaged plating or unusual waviness in the plating.
3.2.2 Sea chests and all other cooling system intake components. The Contractor shall inspect all sea chests, tunnels, hull openings, and grates for general appearance, loose, damaged, or missing grates, loose or missing fasteners, condition of sea strainers and lockwire on bolts, marine growth on grating slots, and any obstructions in the openings that might prevent proper suction and
7 (Rev-2) discharge of water.
3.2.2.1 The Contractor shall repair or replace any damaged, missing, or improperly mounted sea chest grating hardware.
3.2.3 Rudder. The Contractor shall check general condition, condition around the drain plugs, and check for pitting, if any, on the leading and trailing edges.
3.2.4 Propeller and shaft associated components. The Contractor shall inspect the condition of propellers for signs of corrosion, pitting, erosion, fouling, cracks, dings, and nicks by side and blade; inspect fairwaters, rope guards, shafts, and mechanical seals - look for missing screws, physical damage to the blades, pitting, condition of dunce caps, and condition of securing devices.
3.2.5 Transducers. The Contractor shall check general condition for cuts, cracks, corrosion, and surface defects around the openings. Check transducer securing nuts for tightness, and inspect cables for chafing and other damage.
3.2.6 Zinc anodes.
3.2.6.1 The Contractor shall remove all marine growth and oxide coating from all hull, rudder, shaft strut, and sea chest anodes, as applicable, using a light-wire brush.
3.2.6.2 The Contractor shall visually inspect all zinc anodes; check the soundness of mounting strap and stud welds, missing fasteners, and percentage of remaining material.
3.2.7 Coating system inspections. The Contractor shall accomplish the below inspections, in conjunction with the underwater hull inspection conducted by the Underwater Hull Inspection Board (UWHIB). Submit a CFR.
3.2.7.1 Perform a visual inspection of the existing U/W body coating system.
3.2.7.2 Take DFT measurements of the U/W body coating system in accordance with SSPC-PA 2.
3.3 Skeg UT Inspection. The Contractor shall perform the following:
3.3.1 In the presence of the Coast Guard Inspector, NDT inspect (UT) the skeg in way of the centerline propeller:
3.3.1.1 Conduct a visual, magnetic particle and ultrasonic inspection of the skeg in accordance with MIL-STD-271, and map out all areas of metal wastage, documenting by a CFR. A “pit gauge” or other means shall be used as necessary to measure the extent of metal loss and localized pitting.
3.3.1.2 The NDT operator shall be certified and qualified in accordance with SNT-TC-1A.
3.3.1.3 The NDT operator shall use an ultrasonic instrument calibrated in accordance with NAVSEA T9074-AS-GIB-010/271 and SFLC Std Spec 0740.
3.3.1.4 Prove calibration of the instrument on a sample of known thickness before and after
8 (Rev-2) testing in accordance with NAVSEA T9074-AS-GIB-010/271 and SFLC Std Spec 0740.
3.4 Underwater Body Inspection Report. Complete a copy of CG Form CG-2926; Dry-docking and Underwater Body Inspection Work Sheet and submit it via CIR.
9 (Rev-2)
THIS PAGE INTENTIONALLY LEFT BLANK
10 (Rev-2)
11010_UT_0712_FLT
REC_11010_UT_FLT_400’ WAGB (10 CGC POLAR STAR) (0911)
WORK ITEM 2: Hull Plating (U/W Body), Ultrasonic Testing
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to conduct ultrasonic testing (UT) of U/W hull plating.
1.2 Government-furnished property.
None.
2. REFERENCES
COAST GUARD DRAWINGS
Coast Guard Drawing 400 WAGB 1101-2, Rev R, Shell Plating Fwd FR 143 1/2
Coast Guard Drawing 400 WAGB 1101-3, Rev P, Shell Plating Aft FR 143 1/2
Coast Guard Drawing 400 WAGB 0700-1, Rev L, POLAR STAR Docking Plan
COAST GUARD PUBLICATIONS
Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2014, Welding and Allied Processes
OTHER REFERENCES
None.
3. REQUIREMENTS
3.1 General.
3.1.1 CIR. The Contractor shall submit a CIR for the inspections listed in the following paragraph:
3.2 (UT measurements).
3.1.2 Technical Representative.
Not applicable.
11 (Rev-2)
3.1.3 Protective measures.
Not applicable.
3.1.4 Interferences.
None.
3.2 UT measurements. The Contractor shall perform a total of 300 UT measurements: 250 on U/W hull surfaces, 25 on the rudder, 15 on the skeg, and 10 in locations designated by the Coast Guard Inspector. Use Coast Guard Drawings 400 WAGB 1101-2, 400 WAGB 1101-3, and 400 WAGB 0700-1 for guidance, in accordance with SFLC Std Spec 0740, Appendix C. Mark up a copy of Coast Guard Drawings 400 WAGB 1101-2 and 400 WAGB 1101-3 to show all locations selected for measurement and record all measurements in Table I (UT Measurements Summary Sheet - Port/Stbd Shell) provided at the end of this item. Submit a CIR, to also include the marked up drawing and completed Table I.
4.1 UT Table. Table I provided below is for the recording of all UT measurements.
12 (Rev-2)
TABLE I - UT MEASUREMENTS SUMMARY SHEET PORT/STBD SHELL
SHOT # STRAKE # FWD/MID/AFT ORIG PL MEASURED PL PERCENT
PLATE # TOP/MID/BOT THICKNESS THICKNESS WASTAGE
13 (Rev-2)
14 (Rev-2)
WORK ITEM 3: U/W Body, Preserve (Partial)
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to preserve the U/W body surfaces.
1.2 Government-furnished property.
None.
2. REFERENCES
COAST GUARD DRAWINGS
Coast Guard Drawing 400 WAGB 0103-11, Rev J, Outboard Profile
Coast Guard Drawing 400 WAGB 0700-1, Rev L, POLAR STAR Docking Plan
Coast Guard Drawing 400 WAGB 4823-1, Rev D, Seachest & Strainer Compts Fwd 113
Coast Guard Drawing 400 WAGB 4823-2, Rev H, Seachest & Strainer Compt Aft FR
COAST GUARD PUBLICATIONS
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General Requirements
Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2014, Requirements for Preservation of Ship Structures
OTHER REFERENCES
ASTM International (ASTM) D3359, 2009, Standard Test Methods for Measuring Adhesion by Tape Test
The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation Standard SSPC-SP 10/NACE No.2, 2007, Near-White Metal Blast Cleaning
The Society for Protective Coatings (SSPC) Surface Preparation Specification No.1 (SSPC-SP 1), 2016, Solvent Cleaning
The Society for Protective Coatings (SSPC) Surface Preparation Specification No.3 (SSPC-SP 3), 2004, Power Tool Cleaning
The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation Standard SSPC-SP WJ-2/NACE WJ-2, 2016, Waterjet Cleaning of Metals – Very Thorough Cleaning
15 (Rev-2)
3.1.1 CIR.
None.
3.1.2 Tech Rep. The Contractor shall refer to SFLC Std Spec 0000, paragraphs 3.2.4.2.1 (Painting Contractor certification program requirement) and 3.2.4.2.2 (Coating Tech Rep), for applicable requirements.
3.1.3 Protective measures - general. The Contractor shall furnish and install suitable covering to seal off and protect all non-affected surfaces/equipment and spaces in the vicinity of the work area against contamination during the performance of work. Upon completion of work, remove protective material and inspect for the presence of contamination. Clean all equipment and spaces, contaminated due to improper protection, to original condition of cleanliness.
3.1.4 Interferences. The Contractor shall handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences).
3.1.5 Initial inspection. Prior to removing the existing coating system, the Contractor shall inspect and verify whether all draft marks have permanent markings (weld beads or impressions), showing their location on the hull. Submit a CFR.
3.1.6 Water used in preparation and washing procedures. The Contractor shall ensure that water used in all surface preparation tasks, including pre-surface preparation wash and water jetting, is of sufficient purity…