HSCG85-16-R-P45245 Amendment 2

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION

NO.

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.

IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

NSN 7540-01-152-8070

Previous edition unusable

00000

UNITED STATES COAST GUARD

SURFACE FORCES LOGISTICS CENTER

1519 ALASKAN WAY

SEATTLE, WA 98134

HSCG85-16-R-P45245

12/1 /2015

12/04/2015

(references, WIs: 15, 19, 43, 45, & 46)

Remove the following pages from Attachment 1 and replace with the pages appended to this amendment: v, vii, 80, 96-99, 277, 292, and 296.

Changes are annoted with a line on the left.

USCGC POLAR STAR (WAGB-400) DRYDOCK AVAILABILITY FY2016

v (Draft-0)

CONSOLIDATED LIST OF REFERENCES

The below-listed documents form a part of this specification to the extent specified herein.

Approval/publication dates or revision dates/numbers are also identified, to ensure that same document versions are used at time of specification writing and during contract execution.

All Coast Guard drawings, technical publications, and standard specifications will be provided to contractors by the Coast Guard at an appropriate time, or upon request, free of charge. Other Government documents may be accessed – free of charge – as follows:

MIL/DOD/CID Specifications: http://www.assistdocs.com/search/search_basic.cfm Commandant Instruction Manuals: http://www.uscg.mil/directives/default.asp Public Laws, Code of Federal Regulations, U.S Codes, and other Federal Government laws:: www.gpoaccess.gov

The Government is aware of the following internet web links where contractors may procure commercial specifications:

American Welding Society (AWS): http://www.awspubs.com/index.php ANSI, ASTM, IEEEE, NFPA, ASME, SAE Standards: http://www.techstreet.com/ NFPA: http://www.nfpa.org SSPC Standards and pictorial guides: http://shopping.netsuite.com/sspcmarketplace

COAST GUARD DRAWINGS

Coast Guard Drawing 400 WAGB 3803-001, Rev M, Vent & A/C Diag Coast Guard Drawing 400 WAGB 3803-002, Rev L, Vent & A/C Equipment List Coast Guard Drawing 400 WAGB 3803-34, Rev E, A/C Cooling Coil Fdn Typical Coast Guard Drawing 400 WAGB 0103-3, Rev AB, Booklet of General Plans 1/8 Scale

(POLAR STAR)

Coast Guard Drawing 400 WAGB 1101-002, Rev R, Shell Plating Fwd Coast Guard Drawing 400 WAGB 1101-003, Rev P, Shell Plating Aft Coast Guard Drawing 400-WAGB 1105-059, Rev D, Miranda Davit Relocation

Installation Coast Guard Drawing 400-WAGB 1106-3, Rev R, 3rd Dk Plat Fwd FR 143 1/2 Coast Guard Drawing 400-WAGB 1106-4, Rev V, 3rd Dk Plat Aft FR 143 1/2 Coast Guard Drawing 400 WAGB 1906-001, Rev K, Zinc Protectors A&D Coast Guard Drawing 400-WAGB 3901-1, Rev Z, Insulation A&D Coast Guard Drawing 400-WAGB 3902-2, Rev E, Piping Insulation Coast Guard Drawing 400 WAGB 4301-1, Rev Y, Arrg of Shafting Coast Guard Drawing 400 WAGB 4301-2, Rev F, Bulkhead Seal a&D Coast Guard Drawing 400 WAGB 4301-3, Rev J, Shaft Tubes a&D Coast Guard Drawing 400 WAGB 4301-4, Rev 12, Center Tailshaft vii (Draft-0)

Coast Guard Drawing 400-WAGB 4803-9, Rev U, Diag of Flushing & Sprinkling Sys Coast Guard Drawing 400-WAGB 4804-7, Rev L, Diag of H&C Potable Wtr Sys Coast Guard Drawing 400-WAGB-4808-14, Rev S, Arr San Fl 2nd Dk AFT Fr 113 Coast Guard Drawing 400-WAGB-4808-17, Rev C, Operating Diagram for Plumbing and Interior Deck Drains Coast Guard Drawing 400-WAGB 4823-1, Rev D, Seachest & Strain Compts Fwd Coast Guard Drawing 400-WAGB 4823-2, Rev H, Seachest & Strain Compts Aft Coast Guard Drawing 400-WAGB 5101-1, Rev G, Arrgt & Dets of Boiler Coast Guard Drawing 400-WAGB 5101-2, Rev F, Safety Valve Easing Gear Coast Guard Drawing 400-WAGB 5101-3, Rev AC, Arrgt of Steam Boil Blow Escape Coast Guard Drawing 400-WAGB 5101-4, Rev J, Arrgt of Dets of Condensate Drn Tnk Coast Guard Drawing 400-WAGB 5101-5, Rev F, Diag of Steam Boil Blow & Escape Coast Guard Drawing 400-WAGB 5101-6, Rev N, Arrgt & Dets Boil Feedwtr Tank Coast Guard Drawing 400-WAGB 5101-7, Rev 1, Marine Aux Boiler-Bare Boiler

Design Arrgts Coast Guard Drawing 400-WAGB 5501-6, Rev AD, Arrgt of Diesel Oil Transfer Pipg Coast Guard Drawing 400-WAGB 5501-7, Rev U, Arrgt of Diesel Oil Transfer Pipg Aft

Fr 143 Abv Tank Top Coast Guard Drawing 400-WAGB 6202-40, Rev N, Central Hyd Sys E & IWD Coast Guard Drawing 400-WAGB 7802-2, Rev E, Elevators Elem WD Coast Guard Drawing 400-WAGB 8700-1, Rev W, Arrgt of Tank Level Ind Coast Guard Drawing 400-WAGB 1500-3, Rev -, Tank Level Indicator Sys Coast Guard Drawing 400 WAGB 6504-5, Rev G, CO2 Release Alarm Sys Ckt FR-

E+IWD

Coast Guard Drawing 400-WAGB 6505-15, Rev A, Operating Procedure Tank LVL

IND

Coast Guard Fleet Drawing FL 2804-12, Rev -, U.S.C.G. Emblem Coast Guard Fleet Drawing FL 2804-22, Rev-, Consolidated Visual ID for Cutters Coast Guard Drawing 400-WAGB 4803-1-AA Mark-Up Coast Guard Drawing 400-WAGB 4803-2-P Mark-Up Coast Guard Drawing 400-WAGB 4803-7-U Mark-Up Coast Guard Drawing 400-WAGB 4803-9-U Mark-Up

COAST GUARD PUBLICATIONS

Coast Guard Commandant Instruction (COMDTINST) M10360.3D, Jan 2014, Coatings and Colors Manual Coast Guard Commandant Instruction (COMDTINST) M9000.6, Mar 2011, Naval

Engineering Manual Coast Guard Technical Publication (TP) 2029, Manufacturer's Instruction Book - SWBS

Group(s) 243-262 Coast Guard Technical Publication (TP) 2035, Manufacturer's Instruction Book - SWBS

Group(s) 516-521

80 (Draft-0)

S_12300_ESD_0515_SWIT

SYY_NNN_12300_AUT_MMYY_HULL#

WORK ITEM 15: Tanks (Dirty Oil and Waste), Clean and Inspect

1. SCOPE

1.1 Intent. This work item describes the requirements for the Contractor to clean and inspect the tanks identified in Table 1.

TABLE 1 - TANKS

TANK TYPE LOCATION CAPACITY

(GALLONS)

Oily Waste 4-171-3-F 6988 Oily Waste 4-171-4-F 6988 Oily Water 4-171-1-W 5868 Oily Water 4-171-2-W 5868 Dirty L.O. 6-103-1-F 5618 Dirty L.O. 6-165-2-F 3803

Fuel over flow tank 6-103-2-F 5914 Fuel over flow tank 6-165-1-F 4058

Sludge Tank 02-100-0-E 276 Sludge Settling Tank 3-171-0-E 570

Heeling Tank 3-57-1-F 40,436 Heeling Tank 3-57-2-F 40,436 Heeling Tank 3-85-1-F 31,899 Heeling Tank 3-85-2-F 31,899 Heeling Tank 3-113-1-F 30,179 Heeling Tank 3-113-2-F 30,179

Roll Stabilization Tank 2-182-0-F 132,316

1.2 Government-furnished property.

None.

2. REFERENCES

COAST GUARD DRAWINGS

Coast Guard Drawing 400 WAGB 103-3, Rev N, Booklet of General Plans 1/8 Scale

(POLAR STAR)Coast Guard Publications

96 (Draft-0)

S_50500_ESD_0515_SWIT

SYY_LLNNN_50500_AUT_MMYY_HULL#

WORK ITEM 19: Flex Hose Assemblies, Renew

1. SCOPE

1.1 Intent. This work item describes the requirements for the Contractor to renew hose assemblies identified in Table 1.

TABLE 1 – HOSE PARTICULARS

Item # Hose Number Location System Internal/

External Preferred Hose Type

Hose Length

Hose Size Fitting Type Fitting

Material 1 1AB-F/O-001 5-113-0-E Fuel Oil Internal SAE** 60" 1/2" STRx2 F Monel 110 1AB-F/O-002 5-113-0-E Fuel Oil Internal SAE** 72" 1/2" STRx2 F Monel 111 1AB-F/O-003 5-113-0-E Fuel Oil Internal SAE** 84" 1/2" UNK Monel 2 1DOP-OIL-001 5-57-0-E Fuel Oil Internal SAE** 8" 2" UNK Monel 3 1DOP-OIL-002 5-57-0-E Fuel Oil Internal SAE** 8" 2" UNK Monel 4 1DOP-OIL-003 5-57-0-E Fuel Oil Internal SAE** 14" 1/4" UNK Monel 112 1SSA-A-001 3-121-0-E Ship Svc Air Internal NAVSEA* 36" 2" UNK Monel 7 1SSA-A-002 3-121-0-E Ship Svc Air Internal NAVSEA* 48" 1 1/2" UNK Monel 8 1SSA-A-003 3-121-0-E Ship Svc Air Internal NAVSEA* 48" 1 1/2" UNK Monel 9 1SSA-A-004 3-121-0-E Ship Svc Air Internal NAVSEA* 36" 2" UNK Monel 10 1SSA-L/O-001 3-121-0-E Lube Oil Internal SAE** 48" 1" UNK Monel 11 1SSA-L/O-002 3-121-0-E Lube Oil Internal SAE** 36" 1" UNK Monel 12 1SSA-L/O-003 3-121-0-E Lube Oil Internal SAE** 24" 1" UNK Monel 13 1SSA-L/O-004 3-121-0-E Lube Oil Internal SAE** 28" 1" UNK Monel 14 2DOP-OIL-001 5-85-0-E Fuel Oil Internal SAE** 8" 2" UNK Monel 15 2DOP-OIL-002 5-85-0-E Fuel Oil Internal SAE** 8" 2" UNK Monel 16 2DOP-OIL-003 5-85-0-E Fuel Oil Internal SAE** 14" 5/16" UNK Monel 17 2DOP-OIL-004 5-85-0-E Fuel Oil Internal SAE** 14" 5/16" UNK Monel 21 2SSA-A-001 3-121-0-E Ship Svc Air Internal NAVSEA* 36" 2" UNK Monel 22 2SSA-A-002 3-121-0-E Ship Svc Air Internal NAVSEA* 48" 1 1/2" UNK Monel 23 2SSA-A-003 3-121-0-E Ship Svc Air Internal NAVSEA* 48" 1 1/2" UNK Monel 24 2SSA-A-004 3-121-0-E Ship Svc Air Internal NAVSEA* 36" 2" UNK Monel 25 2SSA-L/O-001 3-121-0-E Lube Oil Internal SAE** 48" 1" UNK Monel 26 2SSA-L/O-002 3-121-0-E Lube Oil Internal SAE** 36" 1" UNK Monel 27 2SSA-L/O-003 3-121-0-E Lube Oil Internal SAE** 24" 1" UNK Monel 28 2SSA-L/O-004 3-121-0-E Lube Oil Internal SAE** 24" 1" UNK Monel

97 (Draft-0)

Item # Hose Number Location System Internal/

External Preferred Hose Type

Hose Length

Hose Size Fitting Type Fitting

Material 31 EDG-F/O-001 02-119-0-E Fuel Oil Internal SAE** 36" 3/4" STR FL/90 FL Monel 32 EDG-F/O-002 02-119-0-E Fuel Oil Internal SAE** 18" 3/4" STRx2 F Monel 33 EDG-F/O-003 02-119-0-E Fuel Oil Internal SAE** 60" 5/8" STRx2 F Monel 34 EDG-F/O-004 02-119-0-E Fuel Oil Internal SAE** 120" 1/2" STRx2 F Monel 35 EDG-F/O-005 02-119-0-E Fuel Oil Internal SAE** 120" 1/2" STRx2 F Monel 36 EDG-F/O-006 02-119-0-E Fuel Oil Internal SAE** 48" 5/8" STRx2 F Monel 37 EDG-F/O-007 02-119-0-E Fuel Oil Internal SAE** 96" 5/8" STRx2 F Monel 38 EDG-F/O-008 02-119-0-E Fuel Oil Internal SAE** 18" 1/4" STR F/90F Monel 39 EDG-F/O-009 02-119-0-E Fuel Oil Internal SAE** 12" 1/4" STR F/90F Monel 40 EDG-F/O-010 02-119-0-E Fuel Oil Internal SAE** 72" 1/4" STR F/90F Monel 41 EDG-F/O-011 02-119-0-E Fuel Oil Internal SAE** 16" 1 1/4" STR F/90F Monel 42 EDG-F/O-012 02-119-0-E Fuel Oil Internal SAE** 132" 1/4" STRx2 F Monel 43 EDG-F/O-013 02-119-0-E Fuel Oil Internal SAE** 20" 5/8" STR FL/90 FL Monel 44 EDG-J/W-001 02-119-0-E Jacket Water Internal NAVSEA* 92" 3/4" STRx2 F Monel 45 EDG-J/W-002 02-119-0-E Jacket Water Internal NAVSEA* 120" 3/4" STRx2 F Monel 46 EDG-J/W-003 02-119-0-E Jacket Water Internal NAVSEA* 120" 1/4" STRx2 F Monel 47 EDG-J/W-004 02-119-0-E Jacket Water Internal NAVSEA* 56" 3/4" STRx2 F Monel 48 EDG-J/W-005 02-119-0-E Jacket Water Internal NAVSEA* 120" 3/4" STRx2 F Monel 49 EDG-J/W-006 02-119-0-E Jacket Water Internal NAVSEA* 48" 3/4" STRx2 F Monel 50 EDG-J/W-007 02-119-0-E Jacket Water Internal NAVSEA* 154" 1/4" STRx2 F Monel 51 EDG-L/O-001 02-119-0-E Lube Oil Internal SAE** 104" 1/4" STRx2 F Monel 52 EDG-L/O-002 02-119-0-E Lube Oil Internal SAE** 65" 1/4" STRx2 F Monel 53 EDG-L/O-003 02-119-0-E Lube Oil Internal SAE** 76" 1/4" STRx2 F Monel 54 EDG-L/O-004 02-119-0-E Lube Oil Internal SAE** 48" 1/4" STRx2 F Monel 55 EDG-L/O-005 02-119-0-E Lube Oil Internal SAE** 48" 1/4" STRx2 F Monel 56 EDG-L/O-006 02-119-0-E Lube Oil Internal SAE** 84" 1/4" STRx2 F Monel 57 EDG-L/O-007 02-119-0-E Lube Oil Internal SAE** 48" 1/4" STRx2 F Monel 58 EDG-L/O-008 02-119-0-E Lube Oil Internal SAE** 60" 5/16" STRx2 F Monel 59 EDG-L/O-009 02-119-0-E Lube Oil Internal SAE** 36" 3/4" STRx2 F Monel 60 EDG-L/O-010 02-119-0-E Lube Oil Internal SAE** 48" 3/4" STRx2 F Monel 61 EDG-L/O-011 02-119-0-E Lube Oil Internal SAE** 13" 1 1/2" STRx2 FL Monel 62 EDG-L/O-012 02-119-0-E Lube Oil Internal SAE** 54" 1 1/2" STRx2 F Monel 65 L-STM-001 1-18-1-Q Steam Internal NAVSEA* 12" 3/4" STRx2 M Monel 66 L-STM-002 1-18-1-Q Steam Internal NAVSEA* 24" 1 STRx2 M Monel 67 L-STM-003 1-18-1-Q Steam Internal NAVSEA* 12" 3/4" STRx2 M Monel 68 L-STM-004 1-18-1-Q Steam Internal NAVSEA* 12" 3/4" STRx2 M Monel 69 L-STM-006 1-18-1-Q Steam Internal NAVSEA* 18" 3/8" UNK Monel 70 L-STM-007 1-18-1-Q Steam Internal NAVSEA* 22" 3/8" STRx2 M/F Copper 71 L-STM-011 1-18-1-Q Steam Internal NAVSEA* 22" 3/8" STRx2 M/F Copper

98 (Draft-0)

Item # Hose Number Location System Internal/

External Preferred Hose Type

Hose Length

Hose Size Fitting Type Fitting

Material 72 L-CFW-001 1-18-1-Q Fresh Water Internal NAVSEA* 8" 1 1/4" UNK Monel 73 L-CFW-002 1-18-1-Q Fresh Water Internal NAVSEA* 8" 1 1/4" UNK Monel 74 L-HFW-001 1-18-1-Q Fresh Water Internal NAVSEA* 8" 1 1/4" UNK Monel 75 L-HFW-002 1-18-1-Q Fresh Water Internal NAVSEA* 8" 3/4" UNK Monel 76 L-HFW-003 1-18-1-Q Fresh Water Internal NAVSEA* 8" 1 1/4" UNK Monel 77 L-STM-005 1-18-1-Q Steam Internal NAVSEA* 22" 3/8" STRx2 M/F Monel 79 L-STM-008 1-18-1-Q Steam Internal NAVSEA* 18" 3/8" Comp Flare Copper 80 L-STM-009 1-18-1-Q Steam Internal NAVSEA* 22" 3/8" STRx2 M/F Monel 81 L-STM-010 1-18-1-Q Steam Internal NAVSEA* 18" 3/8" UNK Monel 83 L-STM-012 1-18-1-Q Steam Internal NAVSEA* 18" 3/8" Comp Flare Copper 84 L-STM-013 1-18-1-Q Steam Internal NAVSEA* 22" 3/8" STRx2 M/F Monel 85 L-STM-014 1-18-1-Q Steam Internal NAVSEA* 18" 3/8" UNK Monel 86 L-STM-015 1-18-1-Q Steam Internal NAVSEA* 22" 3/8" STRx2 M/F Copper 87 L-STM-016 1-18-1-Q Steam Internal NAVSEA* 18" 3/8" Comp Flare Copper

91 P15TC-HYD-001

15 Ton Crane (PORT) Hydraulic External SAE** 24" 1 1/4" UNK Stainless

92 P15TC-HYD-002

15 Ton Crane (PORT) Hydraulic External SAE** 36" 1 1/4" UNK Stainless

93 P15TC-HYD-003

15 Ton Crane (PORT) Hydraulic External SAE** 30" 3/4" UNK Stainless

94 P15TC-HYD-004

15 Ton Crane (PORT) Hydraulic External SAE** 36" 1" UNK Stainless

95 P15TC-HYD-005

15 Ton Crane (PORT) Hydraulic External SAE** 36" 1" UNK Stainless

96 P15TC-HYD-006

15 Ton Crane (PORT) Hydraulic External SAE** 30" 1 1/4" UNK Stainless

97 P15TC-HYD-007

15 Ton Crane (PORT) Hydraulic External SAE** 12" 1 1/4" UNK Stainless

98 POTW-CHL-004 3-171-0-E

Potable Water Internal NAVSEA* 16" 3/8" UNK Monel

99 R2-S/W -001 2-35-1-Q Sea Water Internal SAE** 24" 1" STRx2 F 100 R2-S/W -002 2-35-1-Q Sea Water Internal SAE** 31" 1" STRx2 F 101 1AREF-R-001 3-57-0-E Refrigerant Internal NAVSEA* 14" 1" UNK Monel 102 1BREF-R-001 3-57-0-E Refrigerant Internal NAVSEA* 14" 1" UNK Monel 103 2AREF-R-001 3-57-0-E Refrigerant Internal NAVSEA* 14" 1" UNK Monel 104 2BREF-R-001 3-57-0-E Refrigerant Internal NAVSEA* 14" 1" UNK Monel 105 3AREF-R-001 3-57-0-E Refrigerant Internal NAVSEA* 14" 1" UNK Monel 106 3BREF-R-001 3-57-0-E Refrigerant Internal NAVSEA* 14" 1" UNK Monel 107 SA-A-001 3-121-0-E Start Air Internal NAVSEA* 36" 2" UNK Monel 108 SA-A-002 3-121-0-E Start Air Internal NAVSEA* 48" 1 1/2" UNK Monel 109 SA-A-003 3-121-0-E Start Air Internal NAVSEA* 48" 1 1/2" UNK Monel 113 2AB-F/O-001 5-113-0-E Fuel Oil Internal SAE** 60" 1/2" STRx2 F Monel 114 2AB-F/O-002 5-113-0-E Fuel Oil Internal SAE** 72" 1/2" STRx2 F Monel

99 (Draft-0)

Item # Hose Number Location System Internal/

External Preferred Hose Type

Hose Length

Hose Size Fitting Type Fitting

Material 115 2AB-F/O-003 5-113-0-E Fuel Oil Internal SAE** 84" 1/2" UNK Monel

* IAW NAVSEA S6430-AE-TED-010

** IAW SAE J 1942

1.2 Government-furnished property.

None.

2. REFERENCES

COAST GUARD DRAWINGS

None

COAST GUARD PUBLICATIONS

Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General Requirements Surface Forces Logistics Center Standard Specification 5000 (SFLC Std Spec 5000), 2014, Auxiliary Machine Systems\ Coast Guard Commandant Instruction COMDTINST M9000.6F, 2011, Naval

Engineering Manual (NEM)

OTHER REFERENCES

None

3. REQUIREMENTS

3.1 General.

3.1.1 CIR.

None.

3.1.2 Tech Rep.

Not Applicable.

3.1.3 Protective measures. The Contractor shall furnish and install suitable covering to seal off and protect all non-affected surfaces/equipment and spaces in the vicinity of the work area against contamination during the performance of work. Upon completion of work, remove protective material and inspect for the presence of contamination. Clean all equipment and spaces, contaminated due to improper protection, to original condition of cleanliness.

277 (Draft-0)

FUEL TANKS LOCATION CAPACITY -

95%

(GALLONS)

6-143-1-F Motor Room (5-171-0-E) 31240 6-171-3-F Motor Room (5-171-0-E) 10614 3-223-5-F Motor Room (5-171-0-E) 16615 5-223-0-F Motor Room (5-171-0-E) 39857 5-211-0-F Motor Room (5-171-0-E) 55733 4-199-1-J JP-5 Room 830 4-197-1-J JP-5 Room 915 6-197-0-J JP-5 Room 44236

6-133-2-W Gas Turbine Room 5726

1.2 Government-furnished property.

None

2. REFERENCES

COAST GUARD DRAWINGS

Coast Guard Drawing 400-WAGB 103-3, Rev AB, Booklet of General Plans (POLAR

STAR)

Coast Guard Drawing 400-WAGB 8700-1, Rev W, Arrgt of Tank Level Ind Coast Guard Drawing 400-WAGB 6505-15, Rev A, Operating Procedure Tank LVL

IND

COAST GUARD PUBLICATIONS

Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General Requirements Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2014, Requirements for Preservation of Ship Structures Coast Guard Technical Publication (TP) NAVSHIPS 0965_LP_060, Tank Level

Indicator (TLI) System Panel

OTHER REFERENCES

None

3. REQUIREMENTS

3.1 General.

3.1.1 CIR.

None.

292 (Draft-0)

WARNING

Asbestos shall be treated as friable during removal.

Asbestos in excess of 1% is present in the existing marinite paneling.

The affected tanks and piping to be removed are shown outlined in red on CG Dwg 400 WAGB 4803-9 Sheet 5 of 8, Mark-Up. Only the following tanks and associated piping are affected:

Heeling Tank 3-57-1-F Heeling Tank 3-57-2-F Heeling Tank 3-85-1-F Heeling Tank 3-85-2-F Heeling Tank 3-113-1-F Heeling Tank 3-113-2-F Roll Stabilization Tank 2-182-0-F

3.2 Tank Cleaning and Gas Free Certification. Cleaning of the affected tanks shall be conducted in work item Tanks (Dirty Oil, Waste), Clean and Inspect of this specification package. The Contractor shall initially certify and maintain the gas free certification of the tanks as required to perform hot work.

3.3 Ballasting Piping Removals. The contractor shall perform the following work:

The outboard bulkheads on the port and starboard passageways are steel. Inside of the affected berthing areas, the bulkheads are covered by marinite panels which may contain asbestos. The contractor shall remove the marinite panels and contain any asbestos dust to prevent spread of contamination as required to perform the work.

3.3.1 Using the Mark-Up drawings and the Booklet of General Plans for the cutter for guidance, inspect the firemain and ballasting system. Mark areas where piping is to be removed and caps are to be installed. The three valve manifold located at approximately Frame 223 will not be removed as a part of this work item. Verify piping removals with the Coast Guard Inspector prior to commencing work.

3.3.2 Following guidance in the drawing listed above, crop and remove unneeded tank ballasting piping coming off of the firemain. Remove all tank ballasting pipng from the firemain junctions to the terminus inside of each of the affected tanks. Do not remove the three valve manifold located at frame 223 as a part of this specification item.

3.3.2.1 Remove all tank ballasting piping for the affected tanks from the firemain to the tank inlet and down to the terminus in the tank. Grind off and remove all unused pipe hangers.

3.3.3 Crop and remove bulkhead penetrations where the firemain and ballasting piping penetrates steel bulkheads and decks.

3.3.4 Repair the bulkheads and decks by inserting new steel in way of the removal. Follow guidance in SFLC Std Spec 0740 and CG Dwg 400 WAGB 2906-1 for welding. Existing deck material and thicknesses may be obtained from CG Dwg 400 WAGB 1106-3 and CG Dwg 400 WAGB 1106-4.

296 (Draft-0)

3. REQUIREMENTS

3.1 General.

3.1.1 CIR.

None.

3.1.2 Tech Rep.

Not applicable.

3.1.3 Protective measures - general. The Contractor shall furnish and install suitable covering to seal off and protect all non-affected surfaces/equipment and spaces in the vicinity of the work area against contamination during the performance of work. Upon completion of work, remove protective material and inspect for the presence of contamination. Clean all equipment and spaces, contaminated due to improper protection, to original condition of cleanliness.

3.1.4 Interferences. The Contractor shall handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences).

3.2. The ship’s service air compressors are described in CG Tech Pub 2037, Section 551A, Rotary Screw Compressors.

3.3 Air compressor system refurbishment. The contractor shall perform the following work:

3.3.1 Compressor gauge panel.

3.3.1.1 Disconnect all pressure and temperature lines and all electrical wiring leading to the compressor gauge panel.

3.3.1.2 Provide and install a new compressor gauge panel, including all instruments. List of parts for renewal is shown below. See Page 23 of CG Tech Pub 2037, Section 551A Rotary Compressor.

TABLE 1 – NEW INSTRUMENTS FOR COMPRESSOR GAUGE PANEL

ITEM

NUMBER PART NUMBER DESCRIPTION QTY*

1 0009351 Ftg Elbow 1/8” NPT 1 2 0053064 Indicator, Filter Air 1 5 0260674 Gauge, Pres 0-200# 2.5” 2 6 0260879 Indicator, Filter Oil 1 7 0262727 Thermometer 2.5” 150 F 2 8 0262728 Thermometer, 2.5” 250 F 2 9 0262729 Panel Gauge USCG 1

10 0262731 Label Panel Overlay USCG 1

*Quantity is per compressor.

3.3.1.3 Provide and install new phenolic label plates below each pressure gauge and thermometer on the gauge panel. Each label plate shall state the sensing point of the gauge or thermometer.