Page_2_-_A002.doc

DOC document 26 KB Posted

Attached to
Indefinite Delivery Indefinite Quantity Dockside Repairs of CGC WHECs, WMSLs, and Other CG Cutters
Solicitation number
HSCG85-13-R-P45002
Issued by

About this file

Page 2 of A002

View the file

Other files

File Type Posted
SF30-A006.pdf PDF
SF30-A005.pdf PDF
750-WMSL_512_46_4_-_D1_(2).pdf PDF
SF30-A004.pdf PDF
Page_2_-_A004.doc DOC document
SF30-A003.pdf PDF
Page_2_-_A003.doc DOC document
750-WMSL_512_46_1_-_D1_(2).pdf PDF
750-WMSL_512_46_3_-_D1.pdf PDF
750-WMSL_512_46_7_-_D1.pdf PDF
750-WMSL_512_46_6_-_D1_(2).pdf PDF
750-WMSL_512_46_5_-_D1.pdf PDF
SF30-A002.pdf PDF
750-WMSL_512_46_2_-_D1.pdf PDF
Page_2_-_A001.doc DOC document
SF30-A001.pdf PDF
Page_49_(sol._pkg)_Revised.doc DOC document
SF1449_(P45002).pdf PDF
6_SCHEDULE_OF_PRICES_FOR_CGC_RUSH_(IDIQ_DS).xls XLS spreadsheet
7_SCHEDULE_OF_PRICES_FOR_WMSL_(IDIQ).xls XLS spreadsheet
4_LIST_OF_ATTACHMENT_(IDIQ).doc DOC document
9_Request_for_Clarification_(IDIQ_DS).doc DOC document
8_Technical_Evaluation_Criteria_(IDIQ_DS).doc DOC document
10_GOVERNMENT_PROPERTY_REPORT_(Attachment_5).doc DOC document
1_NOTICE_TO_OFFERORS_(IDIQ_DS).doc DOC document
5_DS_IDIQ_Prototype_Specification.pdf PDF
6_WMSL_DS_Notional_Spec.doc DOC document
2_Cover_Sheet_(Solicitation_IDIQ).doc DOC document
3_Solicitation_Pkg_(IDIQ).doc DOC document
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation No. HSCG85-13-R-P45002

Indefinite Delivery Indefinite Quantity Dockside Repairs of San Francisco Bay Area and San Diego, CA CGC Cutters

Amendment No. A002

The purpose of this amendment is as follows:

a.

The following are answers to the following Request for Clarifications:

Question NO. 5:

Work Item No. D-03,BERP (under WMSL notional specification), paragraph 3.2.1, paragraph indicates to remove ventilation & lights in MPC (DWG 750-WMSL-512-044). There is no MPC on the drawing. Please supply contractor with the correct drawing.

ANSWER:

Paragraph 3.2.1 of work item D-03 should referenced DWG 750-WMSL-512-046. The correct drawings are incorporated as an attachment to this amendment.

QUESTION NO. 6:

Page 2 of the solicitation, Description of Work; In the solicitation for Indefinite Delivery Indefinite Quantity (IDIQ) DocksideRepairs of san Francisco Bay Area and San Diego Cutters HSCG85-13-R-P45002, page 2 of 68 paragraph 2 “Description of Work”, section C lists Icebreakers, Buoy & Construction Tender Cutters (IBCT): CGC Aspen, CGC George Cobb. Contractor sees no notional specification or “Schedule of Pricing” for these cutters in the solicitation package. Is it the Government’s intent to request proposal for these vessels.

ANSWER: Under this requirement, the IBCT Product Line will only utilize the IDIQ Dockside Repairs contracts on as needed basis or during emergency situations. A Request for Proposals for these vessels is not necessary under this solicitation.

b.

All other terms and conditions cited on the solicitation will remain unchanged.

File details come from the government source that posted it. Updated .