7_SCHEDULE_OF_PRICES_FOR_WMSL_(IDIQ).xls

XLS spreadsheet 23 KB Posted

Attached to
Indefinite Delivery Indefinite Quantity Dockside Repairs of CGC WHECs, WMSLs, and Other CG Cutters
Solicitation number
HSCG85-13-R-P45002
Issued by

About this file

SCHEDULE OF PRICES - WMSL CUTTER - HSCG85-13-R-P45002

View the file

Other files

File Type Posted
SF30-A006.pdf PDF
SF30-A005.pdf PDF
750-WMSL_512_46_4_-_D1_(2).pdf PDF
SF30-A004.pdf PDF
Page_2_-_A004.doc DOC document
SF30-A003.pdf PDF
Page_2_-_A003.doc DOC document
750-WMSL_512_46_1_-_D1_(2).pdf PDF
750-WMSL_512_46_3_-_D1.pdf PDF
750-WMSL_512_46_7_-_D1.pdf PDF
750-WMSL_512_46_6_-_D1_(2).pdf PDF
750-WMSL_512_46_5_-_D1.pdf PDF
SF30-A002.pdf PDF
750-WMSL_512_46_2_-_D1.pdf PDF
Page_2_-_A002.doc DOC document
Page_2_-_A001.doc DOC document
SF30-A001.pdf PDF
Page_49_(sol._pkg)_Revised.doc DOC document
SF1449_(P45002).pdf PDF
6_SCHEDULE_OF_PRICES_FOR_CGC_RUSH_(IDIQ_DS).xls XLS spreadsheet
4_LIST_OF_ATTACHMENT_(IDIQ).doc DOC document
9_Request_for_Clarification_(IDIQ_DS).doc DOC document
8_Technical_Evaluation_Criteria_(IDIQ_DS).doc DOC document
10_GOVERNMENT_PROPERTY_REPORT_(Attachment_5).doc DOC document
1_NOTICE_TO_OFFERORS_(IDIQ_DS).doc DOC document
5_DS_IDIQ_Prototype_Specification.pdf PDF
6_WMSL_DS_Notional_Spec.doc DOC document
2_Cover_Sheet_(Solicitation_IDIQ).doc DOC document
3_Solicitation_Pkg_(IDIQ).doc DOC document
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

CONTRACTOR PRICE BREAKDOWN
Solicitation No. HSCG85-13-R-P45002
Contractor's price will be broken down for each item of the specification, as follows:
SUBCONTRACTOR
ITEMTITLEPRIMELABORMATERIALLABORMATERIALOTHER
NO.FOR CGC WMSLM/HPRICEPRICEM/HPRICEPRICEPRICETOTAL
D-0102 Level Deck Covering, Install
D-0202 Level Outfit, Modify
D-03BERP, Open
D-04Decoy Launching System Cable Conduit, Install
D-05EDDU and Cabinet 18, Removal
D-06Fatugue Life Enhancement, Install
D-07Flight Deck Socket Fittings, Install
D-08Flight Deck Talon Grid, Install
D-09Helicopter ASIST System Tracks, Remove
D-10HF Antenna, Relocate
D-11HF Transmitter Room Outfit, Install
D-12Line-Up Light, Removal & Installation
D-13MPC and MPC Annex Outfit, Install
D-14MPC Annex Bulkhead Insulation, Intall
D-15Multi-Cable Transit, Modify
D-16Overhead Light Fixtures, Modify
D-17Port Side Talon Grid, Remove
D-18Rigging, Lifting, and Material Handling, Support
D-19SCIF Bulkhead, Modify
D-20Temporary Services, Dockside, Home Pier
D-21Weather Deck Drains, Install
D-22Weather Deck Drains, Removal
Total Amount of Definite Items
Total Evaluated Amount
Composite Labor Hour Rate Applicable to Contract Changes:
Labor Hour Rate$
Estimated Composite Labor Hour4097 HRS
Extended Composite Labor Amount$
NAME OF CONTRACTOR:

&CATTACHMENT 4(b)

Sheet2

Sheet3

File details come from the government source that posted it. Updated .