6_SCHEDULE_OF_PRICES_FOR_CGC_RUSH_(IDIQ_DS).xls

XLS spreadsheet 28 KB Posted

Attached to
Indefinite Delivery Indefinite Quantity Dockside Repairs of CGC WHECs, WMSLs, and Other CG Cutters
Solicitation number
HSCG85-13-R-P45002
Issued by

About this file

SCHEDULE OF PRICES - CGC RUSH - HSCG85-13-R-P45002

View the file

Other files

File Type Posted
SF30-A006.pdf PDF
SF30-A005.pdf PDF
750-WMSL_512_46_4_-_D1_(2).pdf PDF
SF30-A004.pdf PDF
Page_2_-_A004.doc DOC document
SF30-A003.pdf PDF
Page_2_-_A003.doc DOC document
750-WMSL_512_46_1_-_D1_(2).pdf PDF
750-WMSL_512_46_3_-_D1.pdf PDF
750-WMSL_512_46_7_-_D1.pdf PDF
750-WMSL_512_46_6_-_D1_(2).pdf PDF
750-WMSL_512_46_5_-_D1.pdf PDF
SF30-A002.pdf PDF
750-WMSL_512_46_2_-_D1.pdf PDF
Page_2_-_A002.doc DOC document
Page_2_-_A001.doc DOC document
SF30-A001.pdf PDF
Page_49_(sol._pkg)_Revised.doc DOC document
SF1449_(P45002).pdf PDF
7_SCHEDULE_OF_PRICES_FOR_WMSL_(IDIQ).xls XLS spreadsheet
4_LIST_OF_ATTACHMENT_(IDIQ).doc DOC document
9_Request_for_Clarification_(IDIQ_DS).doc DOC document
8_Technical_Evaluation_Criteria_(IDIQ_DS).doc DOC document
10_GOVERNMENT_PROPERTY_REPORT_(Attachment_5).doc DOC document
1_NOTICE_TO_OFFERORS_(IDIQ_DS).doc DOC document
5_DS_IDIQ_Prototype_Specification.pdf PDF
6_WMSL_DS_Notional_Spec.doc DOC document
2_Cover_Sheet_(Solicitation_IDIQ).doc DOC document
3_Solicitation_Pkg_(IDIQ).doc DOC document
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Price Breakdown

Contractor's price will be broken down for each item of the specification, as follows:
SUBCONTRACTOR
ITEMTITLEPRIMELABORMATERIALLABORMATERIALOTHER
NO.FOR CGC RUSH:M/HPRICEPRICEM/HPRICEPRICEPRICETOTAL
D-01Temporary Services
D-02Breakers (Degaussing) Inspect & Test
D-03Circuit Breakers(60Hz) Inspect & Test
D-04Circuit Breakers (400 HZ) Inspect & Test
D-05Commissary Hoist (GEN) Level 2 Inspect & Repair
D-06Warping Capstan (GEN) Level 2 Inspect & Repair
D-07Oily Water Separator Overhaul
D-08Evaporators (GEN) Overhaul
D-09Sewage Ejector Pump Overhaul
D-10Vent Ducts (Galley & Pantry Room) Commercial Cleaning
D-11Vent Ducting Cleaning Main Engine Air Intakes
D-12MDE Filter Pod Renewal
D-13Air Compressor Overhaul
D-14Compressed Air Receivers Inspect & Test
D-15Fuel Oil Manifold Valves Overhaul
D-16EGT Day tank Preserve
D-17Tank (Waste Oil) Clean
D-18Grey water Holding Tanks, Clean & Inspect
D-19Potable water Pneumatic Tank, Clean & Inspect
D-20Tank (Sewage Holding) Preserve 100%
D-21Water Tight Hatch 1-304-1 Repair
D-22Starboard Boat Deck Plating Renewal
D-23Fantail deck Exterior, Inspect & Preserve
D-24After Steering (2-320-0-E) Deck Preservation
D-25Fan room (1-280-1-Q) Deck Preservation & Repair
D-26Fan room (01-97-1-Q) Deck Preservation & Repair
D-27Rescue Gear Locker (01-108-1-A) Deck Plating Renewal
D-28Storage locker 2-90-@-A Deck Plating Renewal
D-29Stack Deck Preservation
D-30Stack deck Structural Plating Renewal
D-31Deck Drain Piping repair
D-32Captain's Cabin Overhead Repairs
D-33Deck plating renewal Mess deck Vestibules
D-34Vacuum Sewage Pump Overhaul
D-35Counter Measure Wash Down System; Renew
D-36Firemain Pressure Sensor Line Repairs
D-37Firemain & ASW Pressure Regulating Valve Overhaul
D-38Chill water System Insulation renewal
D-39Deck Covering (Interior Wet) Renew
D-40Deck covering (Interior Quarry) Tile
D-41Berthing Head Renovation
Total Amount of Definite Items
OPTIONAL ITEMS
O-42Deck Repair After Steering (2-320-0-E)
O-43Grey Water Holding tanks Preserve 100%
Total Amount Of Optional Items
Total Evaluated Amount of Definite & Optional Items
Composite Labor Hour Rate Applicable to Contract Changes:
Labor Hour Rate$________
Estimated Composite Labor Hour1730 HRS
Extended Composite Labor Amount$_______
NAME OF CONTRACTOR:

&CCONTRACTOR PRICE BREAKDOWN

&RHSCG85-13-R-P45002

&CATTACHMENT 4(a)

File details come from the government source that posted it. Updated .