TECHNICAL EVALUATION CRITERIA.doc

DOC document 89 KB Posted

Attached to
Dry-dock & Repairs of CGC MELLON (WHEC 717)
Solicitation number
HSCG85-10-R-P45FX7
Issued by

About this file

TEHNICAL EVALUATION CRITERIA -HSCG85-10-R-P45FX7

View the file

Other files

File Type Posted
SF30 —
Page 2 -Amend. 0006.doc DOC document
SF30 —
Page 2 -Amend. 0004.doc DOC document
SF30 —
USCGC MELLON_Drydock and Repair September 2010 Rev 1.pdf PDF
SF30 —
Page 2 -Amend. 0003.doc DOC document
SF30 —
Page 2 -Amend. A001.doc DOC document
Revised Page 4 - SECTION B P45FX7.doc DOC document
MI_24500_JPH_0908_378E_Liaaen_Single_Prop_rmv_install.pdf PDF
SF30 —
USCGC MELLON_Drydock and Repair_September_2010_Rev_0.pdf PDF
Request for Clarification —
NOTICE TO OFFERORS(MELLON).doc DOC document
Solicitation pkg..doc DOC document
Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Request for Proposal (RFP)

HSCG85-10-R-P45FX7

Dry-Dock Repairs of CGC MELLON (WHEC 717)

TECHNICAL EVALUATION CRITERIA

CATEGORY A: PAST PERFORMANCE

A.1 In accordance with FAR 15.305(a)(2)(1), the offeror is required to identify past or current contracts (including Federal, State, and local government and/or private) for efforts similar to the Government requirement for this availability. The government shall consider this information, as well as information obtained from any other sources, when evaluating the offeror’s past performance. The offeror is further reminded that the source selection authority shall determine the relevance of similar past performance information. The offeror shall limit this information to no more than five contracts performed within the last three years, each listed separately. The offeror is requested to provide this information in the following format for each contract:

a. Contract number, and agency point of contact and telephone number;

b. Ship name, hull number, type, and displacement;

c. Type of availability (dry dock, dockside, etc.), description of work items, and where performed;

d. Original contract commencement and completion dates, actual commencement and completion dates, and explanation of (i.e. reasons for) schedule slippage/extensions, if any;

e. Award and final (award plus growth) contract prices, including the total number of growth work changes and scope of these changes;

f. Total number of actual man-hours expended, and how many of those hours were for additional /changed work;

g. The number of and reasons for any deficiency reports issued by the customer for each specification item. Provide copies of these reports if requested;

h. Discuss problems encountered and the offeror’s corrective actions

ATTACHMENT J.4