Page 2 -Amend. 0004.doc

DOC document 69 KB Posted

Attached to
Dry-dock & Repairs of CGC MELLON (WHEC 717)
Solicitation number
HSCG85-10-R-P45FX7
Issued by

About this file

Page 2 of SF-30 Amend. 0004

View the file

Other files

File Type Posted
SF30 —
Page 2 -Amend. 0006.doc DOC document
SF30 —
SF30 —
USCGC MELLON_Drydock and Repair September 2010 Rev 1.pdf PDF
SF30 —
Page 2 -Amend. 0003.doc DOC document
SF30 —
Page 2 -Amend. A001.doc DOC document
Revised Page 4 - SECTION B P45FX7.doc DOC document
MI_24500_JPH_0908_378E_Liaaen_Single_Prop_rmv_install.pdf PDF
SF30 —
TECHNICAL EVALUATION CRITERIA.doc DOC document
USCGC MELLON_Drydock and Repair_September_2010_Rev_0.pdf PDF
Request for Clarification —
NOTICE TO OFFERORS(MELLON).doc DOC document
Solicitation pkg..doc DOC document
Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUEST FOR PROPOSAL

HSCG85-10-R-P45FX7

DRY-DOCK & REPAIRS OF CGC MELLON (WHEC 717)

AMENDMENT 0004

Page 2 of

The purpose of this amendment is as follows:

a.

The due date and time for submission of the Request for Proposal cited under Amendment No. 0003 is corrected to read 13 July 2010 at 11:00 A.M., Pacific Standard Time.

b.

Revision 1 of the Specification is hereby attached and made part of this requirement. The changes made on the Revision I are as follows:

(1) Page 374, adjusted paragraph 3.16.1 (PARKING SPACES) and added paragraph 3.16.6

(2) Page 378, Table for 378’ WHEC Temporary Service Requirements –

250 GPM for auxiliary cooling water

120 parking spaces

(3) Page 451, added Optional Item O-89, Removal and Reinstall Propeller Hub from Tailshaft . (NOTE: Offerors are advised to utilize the revised Page 4, Schedule of Items, provided under Amendment 0001 dated 24 June 2010.

Failure to utilize the revised page will result for the Request for Proposal to be rejected as non-responsive to the requirement of the solicitation) c.

The following is the answer to the following Request for Clarification:

Question No. 28: Optional Items O-86 and O-87, Propulsion Shaft bearings, paragraph 3.3.1 and 3.3.2; The referenced CG Dwg 378 FRAM W-244-2 indicates that the bearing staves are brass backed rubber staves that are no longer available. NSTM chapter 244 and NAVSEA Dwg 803-1385664 were not supplied.

Paragraph 3.3.1 indicates that the shafting sleeves will be undercut yet there is nothing in the specification indicating this will occur.

Questions;

1. Can the missing references be supplied?

2. Standird size bearings or oversized?

3. Thordon or brass backed rubber cutlass staves

ANSWER:

USCG will supply the missing references upon award of this requirement. For bidding purposes, assume oversized Thordon staves will be required. Actual stave sizes will be determined from shaft liner measurements.

e.

The other terms and conditions of the solicitation will remain unchanged.

File details come from the government source that posted it. Updated .