AttJ.1a(PlnDSPkg)(09R6BX020).doc

DOC document 39 KB Posted

Attached to
USCGC HEALY (WAGB 20) MULTI-OPTION SHIP REPAIR CONTRACT
Solicitation number
HSCG85-09-R-6BX020
Issued by

About this file

Attachment J.1a Planning Specification

View the file

Other files

File Type Posted
Amendment0009(09R6BX020).doc DOC document
Amendment0008(09R6BX020).doc DOC document
Replacement Page 38 —
Amendment0007(09R6BX020).doc DOC document
AttJ.2(RawCostElementBreakdown)(09R6BX020)(Amd 0007).xls XLS spreadsheet
Amendment0006(09R6BX020).doc DOC document
MLCPACINST M9000_6E.pdf PDF
Amendment0005(09R6BX020).doc DOC document
GSO NAVSEA S9AA0-AB-GOS-010 Rev3.pdf PDF
Amendment0004(09R6BX020).doc DOC document
Amendment0003(09R6BX020).doc DOC document
Item D-29 Deck Coverings —
Item D-10 Pressure Gauges Thermometers List.doc DOC document
Item D-12 Flexible Hose List.pdf PDF
Item D-11 Pyrometers Thermocouples List.doc DOC document
Att J.1 Spec Corrections.doc DOC document
Amendment0002(09R6BX020).docx DOCX document
Amendment0001(09R6BX020).docx DOCX document
AttJ.2(RawCostElementBreakdown)(09R6BX020).xls XLS spreadsheet
AttJ.1(NotionalSpec)(09R6BX020).doc DOC document
Solicitation(SchedA-M)(09R6BX020).doc DOC document
AttJ.3(TechEvalCriteria)(09R6BX020).doc DOC document
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

HSCG85-09-R-6BX020

Attachment J.1a

Notional Specification for Planning Contract Line Items 0001, 0005, 0007, 0009, 0011 Scope:

For a given dockside availability, accomplish the requirements in Section C, CLIN 0001 for the associated approved worklist items in accordance with the listed references and Table C-1.

Such requirements include, but are not limited to the following CLIN 0001 obligations:

GFI review (ex. CSMP, drawings)

Discharging contractor’s onsite A-Team commitments (2 meetings) Performing shipchecks on available cutter Material/Equipment research

Procurement, receipt inspection and storage of CFM/GFM Recommendations for prefabrication or early assembly

Subcontractor source selection Providing engineering/design services for some work items

Generation of no more than 50 Condition Found Reports Generation of draft specification Incorporation of MLC recommendations in specification

Generation of final specification

Generation of production schedule

Generation of performance management baseline

Generation of cost proposal