About this file
Exhibit A - CDRLs
View the file
Other files for this federal contract opportunity
Show all 25
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
HQ0147-10-R-0030
Exhibit A
MDA/DT
Missile Defense Data Center (MDDC) Program
EXHIBIT A
CONTRACT DATA REQUIREMENTS LIST
TBD Date
HQ0147-10-R-0030
Exhibit A
A. INTRODUCTION
The Contract Data Requirements List (CDRL) is prepared in a word processing format to increase the efficiency of electronic development and transmission. Block numbering and titles remain as used in the DD Form 1423 as derived from Procedures for the Acquisition and Management of Technical Data, DoD 5010.12-M.
B. APPLICABLE DOCUMENTS
DoDD 5230.24, Distribution Statements on Technical Documents, March 18, 1987
C. AUTHORITIES (BLOCK 4)
Data Item Descriptions (DIDs) entered in CDRL blocks 2 and 4 are selected from the Acquisition Streamlining and Standardization Information System (ASSIST) data base. The application of any DID tailoring is indicated by addition of the suffix "T" to the DID number entered in Block 4. Such tailoring is accomplished to relax format requirements or conform the data requirement to those requirements contained in the Statement of Work (SOW).
D. APPROVAL (BLOCK 8)
Selected data will require approval before their submission is considered final. The approving authority shall be the MDA/DTD Contracting Officer’s Representative (COR) or government designated Task Manager (TM) as indicated by the first addressee entry of Block 14.a. The use of “N/A” in Block 8 does not forfeit or otherwise affect the Government’s right to consider unacceptable any submission of data that does not comply with the contract requirements.
E. DATA DELIVERY DUE DATES (BLOCKS 12 AND 13)
Data will be considered delinquent when not physically arriving or electronically available at the distribution destination on the date(s) specified. Unless otherwise indicated, references to “days” are calendar days.
F. SUPPLEMENTAL INFORMATION
N/A.
G. DEFINITIONS OF ACRONYMS AND ABBREVIATIONS
Entry
Definition
ACO
Administrating Contracting Officer
ASREQ
As required
LT
Letter of transmittal
MAC
Months after contract initiation
N/A Not applicable
H. ADDRESSEE LIST
Block 14
Entry
Complete Mailing Address
MDA/DTD
Missile Defense Agency
MDA/DACT
ATTN: MDA/______
Missile Defense Agency (MDA)
Building 5222 Martin Road
Redstone Arsenal, AL 35896
HQ0147-10-R-0030
Exhibit A
CDRL LISTING
| No. |
| CDRL |
| SOW Paragraph Reference |
| Data Item Description |
| 001 |
| Funds And Manhour Expenditure Report (FMER) |
| 2.1.11 |
| DI-FNCL-80331A/T |
| 002 |
| RESERVED |
| RESERVED |
| RESERVED |
| 003 |
| Task Order Management Plan |
| 2.1.11 |
| DI-MGMT-81117/T |
| 004 |
| Monthly Status Report |
| 2.1.11, 3.1.2 |
| DI-MISC-80508B |
| 005 |
| RESERVED |
| RESERVED |
| RESERVED |
| 006 |
| Final Report |
| 2.1.11 |
| DI-MISC-80508B |
| 007 |
| Technical Report |
| 2.1.11 |
| DI-MISC-80508B |
| 008 |
| Standard Operating Procedures (SOP) |
| 2.1.13, 2.1.16.b, 2.1.16.e |
| DI-MISC-80508B |
| 009 |
| Technical Sustainment Plan |
| 2.1.16.d |
| DI-MISC-80508B |
| 010 |
| Technical Upgrade/Enhancement Plan |
| 2.1.16.f |
| DI-MISC-80508B |
| 011 |
| Material Purchase/Maintenance Plan |
| 2.1.16.f |
| DI-MISC-80508B |
| 012 |
| RESERVED |
| RESERVED |
| RESERVED |
| 013 |
| Library Operations Data Package |
| 4.1 |
| DI-MISC-80508B |
| 014 |
| Truth Analysis Data Package |
| 4.4 |
| DI-MISC-80508B |
| 015 |
| Software Development Data Package |
| 4.5 |
| DI-IPSC-XXXXX |
| 016 |
| Information Technology Data Package |
| 4.6 |
| DI-MISC-80508B |
| 017 |
| Mission Support Data Package |
| 5.1 |
| DI-MISC-80508B |
| 018 |
| RESERVED |
| RESERVED |
| RESERVED |
| 019 |
| Relocation of Operations Plan |
| 7.1 |
| DI-MISC-80508B |
| 020 |
| Transition Plan |
| 7.2 |
| DI-MISC-80508B |
| No. |
| Non-CDRL Plans |
| Requiring Document |
| Data Item Description |
| 021 |
| Government Furnished Property Management Plan |
| Contract |
| DI-ADMIN-80925 |
| 021 |
| List of Compliance and Referenced Documents |
| Contract |
| DI-ADMIN-80925 |
| 021 |
| Subcontract Plan |
| Contract |
| DI-ADMIN-80925 |
| 021 |
| Subcontract Reports SF 294/295 |
| Contract |
| DI-ADMIN-80925 |
| 021 |
| Physical Security Plan |
| DD254 |
| DI-ADMIN-80925 |
| 021 |
| Physical Security Implementation Plan (PSIP) |
| DD254 |
| DI-ADMIN-80925 |
| 021 |
| OPSEC Plan |
| DD254 |
| DI-ADMIN-80925 |
| 021 |
| Information System Certification and Accreditation Plan |
| DD254 |
| DI-ADMIN-80925 |
| 021 |
| Program Protection Plan (PPP) |
| DD254 |
| DI-ADMIN-80925 |
| 021 |
| Security Standard Operation Procedures |
| DD254 |
| DI-ADMIN-80925 |
CONTRACT DATA REQUIREMENTS LIST
Form Approved
(1 Data Item)
OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the government Issuing Contracting Officer for the Contract/PR No. in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
TDP
TM
OTHER
X
| D. SYSTEM|ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
17. PRICE GROUP
| 001 |
| FUNDS AND MANHOUR EXPENDITURE REPORT (FMER) |
| 4. AUTHORITY (DATA ACQUISITION DOCUMENT NO.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
18. ESTIMATED TOTAL PRICE
| DI-FNCL-80331A/T |
| SOW PARAGRAPH(S) 2.1.11 |
| MDA/DTD |
| 7. DD 250 REQ |
| 9. DIST STATEMENT REQUIRED |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. DISTRIBUTION SEE BLOCK 16 |
| LT |
| F |
| MONTHLY |
| SEE BLOCK 16 |
b. COPIES
8. APP CODE
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENT SUBMISSION |
| a. ADDRESSEE |
| DRAFT |
| FINAL |
N/A
| SEE BLOCK 16 |
| SEE BLOCK 16 |
| Reg |
| Repro |
| 16. REMARKS |
| ACO |
BLOCK 4: Contractor devised and Government approved format. A columned report reflecting contractor forecast of manhours and expenditures, by month, on a cumulative basis, throughout the period of performance is required. In addition to a report at the task order (T/O) level, a separate formatted report and corresponding columned forecast will be submitted for each accounting classification reference number (ACRN). The T/O will require a spread sheet similar to Enclosure 1 to the data item description (DID) DI-FNCL-80331A that correlates ACRNs to T/O. Additionally, at the bottom of each FMER report, the contractor shall indicate (under columns a, b, and d), the average manpower strength (AMS) and average unloaded salary (AUS) appropriate to the definition of the column.
BLOCK 9: Distribution Statement F. Further distribution only as directed by MDA/DTD (MDDC Program) or higher DoD authority.
BLOCK 11: Last day of contractor’s monthly accounting period.
BLOCK 12: First report due 15 calendar days after first full accounting period.
BLOCK 13: Subsequent submittals are due on the 15th of the month following contractor's accounting month with the exception of the December submittal, which will be submitted on 31 January. Submission must include all required information.
BLOCK 14: Electronic submission required. Hard copies will be made available upon request. CDRLs due on weekends and holidays shall be due the morning of the next business day.
MDA/DTD
MDA/DACT
15. Total
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
| DD FORM 1423-1, JUN 90 |
| Previous editions are obsolete |
| Page |
| 1 |
| of |
| 1 |
| Pages |
CONTRACT DATA REQUIREMENTS LIST
Form Approved
OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the government Issuing Contracting Officer for the Contract/PR No. in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
TDP
TM
OTHER
X
| D. SYSTEM|ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
17. PRICE GROUP
| 003 |
| TECHNICAL AND MANAGEMENT WORK PLAN |
| TASK ORDER MANAGEMENT PLAN (T/OMP) |
| 4. AUTHORITY (DATA ACQUISITION DOCUMENT NO.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
18. ESTIMATED TOTAL PRICE
| DI-MGMT-81117/T |
| SOW PARAGRAPH(S) 2.1.11 |
| MDA/DTD |
| 7. DD 250 REQ |
| 9. DIST STATEMENT REQUIRED |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. DISTRIBUTION SEE BLOCK 16 |
| LT |
| F |
| ASREQ |
| SEE BLOCK 16 |
b. COPIES
8. APP CODE
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENT SUBMISSION |
| a. ADDRESSEE |
| DRAFT |
| FINAL |
N/A
| N/A |
| SEE BLOCK 16 |
| Reg |
| Repro |
| 16. REMARKS |
| ACO |
BLOCK 4: Contractor devised and Government approved format. Electronic submission shall be made using Microsoft Office Products.
DID Specific Tailoring
10.2.1 Add to the end of the paragraph “The plan shall also identify the contractor’s risk management plan and plans to gain efficiencies and improve effectiveness across the contract, improve performance, reduce on-site footprint, consolidate MDDC Program assets where applicable, develop and implement MDDC Program leave behind, reconfigurable asset capability, and develop and provide MDDC Program operator asset training. In addition, the plan shall describe the contractor’s management control system and how it will be implemented for effective planning and control of resources to execute the program requirements and accomplish multiple and complex tasks and/or task orders simultaneously. The plan shall describe the contractor’s processes to ensure effective procurement management, property accountability, and quality management. ”
10.2.2 Add to the end of the paragraph “The plan shall also identify the contractor’s ability to manage workflow, ensure performance and mitigate risks normally associated with the contractor’s teaming arrangement.”
10.2.6 Delete
BLOCK 8: The Government has 10 calendar days to review and provide comments on the plan. The Contractor has 10 calendar days, after receipt of Government comments, to prepare and deliver the final product.
BLOCK 9: Distribution Statement F. Further distribution only as directed by MDA/DTD (MDDC Program) or higher DoD authority.
BLOCK 12: First Plan due 10 days after each Task Order BLOCK 13: Subsequent Plans due 10 days after each Task Order BLOCK 14: Electronic submission required. Hard copies will be made available upon request. CDRLs due on weekends and holidays shall be due the morning of the next business day.
MDA/DTD
MDA/DACT
15. Total
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
| DD FORM 1423-1, JUN 90 |
| Previous editions are obsolete |
| Page |
| 1 |
| of |
| 1 |
| Pages |
CONTRACT DATA REQUIREMENTS LIST
Form Approved
OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the government Issuing Contracting Officer for the Contract/PR No. in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
TDP
TM
OTHER
X
| D. SYSTEM|ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
17. PRICE GROUP
| 004 |
| TECHNICAL REPORT – STUDY/SERVICES |
| MONTHLY STATUS REPORT |
| 4. AUTHORITY (DATA ACQUISITION DOCUMENT NO.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
18. ESTIMATED TOTAL PRICE
| DI-MGMT-80508B |
| SOW PARAGRAPH(S) 2.1.11, 3.1.2 |
| MDA/DTD |
| 7. DD 250 REQ |
| 9. DIST STATEMENT REQUIRED |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. DISTRIBUTION SEE BLOCK 16 |
| LT |
| F |
| MONTHLY |
| SEE BLOCK 16 |
b. COPIES
8. APP CODE
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENT SUBMISSION |
| a. ADDRESSEE |
| DRAFT |
| FINAL |
N/A
| N/A |
| SEE BLOCK 16 |
| Reg |
| Repro |
| 16. REMARKS |
| ACO |
BLOCK 4: Contractor devised and Government approved format. Electronic submission shall be made using Microsoft Office Products.
BLOCK 9: Distribution Statement F. Further distribution only as directed by MDA/DTD (MDDC Program) or higher DoD authority.
BLOCK 12: Initial report is to cover period to end of first full month following award.
BLOCK 13: Subsequent reports due 15 days after completion of each month’s effort.
BLOCK 14: Electronic submission required. Hard copies will be made available upon request. CDRLs due on weekends and holidays shall be due the morning of the next business day.
MDA/DTD
MDA/DACT
15. Total
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
| DD FORM 1423-1, JUN 90 |
| Previous editions are obsolete |
| Page |
| 1 |
| of |
| 1 |
| Pages |
CONTRACT DATA REQUIREMENTS LIST
Form Approved
OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the government Issuing Contracting Officer for the Contract/PR No. in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
TDP
TM
OTHER
X
| D. SYSTEM|ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
17. PRICE GROUP
| 006 |
| TECHNICAL REPORT – STUDY/SERVICES |
| FINAL REPORT |
| 4. AUTHORITY (DATA ACQUISITION DOCUMENT NO.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
18. ESTIMATED TOTAL PRICE
| DI-MGMT-80508B |
| SOW PARAGRAPH(S) 2.1.11 |
| MDA/DTD |
| 7. DD 250 REQ |
| 9. DIST STATEMENT REQUIRED |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. DISTRIBUTION SEE BLOCK 16 |
| LT |
| F |
| 1TIME |
| SEE BLOCK 16 |
b. COPIES
8. APP CODE
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENT SUBMISSION |
| a. ADDRESSEE |
| DRAFT |
| FINAL |
A
| N/A |
| N/A |
| Reg |
| Repro |
| 16. REMARKS |
| ACO |
BLOCK 4: Contractor format acceptable. Electronic submission shall be made using Microsoft Office Products. The Report shall contain, as a minimum, a complete description of the support performed under the contract period of performance. Report shall provide a summary of the program effort and all major SOW areas: 1) Program Description ; 2) Management Support; 3) Mission Assurance; 4) Operations and Sustainment; 5) Mission Support; 6) Data Collected; 7) Data Distribution/Archival Location ; 8) Data Release Authority; 9) Status of any upgrades/development activities, and 10) Status and/or disposition of all GFE or hardware. The Government’s tasking document will specify the relevant information.
BLOCK 8: The Government has 30 calendar days to review the first draft. The contractor has 30 calendar days, after receipt of Government comments, to prepare and deliver the final product.
BLOCK 9: Distribution Statement F. Further distribution only as directed by MDA/DTD (MDDC Program) or higher DoD authority.
BLOCK 12: Submit report 60 days before end of contract.
BLOCK 14: Electronic submission required. Hard copies will be made available upon request. CDRLs due on weekends and holidays shall be due the morning of the next business day.
MDA/DTD
MDA/DACT
15. Total
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
| DD FORM 1423-1, JUN 90 |
| Previous editions are obsolete |
| Page |
| 1 |
| of |
| 1 |
| Pages |
CONTRACT DATA REQUIREMENTS LIST
Form Approved
OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the government Issuing Contracting Officer for the Contract/PR No. in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
TDP
TM
OTHER
X
| D. SYSTEM|ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
17. PRICE GROUP
| 007 |
| TECHNICAL REPORT – STUDY/SERVICES |
| TECHNICAL REPORT |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
18. ESTIMATED TOTAL PRICE
| DI-MGMT-80508B |
| SOW PARAGRAPH(S) 2.1.11 |
| MDA/DTD |
| 7. DD 250 REQ |
| 9. DIST STATEMENT REQUIRED |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. DISTRIBUTION SEE BLOCK 16 |
| LT |
| F |
| SEE BLOCK 16 |
| SEE BLOCK 16 |
b. COPIES
8. APP CODE
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENT SUBMISSION |
| a. ADDRESSEE |
| DRAFT |
| FINAL |
SEE BLOCK 16
| SEE BLOCK 16 |
| SEE BLOCK 16 |
| Reg |
| Repro |
| 16. REMARKS |
| ACO |
BLOCK 4: Contractor devised and Government approved format. Electronic submission shall be made using Microsoft Office Products. The Government’s tasking document will specify the relevant information.
BLOCKS 8/10/11/12/13: The Government’s tasking document will specify the relevant information.
BLOCK 9: Distribution Statement F. Further distribution only as directed by MDA/DTD (MDDC Program) or higher DoD authority.
BLOCK 14: Electronic submission required. Hard copies will be made available upon request. CDRLs due on weekends and holidays shall be due the morning of the next business day.
MDA/DTD
MDA/DACT
15. Total
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
| DD FORM 1423-1, JUN 90 |
| Previous editions are obsolete |
| Page |
| 1 |
| of |
| 1 |
| Pages |
CONTRACT DATA REQUIREMENTS LIST
Form Approved
OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the government Issuing Contracting Officer for the Contract/PR No. in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
TDP
TM
OTHER
X
| D. SYSTEM|ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
17. PRICE GROUP
| 008 |
| TECHNICAL REPORT – STUDY/SERVICES |
| STANDARD OPERATING PROCEDURES |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
18. ESTIMATED TOTAL PRICE
| DI-MGMT-80508B |
| SOW PARAGRAPH(S) 2.1.13, 2.1.16.c, 2.1.16.e |
| MDA/DTD |
| 7. DD 250 REQ |
| 9. DIST STATEMENT REQUIRED |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. DISTRIBUTION SEE BLOCK 16 |
| LT |
| F |
| ASREQ |
| SEE BLOCK 16 |
b. COPIES
8. APP CODE
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENT SUBMISSION |
| a. ADDRESSEE |
| DRAFT |
| FINAL |
A
| N/A |
| SEE BLOCK 16 |
| Reg |
| Repro |
| 16. REMARKS |
| ACO |
BLOCK 4: Contractor devised and Government approved format. Electronic submission shall be made using Microsoft Office Products. The Government’s tasking document will specify the relevant information.
BLOCK 8: The Government has 15 calendar days to review and provide comments on the plan. The Contractor has 15 calendar days, after receipt of Government comments, to prepare and deliver the final product.
BLOCK 9: Distribution Statement F. Further distribution only as directed by MDA/DTD (MDDC Program) or higher DoD authority.
BLOCKS 12/13: The Government’s tasking document will specify the relevant information.
BLOCK 14: Electronic submission required. Hard copies will be made available upon request. CDRLs due on weekends and holidays shall be due the morning of the next business day.
MDA/DTD
MDA/DACT
15. Total
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
| DD FORM 1423-1, JUN 90 |
| Previous editions are obsolete |
| Page |
| 1 |
| of |
| 1 |
| Pages |
CONTRACT DATA REQUIREMENTS LIST
Form Approved
OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the government Issuing Contracting Officer for the Contract/PR No. in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
TDP
TM
OTHER
X
| D. SYSTEM|ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
17. PRICE GROUP
| TECHNICAL REPORT – STUDY/SERVICES |
| TECHNICAL SUSTAINMENT PLAN |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
18. ESTIMATED TOTAL PRICE
| DI-MGMT-80508B |
| SOW PARAGRAPH(S) 2.1.16.d |
| MDA/DTD |
| 7. DD 250 REQ |
| 9. DIST STATEMENT REQUIRED |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. DISTRIBUTION SEE BLOCK 16 |
| LT |
| F |
| ASREQ |
| SEE BLOCK 16 |
b. COPIES
8. APP CODE
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENT SUBMISSION |
| a. ADDRESSEE |
| DRAFT |
| FINAL |
A
| N/A |
| SEE BLOCK 16 |
| Reg |
| Repro |
| 16. REMARKS |
| ACO |
BLOCK 4: Contractor devised and Government approved format. Electronic submission shall be made using Microsoft Office Products. The plan shall describe the technical sustainment plans for planned and ongoing Operation and Sustainment activities for the contract. The Government’s tasking document will specify the relevant information.
BLOCK 8: The Government has 15 calendar days to review and provide comments on the plan. The Contractor has 15 calendar days, after receipt of Government comments, to prepare and deliver the final product. Subsequent drafts are due as required.
BLOCK 9: Distribution Statement F. Further distribution only as directed by MDA/DTD (MDDC Program) or higher DoD authority.
BLOCKS 12/13: The Government’s tasking document will specify the relevant information.
BLOCK 14: Electronic submission required. Hard copies will be made available upon request. CDRLs due on weekends and holidays shall be due the morning of the next business day.
MDA/DTD
MDA/DACT
15. Total
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
| DD FORM 1423-1, JUN 90 |
| Previous editions are obsolete |
| Page |
| 1 |
| of |
| 1 |
| Pages |
CONTRACT DATA REQUIREMENTS LIST
Form Approved
OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the government Issuing Contracting Officer for the Contract/PR No. in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
TDP
TM
OTHER
X
| D. SYSTEM|ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
17. PRICE GROUP
| TECHNICAL REPORT – STUDY/SERVICES |
| TECHNICAL UPGRADE / ENHANCEMENT PLAN |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
18. ESTIMATED TOTAL PRICE
| DI-MGMT-80508B |
| SOW PARAGRAPH(S) 2.1.16.f |
| MDA/DTD |
| 7. DD 250 REQ |
| 9. DIST STATEMENT REQUIRED |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. DISTRIBUTION SEE BLOCK 16 |
| LT |
| F |
| ASREQ |
| SEE BLOCK 16 |
b. COPIES
8. APP CODE
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENT SUBMISSION |
| a. ADDRESSEE |
| DRAFT |
| FINAL |
A
| N/A |
| SEE BLOCK 16 |
| Reg |
| Repro |
| 16. REMARKS |
| ACO |
BLOCK 4: Contractor devised and Government approved format. Electronic submission shall be made using Microsoft Office Products. The plan shall describe the short- and long-term financial and technical upgrade/enhancement plans to encompass procurement methodologies. The Government’s tasking document will specify the relevant information.
BLOCK 8: The Government has 15 calendar days to review and provide comments on the plan. The Contractor has 15 calendar days, after receipt of Government comments, to prepare and deliver the final product. Subsequent drafts are due as required.
BLOCK 9: Distribution Statement F. Further distribution only as directed by MDA/DTD (MDDC Program) or higher DoD authority.
BLOCKS 12/13: The Government’s tasking document will specify the relevant information.
BLOCK 14: Electronic submission required. Hard copies will be made available upon request. CDRLs due on weekends and holidays shall be due the morning of the next business day.
MDA/DTD
MDA/DACT
15. Total
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
| DD FORM 1423-1, JUN 90 |
| Previous editions are obsolete |
| Page |
| 1 |
| of |
| 1 |
| Pages |
CONTRACT DATA REQUIREMENTS LIST
Form Approved
OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the government Issuing Contracting Officer for the Contract/PR No. in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
TDP
TM
OTHER
X
| D. SYSTEM|ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
17. PRICE GROUP
| TECHNICAL REPORT – STUDY/SERVICES |
| MATERIAL PURCHASE / MAINTENANCE PLAN |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
18. ESTIMATED TOTAL PRICE
| DI-MGMT-80508B |
| SOW PARAGRAPH(S) 2.1.16.f |
| MDA/DTD |
| 7. DD 250 REQ |
| 9. DIST STATEMENT REQUIRED |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. DISTRIBUTION SEE BLOCK 16 |
| LT |
| F |
| ASREQ |
| SEE BLOCK 16 |
b. COPIES
8. APP CODE
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENT SUBMISSION |
| a. ADDRESSEE |
| DRAFT |
| FINAL |
A
| N/A |
| SEE BLOCK 16 |
| Reg |
| Repro |
| 16. REMARKS |
| ACO |
BLOCK 4: Contractor devised and Government approved format. Electronic submission shall be made using Microsoft Office Products. The plan shall describe the material purchase/maintenance plans to maximize Government IT Infrastructure expenditures. The Government’s tasking document will specify the relevant information.
BLOCK 8: The Government has 15 calendar days to review and provide comments on the plan. The Contractor has 15 calendar days, after receipt of Government comments, to prepare and deliver the final product.
BLOCK 9: Distribution Statement F. Further distribution only as directed by MDA/DTD (MDDC Program) or higher DoD authority.
BLOCKS 12/13: The Government’s tasking document will specify the relevant information.
BLOCK 14: Electronic submission required. Hard copies will be made available upon request. CDRLs due on weekends and holidays shall be due the morning of the next business day.
MDA/DTD
MDA/DACT
15. Total
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
| DD FORM 1423-1, JUN 90 |
| Previous editions are obsolete |
| Page |
| 1 |
| of |
| 1 |
| Pages |
CONTRACT DATA REQUIREMENTS LIST
Form Approved
OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the government Issuing Contracting Officer for the Contract/PR No. in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
TDP
TM
OTHER
X
| D. SYSTEM|ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
17. PRICE GROUP
| TECHNICAL REPORT – STUDY/SERVICES |
| LIBRARY OPERATIONS DATA PACKAGE |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
18. ESTIMATED TOTAL PRICE
| DI-MGMT-80508B |
| SOW PARAGRAPH(S) 4.1 |
| MDA/DTD |
| 7. DD 250 REQ |
| 9. DIST STATEMENT REQUIRED |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. DISTRIBUTION SEE BLOCK 16 |
| LT |
| F |
| AS REQ |
| AS REQ |
b. COPIES
8. APP CODE
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENT SUBMISSION |
| a. ADDRESSEE |
| DRAFT |
| FINAL |
SEE BLOCK 16
| N/A |
| SEE BLOCK 16 |
| Reg |
| Repro |
| 16. REMARKS |
| ACO |
BLOCK 4: Contractor devised and Government approved format. Electronic submission shall be made using Microsoft Office Products. This CDRL consolidates the requirements for the Library Operations data. The Government’s tasking document will specify the relevant information. The following data shall be submitted:
DATA DISTRIBUTION HEALTH AND STATUS REPORTS – These reports define current status of data items flowing through the Data Management System and are generated from the Reporting Services database screens.
LIBRARY OPERATIONS METRICS – These reports define overarching statistics for Library Operations and are generated from the backend Microsoft SQL Server database. These metrics can be delivered as required and as part of the MDDC Program Monthly Reports.
BLOCKS 8/10/12/13: The Government’s tasking document will specify the relevant information. All data shall be submitted to the Government for approval and/or acceptance.
BLOCK 9: Distribution Statement F. Further distribution only as directed by MDA/DTD (MDDC Program) or higher DoD authority.
BLOCK 14: Electronic submission required. Hard copies will be made available upon request. CDRLs due on weekends and holidays shall be due the morning of the next business day.
MDA/DTD
MDA/DACT
15. Total
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
| DD FORM 1423-1, JUN 90 |
| Previous editions are obsolete |
| Page |
| 1 |
| of |
| 1 |
| Pages |
CONTRACT DATA REQUIREMENTS LIST
Form Approved
OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the government Issuing Contracting Officer for the Contract/PR No. in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
TDP
TM
OTHER
X
| D. SYSTEM|ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
17. PRICE GROUP
| TECHNICAL REPORT – STUDY/SERVICES |
| TRUTH ANALYSIS DATA PACKAGE |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
18. ESTIMATED TOTAL PRICE
| DI-MGMT-80508B |
| SOW PARAGRAPH(S) 4.4 |
| MDA/DTD |
| 7. DD 250 REQ |
| 9. DIST STATEMENT REQUIRED |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. DISTRIBUTION SEE BLOCK 16 |
| LT |
| F |
| SEE BLOCK 16 |
| SEE BLOCK 16 |
b. COPIES
8. APP CODE
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENT SUBMISSION |
| a. ADDRESSEE |
| DRAFT |
| FINAL |
SEE BLOCK 16
| N/A |
| SEE BLOCK 16 |
| Reg |
| Repro |
| 16. REMARKS |
| ACO |
BLOCK 4: Contractor devised and Government approved format. Electronic submission shall be made using Microsoft Office Products. This CDRL consolidates the requirements for the Truth Analysis data. The Government’s tasking document will specify the relevant information. The following data shall be submitted as a minimum:
TRUTH DATA PACKAGE (TDP) – Mission Analysis Report, Microsoft Office.
TRUTH DATA REQUIREMENTS DOCUMENT (TDRD) - Event Truth Data Requirements with regard to data formats, timelines, coverages, and accuracy.
TRUTH MISSION SUPPORT PLAN – Truth Deployment Plan for Event.
BEST ESTIMATED TRAJECTORIES (BETs) - Text Files in Earth Centered Inertial (ECI), Earth-Centered Earth-Fixed (ECEF), Altitude Latitude Longitude (ALL),3-DoF and 6-DoFs TRUTH SUMMIT COMPILATIONS - Briefing Compilation Presented at Truth Summit.
EXECUTIVE LEVEL BRIEFING INPUTS
TRUTH DEBRIS MODELS - Text data set, 18 columnar format.
TRUTH SEQUEL SERVER TRAJECTORY DATABASES - Nominal and Test data to be accessed by analysts, built in SQL.
SATELLITE-DERIVED EARTH RADIANCE MAP - Text file of Earth during flight test launch used for OSC simulations.
GROUND TEST TRUTH OBSERVATION WORKBOOKS - Excel workbooks that compile observed issues in ground testing Test Cases.
MDA/DTD
MDA/DACT
15. Total
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
| DD FORM 1423-1, JUN 90 |
| Previous editions are obsolete |
| Page |
| 1 |
| of |
| 2 |
| Pages |
CONTRACT DATA REQUIREMENTS LIST
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
TDP
TM
OTHER
X
| D. SYSTEM ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
16. REMARKS (continued) CDRL A014 Truth Analysis Data Package (continued)
BLOCKS 10/12/13: The Government’s tasking document will specify the relevant information. All data shall be submitted to the Government for approval and/or acceptance.
TRUTH DATA PACKAGE (TDP) – Reporting Intervals – 60 and 30 Days Pre-mission. 3-10, 30, 60, and 90 Days Post-mission.
TRUTH DATA REQUIREMENTS DOCUMENT (TDRD) – Initial Due at 120 Days Pre-mission; Final Due at 90 Days Pre-mission.
TRUTH MISSION SUPPORT PLAN – 30 Days Pre-mission
BEST ESTIMATED TRAJECTORIES (BETs) - Due 6 Hrs, 3 Days, 10, Days, 30 Days, and 60 Days Post-mission.
TRUTH SUMMIT COMPILATIONS - Due at 35 Days Post-mission.
EXECUTIVE LEVEL BRIEFING INPUTS - Due 3 Days Post-mission
TRUTH DEBRIS MODELS - Due 45 Days Post-mission
TRUTH SEQUEL SERVER TRAJECTORY DATABASES - Due 60 Days Pre-mission, and Included in TDP Schedule above.
SATELLITE-DERIVED EARTH RADIANCE MAP - Due at T+5 Days.
GROUND TEST TRUTH OBSERVATION WORKBOOKS - Due 45 Days Post-mission.
BLOCK 9: Distribution Statement F. Further distribution only as directed by MDA/DTD (MDDC Program) or higher DoD authority.
BLOCK 14: Electronic submission required. Hard copies will be made available upon request. CDRLs due on weekends and holidays shall be due the morning of the next business day.
| DD FORM 1423-1, JUN 90 |
| Previous editions are obsolete |
| Page |
| 2 |
| of |
| 2 |
| Pages |
CONTRACT DATA REQUIREMENTS LIST
Form Approved
OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the government Issuing Contracting Officer for the Contract/PR No. in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
TDP
TM
OTHER
X
| D. SYSTEM|ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
17. PRICE GROUP
| SEE BLOCK 16 |
| SOFTWARE DEVELOPMENT DATA PACKAGE |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
18. ESTIMATED TOTAL PRICE
| SEE BLOCK 16 |
| SOW PARAGRAPH(S) 4.5 |
| MDA/DTD |
| 7. DD 250 REQ |
| 9. DIST STATEMENT REQUIRED |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. DISTRIBUTION SEE BLOCK 16 |
| LT |
| F |
| SEE BLOCK 16 |
| SEE BLOCK 16 |
b. COPIES
8. APP CODE
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENT SUBMISSION |
| a. ADDRESSEE |
| DRAFT |
| FINAL |
SEE BLOCK 16
| SEE BLOCK 16 |
| SEE BLOCK 16 |
| Reg |
| Repro |
| 16. REMARKS |
| ACO |
BLOCKS 2 and 4: The Government’s tasking document will identify one or more of the following DIDs for use in production of the required software documentation. The format and content of all software documentation shall be fully DID compliant, unless otherwise stated by the Government in the tasking document’s tailoring statement.
SOFTWARE DEVELOPMENT PLAN (DI-IPSC-81427A) - Initial delivery due 6 MOS after contract award. Contractor updates periodically as software requirements change. Delivered yearly after initial delivery.
SYSTEM/SEGMENT DESIGN DOCUMENT (DI-IPSC-81432A) - Initial delivery due 6 MOS after contract award. Contractor updates periodically as software requirements change. Delivered yearly after initial delivery.
SOFTWARE REQUIREMENTS SPECIFICATION (DI-IPSC-81433A) - Delivery as required.
SOFTWARE DESIGN DOCUMENT (DI-IPSC-81435A) - Delivery as required.
INTERFACE REQUIREMENTS SPECIFICATION (DI-IPSC-81434A)– Can be included in the Software Requirements Specification document. Delivery as required.
INTERFACE DESIGN DOCUMENT (DI-IPSC-81436A) - Delivery as required.
DATABASE DESIGN DESCRIPTION (DI-IPSC-81437A) - Delivery as required.
SOFTWARE TEST PLAN ( DI-IPSC-81438A) - Delivery as required.
SOFTWARE TEST DESCRIPTION (DI-IPSC-81439A)– Referred to internally as the SOFTWARE ACCEPTANCE TEST PLAN. - Delivery as required.
SOFTWARE TEST REPORT (DI-IPSC-81440A) – Included in the SOFTWARE ACCEPTANCE TEST PLAN. - Delivery as required.
SOFTWARE PRODUCT SPECIFICATION (DI-IPSC-81441A) - This consists of all software source code, databases and accompanying Database Modeling Language to create said databases (as applicable), et. al. (reference tasking documents) to be delivered wholly to the government at contract end, and as delivered/deployed packages (ASTER, DMS, etc.) upon request by the government. This package will also be part of the contractor’s Transition Plan. Can also be referred to as the SOFTWARE CODE PACKAGE. - Delivery as required.
MDA/DTD
MDA/DACT
15. Total
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
| DD FORM 1423-1, JUN 90 |
| Previous editions are obsolete |
| Page |
| 1 |
| of |
| 2 |
| Pages |
CONTRACT DATA REQUIREMENTS LIST
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
TDP
TM
OTHER
X
| D. SYSTEM ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
16. REMARKS (continued) CDRL A015 Software Development Data Package (continued)
BLOCKS 2 and 4 (continued)
VERSION DESCRIPTION DOCUMENT (DI-IPSC-81442A) – Can be inclusive in the SOFTWARE PRODUCT SPECIFICATION. Delivery as required.
SOFTWARE USER’S MANUAL (DI-IPSC-81443A
) – Also referred to as a USER’S GUIDE. Delivery as required.
SOFTWARE PROGRAMMER’S MANUAL (DI-IPSC-81447A) – Also referred to as CODING STANDARDS documentation. Delivery as required.
BLOCKS 8/10/11/12/13: The tasking document’s tailoring statement will specify the relevant information. All software documentation shall be submitted to the Government for approval and/or acceptance.
BLOCK 9: Distribution Statement F. Further distribution only as directed by MDA/DTD (MDDC Program) or higher DoD authority.
BLOCK 14: Electronic submission required. Hard copies will be made available upon request. CDRLs due on weekends and holidays shall be due the morning of the next business day.
| DD FORM 1423-1, JUN 90 |
| Previous editions are obsolete |
| Page |
| 2 |
| of |
| 2 |
| Pages |
CONTRACT DATA REQUIREMENTS LIST
Form Approved
OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the government Issuing Contracting Officer for the Contract/PR No. in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
TDP
TM
OTHER
X
| D. SYSTEM|ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
17. PRICE GROUP
| TECHNICAL REPORT – STUDY/SERVICES |
| INFORMATION TECHNOLOGY DATA PACKAGE |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
18. ESTIMATED TOTAL PRICE
| DI-MGMT-80508B |
| SOW PARAGRAPH(S) 4.6 |
| MDA/DTD |
| 7. DD 250 REQ |
| 9. DIST STATEMENT REQUIRED |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. DISTRIBUTION SEE BLOCK 16 |
| LT |
| F |
| SEE BLOCK 16 |
| SEE BLOCK 16 |
b. COPIES
8. APP CODE
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENT SUBMISSION |
| a. ADDRESSEE |
| DRAFT |
| FINAL |
SEE BLOCK 16
| N/A |
| SEE BLOCK 16 |
| Reg |
| Repro |
| 16. REMARKS |
| ACO |
BLOCK 4: Contractor devised and Government approved format. Electronic submission shall be made using Microsoft Office Products. This CDRL consolidates the requirements for the Information Technology (IT) data. The Government’s tasking document will specify the relevant information. The following data shall be submitted as a minimum:
INFORMATION TECHNOLOGY HARDWARE AND SOFTWARE - documents all hardware and software associated to the systems, servers, and networks and associated equipment for the MDDC Program to perform MDDC Program operations at multiple locations. Maintained as required; delivered as required.
INFORMATION TECHNOLOGY (IT) SYSTEMS AND NETWORKS ACCREDITATION PLAN - documents DoD/MDA accreditation package for continuing operations for all systems and networks maintained by the MDDC Program IAW the DITSCAP and applicable DoD and MDA IA and systems administration/network administration requirements. Maintained as required; delivered as required.
INFORMATION TECHNOLOGY NETWORK PLAN - documents network architecture and communication interfaces between internal MDDC Program network infrastructure and other network infrastructures in support of the MDDC Program operations and mission requirements. Maintained as required; delivered as required.
INFORMATION TECHNOLOGY PERSONNEL CERTIFICATION PLAN - documents all certifications necessary for IA and administrative personnel to meet DoD, MDA IA, and MDDC Program requirements for security, systems and network administration, and operating systems certification IAW DoD Instruction 8570.01M. Maintained as required; delivered as required.
INFORMATION TECHNOLOGY SYSTEM AND NETWORK DOCUMENTATION PACKAGE - documents all processes, procedures, CONOPS, and configurations for MDDC Program Information Architecture systems and networks. Maintained as required; delivered as required.
MDA/DTD
MDA/DACT
15. Total
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
| DD FORM 1423-1, JUN 90 |
| Previous editions are obsolete |
| Page |
| 1 |
| of |
| 1 |
| Pages |
CONTRACT DATA REQUIREMENTS LIST
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
TDP
TM
OTHER
X
| D. SYSTEM ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
16. REMARKS (continued) CDRL A016 Information Technology Data Package (continued)
BLOCK 4 (continued)
INFORMATION TECHNOLOGY CONTINGENCY/DISASTER RECOVERY PLAN - all documentation, processes and procedures for IT Contingency/Disaster Recovery (DR) IWA MDA guidance. Successfully conduct periodic DR tests IAW the documented processes and procedures. Maintained as required; delivered as required.
INFORMATION TECHNOLOGY LABORATORY SUSTAINMENT PLAN - documents short- and long-term financial and technical sustainment plans and activities for integrated test functional analysis labs and other operations support labs as directed by the Government to support planning, engineering, and operations activities. Maintained as required; delivered as required.
BLOCKS 8/10/12/13: The Government’s tasking document will specify the relevant information. All data shall be submitted to the Government for approval and/or acceptance.
BLOCK 9: Distribution Statement F. Further distribution only as directed by MDA/DTD (MDDC Program) or higher DoD authority.
BLOCK 14: Electronic submission required. Hard copies will be made available upon request. CDRLs due on weekends and holidays shall be due the morning of the next business day.
| DD FORM 1423-1, JUN 90 |
| Previous editions are obsolete |
| Page |
| 2 |
| of |
| 2 |
| Pages |
CONTRACT DATA REQUIREMENTS LIST
Form Approved
OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the government Issuing Contracting Officer for the Contract/PR No. in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
TDP
TM
OTHER
X
| D. SYSTEM|ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
17. PRICE GROUP
| TECHNICAL REPORT – STUDY/SERVICES |
| MISSION SUPPORT DATA PACKAGE |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
18. ESTIMATED TOTAL PRICE
| DI-MGMT-80508B |
| SOW PARAGRAPH(S) 5.1 |
| MDA/DTD |
| 7. DD 250 REQ |
| 9. DIST STATEMENT REQUIRED |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. DISTRIBUTION SEE BLOCK 16 |
| LT |
| F |
| SEE BLOCK 16 |
| SEE BLOCK 16 |
b. COPIES
8. APP CODE
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENT SUBMISSION |
| a. ADDRESSEE |
| DRAFT |
| FINAL |
SEE BLOCK 16
| N/A |
| SEE BLOCK 16 |
| Reg |
| Repro |
| 16. REMARKS |
| ACO |
BLOCK 4: Contractor devised and Government approved format. Electronic submission shall be made using Microsoft Office Products. This CDRL consolidates the requirements for the Mission Support data. The Government’s tasking document will specify the relevant information. The following data shall be submitted as a minimum:
INPUTS TO EXECUTIVE LEVEL BRIEFING: Input to Executive Level Briefings are usually taken from the associated working-level Phase Review briefings (e.g., TRR, MRR, etc.).
MISSION SUPPORT PLANS AND ROM ESTIMATES: Prior to the mission, each asset provides a cost ROM that is used for planning. MSPs are generated for the mobile assets (HALO I, II and Cast Glance) to define their detailed operating plan to include their deployment plans, Test Support Position and sensor settings.
INPUT TO TEST RESOURCES READINESS REVIEW (TRRR): The TRRR addresses the readiness of test resource assets to proceed with testing. Usually held prior to deploying personnel to support the flight test.
INPUT TO MISSION ANALYSIS REVIEW (MAR): A system-level review focusing on analysis performed related to the System Under Test (SUT).
INPUT TO MISSION READINESS REVIEW (MRR): A system-level review focusing on the readiness to proceed to the next phase with testing.
LINK MARGIN ANALYSIS REPORTS: Analysis done for fixed and mobile telemetry (TM) assets to define the expected times when the test assets will be able to close the telemetry link with flight test missiles. As a result of this analysis, the Test Support Positions (TSPs) are defined for mobile TM assets.
MISSION CONFIGURATION/CERTIFICATION PACKAGE: Mission Configuration/Certification Packages define the mission configuration and software baseline for supporting assets. This data is provided to MDA-QS.
MDA/DTD
MDA/DACT
15. Total
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
| DD FORM 1423-1, JUN 90 |
| Previous editions are obsolete |
| Page |
| 1 |
| of |
| 1 |
| Pages |
CONTRACT DATA REQUIREMENTS LIST
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
TDP
TM
OTHER
X
| D. SYSTEM ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
16. REMARKS (continued) CDRL A017 Mission Support Data Package (continued) BLOCK 4 (continued)
INPUT TO OPERATIONAL REQUIREMENTS (OR) DOCS: ORs define range requirements unique for each flight test (in UDS format).
INPUT TO INTEGRATED DATA MANAGEMENT PLAN (IDMP): is to document data management planning and to establish procedures for the collection, reproduction, handling, distribution, and archival of data and…