HQ0034-19-R-0019.pdf
PDF 706 KB Posted
- Solicitation number
- HQ0034-19-R-0019
- Issued by
-
DOD Washington Headquarters Service
About this file
Not Listed
View the file
Other files
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEE ADDENDUM
(No Collect Calls)
HQ003419R0019 13-Dec-2018
b. TELEPHONE NUMBER
703-545-3573
8. OFFER DUE DATE/LOCAL TIME
01:00 PM 14 Jan 2019
5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA – FAR (48 CFR) 53.212
(TYPE OR PRINT)
(SIGNATURE OF CONTRACTING OFFICER)
ADDENDA ARE
26. TOTAL AWARD AMOUNT (For Gov t. Use Only )
23.
CODE 10. THIS ACQUISITION IS
SUCH ADDRESS IN OFFER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT
BELOW IS CHECKED
TELEPHONE NO.
HQ00349. ISSUED BY
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME
VALENCIA R THORNTON
2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER
(TYPE OR PRINT)
30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA
0 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.
25. ACCOUNTING AND APPROPRIATION DATA
1. REQUISITION NUMBER
20.
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
ARE NOT ATTACHED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
. YOUR OFFER ON SOLICITATION
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
% FOR:SET ASIDE:UNRESTRICTED OR X
SMALL BUSINESS
17a.CONTRACTOR/ CODE FACILITY
OFFEROR CODE
WHS - ACQUISITION DIRECTORATE
4800 MARK CENTER DRIVE, SUITE 09F09
ALEXANDRIA VA 22350
18a. PAYMENT WILL BE MADE BY CODE
RATED ORDER UNDER
DPAS (15 CFR 700)
13a. THIS CONTRACT IS A
13b. RATING
CODE15. DELIVER TO CODE 16. ADMINISTERED BY
SEE SCHEDULE
12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
14. METHOD OF SOLICITATION
RFQ IFB RFPX
FAX:
TEL: 703-545-3064 SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
X 8(A)
HUBZONE SMALL
BUSINESS
SIZE STANDARD:
$15,000,000
NAICS:
238220
X
OFFER DATED
29. AWARD OF CONTRACT: REF.
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
EMAIL:
TEL:
31c. DATE SIGNED
SEE SCHEDULE
SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT
24.22.21.19.
WOMEN-OWNED SMALL BUSINESS (WOSB)
ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
(CONTINUED)
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
37. CHECK NUMBER
FINALPARTIALCOMPLETE
36. PAYMENT35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER
FINAL
33. SHIP NUMBER
PARTIAL
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT 41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
STANDARD FORM 1449 (REV. 2/2012) BACK
Prescribed by GSA – FAR (48 CFR) 53.212
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
SEE SCHEDULE
20.
SCHEDULE OF SUPPLIES/ SERVICES
21.
QUANTITY UNIT
22. 23.
UNIT PRICE
24.
AMOUNT
19.
ITEM NO.
Section B - Supplies or Services and Prices
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 12 Months Labor Support
FFP
Labor (Contract Management) - The contractor shall perform all services in accordance with the attached PWS.
NET AMT
PSC CD: Z242
0002 1 Lot $4,138,313.01 $4,138,313.01 Preventative Maintenance
FFP
Preventative Maintenance - The contractor shall perform all services in accordance with the attached PWS. The costs for all preventative maintenance shall be approved by the COR prior to the performance of work.
0003 1 Lot $875,000.00 $875,000.00 Service Calls
FFP
Service Calls - The contractor shall perform all services in accordance with the attached PWS. The costs for all service calls shall be approved by the COR prior to the performance of work.
0004 1 Lot $1,000,000.00 $1,000,000.00 Replacements, Modifications, & Upgrades
FFP
Replacements, Modifications, & Upgrades - The contractor shall perform all services in accordance with the attached PWS. The costs for replacements, modifications, & upgrades shall be approved by the COR prior to the performance of work.
1001 12 Months OPTION Labor Support
FFP
Labor Support - The contractor shall perform all services in accordance with the attached PWS.
1002 1 Lot $4,269,742.41 $4,269,742.41 OPTION Preventative Maintenance
FFP
Preventative Maintenance - The contractor shall perform all services in accordance
1003 1 Lot $901,250.00 $901,250.00 OPTION Service Calls
FFP
Service Calls - The contractor shall perform all services in accordance with the
1004 1 Lot $1,030,000.00 $1,030,000.00 OPTION Replacements, Modifications, & Upgrades
FFP
Replacements, Modifications, & Upgrades - The contractor shall perform all services in accordance with the attached PWS. The costs for replacements, 2001 12 Months OPTION Labor Support
FFP
2002 1 Lot $4,405,405.85 $4,405,405.85 OPTION Preventative Maintenance
FFP
Preventative Maintenance - The contractor shall perform all services in accordance
2003 1 Lot $928,287.50 $928,287.50 OPTION Service Calls
FFP
Service Calls - The contractor shall perform all services in accordance with the
2004 1 Lot $1,060,900.00 $1,060,900.00 OPTION Replacements, Modifications, & Upgrades
FFP
Replacements, Modifications, & Upgrades - The contractor shall perform all services in accordance with the attached PWS. The costs for replacements, 3001 12 Months OPTION Labor Support
FFP
3002 1 Lot $4,545,442.09
$4,545,442.09
OPTION Preventative Maintenance
FFP
Preventative Maintenance - The contractor shall perform all services in accordance
3003 1 Lot $956,136.13 $956,136.13 OPTION Service Calls
FFP
Service Calls - The contractor shall perform all services in accordance with the
3004 1 Lot $1,092,727.00 $1,092,727.00 OPTION Replacements, Modifications, & Upgrades
FFP
Replacements, Modifications, & Upgrades - The contractor shall perform all services in accordance with the attached PWS. The costs for replacements, 4001 12 Months OPTION Labor Support
FFP
4002 1 Lot $4,689,994.36 $4,689,994.36 OPTION Preventative Maintenance
FFP
Preventative Maintenance - The contractor shall perform all services in accordance
4003 1 Lot $984,820.21 $984,820.21 OPTION Service Calls
FFP
Service Calls - The contractor shall perform all services in accordance with the
4004 1 Lot $1,125,508.81 $1,125,508.81 OPTION Replacements, Modifications, & Upgrades
FFP
Replacements, Modifications, & Upgrades - The contractor shall perform all services in accordance with the attached PWS. The costs for replacements, Section C - Descriptions and Specifications
PERFORMANCE WORK STATEMENT
PERFORMANCE WORK STATEMENT
Preventative Maintenance at the Pentagon Heating & Refrigeration Plant
12 December 2018
1.0. TABLE OF CONTENTS
1.0 Acronyms
2.0 Introduction
3.0 Specifications
4.0 Scope Overview
5.0 Deliverable Table
6.0 Key Personnel
7.0 Other Personnel
8.0 Service Calls Tickets
9.0 Corrective Maintenance Tickets
10.0 Preventative and Predictive Maintenance and Inspection (PPMI) Program
11.0 Records
12.0 Boiler Plant Maintenance
13.0 Chilled Water System
14.0 Compressed Air Systems
15.0 Condenser Water System
16.0 Distributed Controls System (DCS)
17.0 Electrical Distribution System (High, Medium and Low Voltage)
18.0 Feedwater System
19.0 Fuel Oil System
20.0 Heating Ventilation and Air Conditioning (HVAC) Equipment Support and Maintenance
21.0 Sewage Lift System
22.0 Auxiliary Systems and Facilities
23.0 Miscellaneous Plant Structures & Equipment Associated with Plant Operations
24.0 Welding/Pipe Fitting Support - Outage Support
25.0 Equipment/System Warranty Management
26.0 Replacements, Modifications and Upgrades
27.0 Government Furnished
28.0 Contractor Furnished
29.0 Cost-Invoice
30.0 Environmental
31.0 Performance-Based Matrix
32.0 Administrative Requirements
33.0 References – In general, all maintenance shall be done in accordance with the original manufacturer’s
34.0 Security
file://usr.osd.mil/ORG/whs/ad/Acquisition%20Directorate/Enterprise%20Facilities%20&%20Construction%20Division%20Folder-Dec%202016/Ops+Maint/FY-19/HQ0034-19-X-XXXX%20HRP%20OM%20WIP/A03%20-%20Requirement%20Docs/2018.12.12%20-%20PWS%20Pentagon%20HRP.docx#_Toc532450254 file://usr.osd.mil/ORG/whs/ad/Acquisition%20Directorate/Enterprise%20Facilities%20&%20Construction%20Division%20Folder-Dec%202016/Ops+Maint/FY-19/HQ0034-19-X-XXXX%20HRP%20OM%20WIP/A03%20-%20Requirement%20Docs/2018.12.12%20-%20PWS%20Pentagon%20HRP.docx#_Toc532450255 file://usr.osd.mil/ORG/whs/ad/Acquisition%20Directorate/Enterprise%20Facilities%20&%20Construction%20Division%20Folder-Dec%202016/Ops+Maint/FY-19/HQ0034-19-X-XXXX%20HRP%20OM%20WIP/A03%20-%20Requirement%20Docs/2018.12.12%20-%20PWS%20Pentagon%20HRP.docx#_Toc532450256 file://usr.osd.mil/ORG/whs/ad/Acquisition%20Directorate/Enterprise%20Facilities%20&%20Construction%20Division%20Folder-Dec%202016/Ops+Maint/FY-19/HQ0034-19-X-XXXX%20HRP%20OM%20WIP/A03%20-%20Requirement%20Docs/2018.12.12%20-%20PWS%20Pentagon%20HRP.docx#_Toc532450257 file://usr.osd.mil/ORG/whs/ad/Acquisition%20Directorate/Enterprise%20Facilities%20&%20Construction%20Division%20Folder-Dec%202016/Ops+Maint/FY-19/HQ0034-19-X-XXXX%20HRP%20OM%20WIP/A03%20-%20Requirement%20Docs/2018.12.12%20-%20PWS%20Pentagon%20HRP.docx#_Toc532450258 file://usr.osd.mil/ORG/whs/ad/Acquisition%20Directorate/Enterprise%20Facilities%20&%20Construction%20Division%20Folder-Dec%202016/Ops+Maint/FY-19/HQ0034-19-X-XXXX%20HRP%20OM%20WIP/A03%20-%20Requirement%20Docs/2018.12.12%20-%20PWS%20Pentagon%20HRP.docx#_Toc532450259 file://usr.osd.mil/ORG/whs/ad/Acquisition%20Directorate/Enterprise%20Facilities%20&%20Construction%20Division%20Folder-Dec%202016/Ops+Maint/FY-19/HQ0034-19-X-XXXX%20HRP%20OM%20WIP/A03%20-%20Requirement%20Docs/2018.12.12%20-%20PWS%20Pentagon%20HRP.docx#_Toc532450260 file://usr.osd.mil/ORG/whs/ad/Acquisition%20Directorate/Enterprise%20Facilities%20&%20Construction%20Division%20Folder-Dec%202016/Ops+Maint/FY-19/HQ0034-19-X-XXXX%20HRP%20OM%20WIP/A03%20-%20Requirement%20Docs/2018.12.12%20-%20PWS%20Pentagon%20HRP.docx#_Toc532450261 file://usr.osd.mil/ORG/whs/ad/Acquisition%20Directorate/Enterprise%20Facilities%20&%20Construction%20Division%20Folder-Dec%202016/Ops+Maint/FY-19/HQ0034-19-X-XXXX%20HRP%20OM%20WIP/A03%20-%20Requirement%20Docs/2018.12.12%20-%20PWS%20Pentagon%20HRP.docx#_Toc532450262 file://usr.osd.mil/ORG/whs/ad/Acquisition%20Directorate/Enterprise%20Facilities%20&%20Construction%20Division%20Folder-Dec%202016/Ops+Maint/FY-19/HQ0034-19-X-XXXX%20HRP%20OM%20WIP/A03%20-%20Requirement%20Docs/2018.12.12%20-%20PWS%20Pentagon%20HRP.docx#_Toc532450263 file://usr.osd.mil/ORG/whs/ad/Acquisition%20Directorate/Enterprise%20Facilities%20&%20Construction%20Division%20Folder-Dec%202016/Ops+Maint/FY-19/HQ0034-19-X-XXXX%20HRP%20OM%20WIP/A03%20-%20Requirement%20Docs/2018.12.12%20-%20PWS%20Pentagon%20HRP.docx#_Toc532450265 file://usr.osd.mil/ORG/whs/ad/Acquisition%20Directorate/Enterprise%20Facilities%20&%20Construction%20Division%20Folder-Dec%202016/Ops+Maint/FY-19/HQ0034-19-X-XXXX%20HRP%20OM%20WIP/A03%20-%20Requirement%20Docs/2018.12.12%20-%20PWS%20Pentagon%20HRP.docx#_Toc532450266 file://usr.osd.mil/ORG/whs/ad/Acquisition%20Directorate/Enterprise%20Facilities%20&%20Construction%20Division%20Folder-Dec%202016/Ops+Maint/FY-19/HQ0034-19-X-XXXX%20HRP%20OM%20WIP/A03%20-%20Requirement%20Docs/2018.12.12%20-%20PWS%20Pentagon%20HRP.docx#_Toc532450267 file://usr.osd.mil/ORG/whs/ad/Acquisition%20Directorate/Enterprise%20Facilities%20&%20Construction%20Division%20Folder-Dec%202016/Ops+Maint/FY-19/HQ0034-19-X-XXXX%20HRP%20OM%20WIP/A03%20-%20Requirement%20Docs/2018.12.12%20-%20PWS%20Pentagon%20HRP.docx#_Toc532450268 file://usr.osd.mil/ORG/whs/ad/Acquisition%20Directorate/Enterprise%20Facilities%20&%20Construction%20Division%20Folder-Dec%202016/Ops+Maint/FY-19/HQ0034-19-X-XXXX%20HRP%20OM%20WIP/A03%20-%20Requirement%20Docs/2018.12.12%20-%20PWS%20Pentagon%20HRP.docx#_Toc532450269 file://usr.osd.mil/ORG/whs/ad/Acquisition%20Directorate/Enterprise%20Facilities%20&%20Construction%20Division%20Folder-Dec%202016/Ops+Maint/FY-19/HQ0034-19-X-XXXX%20HRP%20OM%20WIP/A03%20-%20Requirement%20Docs/2018.12.12%20-%20PWS%20Pentagon%20HRP.docx#_Toc532450270 file://usr.osd.mil/ORG/whs/ad/Acquisition%20Directorate/Enterprise%20Facilities%20&%20Construction%20Division%20Folder-Dec%202016/Ops+Maint/FY-19/HQ0034-19-X-XXXX%20HRP%20OM%20WIP/A03%20-%20Requirement%20Docs/2018.12.12%20-%20PWS%20Pentagon%20HRP.docx#_Toc532450271 file://usr.osd.mil/ORG/whs/ad/Acquisition%20Directorate/Enterprise%20Facilities%20&%20Construction%20Division%20Folder-Dec%202016/Ops+Maint/FY-19/HQ0034-19-X-XXXX%20HRP%20OM%20WIP/A03%20-%20Requirement%20Docs/2018.12.12%20-%20PWS%20Pentagon%20HRP.docx#_Toc532450272 file://usr.osd.mil/ORG/whs/ad/Acquisition%20Directorate/Enterprise%20Facilities%20&%20Construction%20Division%20Folder-Dec%202016/Ops+Maint/FY-19/HQ0034-19-X-XXXX%20HRP%20OM%20WIP/A03%20-%20Requirement%20Docs/2018.12.12%20-%20PWS%20Pentagon%20HRP.docx#_Toc532450273 file://usr.osd.mil/ORG/whs/ad/Acquisition%20Directorate/Enterprise%20Facilities%20&%20Construction%20Division%20Folder-Dec%202016/Ops+Maint/FY-19/HQ0034-19-X-XXXX%20HRP%20OM%20WIP/A03%20-%20Requirement%20Docs/2018.12.12%20-%20PWS%20Pentagon%20HRP.docx#_Toc532450274 file://usr.osd.mil/ORG/whs/ad/Acquisition%20Directorate/Enterprise%20Facilities%20&%20Construction%20Division%20Folder-Dec%202016/Ops+Maint/FY-19/HQ0034-19-X-XXXX%20HRP%20OM%20WIP/A03%20-%20Requirement%20Docs/2018.12.12%20-%20PWS%20Pentagon%20HRP.docx#_Toc532450274 file://usr.osd.mil/ORG/whs/ad/Acquisition%20Directorate/Enterprise%20Facilities%20&%20Construction%20Division%20Folder-Dec%202016/Ops+Maint/FY-19/HQ0034-19-X-XXXX%20HRP%20OM%20WIP/A03%20-%20Requirement%20Docs/2018.12.12%20-%20PWS%20Pentagon%20HRP.docx#_Toc532450275 file://usr.osd.mil/ORG/whs/ad/Acquisition%20Directorate/Enterprise%20Facilities%20&%20Construction%20Division%20Folder-Dec%202016/Ops+Maint/FY-19/HQ0034-19-X-XXXX%20HRP%20OM%20WIP/A03%20-%20Requirement%20Docs/2018.12.12%20-%20PWS%20Pentagon%20HRP.docx#_Toc532450276 file://usr.osd.mil/ORG/whs/ad/Acquisition%20Directorate/Enterprise%20Facilities%20&%20Construction%20Division%20Folder-Dec%202016/Ops+Maint/FY-19/HQ0034-19-X-XXXX%20HRP%20OM%20WIP/A03%20-%20Requirement%20Docs/2018.12.12%20-%20PWS%20Pentagon%20HRP.docx#_Toc532450277 file://usr.osd.mil/ORG/whs/ad/Acquisition%20Directorate/Enterprise%20Facilities%20&%20Construction%20Division%20Folder-Dec%202016/Ops+Maint/FY-19/HQ0034-19-X-XXXX%20HRP%20OM%20WIP/A03%20-%20Requirement%20Docs/2018.12.12%20-%20PWS%20Pentagon%20HRP.docx#_Toc532450278 file://usr.osd.mil/ORG/whs/ad/Acquisition%20Directorate/Enterprise%20Facilities%20&%20Construction%20Division%20Folder-Dec%202016/Ops+Maint/FY-19/HQ0034-19-X-XXXX%20HRP%20OM%20WIP/A03%20-%20Requirement%20Docs/2018.12.12%20-%20PWS%20Pentagon%20HRP.docx#_Toc532450279 file://usr.osd.mil/ORG/whs/ad/Acquisition%20Directorate/Enterprise%20Facilities%20&%20Construction%20Division%20Folder-Dec%202016/Ops+Maint/FY-19/HQ0034-19-X-XXXX%20HRP%20OM%20WIP/A03%20-%20Requirement%20Docs/2018.12.12%20-%20PWS%20Pentagon%20HRP.docx#_Toc532450280 file://usr.osd.mil/ORG/whs/ad/Acquisition%20Directorate/Enterprise%20Facilities%20&%20Construction%20Division%20Folder-Dec%202016/Ops+Maint/FY-19/HQ0034-19-X-XXXX%20HRP%20OM%20WIP/A03%20-%20Requirement%20Docs/2018.12.12%20-%20PWS%20Pentagon%20HRP.docx#_Toc532450281 file://usr.osd.mil/ORG/whs/ad/Acquisition%20Directorate/Enterprise%20Facilities%20&%20Construction%20Division%20Folder-Dec%202016/Ops+Maint/FY-19/HQ0034-19-X-XXXX%20HRP%20OM%20WIP/A03%20-%20Requirement%20Docs/2018.12.12%20-%20PWS%20Pentagon%20HRP.docx#_Toc532450282 file://usr.osd.mil/ORG/whs/ad/Acquisition%20Directorate/Enterprise%20Facilities%20&%20Construction%20Division%20Folder-Dec%202016/Ops+Maint/FY-19/HQ0034-19-X-XXXX%20HRP%20OM%20WIP/A03%20-%20Requirement%20Docs/2018.12.12%20-%20PWS%20Pentagon%20HRP.docx#_Toc532450283 file://usr.osd.mil/ORG/whs/ad/Acquisition%20Directorate/Enterprise%20Facilities%20&%20Construction%20Division%20Folder-Dec%202016/Ops+Maint/FY-19/HQ0034-19-X-XXXX%20HRP%20OM%20WIP/A03%20-%20Requirement%20Docs/2018.12.12%20-%20PWS%20Pentagon%20HRP.docx#_Toc532450284 file://usr.osd.mil/ORG/whs/ad/Acquisition%20Directorate/Enterprise%20Facilities%20&%20Construction%20Division%20Folder-Dec%202016/Ops+Maint/FY-19/HQ0034-19-X-XXXX%20HRP%20OM%20WIP/A03%20-%20Requirement%20Docs/2018.12.12%20-%20PWS%20Pentagon%20HRP.docx#_Toc532450285 file://usr.osd.mil/ORG/whs/ad/Acquisition%20Directorate/Enterprise%20Facilities%20&%20Construction%20Division%20Folder-Dec%202016/Ops+Maint/FY-19/HQ0034-19-X-XXXX%20HRP%20OM%20WIP/A03%20-%20Requirement%20Docs/2018.12.12%20-%20PWS%20Pentagon%20HRP.docx#_Toc532450286 file://usr.osd.mil/ORG/whs/ad/Acquisition%20Directorate/Enterprise%20Facilities%20&%20Construction%20Division%20Folder-Dec%202016/Ops+Maint/FY-19/HQ0034-19-X-XXXX%20HRP%20OM%20WIP/A03%20-%20Requirement%20Docs/2018.12.12%20-%20PWS%20Pentagon%20HRP.docx#_Toc532450287 file://usr.osd.mil/ORG/whs/ad/Acquisition%20Directorate/Enterprise%20Facilities%20&%20Construction%20Division%20Folder-Dec%202016/Ops+Maint/FY-19/HQ0034-19-X-XXXX%20HRP%20OM%20WIP/A03%20-%20Requirement%20Docs/2018.12.12%20-%20PWS%20Pentagon%20HRP.docx#_Toc532450287 file://usr.osd.mil/ORG/whs/ad/Acquisition%20Directorate/Enterprise%20Facilities%20&%20Construction%20Division%20Folder-Dec%202016/Ops+Maint/FY-19/HQ0034-19-X-XXXX%20HRP%20OM%20WIP/A03%20-%20Requirement%20Docs/2018.12.12%20-%20PWS%20Pentagon%20HRP.docx#_Toc532450288
1.0 Acronyms
ASHRAE American Society of Heating, Refrigerating and Air-Conditioning Engineers CM Corrective Maintenance COR Contracting Officer’s Representative CS Contracting Specialist DCS Distributed Controls System FFD Federal Facilities Directorate KO Contracting Officer MOP Method of Procedure NFPA National Fire Protection Association NTP Notice to Proceed O&M Operations and Maintenance OCI Organizational Conflict of Interests OEM Original Equipment Manufacturer OSHA Occupational Safety and Health Administration PH&RP Pentagon Heating & Refrigeration Plant PM Preventative/Predictive Maintenance PWS Performance Work Statement SC Service Call SDM System Description Manual VFD/VSD Variable Frequency Drives/ Variable Speed Drives WHS Washington Headquarters Services
2.0 Introduction
2.1 This is a firm-fixed price contract for Preventative Maintenance (PM) services. A provision for major repair work is covered in Section 26.0 of this PWS; the solicitation of which would be issued via separate proposal by the KO/COR on a case-by-case basis. The Contractor shall provide and perform a comprehensive maintenance program for Mechanical equipment and systems for the Pentagon Heating & Refrigeration Plant (PH&RP) by means of a firm fixed-price contract. The principal mission of the PH&RP is to provide the following services at the Pentagon Reservation and within the following ranges:
Continuous Steam
Continuous Chilled Water Sewage 15 KV Electrical Power
Distribution
Output Range
115 psig +/-5 psig (saturated)
42 to 45 ºF Continuous Continuous
The PH&RP is a mission critical facility that operates 24/7/365 days per year. Any disruption in service would cause serious disruption to operations at the Pentagon Reservation. Thus, this contract’s performance requirements emphasize consistent and reliable provision of services.
2.2 Administration – The Washington Headquarters Services (WHS)/Acquisition Directorate’s Contracting Officer (KO) and Contract Specialist (CS) with administer this requirement with assistance from the WHS FFD (Federal Facilities Directorate) PH&RP (Pentagon Heating & Refrigeration Plant) Contracting Officer’s Representatives (CORs). For this performance work statement, Government refers to the KO, the CS, or the CORs and Contractor refers to the Offeror.
2.3 PH&RP’s Operations & Maintenance Manager and Plant Manager will serve as the primary Government points of contact for the Preventative and Corrective Maintenance contract.
2.4 Period of Performance – The Contractor shall provide Preventative and Corrective Repair Maintenance for the Pentagon Heating & Refrigeration Plant (PH&RP) under a firm fixed price contract. The period of performance will consist of a one (1) 12-month base period and four (4) 12-month option periods.
3.0 Specifications
3.1 The Contractor shall furnish all parts, labor, materials, supervision necessary for the preventative maintenance, predictive maintenance, corrective maintenance (CM) repairs, service calls (SC), and inspections for the equipment and systems listed in Equipment Nameplate Data attachment. All repair work performed under this contract shall be warranted for 90 calendar days after acceptance by the Government. The Equipment Nameplate Data attachment is an existing inventory of the types of equipment and systems maintained under this contract. This contract scope covers all associated equipment, including but not limited to, cables, sensors, dampers and transmitters necessary for proper operation of the equipment and systems even if not specifically identified in the Equipment Nameplate Data attachment.
3.2 Maintenance and repair will include performing quarterly, semi-annual and annual field verification of all control and monitoring sensors and equipment for proper calibration and operation using MAXIMO for tracking. Contractor shall perform operational checks following all maintenance and repair activities.
3.3 Maintenance and repairs procedures shall comply at minimum with guidance provided in the original manufactures manuals, and used as a basis for troubleshooting and repair.
4.0 Scope Overview
4.1 Perform all PM in accordance with OEM Recommendations and approved Job Plans.
4.2 The contract encompasses all activities associated with the maintenance, repairs and calibration of the mechanical equipment and related systems to include:
4.2.1 Boiler Systems (Section 12.0)
4.2.1.1 Steam Distribution System (High & Low Pressure Steam, High & Low Pressure Condensate)
4.2.2 Chillers System (Section 13.0)
4.2.2.1 Chilled Water Distribution System (Supply and Return)
4.2.3 Compressed Air System (Section 14.0)
4.2.4 Condenser Water System (Section 15.0)
4.2.5 Distribution Controls System (DCS) (Section 16.0)
4.2.6 Electrical Distribution System (15 KV, 5KV, low voltage, & Sewage Lift Station Backup
Power System) (Section 17.0)
4.2.7 Feedwater Systems (Section 18.0)
4.2.8 Fuel Oil System (Section 19.0)
4.2.9 HVAC System (Section 20.0)
4.2.10 Sewage Lift System (Section 21.0)
4.3 The Equipment Nameplate Data attachment is an existing inventory of equipment and system types for maintenance under this contract. This contract scope covers all associated equipment, including but not limited to, cables, sensors, dampers and transmitters necessary to operate properly the equipment and systems even if not specifically identified in the Equipment Nameplate Data attachment.
5.0 Deliverable Table
# SUBMITTAL DUE FROM CONTRACTOR GOVERNMENT
REVIEW
8.3.1 Service Calls (SC): Routine
Response
Project Manager shall respond within one (1) hour with a plan of action and be available to walk the job with the Government n/a
8.3.2 Service Calls (SC): Emergency
Response
Project Manager shall respond with a call back within 30 minutes, and shall be on site within two (2) hours. n/a
8.4.3.1 Service Calls: Routine Response
Proposals Proposals shall be submitted within 24 hours 5 business days
8.4.3.2 Service Calls: Emergency Response
Proposals Proposals shall be submitted within 6 hours 4 hours
8.4 Service Calls: Completion in
MAXIMO
All reports and notes shall be entered into MAXIMO and Service Call tickets placed into “Complete” status within three (3) business days n/a
9.3 Corrective Maintenance: Deficiency
Report
Attach the Deficiency Report to the “Complete” PM ticket in MAXIMO within the same three (3) business days n/a
9.3.2 Corrective Maintenance: Deficiency
Report Format 14 days from NTP 5 business days
9.3.3 Corrective Maintenance: MAXIMO
ticket generation
Generate Corrective Maintenance ticket in MAXIMO within three (3) business days n/a
9.3.4 Corrective Maintenance (CM):
Proposals
Proposals shall be submitted within 24 hours of “Complete” from the completed PM in MAXIMO. 5 business days
9.3.6 Corrective Maintenance: Completion
in MAXIMO
All reports and notes shall be entered into MAXIMO and Corrective Maintenance ticket shall be placed into “Complete” (COMP) status within (3) business days.
n/a
10.0 Preventative and Predictive Maintenance and Inspection (PPMI) Plan
Base 12 months: Within 14 days of NTP, submit four (4) hard copies and one (1) CD to the KO and COR Option 12 months: Update and resubmit four (4) hard copies and one (1) CD to the KO and COR 30 days before option performance period begins
10 business days
10.4 10.5
Proposed Changes to Accepted Schedule
Any proposed changes to the accepted schedule must be submitted to the Contracting Officer for review 14 days prior to implementing the changes
5 business days
10.8.2 Preventative Maintenance Schedule Concurrent with PPMI Plan 10 business days
10.8.3 Maintenance & Repair Job Plans Concurrent with PPMI Plan 10 business days
10.8.4 Quality Control Plan Concurrent with PPMI Plan 10 business days
10.8.5 Qualifications Concurrent with PPMI Plan 10 business days
10.8.6.1 Draft Spare Parts List Within 60 calendar days of contract NTP 10 business days
10.8.6.3 Final Spare Parts List Within 14 calendar days from Government comment of Draft Spare Parts List 10 business days
10.8.6.5 Spare Parts Shortfall and Proposal Within 14 calendar days from final submission of Spare Parts List 10 business days
10.11 Replacement units, parts, components and materials
Retain all parts replaced by maintenance/repair activities for at least 10 calendar days after completion of work and keep readily available for inspection by KO or COR upon request.
10 calendar days
10.13 Outage Requests 10 business days advance notice 5 business days
10.14 PPMI Plan Revisions Within 10 business days of Government adding new equipment and/or Contractor replacing equipment. 10 business days
10.17 Routine Daily
Inspections Procedure
Complete daily inspections of the facility and bring any deficiencies to the COR’s attention per Section 9.2 n/a
11.0 MAXIMO (CMMS)
Within 90 calendar days of contract award, Contractor shall provide all asset data, job plans, PM schedules and associated costs for all planned maintenance in MAXIMO
5 business days
11.6.2 Monthly Preventative/Predictive
Maintenance (PM) Report Within 7 calendar days from last working day of the month. 5 business days
11.7.3 Monthly Report: all approved SC
and approved CM work Within 7 calendar days from last working day of the month. 5 business days
11.6.5 PM, SC, Daily Reports and CM
tickets completion in MAXIMO Within three (3) business days of completing the work n/a
11.7 PH&RP MAXIMO Training
PH&RP will provide one (1) specific business process training to one (1) contractor employee within 30 days from NTP.
Contractor is responsible for requesting and scheduling this training with the Government.
n/a
13.3.4 Refrigeration and Motor Oil analysis
reports for all chillers Within the 30 days from NTP n/a
24.3 Welding/Pipe Fitting Support Labor
Rates Within 14 days of contract NTP 5 business days
25.1 Equipment/Warranty Management:
Warranty Detail Report 30 days from contract NTP 10 business days
29.2.2 Schedule of Values (SOV) Within 14 days of contract NTP 10 business days
29.2.3 Preventative Maintenance Schedule Concurrent with PPMI Plan 10 business days
29.3.1 Pencil Copy of Pay Application Within last 7 calendar days of the month 5 business days
29.4 Pay Application Package After Acceptance of the Pencil Copy of Pay Application 3 business days
29.4.2 Wide Area Work Flow (WAWF) After Acceptance of Pay Application Package n/a
30.3 Safety Data Sheets (SDS) Within 30 calendar days of contract NTP 10 business days
32.1 PH&RP Look Ahead Standard
Operating Procedures (SOP)
Submit schedule per SOP every Tuesday for the work schedule for the following week. 2 business days
32.2.1.1 Meeting Agenda 24 hours before the meeting n/a
32.2.2 Meeting Minutes 48 hours after the meeting 3 business days
32.3 Staffing Plan Within 10 business days after contract NTP 5 business days
6.0 Key Personnel
6.1 Required Personnel On-Site: One (1) Project Manager, One (1) MAXIMO Specialist, and One (1)
Electrician are the Government required minimum number of personnel to be on-site during core hours.
6.2 PROJECT MANAGER
6.2.1 Must meet the following at the time of award:
6.2.1.1 Ten (10) years’ experience as journeyman mechanical engineer with field experience in either maritime or industrial plant (construction, operation, or maintenance)
- OR -
6.2.1.2 Ten (10) years’ experience as a journeyman technician with field experience in either maritime or industrial plant (construction, operation, or maintenance).
IN ADDITION TO ONE (1) OF THE FOLLOWING ABOVE (6.2.1.1 OR
6.2.1.2) PROJECT MANAGER MUST POSSESS (1) OF THE
FOLLOWING LICENSES
6.2.1.3 National Institute for the Uniform Licensing of Power Engineers, Inc. (NIUPLE) First Class Power Engineer License
6.2.1.4 Washington DC, Department of Consumer and Regulatory Affairs, Board of Industrial Trades, Class 1 – Steam Engineer License
6.2.2 The Project Manager shall manage all activities required by the contract, lead the on-site technical team and serve as technical point of contact for the performance of this contract. The Project Manager shall be available for all meetings and is designated as key personnel.
6.2.2.1 The Project Manager shall be on-site for all service calls and corrective maintenance. The Project Manager’s “Labor Rate” is firm fixed priced and will not be included in any Service Calls. The Project Manager’s time is included in the base of this contract and shall not be included in additional proposals for service calls and corrective maintenance.
6.3 MAXIMO Specialist
6.3.1 Contractor employees shall have (4) four years’ experience of basic COTS CMMS IBM Maximo knowledge of user function, asset, work orders, and inventory management, at the time of award.
6.4 ELECTRICIAN
6.4.1 Must possess certification in the high, medium and low voltage equipment, and at a minimum, 10 years’ experience and journeyman electrician in motors and controls, motor control centers, variable frequency drives (VFDs) and associated controls, transformers, motors, panels, controls, feeders, motor control centers, protective devices, etc., at the time of award. Electrician must be able to perform the switching of high, medium, low voltage breakers independently.
6.4.2 Electrician must possess a Journeyman Electrician License in Virginia or District of Columbia.
6.5 A journeyman's card showing membership in a recognized trade organization shall be considered as prima facie evidence that the applicant is qualified as a journeyman in that trade, and the examining board may accept that evidence.
7.0 Other Personnel
7.1 Technicians: The Contractor shall provide qualified journeyman, factory trained or certified maintenance personnel for all PH&RP equipment, at the time of award. Training and certification must be current. All lead technicians must be factory trained with a minimum of 10 years of related field experience. The Contractor shall provide factory-trained personnel in maintenance of Mechanical systems and in maintenance of the particular units installed (including attendance to classes provided by the manufacturers). Contractor’s technician shall respond to emergency calls within two (2) hours.
7.1.1 Chillers
7.1.1.1 Chiller Technician – must possess at a minimum 10 years of experience in service, maintenance, and repair of similar chillers of the size and model (York 3,750 Tons Turbo). Also, at a minimum 10 years’ experience in the service, maintenance, repair, and controls as related to the York “OM” Series TurboMaster chillers, 3,750 Tons and larger have a CFC universal license, and valid EPA certification under section 608.
7.1.2 Boilers
7.1.2.1 Boiler Technician – must possess at a minimum 10 years of experience in service, maintenance, repair and controls of similar size (40,000 pph or greater) low NOx burners and multi-fuel (i.e. natural gas and No. 2 fuel) boilers.
7.1.3 DCS
7.1.3.1 Must possess at a minimum 10 years of field experience in service, maintenance, repair and/or control installation of similar size and complexity of industrial controls supporting industrial equipment such as chillers, boilers, pumps as the PH&RP has and Allen Bradley RS Logix experience.
7.1.4 Pumps
7.1.4.1 Pump Technician – must possess at a minimum 10 years of experience in service, maintenance, repair and controls of similar size of pumps as at the PH&RP and at a minimum 10 years of experience in the pump maintenance, repair, and controls, and must has completed pump technology and repair type of training from major pump manufacturers. See attached Inventory List for
PH&RP.
7.1.5 Electric motors, beakers/disconnects/starters/transformers
7.1.5.1 Technicians/electricians must possess certification in the high and low voltage equipment, and at a minimum,10 years’ experience and journeyman electrician in motors and controls, motor control centers, variable frequency drives (VFDs) and associated controls, transformers, motors, panels, controls, feeders, motor control centers, protective devices, etc. Electrician must be able to perform the switching of high, medium, low voltage breakers independently.
7.1.5.2 Electrician must possess a Journeyman Electrician License in Virginia or District of Columbia.
7.1.5.3 A journeyman’s card showing membership in a recognized trade organization shall be considered as prima facie evidence that the applicant is qualified as a journeyman in that trade, and the examining board may accept that evidence.
7.1.6 VFD/VSDs
7.1.6.1 Technicians/electricians must possess certification in the high and low voltage equipment, and at a minimum, 10 years’ experience in control centers, protective devices, etc.
7.1.7 Sewage Plant Equipment
7.1.7.1 Contractor’s technicians/electricians must possess certification in the high and low voltage equipment, pump maintenance, repair and controls and at a minimum, 10 years or more experience in sewage plant equipment maintenance and repair, such as pumps , breakers, transformers, motors, panels, controls, feeders, motor control centers, protective devices, UPS, electric generators, etc.
Contractor’s technician shall respond to emergency calls within 2 hours.
7.1.8 Generators/Engines
7.1.8.1 Technicians must at a minimum possess 10 years’ experience in electric/diesel engine/generator operation, maintenance and controls.
7.1.9 Motorized Valves (MOV) in the Chiller Plant
7.1.9.1 Technician at a minimum must possess 10 years of experience in service, maintenance, repair and controls of similar size of valves as the PH&RP and 10 years of experience in valve maintenance, repair, and controls, and must has completed valve technology and repair type of training from major valve manufacturers.
7.1.10 HVAC
7.1.10.1 Technician must possess certification in the HVAC equipment, and at a minimum, 10 years’ experience in Air Handler Units (AHUs), Fans, etc.
7.1.10.2 HVAC technician shall possess a HVAC journeyman license from Maryland, Virginia, or District of Columbia.
7.1.11 Air Compressors
7.1.11.1 Contractor must possess certification in air compressor technician from the manufacturer in the reciprocating and rotary air compressors and associated equipment, and at a minimum, 10 years’ experience.
7.2 Iconics Senior Application Engineer
7.2.1 Obtain and maintain a NACI background check and CAC.
7.2.2 Requires at least four (4) years direct experience with Iconics and training in
GENESIS64 software suite. The Iconics Engineer shall understand the GENESIS64 Application Server, dashboards, configuration of Hyper Historian and GEO SCADA mapping technology of EarthWorX. The Iconics Engineer shall have experience in project configuration to data acquisition, visualization and deployment and configuration of Kepware, OPC, BACnet, database and other data points for collection, compression and storage.
7.3 The Contractor must have a licensed master plumber and a licensed master welder for emergency response and repairs per contract requirements and must meet the response time in accordance with the
PWS.
7.4 The Contractor must demonstrate that all technicians are factory trained with a minimum of 10 years of experience, have a CFC universal license, and valid EPA certification under Section 608.
7.5 The Contracting Officer shall be notified prior to any changes to key personnel. Government approval will be required for personnel replacements.
7.6 The Contractor Project Manager and alternates shall be fluent in English.
7.7 The Contractor shall provide contingency plans for loss of the Contractor's on-site personnel (e.g., strike, walkout, injury, abrupt resignation); utilities curtailment, and accidental spills of hazardous materials.
8.0 Service Calls Tickets
8.1 Service Calls: Service calls are defined as unscheduled maintenance or corrective repair, to include minor and major repairs on a routine or emergency response, when needed; alteration; fabrication of miscellaneous items; installation of equipment and miscellaneous items; relocation of equipment, materials, and devices; and miscellaneous services. Material cost includes parts or entire unit replacement if repair is not economically feasible.
8.2 The Government will pay the amount for each Service Call to the Contractor on a case-by-case basis through a Service Call ticket. The Contractor shall be fully responsible for all material and labor associated with the entire and complete Service Call proposal. The labor shall not be included in cost proposals if on-site personnel are performing the labor.
8.3 The Contractor shall respond to all Service Calls provided by the KO/COR. The two types of Service Calls are Routine Response and Emergency Response.
8.3.1 Routine Response: Upon receiving a routine call, the Project Manager shall respond within one (1) hour with a plan of action and be available to walk the job with the Government.
8.3.2 Emergency Reponses: Requires immediate action to repair essential systems and/or equipment that may fail and restore them back to its full operational condition as soon as possible. Should an emergency situation arise (e.g., inoperative equipment, burning smell, leaking pipe, refrigerant leak, insufficient utility requirements), the Project Manager shall, respond with a call back in 30 minutes, and shall be on site within two
(2) hours. The Government shall determine if the Service Call is an emergency and shall be dictated in the Service Call ticket.
8.4 Service Call Standard Procedure – Standard procedure on how the Government shall issue a Service Call ticket and how the Contractor shall proceed after receiving a Service Call ticket. Below are the following steps of the procedure:
8.4.1 Step #1 – The Government finds inoperable and/or defective equipment.
8.4.2 Step #2 – The Government generates a Service Call ticket in MAXIMO and assigns the ticket to the Contractor. The Government enters information and notes into the assigned Service Call ticket in MAXIMO. The Government assigns the ticket in MAXIMO with a status of “Waiting on Approval” (WAPPR).
8.4.2.1 A hard copy of the MAXIMO Service Call ticket submitted to the Contractors assigned Project Manager.
8.4.3 Step #3 – The Contractor shall submit a proposal to the Government.
8.4.3.1 Routine Response Service Call ticket proposals shall be submitted within 24 hours.
8.4.3.2 Emergency Response Service Call ticket proposals shall be submitted within 6 hours.
8.4.3.3 The proposal shall include:
8.4.3.3.1 MAXIMO Service Call ticket generated by the Government.
8.4.3.3.2 A detailed breakdown of all estimated costs to include labor hours, materials, and equipment required for completing necessary repairs.
8.4.3.3.3 A schedule for accomplishing the work within 24 hours of Service Call ticket approval. Note: If work cannot be completed within 24 hours, the proposal shall state the estimated time of completion and provide an explanation for why the work cannot be completed within 24 hours.
8.4.3.3.4 The labor shall not be included in cost proposals if on-site personnel are performing the labor.
8.4.4 Step #4 – The Government reviews the proposal and after approval, the Government changes the status of the Service Call ticket to “Approved” (APPR) in MAXIMO.
8.4.4.1 Once the proposal changes to Approved (APPR) status in MAXIMO, the
Contractor has 24 hours to start the performance (repair, material order, maintenance, etc.) of the Service Call ticket.
8.4.4.2 Note: If work cannot be completed within 24 hours, the Contractor shall state the estimated time of completion and provide an explanation for why the work cannot be completed within 24 hours via email to the KO and COR.
8.4.4.3 The Contractor shall not change the status of Service Call tickets in MAXIMO.
8.4.4.4 The Government reserves the right to negotiate the submitted proposal for a fair and reasonable price before acceptance.
8.4.5 Step #5 – The Contractor performs and completes the Service Call ticket. All reports and notes shall be entered into MAXIMO and Service Call ticket shall be placed into “Complete” (COMP) status within (3) business days.
8.4.5.1 Included in the report shall be the Approved proposal for the Completed
MAXIMO ticket.
8.5 Repair procedures shall at minimum comply with guidance provided in the original manufacturers
(OEM) manuals, and should be used as a basis for troubleshooting, repair, and recommended operational performance.
9.0 Corrective Maintenance Tickets
9.1 Corrective Maintenance: Maintenance and repair work required to return a system or component to proper original operating condition as recommended by OEM O&M manuals. Corrective maintenance defined as maintenance work, which involves the repair, or replacements of components, which have failed or broken down and discovered during preventative/predictive maintenance.
9.2 The Contractor shall report any deficiency 24 hours after they complete preventative/predictive maintenance via email to the COR and QA team. A proposal shall be submitted to the Government within 24 hours of submitting the deficiency report. The Government will pay the amount for each corrective maintenance to the contractor on a case-by-case basis through a Service Call ticket. The Contractor shall be fully responsible for all material and labor associated with the entire and complete corrective maintenance proposal. The labor shall not be included in cost proposals if on-site personnel are performing the labor.
9.3 Corrective Maintenance Standard Procedure – Standard procedure on how the Government shall approve a Corrective Maintenance ticket – and how the contractor shall proceed after reporting a Corrective Maintenance ticket. Below are the following steps of the procedure:
9.3.1 Step #1a – The Contractor finds inoperable and/or defective equipment while performing preventative/predictive maintenance.
9.3.2 Step #1b – The Contractor shall follow Section 11.6.5 in this PWS, to “Complete” (COMP) preventative/predictive maintenance ticket in three (3) business days.
9.3.2.1 The Contractor shall submit and attach the Deficiency Report to the
“Complete” (COMP) preventative/predictive maintenance ticket in MAXIMO within the same three (3) business days.
9.3.2.2 The Contractor shall submit a standard Deficiency Report format 14 days from NTP and must be accepted by the Government. Deficiency Report shall include, but is not limited to, the following information: name of contractor/subcontractor, date deficiency found; Corrective Maintenance work order number, name of equipment, deficiency, and recommended repair.
9.3.3 Step #2 – The Contractor generates Corrective Maintenance ticket in MAXIMO to the already existing preventative/predictive maintenance ticket for the equipment the PM ticket was being performed. The Contractor enters information and notes into the assigned Corrective Maintenance ticket. The Contractor assigns the ticket in MAXIMO with a status of “Waiting on Approval” (WAPPR).
9.3.3.1 The Contractor shall generate Corrective Maintenance ticket in MAXIMO within three (3) business days.
9.3.4 Step #3 – The Contractor shall submit a proposal to the Government within 24 hours of
“Complete” (COMP) from the completed preventative/predictive maintenance. The proposal shall include:
9.3.4.1 MAXIMO Corrective Maintenance ticket generated by the Contractor
9.3.4.2 A detailed breakdown of all estimated costs to include labor hours, materials, and equipment required for completing necessary repairs
9.3.4.3 A schedule for accomplishing the work within 24 hours of Corrective
Maintenance ticket approval.
9.3.4.3.1 Note: If work cannot be completed within 24 hours, the proposal shall state the estimated time of completion and provide an explanation for why the work cannot be completed within 24 hours.
9.3.4.4 The labor shall not be included in cost proposals if on-site personnel are performing the labor.
9.3.5 Step #4 – The Government reviews the proposal and after approval, the Government changes the status of the Corrective Maintenance ticket to “Approved” (APPR) in
MAXIMO.
9.3.5.1 Once the proposal changes to “Approved” (APPR) status in MAXIMO, the
Contractor has 24 hours to start the performance (repair, material order, maintenance, etc.) of the Corrective Maintenance ticket.
9.3.5.2 The Contractor shall not change the status of Corrective Maintenance tickets in
MAXIMO.
9.3.5.3 The Government reserves the right to negotiate the submitted proposal for a fair and reasonable price before acceptance.
9.3.6 Step #5 – The Contractor performs and completes the Corrective Maintenance ticket. All reports and notes shall be entered into MAXIMO and Corrective Maintenance ticket shall be placed into “Complete” (COMP) status within (3) business days.
9.3.6.1 Included in the report shall be the approved proposal for the Completed
MAXIMO ticket.
9.4 Maintenance and repairs procedures at minimum shall comply with guidance provided in the original manufactures manuals, and should be used as a basis for troubleshooting and repair.
10.0 Preventative and Predictive Maintenance and Inspection (PPMI) Program
10.1 The Contractor shall develop and implement a Preventative and Predictive Maintenance and Inspection
Plan within 14 days of contract NTP. The Contractor shall submit four (4) hard copies and one (1) CD-ROM of the plan to the KO and COR, which addresses preventative maintenance, minor repairs, major repairs and service call response for the PH&RP that result in extending the useful life of the equipment, minimizing down time, and assuring that operating equipment and systems are performing at peak efficiency.
10.2 Contractor shall perform operational checks following all maintenance and repair activities. The intent of the preventative and predictive maintenance program is to provide routine maintenance services that permit the early detection and correction of items which, if deficient or defective, would:
10.2.1 Interfere with normal operation of the system;
10.2.2 Endanger life and/or property;
10.2.3 Involve increased operating cost or lengthy repairs. Excessive or repeated system breakdowns or deficiencies may be considered by the Contracting Officer (KO) as an indication of unsatisfactory performance of the PPMI by the Contractor.
10.3 The PPMI program shall include all inspection, checks, adjustments, and maintenance items necessary to ensure that each system complies with applicable manufacturers’ or industry standards for safety, reliability, efficiency, and satisfactory operating conditions and maintenance activities described in the O&Ms for the equipment.
10.4 Base 12 month: Within 14 days of contract NTP, the Contractor shall submit four (4) hard copies and one (1) CD-ROM of the plan to the KO and COR. Each copy shall be on a Compact Disk-Read Only Memory (CD-ROM). The Government will review and provide comments within 7 days. A draft copy of the proposed PPMI plan shall be submitted to the KO for acceptance prior to commencing work. All scheduled PPMI work is expected to be completed and updated into MAXIMO within the month scheduled. The KO may require changes or additions to the accepted PPMI program plan should multiple deficiencies occur. Any Contractor proposed changes to the accepted PPMI program must be submitted to the contracting officer for review. Allow 10 business days for Government review of proposed changes.
10.5 Option 12 month(s): The Contractor shall update and resubmit four (4) hard copies and one (1) CD- ROM of the plan to the KO and COR 30 days before option performance period begins. The schedule shall indicate, for each item of equipment or systems identified in Equipment Nameplate Data attachment, the day of the week in which weekly or more frequent inspections shall be performed. The Contractor shall schedule and perform PPMI within the following time-of day constraints within Standard Hours of Operation. Once accepted by the Contracting Officer, the Contractor shall adhere to this schedule in order to facilitate the Government’s surveillance of the work. Any proposed changes to the accepted schedule must be submitted to the Contracting Officer for review 14 days in prior to implementing the changes.
10.6…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.