This is a Facility Maintenance Plan (FMP) for the Horsham (WLG) facility, detailing maintenance requirements for two above-ground fuel storage facilities with diesel and motor gasoline storage tanks. The document provides comprehensive equipment inventories for Facility #228 (Diesel) and Facility #2280 (Motor Gas), each with 5,000-gallon rectangular concrete-encased tanks and associated infrastructure such as remote dispenser pumps, emergency vents, magnetostrictive probes, mechanical tape gauges, fill ports, ball valves, and electronic systems like card and key locks.

The maintenance plan includes detailed specifications for each component, utilizing a standardized Component Unique Identifier (CUID) system and referencing Unified Facilities Criteria (UFC) sections for maintenance guidelines. Key maintenance considerations include system availability impacts, potential shutdowns, manufacturer requirements, and specific maintenance tasks for components like dispenser meters, hoses, nozzles, breakaways, and grounding systems. The document is part of a broader U.S. Army Corps of Engineers preventive and corrective maintenance contract supporting Defense Logistics Agency - Energy (DLA-E) petroleum facilities.

View the file

Other files

File Type Posted
Solicitation - W912DY26RA004.pdf PDF
New Castle (NCG) _FM.xlsx XLSX spreadsheet
McGuire (MCA) _FMP.xlsx XLSX spreadsheet
Martin State (MRT) _FMP.xlsx XLSX spreadsheet
Langley (LGY) _FMP.xlsx XLSX spreadsheet
Hanscom (HSM)__FMP.xlsx XLSX spreadsheet
Fort Eustis (EUS) _FMP.xlsx XLSX spreadsheet
Fort Dix (DIX) _FMP.xlsx XLSX spreadsheet
Bolling (BOL)_FMP.xlsx XLSX spreadsheet
Attachment 0003 Technical Eval Form Rev1_NAD-AF_2025-10-24.pdf PDF
Attachment 0005 Instructions and Evaluation Factors FUELS.pdf PDF
Attachment 0006 - Fuels Draft QASP_20210201.pdf PDF
Attachment 0008 Small Business Participation Plan Template.pdf PDF
Otis (OTS)_FMP.xlsx XLSX spreadsheet
Niagara Falls (NFL)_FMP.xlsx XLSX spreadsheet
Harrisburg (HRR) _FMP.xlsx XLSX spreadsheet
Hancock (HFD) _FMP.xlsx XLSX spreadsheet
Barnes (BNS)__FMP.xlsx XLSX spreadsheet
12.0 Appendix K - DLA RP Inventory_NAD_AF_Final_2025-10-28.xlsx XLSX spreadsheet
Attachment 0001 Draft PWS Appendices NAD-AF 2025-10-26.pdf PDF
Attachment 0004 - PPQ Sample.pdf PDF
Pittsburgh (PIT)_FMP.xlsx XLSX spreadsheet
Bangor (BLL) _FMP.xlsx XLSX spreadsheet
Bangor (BGR)_FMP.xlsx XLSX spreadsheet
Andrews (ADR) _FMP.xlsx XLSX spreadsheet
Exhibit A CDRL - NAD-AF CDRL Set 1 1-67.pdf PDF
Attachment 0007 Price Worksheet NAD-AF Fuels 10.21.25.xlsx XLSX spreadsheet
Pittsburgh (GPI)_FMP.xlsx XLSX spreadsheet
Pease (PNG)_FMP.xlsx XLSX spreadsheet
McGuire (MCG)_FMP.xlsx XLSX spreadsheet
Lakehurst (LKH) _FMP.xlsx XLSX spreadsheet
Frances Gabreski (SUF)__FMP.xlsx XLSX spreadsheet
Fort Indiantown (HRI) _FMP.xlsx XLSX spreadsheet
Dover (DOV) _FMP.xlsx XLSX spreadsheet
Burlington (BUR)_FMP.xlsx XLSX spreadsheet
Bradley (BRD)_FMP.xlsx XLSX spreadsheet
Atlantic City (ATL) _FMP.xlsx XLSX spreadsheet
Attachment 0002 Sample Service Order.xlsx XLSX spreadsheet
Show all 38

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Administrative

LocationSite NameHorsham AGS
RPSUID3526
DLA Site CodeWLG
Hours of Operation0700 - 1600
Address2164 McGuire Street

Horsham Pa. 19044

ContractContractor
Contract #
Local POCsFMSR Phone
FMSR Email
Alt FMSR Phone
Alt FMSR Email
DLA/SCP POCsDLA PM Phone
DLA PM Email
SCP PM Phone
SCP PM Email
Contractor POCsContractor PM Phone
Contractor PM Email
Contractor QC Phone
Contractor QC Email
Contractor SM Phone
Contractor SM Email
USACE POCsUSACE PM/COR Phone
USACE PM/COR Email
USACE PE Phone
USACE PE Email
USACE KO Phone
USACE KO Email

Appendix K - Facility Maintenance Plan

&P of &N

Instructions:

This table shows the minimum information required. Additional details should be included based on site specific requirements. Additional POCs may be required.

General Facility Description

WLG HORSHAM AGS
Facility #From EBS ListingRPA Total Unit of Measure QuantityFAC Measurement TypeNotes
TANKS
228OPERATING STORAGE, DIESEL - ABOVE GROUND5,000GA
2280OPERATING STORAGE, MOTOR GAS - ABOVE GROUND5,000GA

Appendix K - Facility Maintenance Plan

&P of &N

Instructions:

Include a general facility overview and description of each fuel system for the sites in accordance with UFC 3-460-01. Examples include: Bulk Storage Facilities, Aircraft Fueling Facilities, Marine and Dispensing Facilities, Ground Products Fueling Facilities, Alternate POL Facilities, and Support Facilities. Also include facility #s, facility names, fuel type, photos, and any other pertinent information.

Include Site Specific Conditions and Restrictions in this tab.

Communication Plan

Appendix K - Facility Maintenance Plan

&P of &N

Instructions:

Communication plan shall address in/out briefs, lines of communication, coordination for access, etc.

Safety

Appendix K - Facility Maintenance Plan

&P of &N

Instructions:

Site Specific Addendum and Activity Hazard Analysis, which are Attachments to the APP, specific to activities or tasks related to recurring maintenance for this site.

PM Schedule

Instructions:

Link PM schedule here

Task Matrix

Applicable Facility AssetsUFC System Level Maintenance FrequencySpecial Considerations
DLA
(EBS) Facility #Army Facility #Navy (iNFADS) Facility #Air Force (ACESRPFM/ NEXGEN) Facility #Real Property Unique IdentifierFacility NameOperational AreaComponent TypeCUIDMakeModelCapacity/SizeQSAUFC Section ReferenceManufacturer RequirementsOperator/ equipment RequirementsSystem availabilityOther ContractComments
2282281150325OPERATING STORAGE, DIESEL - ABOVE GROUNDRectangular Concrete-Encased TanksWLG-228-RCET-0001N/AN/A5,000 GALXSection 8-5.3N/AN/AN/ATank
2282281150325OPERATING STORAGE, DIESEL - ABOVE GROUNDPoint Sensor - DryWLG-228-PSDRY-0002N/AN/AN/AX*XSection 6-13.1.2N/AN/AN/ASensor
2282281150325OPERATING STORAGE, DIESEL - ABOVE GROUNDMagnetostrictive ProbesWLG-228-MRPRB-0003N/AN/AN/AX*XSection 8-9.8.2N/AN/AN/AProbe
2282281150325OPERATING STORAGE, DIESEL - ABOVE GROUNDEmergency VentsWLG-228-EMGVT-0004CLAY & BAILEY4P7A4"XSection 8-9.4N/AN/AN/AVent
2282281150325OPERATING STORAGE, DIESEL - ABOVE GROUNDMechanical Tape GaugesWLG-228-MTGA-0005MORRISON8182"X*Section 8-9.7N/AN/AN/ATape Gauge
2282281150325OPERATING STORAGE, DIESEL - ABOVE GROUNDRemote Dispenser PumpsWLG-228-RDSP-0006FE PETRON/AN/ASection 7-15.1N/AN/AN/APump
2282281150325OPERATING STORAGE, DIESEL - ABOVE GROUNDTank Pressure/Vacuum VentsWLG-228-TPVVT-0007OPWN/A3"XSection 8-9.3N/AMan LiftN/AVent
2282281150325OPERATING STORAGE, DIESEL - ABOVE GROUNDBall ValvesWLG-228-BLVL-0008N/AN/A1-1/2"X*Section 6-6.2.4N/AN/AN/ABall Valve
2282281150325OPERATING STORAGE, DIESEL - ABOVE GROUNDCombination Dual Rate-of-Flow Control and Solenoid ValvesWLG-228-CFSCVL-0009SNAP-TITEN/A1-1/2"X*Section 4-3.3.1N/AN/AN/ASOLENOID VALVE ONLY
2282281150325OPERATING STORAGE, DIESEL - ABOVE GROUNDFill PortsWLG-228-FPRT-0010N/AN/AN/AX*Section 8-9.12N/AN/AN/AFill port
2282281150325OPERATING STORAGE, DIESEL - ABOVE GROUNDEmergency Shutoff Valves (Shear Valves)WLG-228-ESHVL-0011OPWN/A1-1/2"XSection 7-12N/AN/AN/AValve
2282281150325OPERATING STORAGE, DIESEL - ABOVE GROUNDDispenser CabinetWLG-228-DSCB-0012WAYNEN/AN/AXSection 7-7N/AN/AN/ADispenser
2282281150325OPERATING STORAGE, DIESEL - ABOVE GROUNDDispenser MetersWLG-228-DSMTR-0013WAYNEN/AN/AXSection 7-8N/AMeters shall be recalibrated utilizing a certified 5 gallon (20 liter) prover canRequires system to be taken out of serviceMeter
2282281150325OPERATING STORAGE, DIESEL - ABOVE GROUNDDispenser FiltersWLG-228-DSFLR-0014DONALDSONP550215N/ASection 7-9N/AN/AN/AFilter
2282281150325OPERATING STORAGE, DIESEL - ABOVE GROUNDDispenser HosesWLG-228-DSHS-0015VSTV34CP3/4" X 8'Section 7-3N/AN/AN/AHose
2282281150325OPERATING STORAGE, DIESEL - ABOVE GROUNDBreakawaysWLG-228-DSBW-0016OPW66V3/4"Section 7-4N/AN/AN/ABreakaway
2282281150325OPERATING STORAGE, DIESEL - ABOVE GROUNDDispenser HosesWLG-228-DSHS-0017N/AN/A3/4" X 10'Section 7-3N/AN/AN/AHose
2282281150325OPERATING STORAGE, DIESEL - ABOVE GROUNDSwivelsWLG-228-DSSW-0018HUSKYN/A3/4"Section 7-5N/AN/AN/ASwivel
2282281150325OPERATING STORAGE, DIESEL - ABOVE GROUNDDispenser NozzlesWLG-228-DSNZ-0019OPW113/4"XSection 7-2N/AN/AN/ANozzle
2282281150325OPERATING STORAGE, DIESEL - ABOVE GROUNDHose RetrieverWLG-228-HSRTV-0020ZeppiniZS43/4"Section 7-6N/AN/AN/ARetractor
2282281150325OPERATING STORAGE, DIESEL - ABOVE GROUNDDispenser HosesWLG-228-DSHS-0021N/AN/A1" X 20'Section 7-3N/AN/AN/AHose
2282281150325OPERATING STORAGE, DIESEL - ABOVE GROUNDFueling NozzlesWLG-228-FLNZ-0022CARTER64349Section 4-7.3N/AN/AN/ANozzle
2282281150325OPERATING STORAGE, DIESEL - ABOVE GROUNDBall ValvesWLG-228-BLVL-0023MORRISONN/A1"X*Section 6-6.2.4N/AN/AN/ABall Valve
2282281150325OPERATING STORAGE, DIESEL - ABOVE GROUNDEFSO SystemsWLG-228-EFSO-0024N/AN/AX*Section 7-16N/APrior to testing notified site FDN/AEFSO
2282281150325OPERATING STORAGE, DIESEL - ABOVE GROUNDCard and Key LocksWLG-228-CP-0025SYNTECHN/AN/AXSection 9-2.1N/AN/AN/AFuel Master
2282281150325OPERATING STORAGE, DIESEL - ABOVE GROUNDEmergency Eyewash/ShowersWLG-228-EMEWSH-0026SPEAKMANN/AN/AX*XXSection 11-3N/AN/AN/AEyewash/Shower
228022801150328OPERATING STORAGE, MOTOR GAS - ABOVE GROUNDRectangular Concrete-Encased TanksWLG-2280-RCET-0001N/A5,000 GALXSection 8-5.3N/AN/AN/ATank
228022801150328OPERATING STORAGE, MOTOR GAS - ABOVE GROUNDRemote Dispenser PumpsWLG-2280-RDSP-0002FE PETRON/AN/ASection 7-15.1N/AN/AN/APump
228022801150328OPERATING STORAGE, MOTOR GAS - ABOVE GROUNDEmergency VentsWLG-2280-EMGVT-0003MORRISON2444"XSection 8-9.4N/AN/AN/AVent
228022801150328OPERATING STORAGE, MOTOR GAS - ABOVE GROUNDMagnetostrictive ProbesWLG-2280-MRPRB-0004N/AN/A3"X*XSection 8-9.8.2N/AN/AN/AProbe
228022801150328OPERATING STORAGE, MOTOR GAS - ABOVE GROUNDMechanical Tape GaugesWLG-2280-MTGA-0005MORRISON1812"X*Section 8-9.7N/AN/AN/AGauge
228022801150328OPERATING STORAGE, MOTOR GAS - ABOVE GROUNDFill PortsWLG-2280-FPRT-0006N/AN/AN/AX*Section 8-9.12N/AN/AN/AFill Port
228022801150328OPERATING STORAGE, MOTOR GAS - ABOVE GROUNDTank Pressure/Vacuum VentsWLG-2280-TPVVT-0007OPWN/AN/AXSection 8-9.3N/AMan LiftN/AVent
228022801150328OPERATING STORAGE, MOTOR GAS - ABOVE GROUNDBall ValvesWLG-2280-BLVL-0008DIXONN/A1-1/2"X*Section 6-6.2.4N/AN/AN/ABall Valve
228022801150328OPERATING STORAGE, MOTOR GAS - ABOVE GROUNDCombination Dual Rate-of-Flow Control and Solenoid ValvesWLG-2280-CFSCVL-0009SNAP-TITEN/A1-1/2"X*Section 4-3.3.1N/AN/AN/ASOLENOID VALVE
228022801150328OPERATING STORAGE, MOTOR GAS - ABOVE GROUNDEmergency Shutoff Valves (Shear Valves)WLG-2280-ESHVL-0010OPWN/A1-1/2"XSection 7-12N/AN/AN/AShear Valve
228022801150328OPERATING STORAGE, MOTOR GAS - ABOVE GROUNDDispenser CabinetWLG-2280-DSCB-0011WAYNE766101D/27AJ/JW1N/AXSection 7-7N/AN/AN/ADispenser Cabin
228022801150328OPERATING STORAGE, MOTOR GAS - ABOVE GROUNDDispenser MetersWLG-2280-DSMTR-0012WAYNEN/AN/AXSection 7-8N/AMeters shall be recalibrated utilizing a certified 5 gallon (20 liter) prover canRequires system to be taken out of serviceMeter
228022801150328OPERATING STORAGE, MOTOR GAS - ABOVE GROUNDDispenser FiltersWLG-2280-DSFLR-0013DONALDSONP550215N/ASection 7-9N/AFilter will be provided by the siteRequires system to be taken out of serviceFilters
228022801150328OPERATING STORAGE, MOTOR GAS - ABOVE GROUNDDispenser HosesWLG-2280-DSHS-0014N/AN/A3/4" X 10'Section 7-3N/AN/AN/AHose Retriev
228022801150328OPERATING STORAGE, MOTOR GAS - ABOVE GROUNDBreakawaysWLG-2280-DSBW-0015OPW66V3/4"Section 7-4N/AN/AN/ABreakaway
228022801150328OPERATING STORAGE, MOTOR GAS - ABOVE GROUNDDispenser HosesWLG-2280-DSHS-0016N/AN/A3/4" X 8"Section 7-3N/AN/AN/AHose Retriev
228022801150328OPERATING STORAGE, MOTOR GAS - ABOVE GROUNDDispenser NozzlesWLG-2280-DSNZ-0017OPW11N/AXSection 7-2N/AN/AN/ANozzle
228022801150328OPERATING STORAGE, MOTOR GAS - ABOVE GROUNDHose RetrieverWLG-2280-HSRTV-0018WAYNEN/AN/ASection 7-6N/AN/AN/ARetractor
228022801150328OPERATING STORAGE, MOTOR GAS - ABOVE GROUNDStatic Grounding SystemsWLG-2280-STGS-0019N/AN/AN/AX*XSection 9-1.6.2N/AN/AN/AGround

&"Times New Roman,Bold"&14APPENDIX F - Facility Maintenance Plan

Instructions:

1. Input all data as indicated on the sheet.

2. Additional documents referred to in the Special Considerations column shall be included as an appendix to this FMP.

3. The contractor shall generate a Component Unique Identifier (CUID) for each component utilizing the Component Acronym Sheet within this Work Book. The unique identifier must use the following:

Three letter Site Code - Facility # - Component Acronym - Sequential number Example: AAD-00063A-RCVL-0001

If component acronym is not listed, the contractor shall request an acronym be established through the HNC Project Manager and Project Engineer via email. Contractors may utilize other means of tracking/labeling assets such as QR codes in addition to the required CUID however, tracking/labeling must correlate with the CUID. This CUID shall be the standard for all DLA capitalized equipment. Base Asset ID if used by site shall be cross referenced with CUID appropriately.

4. Utilize the UFC Section Reference Work Category as noted on the Component Acronym Sheet.

5. Enter any applicable manufacturer requirements not stated in the UFC. References are acceptable with attachments.

6. Enter any applicable operator support or government owned equipment required to complete the RM task.

7. Enter impact on system availability by performing the RM task. This could include shutdown, lockout, or similar impacts.

8. Enter contract information for any other contract, contractor, or government personnel performing the applicable task. This is applicable to other Centrally Managed Programs, SRM, MILCON, or Public Works/Civil Engineering projects.

9. Print Hard Copies as 11x17.

FS-PF Schedule

Instructions:

1. Input all data as indicated on the sheet.

2. Additional documents referred to in the Special Considerations column shall be included as an appendix to this FMP.

3. The contractor shall generate a Component Unique Identifier (CUID) for each component utilizing the Component Acronym Sheet within this Work Book. The unique identifier must use the following:

Three letter Site Code - Facility # - Component Acronym - Sequential number Example: AAD-00063A-RCVL-0001

If component acronym is not listed, the contractor shall request an acronym be established through the HNC Project Manager and Project Engineer via email. Contractors may utilize other means of tracking/labeling assets such as QR codes in addition to the required CUID however, tracking/labeling must correlate with the CUID. This CUID shall be the standard for all DLA capitalized equipment.

4. Utilize the UFC Section Reference Work Category as noted on the Component Acronym Sheet.

5. Enter any applicable manufacturer requirements not stated in the UFC. References are acceptable with attachments.

6. Enter any applicable operator support or government owned equipment required to complete the RM task.

7. Enter impact on system availability by performing the RM task. This could include shutdown, lockout, or similar impacts.

8. Filter Separators and Pre-Filters identified here shall also be provided in the Task Matrix Tab.

9. Print Hard Copies as 11x17.

Component Acronym

Component Unique Identifier:Site Code-Facility #-Component Acronym-Sequential #
Example:AAD-00063A-RCVL-0001
NOTE: If component acronym is not listed, the contractor shall request an acronym be established through the HNC Project Manager and Project Engineer via email. Contractors may utilize other means of tracking/labeling assets such as QR codes in addition to the required CUID however, tracking/labeling must correlate with the CUID. This CUID shall be the standard for all DLA capitalized equipment
DLA Work Type CategoryUFC Section Reference Work Category
(Revised per Change 1, 29 April 2021)Component Acronym
Air CompressorsAir CompressorsAIRC
AlarmsExternally Mounted Level Alarms (Section 8-9.9.1)EMLA
Internally Mounted Level Alarms (Section 8-9.9.3)IMLA
BollardBollardsBLRD
BuildingBuilding HVACBHVAC
Building Domestic Water SystemBWTR
Building Waste WaterBWSW
Building - LightingBLTG
Building - ArchitecturalBARCH
Building - Fire Sprinkler SystemBFIRE
Containment/JointsContainment Systems (General) (Section 8-10.1)CSGEN
Concrete and Cement Brick Dike/Berm Walls (Section 8-10.2.1)DKBW
Dike/Berm Floors (Section 8-10.2.2)DKBF
Earthen Dike Walls (Section 8-10.3)ETHDW
Self-Diking or Vaulted Tank Containment (Section 8-10.4)SDVTCS
Flexible Membrane Liners (Section 8-10.5)FXML
Fuel Truck and Rail Car Containment Areas (Section 11-1.1)FTKRCC
Remote Spill Containment (Section 11-1.2)RSCS
Piers and Wharves Fuel Containment Systems (Section 5-1.2) - TestingFPWCT
Fuel Pier/Wharf Containment (PWS Section 3)FPWC
Corrosion Control/CoatingsAboveground Piping and Equipment Coatings (Section 6-10.1)AGPCT
MiscellaneousMiscellaneous Deactivated Components (Section 12-5)MDEAC
Electrical/LightingLighting (Section 9-1.8)LIGHT
Electrical/PowerElectrical Equipment (Section 9-1.2)ELEQ
Power Cables (Section 9-1.3)PWRCBL
Motor Controls (Section 9-1.4)MTRCT
Panelboards (Section 9-1.5)PNLB
Electric Motors (Section 9-1.7)ELEMT
Electronic Equipment (9-1.9)ELTREQ
Card and Key Locks (Section 9-3)CKLK
Electrical/ProtectionPower Grounding Systems (Section 9-1.6.1)PWRGS
Static Grounding Systems (Section 9-1.6.2)STGS
Cathodic Protection (Section 9-2.1)CP
Lightning Surge Arresters (Section 9-2.2.1)LSAR
Lightning Protection Systems (Section 9-4)LPTS
Ground Verification System (Section 9-5)GRVS
Electronic Overfill Protection Systems (Section 9-6)EOPS
Eyewash/ShowerEmergency Eyewash/Showers (Section 11-3)EMEWSH
Fencing/
GatesFencingFENC
GatesGATE
FiltrationPre-Filters (Section 3-6.1)PFVSL
Filter Separators (Section 3-6.2)FLSP
Haypack Filters (Section 3-6.3)HPKF
Basket Strainers (Section 3-6.4)BSTR
Filter Separator Sump Heaters (Section 3-6.5)FSSH
Sidestream Filtration Systems (Section 8-9.11)SSFTS
Fire Suppression EquipmentFlame Arrestors (Section 8-9.5)FLMARR
Foam Fire Protection Systems (Section 8-9.15)FFPS
Fire Protection Systems - Wet PipeFPRS
Fuel LaboratoriesVentilation Hoods (Section 11-4.1)VENTHD
GaugesPressure and Pressure/Vacuum Gauges (Section 6-7.1)PVGA
Differential Pressure Gauges (Section 6-7.2)DPGA
Mechanical Tape Gauges (Section 8-9.7)MTGA
Mechanically Operated Tape Gauge (Section 8-9.8.1)MOTGA
Magnetostrictive Probes (Section 8-9.8.2)MRPRB
Servo Gauge (Section 8-9.8.3)SRVGA
GeneratorsBack-Up Power GeneratorsBGEN
Heating CoilsSteam Type Heating Coils (Section 8-9.16.1)STHC
Thermal Fluid Type Heating Coils (Section 8-9.16.2)TFTHC
Electric Rod Type Heating (Section 8-9.16.3)ERTH
HosesLoading Fuel Hoses (Section 3-9.1)LDHS
Offloading Fuel Hoses (Section 3-9.2)OLHS
Aircraft Fueling Hoses (Section 4-7.5)ACFHS
HydrazineHydrazine Charging Units (Section 10-3)HDZCU
InspectionsTrouble ShootTRBST
API 510 InspectionsAPI510
API 653 or STI InspectionAPI653
Coatings Condition SurveyCCS
Issue/Receive - GroundDispenser Nozzles (Section 7-2)DSNZ
Dispenser Hoses (Section 7-3)DSHS
Breakaways (Section 7-4)DSBW
Swivels (Section 7-5)DSSW
Hose Retriever (Section 7-6)HSRTV
Dispenser Cabinet (Section 7-7)DSCB
Dispenser Meters (Section 7-8)DSMTR
Dispenser Filters (Section 7-9)DSFLR
Dispenser Strainers (Section 7-10)DSSTR
Ground Vehicle Fuel Piping (Section 7-11)GVFP
Emergency Shutoff Valves (Shear Valves) (Section 7-12)ESHVL
Dispenser Sumps (Section 7-13)DSSMP
Transition Sumps (Section 7-14)TRSMP
Remote Dispenser Pumps (Section 7-15.1)RDSP
Self-Contained Dispenser Pumps (Section 7-15.2)SCDSP
EFSO Systems (Section 7-16)EFSO
Stage I Vapor Recovery (Section 7-17.1)SIVP
Stage II Vapor Recovery (Section 7-17.2)SIIVP
Vapor Burners (Section 7-17.3)VPBNR
Point Sensor - Dry (Section 7-19.1.1)PSDRY
Automatic Line Leak Detector (Section 7-19.1.2)ALLD
Visual Monitoring (Section 7-20.1)VSLM
Issue/Receive - MarineMarine Receipt (Section 5-2)MRNRCP
Marine Issue (Section 5-3)MRNISU
Marine Loading Arms (Section 5-4)MRNLA
Marine Transfer Hoses (Section 5-5.1)MBTHS
Underwater Hoses (Section 5-5.2)UWHS
Single Point Mooring Systems (Section 5-7.1)SPMSS
Multi Point Mooring Systems (Section 5-7.2)MPMSS
Submerged Piping Systems (Section 5-8)SMPS
Boom Reels (Section 5-9)BMRL
Liquefied PetroleumLiquefied Petroleum Tanks (Section 10-1.1)LPTANK
Liquefied Petroleum Pipelines (Section 10-1.2)LPPIPE
Liquefied Petroleum Vapor Lines (Section 10-1.3)LPVPL
LPG Vaporizers (Section 10-1.4)LPGVPZ
Petroleum Gas Regulators (Section 10-1.5)PGREG
Liquefied Petroleum Gas Hoses (Section 10-1.6)LPGHS
Meter/
calibrationsPositive Displacement Meters (Section 3-7.1)PDMT
Turbine Flow Meters (Section 3-7.2)TBFMT
Orifice Flow Meters (Section 3-7.3)OFMT
Natural DisasterNatural Disaster
Natural GasCNG Piping (Section 10-2.1)NGPIPE
CNG Compressors (Section 10-2.2)NGCOMP
CNG Storage (Section 10-2.3)NGSTOR
CNG Dispensers (Section 10-2.4)NGDS
CNG Dispenser Hoses (Section 10-2.5)NGDSHS
NozzleHydrant Adapters (Section 4-7.2)HADP
Fueling Nozzles (Section 4-7.3)FLNZ
OtherFuel Additive Injectors (Section 3-11)FAIJ
PantographFixed Pantographs (Section 4-7.1.1)FXPNT
Detachable Pantographs (Section 4-7.1.2)DTPNT
PipingOn-Base Pipelines (Section 6-1.1)OBPL
Non-DOT Regulated (Section 6-1.2.1)NDPL
Aboveground Piping (Section 6-1.3)AGPL
Double-Wall Piping (Section 6-1.4)DWPL
Low Point Drains (Section 6-12.1)LPDN
High Point Vents (Section 6-12.2)HPVT
Sight Flow Indicators (Section 6-12.3)SFND
Rope Sensor Systems (Section 6-13.1.1)RPSS
Point Sensor - Dry (Section 6-13.1.2)PSDRY
Visual Monitoring (Section 6-14.1)VSLM
Pipe Penetrations (Section 8-10.6)PPEN
Deactivated Petroleum Fuel Pipelines (Section 12-3)DEACPL
Pressure/Temperature ControlAir Eliminator Tanks (Section 3-10.1)AELT
Automatic Air Vents (Section 3-10.2)AAVT
Surge Suppressors (Section 4-7.4)SRGSP
Thermal and Pressure Relief Valves (Section 6-6.3)TPRVL
Pressure Transmitters (Section 6-7.3)PRTR
Differential Pressure Transmitters (Section 6-7.4)DPTR
Flexible Ball Joints (Section 6-8)FBLJT
Dial Thermometer (Section 6-9.1)DTHMR
Emergency Vents (Section 8-9.4)EMGVT
PumpCentrifugal Pumps (Section 3-8.1)CENP
Vertical Inline Pumps (Section 3-8.2)VILP
Vertical Turbine/Submerged Turbine Pumps (Section 3-8.3)VTSP
Sliding Vane Pumps (Section 3-8.5)SLVP
Gear Pumps (Section 3-8.6)GERP
Diaphragm Pumps (Section 3-8.7)DIAP
Internal Combustion Drives (Section 3-8.8)ICDR
Gearboxes (Section 3-8.9)GRBX
Deactivated Petroleum Fuel Pumps (Section 12-4)DEACP
Signage/MarkingsSignage and Markings (Section 2-7)SIGN
StructuresPumphouse/Filter Buildings (Section 11-2.1)PFBLDG
Canopies (Section 11-2.2)CNPY
Cranes and Hoists (Section 11-6)CRNHST
TankAboveground Field-Erected Tanks (Section 8-4)AGFET
Geodesic Dome Roofs (Section 8-4.2)GEODR
Foundations (Section 8-4.3)FOUND
Aboveground Shop Fabricated Tanks (Section 8-5.1)AGSFP
Self-Diking or Vaulted Tanks (Section 8-5.2)SDVT
Rectangular Concrete-Encased Tanks (Section 8-5.3)RCET
Single-Walled Underground Shop-Fabricated Tanks (Section 8-5.4.1)UGSSFT
Double-Walled Underground Shop-Fabricated Tanks (Section 8-5.4.2)UGDSFT
Underground Field-Constructed Tanks (Cut and Cover Tanks) (Section 8-6)UGFET
Tank Cleaning (Section 8-7)TCLEAN
Aluminum Honeycomb Floating Pans (Section 8-9.1.1)AHFP
Steel Floating Pans (Section 8-9.1.2)STLFP
Pontoon Floating Pans (Section 8-9.1.3)PTNFP
Floating Roofs (Section 8-9.1.4)FLTRF
Floating Roof and Pan Pressure/Vacuum Vents (Section 8-9.1.5)FPPVV
Floating Roof and Pan Legs (Section 8-9.1.6)FRPLG
Secondary Tank Bottoms (Section 8-9.2)SNDTB
Tank Pressure/Vacuum Vents (Section 8-9.3)TPVVT
Product Saver Tanks (Section 8-9.10)PRDST
Fill Ports (Section 8-9.12)FPRT
Point Sensor - Dry (Section 8-9.13.1)PSDRY
Point Sensor - Wet (Section 8-9.13.2)PSWET
Point Sensor - Pressure/Vacuum (Section 8-9.13.3)PSPV
Visual Leak Detection (Section 8-9.13.4)VSLLD
Floating Suction Lines (Section 8-9.14)FLTSL
Stilling Wells (Section 8-9.17)STGW
Deactivated Petroleum Fuel Tanks (Section 12-2)DEACT
TestingPressure Testing
Underground PitsIsolation Valve Pits (Section 6-11.1)ISVLP
Hydrant Fuel Pits (Section 6-11.2)HDFP
High Point Vent Pits (Section 6-11.3)HPVP
Low Point Drain Pits (Section 6-11.4)LPDP
Lateral Control Pits (Section 6-11.5)LTCP
ValvesGeneral System Control Valves (Section 4-3.2.1)GSCVL
Refuel Control Valves (Section 4-3.2.5)RCVL
Pressure Relief Valves (Section 4-3.2.6)PRCVL
Defuel Control Valve (Section 4-3.2.7)DFCVL
Dual Rate-of-Flow Control Valves (Section 4-3.2.8)DRFCVL
Combination Dual Rate-of-Flow Control and Solenoid Valves (Section 4-3.3.1)CFSCVL
Dual Pressure Relief, Solenoid Shutoff, and Check Valves (Section 4-3.3.2)DPSCVL
Non-Surge Check Valves (Section 4-4.2.1)NSCKVL
Filter Separator Control Valves (Section 4-4.2.2)FSCVL
Defuel/Flush Valves (Section 4-4.2.3)DFFCVL
Issue Venturi (Section 4-4.2.4)ISVTR
Return Venturi (Section 4-4.2.5)RTVTR
Back Pressure Control Valves (Section 4-4.2.6)BPCVL
Pressure Control Valves (Section 4-4.2.7)PCVL
Hydrant Control Valves (Section 4-4.2.8)HCVL
Emergency Shut-off Valves (Section 4-4.2.9)ESOVL
Pantograph Control Valves (Section 4-5.2.12)PTCVL
Pantograph Pressure Control Valves (Section 4-5.2.13)PTPCVL
Overfill Valve for Product Recovery Tanks (Section 4-8.1)OVLPRT
Plug Valves - Lubricated (Section 6-6.2.1)PLVL
Plug Valves - Non-lubricated (Section 6-6.2.2)NPLVL
Gate Valves (Section 6-6.2.3)GTVL
Ball Valves (Section 6-6.2.4)BLVL
Double Block and Bleed Valves (Section 6-6.2.5)DBBVL
Butterfly Valves (Section 6-6.2.6)BFVL
Globe Valves (Section 6-6.2.7)GLVL
Check Valves (Section 6-6.2.8)CKVL
Line Blanks, Ring Spacers, and Spectacle Blinds (Section 6-6.2.9)BLIND
Manual Valve Gear Operators (Section 6-6.2.10)MVLGO
Fire Valves (Section 6-6.4.1)FRVL
Fusible Link Butterfly Valves (Section 6-6.4.2)FLBFVL
Truck Fill Valves (Section 6-6.5.1)TFVL
Motor Operators (Section 6-6.6)MTROP
External High Level Shutoff Valves (HLSO) (Section 8-9.6.1)EHLSVL
Internal HLSO Valves (Section 8-9.6.2)IHLSVL
WasteOil/Water Separators (Section 11-5)OWS

&"Times New Roman,Bold"&14APPENDIX F - Facility Maintenance Plan of 4

Versions and Notes

VersionDateDescription of changes
v2.08/18/21Updated Task Matrix to meet UFC 3-460-03 Change 1 , 29 April 2021
Updated Component Acronym Tab to meet UFC 3-460-03 Change 1 , 29 April 2021