Bolling (BOL)_FMP.xlsx

XLSX spreadsheet 62 KB Posted

Attached to
North Atlantic Division - Air Force (NAD-AF)
Solicitation number
W912DY27RA001
Issued by

About this file

This file is a Facility Maintenance Plan (FMP) for the Bolling (BOL) fueling station located at Joint Base Anacostia-Bolling in Washington, DC. The document provides a comprehensive inventory and detailed breakdown of the facility's fuel infrastructure, including three 10,000-gallon double-walled underground tanks (two diesel, one MRR), a service station with eight dispensers, canopies, lighting, emergency systems, and various associated equipment such as vapor recovery systems, breakaway valves, hose retrievers, and grounding systems.

The FMP includes extensive technical specifications for each component, utilizing a standardized Component Unique Identifier (CUID) system that follows a specific format of Site Code-Facility #-Component Acronym-Sequential Number. The document provides instructions for maintenance tracking, requiring contractors to document manufacturer requirements, operator support needs, system availability impacts, and any potential maintenance-related interruptions. The facility operates from 0700-1530 Monday through Friday and is located in Building 520 at the joint base, with a focus on maintaining operational readiness and compliance with federal petroleum facility regulations.

View the file

Other files

File Type Posted
Solicitation - W912DY26RA004.pdf PDF
Pittsburgh (PIT)_FMP.xlsx XLSX spreadsheet
Bangor (BLL) _FMP.xlsx XLSX spreadsheet
Bangor (BGR)_FMP.xlsx XLSX spreadsheet
Andrews (ADR) _FMP.xlsx XLSX spreadsheet
Exhibit A CDRL - NAD-AF CDRL Set 1 1-67.pdf PDF
Attachment 0007 Price Worksheet NAD-AF Fuels 10.21.25.xlsx XLSX spreadsheet
Pittsburgh (GPI)_FMP.xlsx XLSX spreadsheet
Pease (PNG)_FMP.xlsx XLSX spreadsheet
McGuire (MCG)_FMP.xlsx XLSX spreadsheet
Lakehurst (LKH) _FMP.xlsx XLSX spreadsheet
Frances Gabreski (SUF)__FMP.xlsx XLSX spreadsheet
Fort Indiantown (HRI) _FMP.xlsx XLSX spreadsheet
Dover (DOV) _FMP.xlsx XLSX spreadsheet
Burlington (BUR)_FMP.xlsx XLSX spreadsheet
Bradley (BRD)_FMP.xlsx XLSX spreadsheet
Atlantic City (ATL) _FMP.xlsx XLSX spreadsheet
Attachment 0002 Sample Service Order.xlsx XLSX spreadsheet
New Castle (NCG) _FM.xlsx XLSX spreadsheet
McGuire (MCA) _FMP.xlsx XLSX spreadsheet
Martin State (MRT) _FMP.xlsx XLSX spreadsheet
Langley (LGY) _FMP.xlsx XLSX spreadsheet
Horsham (WLG) _FMP.xlsx XLSX spreadsheet
Hanscom (HSM)__FMP.xlsx XLSX spreadsheet
Fort Eustis (EUS) _FMP.xlsx XLSX spreadsheet
Fort Dix (DIX) _FMP.xlsx XLSX spreadsheet
Attachment 0003 Technical Eval Form Rev1_NAD-AF_2025-10-24.pdf PDF
Attachment 0005 Instructions and Evaluation Factors FUELS.pdf PDF
Attachment 0006 - Fuels Draft QASP_20210201.pdf PDF
Attachment 0008 Small Business Participation Plan Template.pdf PDF
Otis (OTS)_FMP.xlsx XLSX spreadsheet
Niagara Falls (NFL)_FMP.xlsx XLSX spreadsheet
Harrisburg (HRR) _FMP.xlsx XLSX spreadsheet
Hancock (HFD) _FMP.xlsx XLSX spreadsheet
Barnes (BNS)__FMP.xlsx XLSX spreadsheet
12.0 Appendix K - DLA RP Inventory_NAD_AF_Final_2025-10-28.xlsx XLSX spreadsheet
Attachment 0001 Draft PWS Appendices NAD-AF 2025-10-26.pdf PDF
Attachment 0004 - PPQ Sample.pdf PDF
Show all 38

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Administrative

LocationSite NameJoint Base Anacostia-Bolling
RPSUID193494
DLA Site CodeBOL
Hours of Operation0700-1530 M-F
AddressAndrew Bruce

Bldg 520 Joint Base Anacostia Bolling Washington DC 20032

ContractContractor
Contract #
Local POCsFMSR Phone
FMSR Email
Alt FMSR Phone
Alt FMSR Email
DLA/SCP POCsDLA PM Phone
DLA PM Email
SCP PM Phone
SCP PM Email
Contractor POCsContractor PM Phone
Contractor PM Email
Contractor QC Phone
Contractor QC Email
Contractor SM Phone
Contractor SM Email
USACE POCsUSACE PM/COR Phone
USACE PM/COR Email
USACE PE Phone
USACE PE Email
USACE KO Phone
USACE KO Email

Facility Maintenance Plan &A

&P of &N

Instructions:

This table shows the minimum information required. Additional details should be included based on site specific requirements. Additional POCs may be required.

General Facility Description

Anacostia-Bolling (BOL)
Facility #From EBS ListingRPA Total Unit of Measure QuantityFAC Measurement Type
TANKS
365Double-Walled Underground Shop-Fabricated Tanks - MRR10K gallons
365Double-Walled Underground Shop-Fabricated Tanks - Diesel10K gallons
365Double-Walled Underground Shop-Fabricated Tanks - Diesel10K gallons
Service Station
365FILLING STATION BUILDING4 dispensersSF
365SECURITY LIGHTING AT 365
365SIDEWALK AT 365
365FILLING STATION B365 CANOPY

Facility Maintenance Plan &A

&P of &N

Instructions:

Include a general facility overview and description of each fuel system for the sites in accordance with UFC 3-460-01. Examples include: Bulk Storage Facilities, Aircraft Fueling Facilities, Marine and Dispensing Facilities, Ground Products Fueling Facilities, Alternate POL Facilities, and Support Facilities. Also include facility #s, facility names, fuel type, photos, and any other pertinent information.

Include Site Specific Conditions and Restrictions in this tab.

Communication Plan

&A

&P of &N

Instructions:

Communication plan shall address in/out briefs, lines of communication, coordination for access, etc.

Safety

&A

&P of &N

Instructions:

Site Specific Addendum and Activity Hazard Analysis, which are Attachments to the APP, specific to activities or tasks related to recurring maintenance for this site.

PM Schedule

Instructions:

Link PM schedule here

Task Matrix

Applicable Facility AssetsUFC System Level Maintenance FrequencySpecial Considerations
DLA
(EBS) Facility #Army Facility #Navy (iNFADS) Facility #Air Force (ACESRPFM/ NEXGEN) Facility #Real Property Unique IdentifierFacility NameOperational AreaComponent TypeCUIDMakeModelCapacity/SizeQSAUFC Section ReferenceManufacturer RequirementsOperator/ equipment RequirementsSystem availabilityOther ContractComments
365365393467Service StationFueling stationBollardBOL-365-BLRD-063ConcretePlastic Cover5' x 6"0There is 8 on siteDS50, Dispenser 8
365365393467Service StationFueling AreaBollardBOL-365-BLRD-099Yellow Plastic Sleeve5 1/4" x 60"0
365365393467Service StationFueling AreaBollardBOL-365-BLRD-099aYellow Plastic Sleeve5 1/4" x 60"0
365365393467Service StationFueling AreaBollardBOL-365-BLRD-099bYellow Plastic Sleeve5 1/4" x 60"0
365365393467Service StationFueling AreaBollardBOL-365-BLRD-099cYellow Plastic Sleeve5 1/4" x 60"0
365365393467Service StationFueling AreaBollardBOL-365-BLRD-099dYellow Plastic Sleeve5 1/4" x 60"0
365365393467Service StationFueling AreaBollardBOL-365-BLRD-099eYellow Plastic Sleeve5 1/4" x 60"0
365365393467Service StationFueling AreaBollardBOL-365-BLRD-099fYellow Plastic Sleeve5 1/4" x 60"0
3653651144977Service StationFueling stationCanopiesBOL-365-CP-06420' x 30'XSection 11-2.22 Supports 4 Lights, Dispenser 5-8
3653651144977Service StationFueling stationCanopiesBOL-365-CP-06520' x40'XSection 11-2.23 Supports 8 lights, Dispenser 1-4
365365393467Service Station365Emergency Eyewash/ShowersBOL-365-ESOVL-066SpeakmanSE-7000-PL = 462Section 11-3,
365365393467Service StationFueling AreaSignage and MarkingsBOL-365-SPMSS-092DANGER No Open Flame Signs24"x 24" (2-ea)Section 2-7Pole Mounted,
365365393467Service StationFueling AreaSignage and MarkingsBOL-365-SPMSS-092aDANGER No Open Flame Signs24"x 24" (2-ea)Section 2-7Pole Mounted
365365393467Service StationFueling AreaSignage and MarkingsBOL-365-SPMSS-093DANGER No Open Flame Signs18"x 12" (5-ea)Section 2-7Fence
365365393467Service StationFueling AreaSignage and MarkingsBOL-365-SPMSS-093aDANGER No Open Flame Signs18"x 12" (5-ea)Section 2-7Fence
365365393467Service StationFueling AreaSignage and MarkingsBOL-365-SPMSS-093bDANGER No Open Flame Signs18"x 12" (5-ea)Section 2-7Fence
365365393467Service StationFueling AreaSignage and MarkingsBOL-365-SPMSS-093cDANGER No Open Flame Signs18"x 12" (5-ea)Section 2-7Fence
365365393467Service StationFueling AreaSignage and MarkingsBOL-365-SPMSS-093dDANGER No Open Flame Signs18"x 12" (5-ea)Section 2-7Fence
365365393467Service StationFueling AreaSignage and MarkingsBOL-365-SPMSS-094DANGER No Open Flame Signs24"x 18" (3-ea)Section 2-7Fence
365365393467Service StationFueling AreaSignage and MarkingsBOL-365-SPMSS-094aDANGER No Open Flame Signs24"x 18" (3-ea)Section 2-7Fence
365365393467Service StationFueling AreaSignage and MarkingsBOL-365-SPMSS-094bDANGER No Open Flame Signs24"x 18" (3-ea)Section 2-7Fence
365365393467Service StationFueling AreaSignage and MarkingsBOL-365-SPMSS-095WARNING Gas into Containers Signs28"x 26" (2-ea)Section 2-7Pole Mounted
365365393467Service StationFueling AreaSignage and MarkingsBOL-365-SPMSS-095aWARNING Gas into Containers Signs28"x 26" (2-ea)Section 2-7Pole Mounted
365365393467Service StationFueling AreaSignage and MarkingsBOL-365-SPMSS-096MRR Tank 1 Sign24"x 18" (1-ea)Section 2-7Pole Mounted
365365393467Service StationFueling AreaSignage and MarkingsBOL-365-SPMSS-097DS2 Tank 2 Sign24"x 18" (1-ea)Section 2-7Pole Mounted
365365393467Service StationFueling AreaSignage and MarkingsBOL-365-SPMSS-098DS2 Tank 3 Sign24"x 18" (1-ea)Section 2-7Pole Mounted
36536510000Service StationTank 1Rope Sensor SystemsBOL-365-SNDTB-077Section 6-13.1.1Snake Sensor,
36536510000Service StationTank 2Rope Sensor SystemsBOL-365-SNDTB-082Section 6-13.1.1Snake Sensor,
36536510000Service StationTank 3Rope Sensor SystemsBOL-365-SNDTB-087Section 6-13.1.1Snake Sensor,
36536510000Service StationTank 1Point Sensor - DryBOL-365-PSPV-073Veeder-RootSection 6-13.1.2,
36536510000Service StationTank 2Point Sensor - DryBOL-365-PSPV-079Veeder-RootSection 6-13.1.2,
36536510000Service StationTank 3Point Sensor - DryBOL-365-PSPV-084Veeder-RootSection 6-13.1.2,
36536510000Service StationTank 1Ball ValvesBOL-365-BLVL-0722"Section 6-6.2.4,
36536510000Service StationTank 2Ball ValvesBOL-365-BLVL-0782"Section 6-6.2.4,
36536510000Service StationTank 3Ball ValvesBOL-365-BLVL-0832"Section 6-6.2.4,
365365393467Service StationFueling stationEmergency Shutoff Valves (Shear Valves)BOL-365-EMGVT-002OPW1 1/2"Section 7-12MRR, Dipsenser1/2
365365393467Service StationFueling stationEmergency Shutoff Valves (Shear Valves)BOL-365-EMGVT-016OPW2"Section 7-12DS3, Dispenser 3/4
365365393467Service StationFueling stationEmergency Shutoff Valves (Shear Valves)BOL-365-EMGVT-032OPW2"Section 7-12DS19, Dispenser 5/6
365365393467Service StationFueling stationEmergency Shutoff Valves (Shear Valves)BOL-365-EMGVT-048OPW2"Section 7-12DS35, Dispenser 7/8
365365393467Service Station365EFSO SystemsBOL-365-ELEMT-067XSection 7-162 on site,
36536510000Service StationTank 1Stage II Vapor RecoveryBOL-365-STGS-0764"Section 7-17.2,
365365393467Service StationFueling stationDispenser NozzlesBOL-365-DSSTR-006EMCOXSection 7-2Stage 2 Vapor RecoveryMRR, Dispenser 1
365365393467Service StationFueling stationDispenser NozzlesBOL-365-DSSTR-012EMCOXSection 7-2Stage 2 Vapor RecoveryMRR, Dispenser 2
365365393467Service StationFueling stationDispenser NozzlesBOL-365-DSSTR-022OPW7-HB1"XSection 7-2DS9, Dispenser 3
365365393467Service StationFueling stationDispenser NozzlesBOL-365-DSSTR-029OPW7-HB1"XSection 7-2DS16, Dispenser 4
365365393467Service StationFueling stationDispenser NozzlesBOL-365-DSSTR-038OPW7-HB1"XSection 7-2DS25, Dispenser 5
365365393467Service StationFueling stationDispenser NozzlesBOL-365-DSSTR-045OPW7-HB1"XSection 7-2DS32, Dispenser 6
365365393467Service StationFueling stationDispenser NozzlesBOL-365-DSSTR-054OPW7-HB1"XSection 7-2DS41, Dispenser 7
365365393467Service StationFueling stationDispenser NozzlesBOL-365-DSSTR-061OPW7-HB1"XSection 7-2DS48, Dispenser 8
365365393467Service StationFueling stationDispenser HosesBOL-365-DSMTR-003VEYANCE9253408'XSection 7-3STAGE 2 VAPOR RECOVERYMRR, Dipsenser1
365365393467Service StationFueling stationDispenser HosesBOL-365-DSMTR-005Contitech10509712"XSection 7-3Stage 2 Vapor RecoveryDispenser Whip Hoses , MRR, Dipenser 1
365365393467Service StationFueling stationDispenser HosesBOL-365-DSMTR-007Good Year559M3.5'XSection 7-3Stage 2 Vapor Recovery HoseMRR, Dispenser 1
365365393467Service StationFueling stationDispenser HosesBOL-365-DSMTR-009VEYANCE9253408'XSection 7-3STAGE 2 VAPOR RECOVERYMRR, Dipsenser 2
365365393467Service StationFueling stationDispenser HosesBOL-365-DSMTR-011Contitech10509712"XSection 7-3Stage 2 Vapor RecoveryMRR, Dipenser 2
365365393467Service StationFueling stationDispenser HosesBOL-365-DSMTR-013Good Year559M3.5'XSection 7-3Stage 2 Vapor Recovery HoseMRR, Dispenser 2
365365393467Service StationFueling stationDispenser HosesBOL-365-DSMTR-018RU559N1" x 8'XSection 7-3DS5, Dispenser 3
365365393467Service StationFueling stationDispenser HosesBOL-365-DSMTR-020OPW1" x 6"XSection 7-3Dispenser Whip Hoses, DS7, Dispenser 3
365365393467Service StationFueling stationDispenser HosesBOL-365-DSMTR-025RU559N1" x 8'XSection 7-3DS12, Dispenser 4
365365393467Service StationFueling stationDispenser HosesBOL-365-DSMTR-027OPW1" x 6"XSection 7-3Dispenser Whip Hoses, DS14, Dispenser 4
365365393467Service StationFueling stationDispenser HosesBOL-365-DSMTR-034RU559N1" x 8'XSection 7-3DS21, Dispenser 5
365365393467Service StationFueling stationDispenser HosesBOL-365-DSMTR-036OPW1" x 6"XSection 7-3Dispenser Whip Hoses, DS23, Dispenser 5
365365393467Service StationFueling stationDispenser HosesBOL-365-DSMTR-041RU559N1" x 8'XSection 7-3DS28, Dispenser 6
365365393467Service StationFueling stationDispenser HosesBOL-365-DSMTR-043OPW1" x 6"XSection 7-3Dispenser Whip Hoses, DS30, Dispenser 6
365365393467Service StationFueling stationDispenser HosesBOL-365-DSMTR-050RU559N1" x 8'XSection 7-3DS37, Dispenser 7
365365393467Service StationFueling stationDispenser HosesBOL-365-DSMTR-052OPW1" x 6"XSection 7-3Dispenser Whip Hoses, DS39, Dispenser 7
365365393467Service StationFueling stationDispenser HosesBOL-365-DSMTR-057RU559N1" x 8'XSection 7-3DS44, Dispenser 8
365365393467Service StationFueling stationDispenser HosesBOL-365-DSMTR-059OPW1" x 6"XSection 7-3Dispenser Whip Hoses, DS46, Dispenser 8
365365393467Service StationFueling stationBreakawaysBOL-365-BFVL-004EMCOA4119EVRXSection 7-4Stage 2 Vapor RecoveryMRR, Dispenser 1
365365393467Service StationFueling stationBreakawaysBOL-365-BFVL-010EMCOA4119EVRXSection 7-4Stage 2 Vapor RecoveryMRR, Dispenser 2
365365393467Service StationFueling stationBreakawaysBOL-365-BFVL-019OPW66V-13001"XSection 7-4DS6, Dispenser 3
365365393467Service StationFueling stationBreakawaysBOL-365-BFVL-026OPW66V-13001"XSection 7-4DS13, Dispenser 4
365365393467Service StationFueling stationBreakawaysBOL-365-BFVL-035OPW66V-13001"XSection 7-4DS22, Dispenser 5
365365393467Service StationFueling stationBreakawaysBOL-365-BFVL-042OPW66V-13001"XSection 7-4DS29, Dispenser 6
365365393467Service StationFueling stationBreakawaysBOL-365-BFVL-051OPW66V-13001"XSection 7-4DS38, Dispenser 7
365365393467Service StationFueling stationBreakawaysBOL-365-BFVL-058OPW66V-13001"XSection 7-4DS45, Dispenser 8
365365393467Service StationFueling stationSwivelsBOL-365-TCLEAN-021OPW1"Section 7-5DS8, Dispenser 3
365365393467Service StationFueling stationSwivelsBOL-365-TCLEAN-028OPW1"Section 7-5DS15, Dispenser 4
365365393467Service StationFueling stationSwivelsBOL-365-TCLEAN-037OPW1"Section 7-5DS24, Dispenser 5
365365393467Service StationFueling stationSwivelsBOL-365-TCLEAN-044OPW1"Section 7-5DS31, Dispenser 6
365365393467Service StationFueling stationSwivelsBOL-365-TCLEAN-053OPW1"Section 7-5DS40, Dispenser 7
365365393467Service StationFueling stationSwivelsBOL-365-TCLEAN-060OPW1"Section 7-5DS47, Dispenser 8
365365393467Service StationFueling stationHose RetrieverBOL-365-HADP-008ZeppiniSection 7-6MRR, Dispenser 1
365365393467Service StationFueling stationHose RetrieverBOL-365-HADP-014ZeppiniSection 7-6MRR, Dispenser 2
365365393467Service StationFueling stationHose RetrieverBOL-365-HADP-023Pomeco100-36'Section 7-6DS10, Dispenser 3
365365393467Service StationFueling stationHose RetrieverBOL-365-HADP-030Pomeco100-36'Section 7-6DS17, Dispenser 4
365365393467Service StationFueling stationHose RetrieverBOL-365-HADP-039Pomeco100-36'Section 7-6DS26, Dispenser 5
365365393467Service StationFueling stationHose RetrieverBOL-365-HADP-046Pomeco100-36'Section 7-6DS33, Dispenser 6
365365393467Service StationFueling stationHose RetrieverBOL-365-HADP-055Pomeco100-36'Section 7-6DS42, Dispenser 7
365365393467Service StationFueling stationHose RetrieverBOL-365-HADP-062Pomeco100-36'Section 7-6DS49, Dispenser 8
365365393467Service StationFueling stationDispenser CabinetBOL-365-DSFLR-001Wayne3/G7202P = 33191DSection 7-7MRR, Dipsenser1/2
365365393467Service StationFueling stationDispenser CabinetBOL-365-DSFLR-015Bennett3712SNS = 10V1057007Section 7-7DieselDS2, Dispenser 3/4
365365393467Service StationFueling stationDispenser CabinetBOL-365-DSFLR-031Wayne7/G6202P/27AGJK/AJMSW1 = 29919DSection 7-7DS18, Dispenser 5/6
365365393467Service StationFueling stationDispenser CabinetBOL-365-DSFLR-047Wayne3/G7202P/29HJ/JKS3 = 33188DSection 7-7DS34, Dispenser 7/8
365365393467Service StationFueling stationDispenser FiltersBOL-365-DSHS-017Bio-Tech70991 = 400BHA -05Section 7-9DS4, Dispenser 3
365365393467Service StationFueling stationDispenser FiltersBOL-365-DSHS-024Bio-Tech70991 = 400BHA -05Section 7-9DS11, Dispenser 4
365365393467Service StationFueling stationDispenser FiltersBOL-365-DSHS-033Bio-Tech70991 = 400BHA -05Section 7-9DS20, Dispenser 5
365365393467Service StationFueling stationDispenser FiltersBOL-365-DSHS-040Bio-Tech70991 = 400BHA -05Section 7-9DS27, Dispenser 6
365365393467Service StationFueling stationDispenser FiltersBOL-365-DSHS-049Bio-Tech70991 = 400BHA -05Section 7-9DS36, Dispenser 7
365365393467Service StationFueling stationDispenser FiltersBOL-365-DSHS-056Bio-Tech70991 = 400BHA -05Section 7-9DS43, Dispenser 8
36536510000Service StationTank FarmDouble-Walled Underground Shop-Fabricated TanksBOL-365-DPSCVL-06910000 GallonsXSection 8-5.4.2Tank 1 MRR,
36536510000Service StationTank FarmDouble-Walled Underground Shop-Fabricated TanksBOL-365-DPSCVL-07010000 GallonsXSection 8-5.4.2Tank 2 DS2,
36536510000Service StationTank FarmDouble-Walled Underground Shop-Fabricated TanksBOL-365-DPSCVL-07110000 GallonsXSection 8-5.4.2Tank 3 DS2,
36536510000Service StationTank 1Fill PortsBOL-365-FSCVL-0754"Section 8-9.12,
36536510000Service StationTank 2Fill PortsBOL-365-FSCVL-0814"Section 8-9.12,
36536510000Service StationTank 3Fill PortsBOL-365-FSCVL-0864"Section 8-9.12,
36536510000Service StationTank FarmEmergency VentsBOL-365-EHLSVL-088OPWXSection 8-9.4One vent per tank,
36536510000Service Station365Externally Mounted Level AlarmsBOL-365-FPRT-068Veeder-RootSection 8-9.9.1Attached to a test button,
36536510000Service StationTank FarmStatic Grounding SystemsBOL-365-STHC-089HanneyHGR 100-100 = 2885032Section 9-1.6.22-ea Ground reels,
3653651145034Service StationExterior Service StationLightingBOL-365-LPTS-09025' RoundSection 9-1.8Pole #1 -3 Lights, Pole #2 - 2 Lights,
3653651145034Service StationExterior Service StationLightingBOL-365-LPTS-090a25' RoundSection 9-1.8Pole #1 -3 Lights, Pole #2 - 2 Lights,
36536510000Service StationTank 1Electronic Overfill Protection SystemsBOL-365-EMEWSH-074Veeder-Root4"Section 9-6,
36536510000Service StationTank 2Electronic Overfill Protection SystemsBOL-365-EMEWSH-080Veeder-Root4"Section 9-6,
36536510000Service StationTank 3Electronic Overfill Protection SystemsBOL-365-EMEWSH-085Veeder-Root4"Section 9-6,
365365161005Service Station365Electronic Overfill Protection SystemsBOL-365-EMEWSH-091Veeder-Root0848290-022 = E0516055305001Section 9-6,

&"Times New Roman,Bold"&14Facility Maintenance Plan &A

&P of &N

Instructions:

1. Input all data as indicated on the sheet.

2. Additional documents referred to in the Special Considerations column shall be included as an appendix to this FMP.

3. The contractor shall generate a Component Unique Identifier (CUID) for each component utilizing the Component Acronym Sheet within this Work Book. The unique identifier must use the following:

Three letter Site Code - Facility # - Component Acronym - Sequential number Example: AAD-00063A-RCVL-0001

If component acronym is not listed, the contractor shall request an acronym be established through the HNC Project Manager and Project Engineer via email. Contractors may utilize other means of tracking/labeling assets such as QR codes in addition to the required CUID however, tracking/labeling must correlate with the CUID. This CUID shall be the standard for all DLA capitalized equipment. Base Asset ID if used by site shall be cross referenced with CUID appropriately.

4. Utilize the UFC Section Reference Work Category as noted on the Component Acronym Sheet.

5. Enter any applicable manufacturer requirements not stated in the UFC. References are acceptable with attachments.

6. Enter any applicable operator support or government owned equipment required to complete the RM task.

7. Enter impact on system availability by performing the RM task. This could include shutdown, lockout, or similar impacts.

8. Enter contract information for any other contract, contractor, or government personnel performing the applicable task. This is applicable to other Centrally Managed Programs, SRM, MILCON, or Public Works/Civil Engineering projects.

9. Print Hard Copies as 11x17.

FS-PF Schedule

Instructions:

1. Input all data as indicated on the sheet.

2. Additional documents referred to in the Special Considerations column shall be included as an appendix to this FMP.

3. The contractor shall generate a Component Unique Identifier (CUID) for each component utilizing the Component Acronym Sheet within this Work Book. The unique identifier must use the following:

Three letter Site Code - Facility # - Component Acronym - Sequential number Example: AAD-00063A-RCVL-0001

If component acronym is not listed, the contractor shall request an acronym be established through the HNC Project Manager and Project Engineer via email. Contractors may utilize other means of tracking/labeling assets such as QR codes in addition to the required CUID however, tracking/labeling must correlate with the CUID. This CUID shall be the standard for all DLA capitalized equipment.

4. Utilize the UFC Section Reference Work Category as noted on the Component Acronym Sheet.

5. Enter any applicable manufacturer requirements not stated in the UFC. References are acceptable with attachments.

6. Enter any applicable operator support or government owned equipment required to complete the RM task.

7. Enter impact on system availability by performing the RM task. This could include shutdown, lockout, or similar impacts.

8. Filter Separators and Pre-Filters identified here shall also be provided in the Task Matrix Tab.

9. Print Hard Copies as 11x17.

Component Acronym

Component Unique Identifier:Site Code-Facility #-Component Acronym-Sequential #
Example:AAD-00063A-RCVL-0001
NOTE: If component acronym is not listed, the contractor shall request an acronym be established through the HNC Project Manager and Project Engineer via email. Contractors may utilize other means of tracking/labeling assets such as QR codes in addition to the required CUID however, tracking/labeling must correlate with the CUID. This CUID shall be the standard for all DLA capitalized equipment
DLA Work Type CategoryUFC Section Reference Work Category
(Revised per Change 1, 29 April 2021)Component Acronym
Air CompressorsAir CompressorsAIRC
AlarmsExternally Mounted Level Alarms (Section 8-9.9.1)EMLA
Internally Mounted Level Alarms (Section 8-9.9.3)IMLA
BollardBollardsBLRD
BuildingBuilding HVACBHVAC
Building Domestic Water SystemBWTR
Building Waste WaterBWSW
Building - LightingBLTG
Building - ArchitecturalBARCH
Building - Fire Sprinkler SystemBFIRE
Containment/JointsContainment Systems (General) (Section 8-10.1)CSGEN
Concrete and Cement Brick Dike/Berm Walls (Section 8-10.2.1)DKBW
Dike/Berm Floors (Section 8-10.2.2)DKBF
Earthen Dike Walls (Section 8-10.3)ETHDW
Self-Diking or Vaulted Tank Containment (Section 8-10.4)SDVTCS
Flexible Membrane Liners (Section 8-10.5)FXML
Fuel Truck and Rail Car Containment Areas (Section 11-1.1)FTKRCC
Remote Spill Containment (Section 11-1.2)RSCS
Piers and Wharves Fuel Containment Systems (Section 5-1.2) - TestingFPWCT
Fuel Pier/Wharf Containment (PWS Section 3)FPWC
Corrosion Control/CoatingsAboveground Piping and Equipment Coatings (Section 6-10.1)AGPCT
MiscellaneousMiscellaneous Deactivated Components (Section 12-5)MDEAC
Electrical/LightingLighting (Section 9-1.8)LIGHT
Electrical/PowerElectrical Equipment (Section 9-1.2)ELEQ
Power Cables (Section 9-1.3)PWRCBL
Motor Controls (Section 9-1.4)MTRCT
Panelboards (Section 9-1.5)PNLB
Electric Motors (Section 9-1.7)ELEMT
Electronic Equipment (9-1.9)ELTREQ
Card and Key Locks (Section 9-3)CKLK
Electrical/ProtectionPower Grounding Systems (Section 9-1.6.1)PWRGS
Static Grounding Systems (Section 9-1.6.2)STGS
Cathodic Protection (Section 9-2.1)CP
Lightning Surge Arresters (Section 9-2.2.1)LSAR
Lightning Protection Systems (Section 9-4)LPTS
Ground Verification System (Section 9-5)GRVS
Electronic Overfill Protection Systems (Section 9-6)EOPS
Eyewash/ShowerEmergency Eyewash/Showers (Section 11-3)EMEWSH
Fencing/
GatesFencingFENC
GatesGATE
FiltrationPre-Filters (Section 3-6.1)PFVSL
Filter Separators (Section 3-6.2)FLSP
Haypack Filters (Section 3-6.3)HPKF
Basket Strainers (Section 3-6.4)BSTR
Filter Separator Sump Heaters (Section 3-6.5)FSSH
Sidestream Filtration Systems (Section 8-9.11)SSFTS
Fire Suppression EquipmentFlame Arrestors (Section 8-9.5)FLMARR
Foam Fire Protection Systems (Section 8-9.15)FFPS
Fire Protection Systems - Wet PipeFPRS
Fuel LaboratoriesVentilation Hoods (Section 11-4.1)VENTHD
GaugesPressure and Pressure/Vacuum Gauges (Section 6-7.1)PVGA
Differential Pressure Gauges (Section 6-7.2)DPGA
Mechanical Tape Gauges (Section 8-9.7)MTGA
Mechanically Operated Tape Gauge (Section 8-9.8.1)MOTGA
Magnetostrictive Probes (Section 8-9.8.2)MRPRB
Servo Gauge (Section 8-9.8.3)SRVGA
GeneratorsBack-Up Power GeneratorsBGEN
Heating CoilsSteam Type Heating Coils (Section 8-9.16.1)STHC
Thermal Fluid Type Heating Coils (Section 8-9.16.2)TFTHC
Electric Rod Type Heating (Section 8-9.16.3)ERTH
HosesLoading Fuel Hoses (Section 3-9.1)LDHS
Offloading Fuel Hoses (Section 3-9.2)OLHS
Aircraft Fueling Hoses (Section 4-7.5)ACFHS
HydrazineHydrazine Charging Units (Section 10-3)HDZCU
InspectionsTrouble ShootTRBST
API 510 InspectionsAPI510
API 653 or STI InspectionAPI653
Coatings Condition SurveyCCS
Issue/Receive - GroundDispenser Nozzles (Section 7-2)DSNZ
Dispenser Hoses (Section 7-3)DSHS
Breakaways (Section 7-4)DSBW
Swivels (Section 7-5)DSSW
Hose Retriever (Section 7-6)HSRTV
Dispenser Cabinet (Section 7-7)DSCB
Dispenser Meters (Section 7-8)DSMTR
Dispenser Filters (Section 7-9)DSFLR
Dispenser Strainers (Section 7-10)DSSTR
Ground Vehicle Fuel Piping (Section 7-11)GVFP
Emergency Shutoff Valves (Shear Valves) (Section 7-12)ESHVL
Dispenser Sumps (Section 7-13)DSSMP
Transition Sumps (Section 7-14)TRSMP
Remote Dispenser Pumps (Section 7-15.1)RDSP
Self-Contained Dispenser Pumps (Section 7-15.2)SCDSP
EFSO Systems (Section 7-16)EFSO
Stage I Vapor Recovery (Section 7-17.1)SIVP
Stage II Vapor Recovery (Section 7-17.2)SIIVP
Vapor Burners (Section 7-17.3)VPBNR
Point Sensor - Dry (Section 7-19.1.1)PSDRY
Automatic Line Leak Detector (Section 7-19.1.2)ALLD
Visual Monitoring (Section 7-20.1)VSLM
Issue/Receive - MarineMarine Receipt (Section 5-2)MRNRCP
Marine Issue (Section 5-3)MRNISU
Marine Loading Arms (Section 5-4)MRNLA
Marine Transfer Hoses (Section 5-5.1)MBTHS
Underwater Hoses (Section 5-5.2)UWHS
Single Point Mooring Systems (Section 5-7.1)SPMSS
Multi Point Mooring Systems (Section 5-7.2)MPMSS
Submerged Piping Systems (Section 5-8)SMPS
Boom Reels (Section 5-9)BMRL
Liquefied PetroleumLiquefied Petroleum Tanks (Section 10-1.1)LPTANK
Liquefied Petroleum Pipelines (Section 10-1.2)LPPIPE
Liquefied Petroleum Vapor Lines (Section 10-1.3)LPVPL
LPG Vaporizers (Section 10-1.4)LPGVPZ
Petroleum Gas Regulators (Section 10-1.5)PGREG
Liquefied Petroleum Gas Hoses (Section 10-1.6)LPGHS
Meter/
calibrationsPositive Displacement Meters (Section 3-7.1)PDMT
Turbine Flow Meters (Section 3-7.2)TBFMT
Orifice Flow Meters (Section 3-7.3)OFMT
Natural DisasterNatural Disaster
Natural GasCNG Piping (Section 10-2.1)NGPIPE
CNG Compressors (Section 10-2.2)NGCOMP
CNG Storage (Section 10-2.3)NGSTOR
CNG Dispensers (Section 10-2.4)NGDS
CNG Dispenser Hoses (Section 10-2.5)NGDSHS
NozzleHydrant Adapters (Section 4-7.2)HADP
Fueling Nozzles (Section 4-7.3)FLNZ
OtherFuel Additive Injectors (Section 3-11)FAIJ
PantographFixed Pantographs (Section 4-7.1.1)FXPNT
Detachable Pantographs (Section 4-7.1.2)DTPNT
PipingOn-Base Pipelines (Section 6-1.1)OBPL
Non-DOT Regulated (Section 6-1.2.1)NDPL
Aboveground Piping (Section 6-1.3)AGPL
Double-Wall Piping (Section 6-1.4)DWPL
Low Point Drains (Section 6-12.1)LPDN
High Point Vents (Section 6-12.2)HPVT
Sight Flow Indicators (Section 6-12.3)SFND
Rope Sensor Systems (Section 6-13.1.1)RPSS
Point Sensor - Dry (Section 6-13.1.2)PSDRY
Visual Monitoring (Section 6-14.1)VSLM
Pipe Penetrations (Section 8-10.6)PPEN
Deactivated Petroleum Fuel Pipelines (Section 12-3)DEACPL
Pressure/Temperature ControlAir Eliminator Tanks (Section 3-10.1)AELT
Automatic Air Vents (Section 3-10.2)AAVT
Surge Suppressors (Section 4-7.4)SRGSP
Thermal and Pressure Relief Valves (Section 6-6.3)TPRVL
Pressure Transmitters (Section 6-7.3)PRTR
Differential Pressure Transmitters (Section 6-7.4)DPTR
Flexible Ball Joints (Section 6-8)FBLJT
Dial Thermometer (Section 6-9.1)DTHMR
Emergency Vents (Section 8-9.4)EMGVT
PumpCentrifugal Pumps (Section 3-8.1)CENP
Vertical Inline Pumps (Section 3-8.2)VILP
Vertical Turbine/Submerged Turbine Pumps (Section 3-8.3)VTSP
Sliding Vane Pumps (Section 3-8.5)SLVP
Gear Pumps (Section 3-8.6)GERP
Diaphragm Pumps (Section 3-8.7)DIAP
Internal Combustion Drives (Section 3-8.8)ICDR
Gearboxes (Section 3-8.9)GRBX
Deactivated Petroleum Fuel Pumps (Section 12-4)DEACP
Signage/MarkingsSignage and Markings (Section 2-7)SIGN
StructuresPumphouse/Filter Buildings (Section 11-2.1)PFBLDG
Canopies (Section 11-2.2)CNPY
Cranes and Hoists (Section 11-6)CRNHST
TankAboveground Field-Erected Tanks (Section 8-4)AGFET
Geodesic Dome Roofs (Section 8-4.2)GEODR
Foundations (Section 8-4.3)FOUND
Aboveground Shop Fabricated Tanks (Section 8-5.1)AGSFP
Self-Diking or Vaulted Tanks (Section 8-5.2)SDVT
Rectangular Concrete-Encased Tanks (Section 8-5.3)RCET
Single-Walled Underground Shop-Fabricated Tanks (Section 8-5.4.1)UGSSFT
Double-Walled Underground Shop-Fabricated Tanks (Section 8-5.4.2)UGDSFT
Underground Field-Constructed Tanks (Cut and Cover Tanks) (Section 8-6)UGFET
Tank Cleaning (Section 8-7)TCLEAN
Aluminum Honeycomb Floating Pans (Section 8-9.1.1)AHFP
Steel Floating Pans (Section 8-9.1.2)STLFP
Pontoon Floating Pans (Section 8-9.1.3)PTNFP
Floating Roofs (Section 8-9.1.4)FLTRF
Floating Roof and Pan Pressure/Vacuum Vents (Section 8-9.1.5)FPPVV
Floating Roof and Pan Legs (Section 8-9.1.6)FRPLG
Secondary Tank Bottoms (Section 8-9.2)SNDTB
Tank Pressure/Vacuum Vents (Section 8-9.3)TPVVT
Product Saver Tanks (Section 8-9.10)PRDST
Fill Ports (Section 8-9.12)FPRT
Point Sensor - Dry (Section 8-9.13.1)PSDRY
Point Sensor - Wet (Section 8-9.13.2)PSWET
Point Sensor - Pressure/Vacuum (Section 8-9.13.3)PSPV
Visual Leak Detection (Section 8-9.13.4)VSLLD
Floating Suction Lines (Section 8-9.14)FLTSL
Stilling Wells (Section 8-9.17)STGW
Deactivated Petroleum Fuel Tanks (Section 12-2)DEACT
TestingPressure Testing
Underground PitsIsolation Valve Pits (Section 6-11.1)ISVLP
Hydrant Fuel Pits (Section 6-11.2)HDFP
High Point Vent Pits (Section 6-11.3)HPVP
Low Point Drain Pits (Section 6-11.4)LPDP
Lateral Control Pits (Section 6-11.5)LTCP
ValvesGeneral System Control Valves (Section 4-3.2.1)GSCVL
Refuel Control Valves (Section 4-3.2.5)RCVL
Pressure Relief Valves (Section 4-3.2.6)PRCVL
Defuel Control Valve (Section 4-3.2.7)DFCVL
Dual Rate-of-Flow Control Valves (Section 4-3.2.8)DRFCVL
Combination Dual Rate-of-Flow Control and Solenoid Valves (Section 4-3.3.1)CFSCVL
Dual Pressure Relief, Solenoid Shutoff, and Check Valves (Section 4-3.3.2)DPSCVL
Non-Surge Check Valves (Section 4-4.2.1)NSCKVL
Filter Separator Control Valves (Section 4-4.2.2)FSCVL
Defuel/Flush Valves (Section 4-4.2.3)DFFCVL
Issue Venturi (Section 4-4.2.4)ISVTR
Return Venturi (Section 4-4.2.5)RTVTR
Back Pressure Control Valves (Section 4-4.2.6)BPCVL
Pressure Control Valves (Section 4-4.2.7)PCVL
Hydrant Control Valves (Section 4-4.2.8)HCVL
Emergency Shut-off Valves (Section 4-4.2.9)ESOVL
Pantograph Control Valves (Section 4-5.2.12)PTCVL
Pantograph Pressure Control Valves (Section 4-5.2.13)PTPCVL
Overfill Valve for Product Recovery Tanks (Section 4-8.1)OVLPRT
Plug Valves - Lubricated (Section 6-6.2.1)PLVL
Plug Valves - Non-lubricated (Section 6-6.2.2)NPLVL
Gate Valves (Section 6-6.2.3)GTVL
Ball Valves (Section 6-6.2.4)BLVL
Double Block and Bleed Valves (Section 6-6.2.5)DBBVL
Butterfly Valves (Section 6-6.2.6)BFVL
Globe Valves (Section 6-6.2.7)GLVL
Check Valves (Section 6-6.2.8)CKVL
Line Blanks, Ring Spacers, and Spectacle Blinds (Section 6-6.2.9)BLIND
Manual Valve Gear Operators (Section 6-6.2.10)MVLGO
Fire Valves (Section 6-6.4.1)FRVL
Fusible Link Butterfly Valves (Section 6-6.4.2)FLBFVL
Truck Fill Valves (Section 6-6.5.1)TFVL
Motor Operators (Section 6-6.6)MTROP
External High Level Shutoff Valves (HLSO) (Section 8-9.6.1)EHLSVL
Internal HLSO Valves (Section 8-9.6.2)IHLSVL
WasteOil/Water Separators (Section 11-5)OWS

&"Times New Roman,Bold"&14APPENDIX F - Facility Maintenance Plan of 4

Versions and Notes Version Date Description of changes

File details come from the government source that posted it. Updated .