HISTORICAL SMALL BUSINESS UTILIZATION.docx

DOCX document 17 KB Posted

Attached to
P3003, Consolidated Communication Center, AAFB Federal contract opportunity
Solicitation number
N40080-21-R-9670
Issued by
Department of the Navy Naval Facilities Engineering Command

About this file

This document contains a historical small business utilization form and details of a federal contract opportunity for construction services. The form requires offerors for solicitation N40080-21-R-9670 to provide past performance data on small business subcontracting achievements for up to three relevant projects. It collects information on small business dollars and percentages subcontracted at the prime and subcategory levels. The federal contract opportunity is for P3003 to construct a 79,374 square foot consolidated communication center at Joint Base Andrews for the Air Force, White House, and Defense Information System Agency. The scope of work includes building the new facility, demolishing two existing buildings, and removing electrical, HVAC, and fuel tank infrastructure. The solicitation is being conducted by the Department of the Navy Naval Facilities Engineering Command for critical communication center functions.

View the file

Other files for this federal contract opportunity

Other files attached to P3003, Consolidated Communication Center, AAFB, newest first.
File Type Posted
P-3003 AMENDMENT 0009.pdf PDF
P-3003 AMENDMENT 0008.pdf PDF
P-3003 AMENDMENT 0007.pdf PDF
P-3003 AMENDMENT 0006.pdf PDF
P3003 Revised Price Schedule - 15 APR 2021.doc DOC document
P3003 AMENDMENT 0005.pdf PDF
Site Vist Sign In Sheet2.pdf PDF
Site Visit Sign In Sheet1.pdf PDF
P-3003 AMENDMENT 0004.pdf PDF
Andrews Air Force Base (ADW) MD - Bing Maps.pdf PDF
P-3003 AMENDMENT 0003.pdf PDF
P-3003 AMENDMENT 0002.pdf PDF
02 P3003 IFC Drawings Vol 4.pdf PDF
02 P3003 IFC Drawings Vol 2.pdf PDF
P-3003 AMENDMENT 0001.pdf PDF
02 P3003 IFC Drawings Vol 1.pdf PDF
02 P3003 IFC Drawings Vol 6.pdf PDF
02 P3003 IFC Drawings Vol 7.pdf PDF
02 P3003 IFC Drawings Vol 5.pdf PDF
02 P3003 IFC Drawings Vol 3.pdf PDF
Construction Experience Project Data Sheet.doc DOC document
SMALL BUSINESS PARTICIPATION COMMITMENT DOCUMENT.docx DOCX document
06 P3003 CCC SID IFC.pdf PDF
N40080-21-R-9670 - P3003 SOLICITATION.pdf PDF
SMALL BUSINESS SUBCONTRACTING PLAN.docx DOCX document
P3003 Bid Schedule - 18 Mar 2021.doc DOC document
Past Performance Questionannaire.docx DOCX document
P3003 - Hazard Analysis Report.pdf PDF
06 P3003 CCC FFE 2021 IFC.pdf PDF
03 P3003 CCC Specifications Signed.pdf PDF
Show all 30

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

HISTORICAL SMALL BUSINESS UTILIZATION

N40080-21-R-9670

This form is to be completed by all Offerors (both large and small businesses) in order to provide supporting information for the evaluation of Factor 5, Small Business Utilization and Participation. Attachment E documents the offeror’s historical small business utilization and achievements for each project submitted under Factor 2, Experience. Round all percentages to the nearest tenth of a percent (i.e., include only 1 number after the decimal point).

Include actual dollar values subcontracted for each of the categories listed. Include the whole dollar and percentage goals ONLY if a goal was established. If established goals were not met on any submitted projects, an explanation for each unmet goal is required. Acknowledging a goal was missed, is not the same as providing an explanation for why a goal was missed. If goals were not established for a project, mark N/A. Enter zeroes (0) where applicable.

Project #1: Contract/Project Number/Task Order Number:

Project Title:

Offeror Size: Large Business |_| Small Business |_|

Performed as: Prime Contractor |_| Subcontractor |_| JV Member |_|

Subcontracting Plan Required: |_| Yes |_| No

ACTUAL

SUBCONTRACTED

SUBCONTRACT GOAL

(if applicable)

Total Project Dollar Value: $

Total Self Performed Value: $
Whole Dollars
Percent
Percent

Total Subcontracted Value: $

(a) Small Business Concerns (Include Values from d-h below and Self-Performed Value IF Small Business)

(b) Large Business Concerns

(c) Total (sum of lines a & b above)

(d) Small Disadvantaged Business Concerns (SDB)

(e) Women-Owned Small Business Concerns (WOSB)

(f) HUBZone Small Business Concerns

(g) Veteran-Owned Small Business Concerns (VOSB)

(h) Service-Disabled Veteran-Owned Small Business Concerns (SDVOSB)

Explanation of each unmet goal (if applicable):

Explanation for a lack of small business subcontracting achievements (if applicable):

Name of customer reference for this project:

Phone Number:

Email address:

ACTUAL

SUBCONTRACTED

SUBCONTRACT GOAL

(if applicable)

Project #2: Contract/Project Number/Task Order Number:

Project Title:

Offeror Size: Large Business |_| Small Business |_|

Performed as: Prime Contractor |_| Subcontractor |_| JV Member |_|

Subcontracting Plan Required: |_| Yes |_| No

Total Project Dollar Value: $
Whole Dollars
Percent
Percent

Total Self Performed Value: $

Total Subcontracted Value: $

(a) Small Business Concerns (Include Values from d-h below and Self-Performed Value IF Small Business)

(b) Large Business Concerns

(c) Total (sum of lines a & b above)

(d) Small Disadvantaged Business Concerns (SDB)

(e) Women-Owned Small Business Concerns (WOSB)

(f) HUBZone Small Business Concerns

(g) Veteran-Owned Small Business Concerns (VOSB)

(h) Service-Disabled Veteran-Owned Small Business Concerns (SDVOSB)

Explanation of each unmet goal (if applicable):

Explanation for a lack of small business subcontracting achievements (if applicable):

ACTUAL

SUBCONTRACTED

SUBCONTRACT GOAL

(if applicable)

Name of customer reference for this project:

Phone Number:

Email address:

Project #3: Contract/Project Number/Task Order Number:

Project Title:

Offeror Size: Large Business |_| Small Business |_|

Performed as: Prime Contractor |_| Subcontractor |_| JV Member |_|

Subcontracting Plan Required: |_| Yes |_| No

Whole Dollars
Percent
Percent

Total Project Dollar Value: $

Total Self Performed Value: $

Total Subcontracted Value: $

(a) Small Business Concerns (Include Values from d-h below and Self-Performed Value IF Small Business)

(b) Large Business Concerns

(c) Total (sum of lines a & b above)

(d) Small Disadvantaged Business Concerns (SDB)

(e) Women-Owned Small Business Concerns (WOSB)

(f) HUBZone Small Business Concerns

File details come from the government source that posted it. Updated .