02 P3003 IFC Drawings Vol 3.pdf

PDF 33 MB Posted

Attached to
P3003, Consolidated Communication Center, AAFB Federal contract opportunity
Solicitation number
N40080-21-R-9670
Issued by
Department of the Navy Naval Facilities Engineering Command

About this file

This solicitation is for the construction of a 79,374 square foot consolidated communication center at Joint Base Andrews in Maryland. The two-story steel and masonry facility will support critical communication functions for the Air Force, White House, and Defense Information System Agency. It will include communication infrastructure, environmental controls, parking area, exterior lighting and landscaping. In addition, the project scope involves demolishing two existing buildings totaling 105,841 square feet and removing associated infrastructure including electrical/communications ducts, HVAC equipment and fuel tanks. The solicitation was issued by the Department of the Navy Naval Facilities Engineering Command for the design and construction of the new communication center and demolition of the existing facilities. The closing date for proposals was not included in the document.

View the file

Other files for this federal contract opportunity

Other files attached to P3003, Consolidated Communication Center, AAFB, newest first.
File Type Posted
P-3003 AMENDMENT 0009.pdf PDF
P-3003 AMENDMENT 0008.pdf PDF
P-3003 AMENDMENT 0007.pdf PDF
P-3003 AMENDMENT 0006.pdf PDF
P3003 Revised Price Schedule - 15 APR 2021.doc DOC document
P3003 AMENDMENT 0005.pdf PDF
Site Vist Sign In Sheet2.pdf PDF
Site Visit Sign In Sheet1.pdf PDF
P-3003 AMENDMENT 0004.pdf PDF
Andrews Air Force Base (ADW) MD - Bing Maps.pdf PDF
P-3003 AMENDMENT 0003.pdf PDF
P-3003 AMENDMENT 0002.pdf PDF
02 P3003 IFC Drawings Vol 6.pdf PDF
02 P3003 IFC Drawings Vol 7.pdf PDF
02 P3003 IFC Drawings Vol 1.pdf PDF
02 P3003 IFC Drawings Vol 4.pdf PDF
02 P3003 IFC Drawings Vol 2.pdf PDF
P-3003 AMENDMENT 0001.pdf PDF
02 P3003 IFC Drawings Vol 5.pdf PDF
P3003 - Hazard Analysis Report.pdf PDF
SMALL BUSINESS PARTICIPATION COMMITMENT DOCUMENT.docx DOCX document
06 P3003 CCC SID IFC.pdf PDF
N40080-21-R-9670 - P3003 SOLICITATION.pdf PDF
SMALL BUSINESS SUBCONTRACTING PLAN.docx DOCX document
P3003 Bid Schedule - 18 Mar 2021.doc DOC document
Past Performance Questionannaire.docx DOCX document
Construction Experience Project Data Sheet.doc DOC document
06 P3003 CCC FFE 2021 IFC.pdf PDF
03 P3003 CCC Specifications Signed.pdf PDF
HISTORICAL SMALL BUSINESS UTILIZATION.docx DOCX document
Show all 30

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

III

III II

I

II

I

S

C

E

ROP2

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L O

D

L O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L O

D

L O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L O

D

L

O

D

L

O

D

LOD

L

O

D

L

O

D

L

O

D

L O

D

LOD

L O

D

L

O

D

L O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

LOD

L

O

DLOD

L

O

D

L O

D

L O

D

L O

D L

O D

LOD

LOD

LOD LOD

L

O

D

L

O

D

L

O

D

L O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

C-700

1553599

FIRE PROTECTION

BRANCH MANAGER

N A

V A

L

F

A C

I L

I T

I E

S

E

N G

I N

E E

R I N

G

C

O M

M A

N D

W

A S

H

W A

S H

I N

G T

O N

C A

M P

S

R

I N

G S

M

D

J O

I N

T

B

A S

E

A

N D

R E

W S

C A

R

I N

G S

M

D

R E

V D

A T

E

F I L E

M

E

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR.

EPROJECT NO.

SHEET

NAVFAC DRAWING NO.

DES DRW

N A

V A

L

F

A C

I L I T

I E

S

E

N G

I N

E E

R I N

G

C O

M M

A N

D

D E

P A

R T

M E

T

O

F

T

H

V

Y

S Y

M D

E S

C R

I P

T I O

N D

A T

E A

P P

R

DRAWFORM REVISION: 31 JANUARY 2017

CDA

JTG

OF

CHK

SATISFACTORY TO DATE

FOR COMMANDER NAVFAC

ACTIVITY

APPROVED

THC

AS NOTED

UNCLASSIFIED/ /FOR OFFICIAL USE ONLY

U N

C L

A S

S I F

I E

D

F

R

F

I C

I A

L

U

L

Y

U N

C L

A S

S I F

I E

D

F

F

I C

I A

L

U

L

Y

UNCLASSIFIED/ /FOR OFFICIAL USE ONLY

CO

NS

OL

ID

AT

ED

C

OM

MU

NI

CA

TI

ON

C

EN

TE

R

N40080-15-D-0452 TO 004

2850 EISENHOWER AVENUE

SUITE 200

ALEXANDRIA, VA 22314

P-

KEY PLAN:

P R

O F E

S S

I O

N A

L

C

E R

T I F I C

A T I O

I

E R

E B

Y

C

E R

T I

Y

A T

T H

E S

E

D

O C

U M

E N

R

E

P

R E

P A

R E

D

P

R O

V E

D

B

Y

M

E

A

U

C

E N

S E

D

P

R O

F E

S S

I O

N A

L

E

N G

I N

E E

R

U

N D

E

L A

T

A

M

A R

Y L

A N

D

L I C

E N

E

X P

I R

A T

I O

N

D

A T

E

I S

S U

C

N

S T

R U

C T

I O

N

A/E INFO

02/19/2021

BY MAJ BIRKHOLD VIA EMAIL

PM/DM JFH/EC

CHIEF ENG/ARCH

E R

O S

I O

N

A

D

I M

E N

T

C

O N

T R

A

N

O

V E

R A

L L

SACSMS MLC

13108372

EROSION AND SEDIMENT CONTROL PLAN - OVERALL

SCALE: 1" = 100'

PLAN

NORTH

0 100' 200'

SCALE: 1" = 100'

SEE SHEET C-721, C-723, C-725

SEE SHEET C-711, C-713, C-715, 720, C-722, C-724

SEE SHEET C-710, C-712, C-714

SIP

SIP

SIP

SIP

SIP

SIP

SIP

SIP

SIP

SIP

C

C

C

C

C

C W

D

C

C W

D

C

X

C W

D

C

C

C

SIP

SIP

SIP

SIP

SIP

CIP

SIP

C

C W

D

S S

F

S S

F

S S

F

S

S

F

S S

F

S

S

F

S

S

F

GIP

SIP

CIP

SIP

T

A

B

T

A

B

SIP

CIP

CIP

CIP

CIP

SIP

SIP

SIP

C

ROP2

C

W

S

SIP

GIP

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L O

D

L

O

D

L O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L O

D

L O

D

L O

D

L O

D

L O

D

L

O

D

L

O

D

L

O

D L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L O

D

LOD

L O

D

L O

D

L

O

D

L

O

D

L

O

D

L

O

D

LOD

LOD

L O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L O

D

L

O

D

L

O

D

LOD

L

O

D

L O

D

L

O

D

LOD

L O

D

L

O

D

L O

D

L

O

D

L

O

D

L O

D

D.A. TO SIP

0.80 AC

D.A. TO SIP

0.74 AC

D.A. TO SIP

0.76 AC

D.A. TO SIP

0.69 AC

D.A. TO SIP

0.76 AC

D.A. TO SIP

0.47 AC

D.A. TO SIP

0.47 AC

D.A. TO SIP

0.47 AC

D.A. TO SIP

0.47 AC

D.A. TO SIP

0.47 AC

D.A. TO SIP

0.47 AC

D.A. TO SIP

0.15 AC

D.A. TO SIP

0.17 AC

D.A. TO SIP

0.12 AC

D.A. TO SIP

0.23 AC

D.A. TO SIP

0.79 AC

D.A. TO SIP

0.11 AC

D.A. TO GIP

1.46 AC

ST-II 1

D.A. TO SIP

0.47 AC

D.A. TO CIP

0.03 AC

SUPER SILT FENCE

AVG. S<10%

MAX SLOPE L = 200'

SSF LF = 660'

D.A. TO SIP

0.18 AC

D.A. TO CIP

0.11 AC

D.A. TO TAB AND

GIP 0.40 AC

PEDESTRIAN ACCESS GATE

IN PERIMETER FENCE

D.A. TO SIP

0.47 AC

SD-13

SD-25

SD-9

SD-6

SD-12

SD-5

SD-4

SD-3

SD-11

SD-10

SD-20

SD-8

SD-2

SD-1

SD-27

SD-28

SD-26

ROP II

CLASS I RIPRAP

LA = 100'

W = 10'

D50 = 9.5"

T = 19"

MIN. RIPRAP HEIGHT = 2.6'

V10 = 5.29 FT/S

Q10 = 26.10 FT3/S

C-710

1553599

FIRE PROTECTION

BRANCH MANAGER

N A

V A

L

F

A C

I L

I T

I E

S

E

N G

I N

E E

R I N

G

C

O M

M A

S

H

W A

S H

I N

G T

O N

C A

R

I N

G S

M

D

J O

I N

T

B

A S

E

A

N D

R E

W S

C A

R

I N

G S

M

D

R E

V D

A T

E

F I

M

E

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR.

EPROJECT NO.

SHEET

NAVFAC DRAWING NO.

DES DRW

N A

V A

L

F

A C

I L I T

I E

S

E

N G

I N

E E

R I N

G

C O

M M

A N

D

D E

P A

R T

M E

T

V

Y

S Y

M D

E S

C R

I P

T I O

N D

A T

E A

P P

R

DRAWFORM REVISION: 31 JANUARY 2017

CDA

JTG

OF

CHK

SATISFACTORY TO DATE

FOR COMMANDER NAVFAC

ACTIVITY

APPROVED

THC

AS NOTED

UNCLASSIFIED/ /FOR OFFICIAL USE ONLY

U N

C L

A S

S I F

I E

D

F

F

I C

I A

L

U

L

Y

U N

C L

A S

S I F

I E

D

F

F

I C

I A

L

U

L

Y

UNCLASSIFIED/ /FOR OFFICIAL USE ONLY

CO

NS

OL

ID

AT

ED

C

OM

MU

NI

CA

TI

ON

C

EN

TE

R

N40080-15-D-0452 TO 004

2850 EISENHOWER AVENUE

SUITE 200

ALEXANDRIA, VA 22314

P-

KEY PLAN:

P R

O F E

S S

I O

N A

L

C

E R

T I F I C

A T I O

E R

E B

Y

C

E R

T I

A T

T H

E S

E

D

O C

U M

E N

R

E

P

R E

P A

R E

D

P

R O

V E

D

B

Y

M

E

A

C

E N

S E

D

P

R O

F E

S S

I O

N A

L

E

N G

I N

E E

R

U

N D

E

L A

T

A

M

A R

Y L

A N

D

L I C

E N

E

X P

I R

A T

I O

N

D

A T

E

I S

S U

N

S T

R U

C T

I O

N

A/E INFO

02/19/2021

BY MAJ BIRKHOLD VIA EMAIL

PM/DM JFH/EC

CHIEF ENG/ARCH

E R

O S

I O

N

A

D

I M

E N

T

C

O N

T R

A

N

A

R E

H A

I T

I A

L

SACSMS MLC

13108373

EROSION AND SEDIMENT CONTROL PLAN - AREA 1 - PHASE 1 INITIAL

SCALE: 1" = 40'

PLAN

NORTH

0 40' 80'20'

SCALE: 1" = 40'

MATCH LINE SHEET C-711

1. SEE SHEETS C-001 AND C-002 FOR SITE NOTES,

LEGENDS, AND ABBREVIATIONS.

2. SEE SHEETS C-750, C-751, C-752, AND C-753 FOR

EROSION AND SEDIMENT CONTROL AND

STANDARD STABILIZATION NOTES.

3. NOTE TO CONTRACTOR: EROSION AND

SEDIMENT CONTROL WILL BE STRICTLY

ENFORCED.

4. ALL AREAS WITHIN THE LOD AND OUTSIDE ESC

CONTROL DRAINAGE AREAS WILL BE SUBJECT

TO SAME DAY STABILIZATION AT THE END OF

EACH DAY'S WORK.

GENERAL NOTES

LEGEND

SIP

ST-II

CWD - 15

ST-II

CLEAR WATER

DIVERSION PIPE

STANDARD INLET

PROTECTION

STONE/RIPRAP OUTLET

SEDIMENT TRAP ST II

CONSTRUCTION FENCE

RIPRAP INFLOW

PROTECTION

RRP

TREE PROTECTION

CIPCIP

CURB INLET PROTECTION

FOLLOWING INITIAL SOIL DISTURBANCE OR RE-DISTURBANCE, PERMANENT

OR TEMPORARY STABILIZATION MUST BE COMPLETED WITHIN;

a. THREE (3) CALENDAR DAYS AS TO THE SURFACE OF ALL PERIMETER, DIKES, SWALES, DITCHES, PERIMETER SLOPES, AND ALL SLOPES

STEEPER THAN 3 HORIZONTAL TO 1 VERTICAL (3:1); AND

b. SEVEN (7) CALENDAR DAYS AS TO ALL OTHER DISTURBED OR GRADED

AREAS ON THE PROJECT SITE NOT UNDER ACTIVE GRADING.

MDE STANDARD STABILIZATION NOTE

DRAINAGE DIVIDE LINE

ROP2

ROCK OUTLET PROTECTION II

SSF SUPER SILT FENCE

GIP

GABION INLET

PROTECTION

TEMPORARY ASPHALT BERMTAB

TERMINAL POINT BETWEEN SSF

AND CONSTRUCTION FENCE

LOD

LIMITS OF DISTURBANCE

I I

I I I

C

W

S

CIP

CIP

CIP

S

C

E

S

S

F

S

S

F

A -1

A -1

A

T

A

B

TAB

GIP

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

LOD

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L O

D

L

O

D

L O

D

L

O

D

L

O

D

L

O

D

D.A. TO EARTH

DIKE 0.47 AC

D.A. TO CIP

0.25 AC

D.A. TO CIP

0.17 AC

D.A. TO CIP

0.09 AC

ST-II 1

DISCHARGE:

Q10 = 5.92 CFS

V10 = 2.06 FT/S

GATE IN

PERIMETER FENCE

SUPER SILT FENCE

AVG. S<10%

MAX SLOPE L = 180'

SSF LF = 250'

D.A. TO TAB AND

GIP 0.07 AC

STOCKPILE AREA

MAX HEIGHT = 20'

MAX SIDE SLOPE = 2:1

D.A. DIRECT TO

ST-II 0.19 AC

253.5

TOTAL D.A. TO ST-II

(INCLUDING EARTH DIKE

AND TABS) = 1.13 AC

C-711

1553599

FIRE PROTECTION

BRANCH MANAGER

N A

V A

L

F

A C

I L

I T

I E

S

E

N G

I N

E E

R I N

G

C

O M

M A

S

H

W A

S H

I N

G T

O N

C A

R

I N

G S

M

D

J O

I N

T

B

A S

E

A

N D

R E

W S

C A

R

I N

G S

M

D

R E

V D

A T

E

F I

M

E

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR.

EPROJECT NO.

SHEET

NAVFAC DRAWING NO.

DES DRW

N A

V A

L

F

A C

I L I T

I E

S

E

N G

I N

E E

R I N

G

C O

M M

A N

D

D E

P A

R T

M E

T

V

Y

S Y

M D

E S

C R

I P

T I O

N D

A T

E A

P P

R

DRAWFORM REVISION: 31 JANUARY 2017

CDA

JTG

OF

CHK

SATISFACTORY TO DATE

FOR COMMANDER NAVFAC

ACTIVITY

APPROVED

THC

AS NOTED

UNCLASSIFIED/ /FOR OFFICIAL USE ONLY

U N

C L

A S

S I F

I E

D

F

F

I C

I A

L

U

L

Y

U N

C L

A S

S I F

I E

D

F

F

I C

I A

L

U

L

Y

UNCLASSIFIED/ /FOR OFFICIAL USE ONLY

CO

NS

OL

ID

AT

ED

C

OM

MU

NI

CA

TI

ON

C

EN

TE

R

N40080-15-D-0452 TO 004

2850 EISENHOWER AVENUE

SUITE 200

ALEXANDRIA, VA 22314

P-

KEY PLAN:

P R

O F E

S S

I O

N A

L

C

E R

T I F I C

A T I O

E R

E B

Y

C

E R

T I

A T

T H

E S

E

D

O C

U M

E N

R

E

P

R E

P A

R E

D

P

R O

V E

D

B

Y

M

E

A

C

E N

S E

D

P

R O

F E

S S

I O

N A

L

E

N G

I N

E E

R

U

N D

E

L A

T

A

M

A R

Y L

A N

D

L I C

E N

E

X P

I R

A T

I O

N

D

A T

E

I S

S U

N

S T

R U

C T

I O

N

A/E INFO

02/19/2021

BY MAJ BIRKHOLD VIA EMAIL

PM/DM JFH/EC

CHIEF ENG/ARCH

E R

O S

I O

N

A

D

I M

E N

T

C

O N

T R

A

N

A

R E

H A

I T

I A

L

SACSMS MLC

13108374 0 40' 80'20'

SCALE: 1" = 40'

EROSION AND SEDIMENT CONTROL PLAN

- AREA 2 - PHASE 1 INITIAL

SCALE: 1" = 40'

PLAN

NORTH

MATCH LINE SHEET C-710

1. SEE SHEETS C-001 AND C-002 FOR SITE NOTES,

LEGENDS, AND ABBREVIATIONS.

2. SEE SHEETS C-750, C-751, C-752, AND C-753 FOR

EROSION AND SEDIMENT CONTROL AND

STANDARD STABILIZATION NOTES.

3. NOTE TO CONTRACTOR: EROSION AND SEDIMENT

CONTROL WILL BE STRICTLY ENFORCED.

4. ALL AREAS WITHIN THE LOD AND OUTSIDE ESC

CONTROL DRAINAGE AREAS WILL BE SUBJECT TO

SAME DAY STABILIZATION AT THE END OF EACH

DAY'S WORK.

GENERAL NOTES

LEGEND

ST-II

SCE

STABILIZED CONSTRUCTION

ENTRANCE

ST-II

STONE/RIPRAP OUTLET

SEDIMENT TRAP ST II

CONSTRUCTION

PERIMETER FENCE

CWS

CONCRETE WASHOUT

STRUCTURE

SSF SUPER SILT FENCE

STOCKPILE AREA

FOLLOWING INITIAL SOIL DISTURBANCE OR RE-DISTURBANCE, PERMANENT

OR TEMPORARY STABILIZATION MUST BE COMPLETED WITHIN;

a. THREE (3) CALENDAR DAYS AS TO THE SURFACE OF ALL PERIMETER, DIKES, SWALES, DITCHES, PERIMETER SLOPES, AND ALL SLOPES

STEEPER THAN 3 HORIZONTAL TO 1 VERTICAL (3:1); AND

b. SEVEN (7) CALENDAR DAYS AS TO ALL OTHER DISTURBED OR GRADED

AREAS ON THE PROJECT SITE NOT UNDER ACTIVE GRADING.

MDE STANDARD STABILIZATION NOTE

DRAINAGE DIVIDE LINE

TEMPORARY ASPHALT BERMTAB

EARTH DIKE

CIPCIP

CURB INLET PROTECTION

TERMINAL POINT BETWEEN SSF

AND CONSTRUCTION FENCE

LOD

LIMITS OF DISTURBANCE

GIP

GABION INLET

PROTECTION

SAME DAY STABILIZATION

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L O

D

L

O

D

L O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L O

D

L O

D

L O

D

L O

D

L O

D

L

O

D

L

O

D

L

O

D L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L O

D

LOD

L O

D

L O

D

L

O

D

L

O

D

L

O

D

L

O

D

LOD

LOD

L O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L O

D

L

O

D

L

O

D

LOD

L

O

D

L O

D

L

O

D

LOD

L O

D

L

O

D

L O

D

L

O

D

L

O

D

L O

D

ST-II 1

ST-I 1

ST-I 2

D.A. TO CIP

0.15 AC

D.A. TO CIP

0.07 AC

D.A. TO CIP

0.03 AC

D.A. TO SIP

0.30 AC

D.A. TO SIP

0.80 AC

D.A. TO SIP

0.74 AC

D.A. TO SIP

0.76 AC

D.A. TO SIP

0.69 AC

D.A. TO SIP

0.76 AC

D.A. TO CIP

0.25 AC

D.A. TO CIP

0.19 AC

D.A. TO SIP

0.47 AC

D.A. TO CIP

0.14 AC

D.A. TO CIP

0.13 AC

D.A. TO SIP

0.60 AC

SUPER SILT FENCE

AVG. S<10%

MAX SLOPE L = 230'

SSF LF = 160'

D.A. TO SIP

0.77 AC

D.A. TO ST-I 2

1.20 AC

D.A. TO ST-I 1

1.40 AC

D.A. TO TAB

AND GIP

0.12 AC

D.A. TO SIP

0.18 AC

D.A. TO GIP

0.72 AC

D.A. TO SIP

0.46 AC

GIP

CIP

CIP

CIP

C

C

C

C

C

C W

D

C

C W

D

C

X

C

C

C

C

SIP

SIP

SIP

SIP

SIP

SIP

CIP

CIP

CIP

SIP

C

CIP

SIP

C W

D

T

A

B

T

A

B

SIP

SIP

GIP

SIP

SIP

CIP

CIP

CIP

CIP

SIP

A

A

A

A

C W

D

RRP

RRP

RRP

ROP2

ROP2

ROP2

ROP2

ROP2

C

W

S

A

D.A. TO CIP

0.25 AC

D.A. TO CIP

0.15 AC

D.A. TO CIP

0.05 AC

D.A. TO CIP

0.17 AC

D.A. TO CIP

0.07 AC

D.A. TO EARTH

DIKE 0.17 AC

D.A. TO SIP

0.22 AC

P

P

P

P-116

P-18

SD-25

SD-6

SD-5

SD-4

SD-19

SD-3

SD-2

SD-1

SD-8

SD-27

SD-9

SD-10

SD-11

SD-12

SD-13

STDI-1571

C-712

1553599

FIRE PROTECTION

BRANCH MANAGER

N A

V A

L

F

A C

I L

I T

I E

S

E

N G

I N

E E

R I N

G

C

O M

M A

S

H

W A

S H

I N

G T

O N

C A

R

I N

G S

M

D

J O

I N

T

B

A S

E

A

N D

R E

W S

C A

R

I N

G S

M

D

R E

V D

A T

E

F I

M

E

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR.

EPROJECT NO.

SHEET

NAVFAC DRAWING NO.

DES DRW

N A

V A

L

F

A C

I L I T

I E

S

E

N G

I N

E E

R I N

G

C O

M M

A N

D

D E

P A

R T

M E

T

V

Y

S Y

M D

E S

C R

I P

T I O

N D

A T

E A

P P

R

DRAWFORM REVISION: 31 JANUARY 2017

CDA

JTG

OF

CHK

SATISFACTORY TO DATE

FOR COMMANDER NAVFAC

ACTIVITY

APPROVED

THC

AS NOTED

UNCLASSIFIED/ /FOR OFFICIAL USE ONLY

U N

C L

A S

S I F

I E

D

F

F

I C

I A

L

U

L

Y

U N

C L

A S

S I F

I E

D

F

F

I C

I A

L

U

L

Y

UNCLASSIFIED/ /FOR OFFICIAL USE ONLY

CO

NS

OL

ID

AT

ED

C

OM

MU

NI

CA

TI

ON

C

EN

TE

R

N40080-15-D-0452 TO 004

2850 EISENHOWER AVENUE

SUITE 200

ALEXANDRIA, VA 22314

P-

KEY PLAN:

P R

O F E

S S

I O

N A

L

C

E R

T I F I C

A T I O

E R

E B

Y

C

E R

T I

A T

T H

E S

E

D

O C

U M

E N

R

E

P

R E

P A

R E

D

P

R O

V E

D

B

Y

M

E

A

C

E N

S E

D

P

R O

F E

S S

I O

N A

L

E

N G

I N

E E

R

U

N D

E

L A

T

A

M

A R

Y L

A N

D

L I C

E N

E

X P

I R

A T

I O

N

D

A T

E

I S

S U

N

S T

R U

C T

I O

N

A/E INFO

02/19/2021

BY MAJ BIRKHOLD VIA EMAIL

PM/DM JFH/EC

CHIEF ENG/ARCH

E R

O S

I O

N

A

D

I M

E N

T

C

O N

T R

A

N

A

R E

H A

T E

R I M

SACSMS MLC

13108375

EROSION AND SEDIMENT CONTROL PLAN

- AREA 1 - PHASE 1 INTERIM

SCALE: 1" = 40'

PLAN

NORTH

0 40' 80'20'

SCALE: 1" = 40'

MATCH LINE SHEET C-713

1. SEE SHEETS C-001 AND C-002 FOR SITE NOTES,

LEGENDS, AND ABBREVIATIONS.

2. SEE SHEETS C-750, C-751, C-752, AND C-753 FOR

EROSION AND SEDIMENT CONTROL AND

STANDARD STABILIZATION NOTES.

3. PROVIDE SAME DAY STABILIZATION IN UTILITY

TRENCH AREAS.

4. NOTE TO CONTRACTOR: EROSION AND SEDIMENT

CONTROL WILL BE STRICTLY ENFORCED.

4. ALL AREAS WITHIN THE LOD AND OUTSIDE ESC

CONTROL DRAINAGE AREAS WILL BE SUBJECT TO

SAME DAY STABILIZATION AT THE END OF EACH

DAY'S WORK.

5.

GENERAL NOTES

LEGEND

CIP

ST-II

CWD - 15

CIP

ST-II

CLEAR WATER

DIVERSION PIPE

CURB INLET PROTECTION

STONE/RIPRAP OUTLET

SEDIMENT TRAP ST II

CONSTRUCTION

PERIMETER FENCE

TREE PROTECTION

SIPSIP

STANDARD INLET

PROTECTION

FOLLOWING INITIAL SOIL DISTURBANCE OR RE-DISTURBANCE, PERMANENT

OR TEMPORARY STABILIZATION MUST BE COMPLETED WITHIN;

a. THREE (3) CALENDAR DAYS AS TO THE SURFACE OF ALL PERIMETER, DIKES, SWALES, DITCHES, PERIMETER SLOPES, AND ALL SLOPES

STEEPER THAN 3 HORIZONTAL TO 1 VERTICAL (3:1); AND

b. SEVEN (7) CALENDAR DAYS AS TO ALL OTHER DISTURBED OR GRADED

AREAS ON THE PROJECT SITE NOT UNDER ACTIVE GRADING.

MDE STANDARD STABILIZATION NOTE

SSF SUPER SILT FENCE

ROP2

ROCK OUTLET PROTECTION II

DRAINAGE DIVIDE LINE

TEMPORARY ASPHALT BERMTAB

EARTH DIKE

TERMINAL POINT BETWEEN SSF

AND CONSTRUCTION FENCE

LOD

LIMITS OF DISTURBANCE

GIP

GABION INLET

I I I

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

LOD

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L O

D

L

O

D

L O

D

L

O

D

L

O

D

L

O

D

D.A. TO CIP

0.17 AC

D.A. TO CIP

0.09 AC

D.A. TO EARTH

DIKE 0.13 AC

D.A. TO CIP

0.13 AC

SUPER SILT FENCE

AVG. S<10%

MAX SLOPE L = 180'

SSF LF = 250'

C

W

S

CIP

CIP

CIP

S

C

E

A -1

A -1

A

T

A

B

TAB

A -1

A -1

A

A

A

GIP

GATE IN PERIMETER

FENCE

D.A. TO EARTH

DIKE 0.09 AC

D.A. TO CIP

0.25 AC

STOCKPILE AREA

MAX HEIGHT = 20'

MAX SIDE SLOPE = 2:1

D.A. TO TAB AND

GIP 0.12 AC

TOTAL D.A. TO ST-II

(INCLUDING EARTH DIKE

AND TABS) = 0.33 AC

253.5

ST-II 1

DISCHARGE:

Q10 = 0.05 CFS

V10 = 0.33 FT/S

D.A. TO CIP

0.25 AC

C-713

1553599

FIRE PROTECTION

BRANCH MANAGER

N A

V A

L

F

A C

I L

I T

I E

S

E

N G

I N

E E

R I N

G

C

O M

M A

S

H

W A

S H

I N

G T

O N

C A

R

I N

G S

M

D

J O

I N

T

B

A S

E

A

N D

R E

W S

C A

R

I N

G S

M

D

R E

V D

A T

E

F I

M

E

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR.

EPROJECT NO.

SHEET

NAVFAC DRAWING NO.

DES DRW

N A

V A

L

F

A C

I L I T

I E

S

E

N G

I N

E E

R I N

G

C O

M M

A N

D

D E

P A

R T

M E

T

V

Y

S Y

M D

E S

C R

I P

T I O

N D

A T

E A

P P

R

DRAWFORM REVISION: 31 JANUARY 2017

CDA

JTG

OF

CHK

SATISFACTORY TO DATE

FOR COMMANDER NAVFAC

ACTIVITY

APPROVED

THC

AS NOTED

UNCLASSIFIED/ /FOR OFFICIAL USE ONLY

U N

C L

A S

S I F

I E

D

F

F

I C

I A

L

U

L

Y

U N

C L

A S

S I F

I E

D

F

F

I C

I A

L

U

L

Y

UNCLASSIFIED/ /FOR OFFICIAL USE ONLY

CO

NS

OL

ID

AT

ED

C

OM

MU

NI

CA

TI

ON

C

EN

TE

R

N40080-15-D-0452 TO 004

2850 EISENHOWER AVENUE

SUITE 200

ALEXANDRIA, VA 22314

P-

KEY PLAN:

P R

O F E

S S

I O

N A

L

C

E R

T I F I C

A T I O

E R

E B

Y

C

E R

T I

A T

T H

E S

E

D

O C

U M

E N

R

E

P

R E

P A

R E

D

P

R O

V E

D

B

Y

M

E

A

C

E N

S E

D

P

R O

F E

S S

I O

N A

L

E

N G

I N

E E

R

U

N D

E

L A

T

A

M

A R

Y L

A N

D

L I C

E N

E

X P

I R

A T

I O

N

D

A T

E

I S

S U

N

S T

R U

C T

I O

N

A/E INFO

02/19/2021

BY MAJ BIRKHOLD VIA EMAIL

PM/DM JFH/EC

CHIEF ENG/ARCH

E R

O S

I O

N

A

D

I M

E N

T

C

O N

T R

A

N

A

R E

H A

T E

R I M

SACSMS MLC

13108376 0 40' 80'20'

SCALE: 1" = 40'

EROSION AND SEDIMENT CONTROL PLAN

- AREA 2 - PHASE 1 INTERIM

SCALE: 1" = 40'

PLAN

NORTH

MATCH LINE SHEET C-712

1. SEE SHEETS C-001 AND C-002 FOR SITE NOTES,

LEGENDS, AND ABBREVIATIONS.

2. SEE SHEETS C-750, C-751, C-752, AND C-753 FOR

EROSION AND SEDIMENT CONTROL AND STANDARD

STABILIZATION NOTES.

3. PROVIDE SAME DAY STABILIZATION IN UTILITY

TRENCH AREAS.

4. NOTE TO CONTRACTOR: EROSION AND SEDIMENT

CONTROL WILL BE STRICTLY ENFORCED.

4. ALL AREAS WITHIN THE LOD AND OUTSIDE ESC

CONTROL DRAINAGE AREAS WILL BE SUBJECT TO

SAME DAY STABILIZATION AT THE END OF EACH

DAY'S WORK.

GENERAL NOTES

LEGEND

CIP

ST-II

SCE

STABILIZED CONSTRUCTION

ENTRANCE

CIP

ST-II

CURB INLET PROTECTION

STONE/RIPRAP OUTLET

SEDIMENT TRAP ST II

CONSTRUCTION

PERIMETER FENCE

TREE PROTECTION

SSF SUPER SILT FENCE

STOCKPILE AREA

FOLLOWING INITIAL SOIL DISTURBANCE OR RE-DISTURBANCE, PERMANENT

OR TEMPORARY STABILIZATION MUST BE COMPLETED WITHIN;

a. THREE (3) CALENDAR DAYS AS TO THE SURFACE OF ALL PERIMETER, DIKES, SWALES, DITCHES, PERIMETER SLOPES, AND ALL SLOPES

STEEPER THAN 3 HORIZONTAL TO 1 VERTICAL (3:1); AND

b. SEVEN (7) CALENDAR DAYS AS TO ALL OTHER DISTURBED OR GRADED

AREAS ON THE PROJECT SITE NOT UNDER ACTIVE GRADING.

MDE STANDARD STABILIZATION NOTE

DRAINAGE DIVIDE LINE

TEMPORARY ASPHALT BERMTAB

EARTH DIKE

TERMINAL POINT BETWEEN SSF

AND CONSTRUCTION FENCE

LOD

LIMITS OF DISTURBANCE

GIP

GABION INLET

SAME DAY STABILIZATION

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L O

D

L

O

D

L O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L O

D

L O

D

L O

D

L O

D

L O

D

L

O

D

L

O

D

L

O

D L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L O

D

LOD

L O

D

L O

D

L

O

D

L

O

D

L

O

D

L

O

D

LOD

LOD

L O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L O

D

L

O

D

L

O

D

LOD

L

O

D

L O

D

L

O

D

LOD

L O

D

L

O

D

L O

D

L

O

D

L

O

D

L O

D

C-714

1553599

FIRE PROTECTION

BRANCH MANAGER

N A

V A

L

F

A C

I L

I T

I E

S

E

N G

I N

E E

R I N

G

C

O M

M A

S

H

W A

S H

I N

G T

O N

C A

R

I N

G S

M

D

J O

I N

T

B

A S

E

A

N D

R E

W S

C A

R

I N

G S

M

D

R E

V D

A T

E

F I

M

E

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR.

EPROJECT NO.

SHEET

NAVFAC DRAWING NO.

DES DRW

N A

V A

L

F

A C

I L I T

I E

S

E

N G

I N

E E

R I N

G

C O

M M

A N

D

D E

P A

R T

M E

T

V

Y

S Y

M D

E S

C R

I P

T I O

N D

A T

E A

P P

R

DRAWFORM REVISION: 31 JANUARY 2017

CDA

JTG

OF

CHK

SATISFACTORY TO DATE

FOR COMMANDER NAVFAC

ACTIVITY

APPROVED

THC

AS NOTED

UNCLASSIFIED/ /FOR OFFICIAL USE ONLY

U N

C L

A S

S I F

I E

D

F

F

I C

I A

L

U

L

Y

U N

C L

A S

S I F

I E

D

F

F

I C

I A

L

U

L

Y

UNCLASSIFIED/ /FOR OFFICIAL USE ONLY

CO

NS

OL

ID

AT

ED

C

OM

MU

NI

CA

TI

ON

C

EN

TE

R

N40080-15-D-0452 TO 004

2850 EISENHOWER AVENUE

SUITE 200

ALEXANDRIA, VA 22314

P-

KEY PLAN:

P R

O F E

S S

I O

N A

L

C

E R

T I F I C

A T I O

E R

E B

Y

C

E R

T I

A T

T H

E S

E

D

O C

U M

E N

R

E

P

R E

P A

R E

D

P

R O

V E

D

B

Y

M

E

A

C

E N

S E

D

P

R O

F E

S S

I O

N A

L

E

N G

I N

E E

R

U

N D

E

L A

T

A

M

A R

Y L

A N

D

L I C

E N

E

X P

I R

A T

I O

N

D

A T

E

I S

S U

N

S T

R U

C T

I O

N

A/E INFO

02/19/2021

BY MAJ BIRKHOLD VIA EMAIL

PM/DM JFH/EC

CHIEF ENG/ARCH

E R

O S

I O

N

A

D

I M

E N

T

C

O N

T R

A

N

A

R E

H A

N

A L

SACSMS MLC

13108377

EROSION AND SEDIMENT CONTROL PLAN

- AREA 1 - PHASE 1 FINAL

SCALE: 1" = 40'

PLAN

NORTH

0 40' 80'20'

SCALE: 1" = 40'

MATCH LINE SHEET C-715

1. SEE SHEETS C-001 AND C-002 FOR SITE NOTES,

LEGENDS, AND ABBREVIATIONS.

2. SEE SHEETS C-750, C-751, C-752, AND C-753 FOR

EROSION AND SEDIMENT CONTROL AND

STANDARD STABILIZATION NOTES.

3. NOTE TO CONTRACTOR: EROSION AND SEDIMENT

CONTROL WILL BE STRICTLY ENFORCED.

4. ALL AREAS WITHIN THE LOD AND OUTSIDE ESC

CONTROL DRAINAGE AREAS WILL BE SUBJECT

TO SAME DAY STABILIZATION AT THE END OF

EACH DAY'S WORK.

GENERAL NOTES

WORK NOTES

1. APPLY TOPSOIL, MULCH, AND PERMANENT

SEEDING.

FOLLOWING INITIAL SOIL DISTURBANCE OR RE-DISTURBANCE, PERMANENT

OR TEMPORARY STABILIZATION MUST BE COMPLETED WITHIN;

a. THREE (3) CALENDAR DAYS AS TO THE SURFACE OF ALL PERIMETER, DIKES, SWALES, DITCHES, PERIMETER SLOPES, AND ALL SLOPES

STEEPER THAN 3 HORIZONTAL TO 1 VERTICAL (3:1); AND

b. SEVEN (7) CALENDAR DAYS AS TO ALL OTHER DISTURBED OR GRADED

AREAS ON THE PROJECT SITE NOT UNDER ACTIVE GRADING.

MDE STANDARD STABILIZATION NOTE

LEGEND

I I I

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

LOD

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L O

D

L

O

D

L O

D

L

O

D

L

O

D

L

O

D

C-715

1553599

FIRE PROTECTION

BRANCH MANAGER

N A

V A

L

F

A C

I L

I T

I E

S

E

N G

I N

E E

R I N

G

C

O M

M A

S

H

W A

S H

I N

G T

O N

C A

R

I N

G S

M

D

J O

I N

T

B

A S

E

A

N D

R E

W S

C A

R

I N

G S

M

D

R E

V D

A T

E

F I

M

E

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR.

EPROJECT NO.

SHEET

NAVFAC DRAWING NO.

DES DRW

N A

V A

L

F

A C

I L I T

I E

S

E

N G

I N

E E

R I N

G

C O

M M

A N

D

D E

P A

R T

M E

T

V

Y

S Y

M D

E S

C R

I P

T I O

N D

A T

E A

P P

R

DRAWFORM REVISION: 31 JANUARY 2017

CDA

JTG

OF

CHK

SATISFACTORY TO DATE

FOR COMMANDER NAVFAC

ACTIVITY

APPROVED

THC

AS NOTED

UNCLASSIFIED/ /FOR OFFICIAL USE ONLY

U N

C L

A S

S I F

I E

D

F

F

I C

I A

L

U

L

Y

U N

C L

A S

S I F

I E

D

F

F

I C

I A

L

U

L

Y

UNCLASSIFIED/ /FOR OFFICIAL USE ONLY

CO

NS

OL

ID

AT

ED

C

OM

MU

NI

CA

TI

ON

C

EN

TE

R

N40080-15-D-0452 TO 004

2850 EISENHOWER AVENUE

SUITE 200

ALEXANDRIA, VA 22314

P-

KEY PLAN:

P R

O F E

S S

I O

N A

L

C

E R

T I F I C

A T I O

E R

E B

Y

C

E R

T I

A T

T H

E S

E

D

O C

U M

E N

R

E

P

R E

P A

R E

D

P

R O

V E

D

B

Y

M

E

A

C

E N

S E

D

P

R O

F E

S S

I O

N A

L

E

N G

I N

E E

R

U

N D

E

L A

T

A

M

A R

Y L

A N

D

L I C

E N

E

X P

I R

A T

I O

N

D

A T

E

I S

S U

N

S T

R U

C T

I O

N

A/E INFO

02/19/2021

BY MAJ BIRKHOLD VIA EMAIL

PM/DM JFH/EC

CHIEF ENG/ARCH

E R

O S

I O

N

A

D

I M

E N

T

C

O N

T R

A

N

A

R E

H A

N

A L

SACSMS MLC

13108378 0 40' 80'20'

SCALE: 1" = 40'

EROSION AND SEDIMENT CONTROL PLAN -

AREA 2 - PHASE 1 FINAL

SCALE: 1" = 40'

PLAN

NORTH

MATCH LINE SHEET C-714

1. SEE SHEETS C-001 AND C-002 FOR SITE NOTES,

LEGENDS, AND ABBREVIATIONS.

2. SEE SHEETS C-750, C-751, C-752, AND C-753 FOR

EROSION AND SEDIMENT CONTROL AND

STANDARD STABILIZATION NOTES.

3. NOTE TO CONTRACTOR: EROSION AND SEDIMENT

CONTROL WILL BE STRICTLY ENFORCED.

4. ALL AREAS WITHIN THE LOD AND OUTSIDE ESC

CONTROL DRAINAGE AREAS WILL BE SUBJECT TO

SAME DAY STABILIZATION AT THE END OF EACH

DAY'S WORK.

GENERAL NOTES

WORK NOTES

1. APPLY TOPSOIL, MULCH ,AND PERMANENT

SEEDING.

FOLLOWING INITIAL SOIL DISTURBANCE OR RE-DISTURBANCE, PERMANENT

OR TEMPORARY STABILIZATION MUST BE COMPLETED WITHIN;

a. THREE (3) CALENDAR DAYS AS TO THE SURFACE OF ALL PERIMETER, DIKES, SWALES, DITCHES, PERIMETER SLOPES, AND ALL SLOPES

STEEPER THAN 3 HORIZONTAL TO 1 VERTICAL (3:1); AND

b. SEVEN (7) CALENDAR DAYS AS TO ALL OTHER DISTURBED OR GRADED

AREAS ON THE PROJECT SITE NOT UNDER ACTIVE GRADING.

MDE STANDARD STABILIZATION NOTE

LEGEND

I I I

I I I

L

O

D

L

O

D

L

O

D

LOD

LOD

LOD

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

S

S

F

S

S

F

S

S

F

S

S

F

S

S

F

S

S

F

SSF

SSF

S

S

F

S

S

F

S

S

F

S

S

F

S

S

F

SIP

SIP

SIP

SIP

SIP

SIP

SIP

S

S

F

S

S

F

S

S

F

S

S

F

S

S

F

S

S

F

CIP

CIP

CIP

SIP

C

W

S

C

W

S

CIP

S

C

E

S

C

E

SIP

SIP

SIP

D.A. TO SIP

0.75 AC

D.A. TO CIP

0.25 AC

D.A. TO SIP

0.09 AC

GATE IN

PERIMETER FENCE

SUPER SILT FENCE

AVG. S<10%

MAX SLOPE L = 200'

SSF LF = 450'

SUPER SILT FENCE

AVG. S<10%

MAX SLOPE L = 300'

SSF LF = 1640'

GATE IN

PERIMETER FENCE

SUPER SILT FENCE

AVG. S<10%

MAX SLOPE L = 180'

SSF LF = 210'

SUPER SILT FENCE

AVG. S 10-20%

MAX SLOPE L = 190'

SSF LF = 360'

D.A. TO SIP

0.18 AC

D.A. TO SIP

0.09 AC

D.A. TO SIP

0.57 AC

D.A. TO SIP

0.13 AC

D.A. TO SIP

0.05 AC

D.A. TO SIP

0.06 AC

D.A. TO CIP

0.17 AC

D.A. TO SIP

0.53 AC

D.A. TO SIP

0.11 AC

D.A. TO CIP

0.09 AC

D.A. TO CIP

0.09 AC

SUPER SILT FENCE

AVG. S<10%

MAX SLOPE L = 300'

SSF LF = 1640'

D.A. TO SIP

0.40 AC

C-720

1553599

FIRE PROTECTION

BRANCH MANAGER

N A

V A

L

F

A C

I L

I T

I E

S

E

N G

I N

E E

R I N

G

C

O M

M A

S

H

W A

S H

I N

G T

O N

C A

R

I N

G S

M

D

J O

I N

T

B

A S

E

A

N D

R E

W S

C A

R

I N

G S

M

D

R E

V D

A T

E

F I

M

E

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR.

EPROJECT NO.

SHEET

NAVFAC DRAWING NO.

DES DRW

N A

V A

L

F

A C

I L I T

I E

S

E

N G

I N

E E

R I N

G

C O

M M

A N

D

D E

P A

R T

M E

T

V

Y

S Y

M D

E S

C R

I P

T I O

N D

A T

E A

P P

R

DRAWFORM REVISION: 31 JANUARY 2017

CDA

JTG

OF

CHK

SATISFACTORY TO DATE

FOR COMMANDER NAVFAC

ACTIVITY

APPROVED

THC

AS NOTED

UNCLASSIFIED/ /FOR OFFICIAL USE ONLY

U N

C L

A S

S I F

I E

D

F

F

I C

I A

L

U

L

Y

U N

C L

A S

S I F

I E

D

F

F

I C

I A

L

U

L

Y

UNCLASSIFIED/ /FOR OFFICIAL USE ONLY

CO

NS

OL

ID

AT

ED

C

OM

MU

NI

CA

TI

ON

C

EN

TE

R

N40080-15-D-0452 TO 004

2850 EISENHOWER AVENUE

SUITE 200

ALEXANDRIA, VA 22314

P-

KEY PLAN:

P R

O F E

S S

I O

N A

L

C

E R

T I F I C

A T I O

E R

E B

Y

C

E R

T I

A T

T H

E S

E

D

O C

U M

E N

R

E

P

R E

P A

R E

D

P

R O

V E

D

B

Y

M

E

A

C

E N

S E

D

P

R O

F E

S S

I O

N A

L

E

N G

I N

E E

R

U

N D

E

L A

T

A

M

A R

Y L

A N

D

L I C

E N

E

X P

I R

A T

I O

N

D

A T

E

I S

S U

N

S T

R U

C T

I O

N

A/E INFO

02/19/2021

BY MAJ BIRKHOLD VIA EMAIL

PM/DM JFH/EC

CHIEF ENG/ARCH

E R

O S

I O

N

A

D

I M

E N

T

C

O N

T R

A

N

A

R E

H A

I T

I A

L

SACSMS MLC

13108379 0 40' 80'20'

SCALE: 1" = 40'

EROSION AND SEDIMENT CONTROL PLAN -

AREA 2 - PHASE 2 INITIAL

SCALE: 1" = 40'

PLAN

NORTH

M A

T C

H

L

I N

E

S

H E

1. SEE SHEETS C-001 AND C-002 FOR SITE NOTES,

LEGENDS, AND ABBREVIATIONS.

2. SEE SHEETS C-750, C-751, C-752, AND C-753 FOR

EROSION AND SEDIMENT CONTROL AND

STANDARD STABILIZATION NOTES.

3. NOTE TO CONTRACTOR: EROSION AND SEDIMENT

CONTROL WILL BE STRICTLY ENFORCED.

4. ALL AREAS WITHIN THE LOD AND OUTSIDE ESC

CONTROL DRAINAGE AREAS WILL BE SUBJECT

TO SAME DAY STABILIZATION AT THE END OF

EACH DAY'S WORK.

5. BID OPTION INCLUDES ALL WORK SHOWN ON

THIS SHEET

GENERAL NOTES

LEGEND

CIP

SIP

STABILIZED CONSTRUCTION

ENTRANCE

CIP

SIP

CURB INLET PROTECTION

STANDARD INLET

PROTECTION

SUPER SILT FENCE

SSF

SCE

CONSTRUCTION FENCE

TREE PROTECTION

CWS

CONCRETE WASHOUT

STRUCTURE

FOLLOWING INITIAL SOIL DISTURBANCE OR RE-DISTURBANCE, PERMANENT

OR TEMPORARY STABILIZATION MUST BE COMPLETED WITHIN;

a. THREE (3) CALENDAR DAYS AS TO THE SURFACE OF ALL PERIMETER, DIKES, SWALES, DITCHES, PERIMETER SLOPES, AND ALL SLOPES

STEEPER THAN 3 HORIZONTAL TO 1 VERTICAL (3:1); AND

b. SEVEN (7) CALENDAR DAYS AS TO ALL OTHER DISTURBED OR GRADED

AREAS ON THE PROJECT SITE NOT UNDER ACTIVE GRADING.

MDE STANDARD STABILIZATION NOTE

DRAINAGE DIVIDE LINE

TERMINAL POINT BETWEEN SSF

AND CONSTRUCTION FENCE

IIIIIII

IIIIII

I I I I I I

IIIIII

III

III

II

I

II

I

II

I

I I I I I I

II

I

II

I

II

I

II

I

III

III

III

III

III

III

L

O

D

LOD

L O

D

LOD

L

O

D

LOD

LOD

L

O

D

L

O

D

L

O

D

LOD

L O

D

LOD

L O

D

L

O

D

L

O

D

L O

D L

O D

L O

D

L

O

D

LOD

LOD

LOD

LOD

LOD

LOD

LOD LOD LOD

S S

F S

S F

S

S

F

SSF

SSF

SSF

SIP

S S

F

S

S

F

S

S

F

SSF

SSF

SIP

CIP

SIP

AGIP

AGIP

CIP

CIP

SUPER SILT FENCE

AVG. S<10%

MAX SLOPE L = 300'

SSF LF = 1640'

D.A. TO SIP

0.14 AC

D.A. TO CIP

0.05 AC

D.A. TO SIP

0.03 AC

D.A. TO CIP

0.03 AC

D.A. TO CIP

0.18 AC

D.A. TO SIP

0.11 AC

D.A. TO AGIP

0.05 AC

D.A. TO AGIP

0.06 AC

C-721

1553599

FIRE PROTECTION

BRANCH MANAGER

N A

V A

L

F

A C

I L

I T

I E

S

E

N G

I N

E E

R I N

G

C

O M

M A

S

H

W A

S H

I N

G T

O N

C A

R

I N

G S

M

D

J O

I N

T

B

A S

E

A

N D

R E

W S

C A

R

I N

G S

M

D

R E

V D

A T

E

F I

M

E

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR.

EPROJECT NO.

SHEET

NAVFAC DRAWING NO.

DES DRW

N A

V A

L

F

A C

I L I T

I E

S

E

N G

I N

E E

R I N

G

C O

M M

A N

D

D E

P A

R T

M E

T

V

Y

S Y

M D

E S

C R

I P

T I O

N D

A T

E A

P P

R

DRAWFORM REVISION: 31 JANUARY 2017

CDA

JTG

OF

CHK

SATISFACTORY TO DATE

FOR COMMANDER NAVFAC

ACTIVITY

APPROVED

THC

AS NOTED

UNCLASSIFIED/ /FOR OFFICIAL USE ONLY

U N

C L

A S

S I F

I E

D

F

F

I C

I A

L

U

L

Y

U N

C L

A S

S I F

I E

D

F

F

I C

I A

L

U

L

Y

UNCLASSIFIED/ /FOR OFFICIAL USE ONLY

CO

NS

OL

ID

AT

ED

C

OM

MU

NI

CA

TI

ON

C

EN

TE

R

N40080-15-D-0452 TO 004

2850 EISENHOWER AVENUE

SUITE 200

ALEXANDRIA, VA 22314

P-

KEY PLAN:

P R

O F E

S S

I O

N A

L

C

E R

T I F I C

A T I O

E R

E B

Y

C

E R

T I

A T

T H

E S

E

D

O C

U M

E N

R

E

P

R E

P A

R E

D

P

R O

V E

D

B

Y

M

E

A

C

E N

S E

D

P

R O

F E

S S

I O

N A

L

E

N G

I N

E E

R

U

N D

E

L A

T

A

M

A R

Y L

A N

D

L I C

E N

E

X P

I R

A T

I O

N

D

A T

E

I S

S U

N

S T

R U

C T

I O

N

A/E INFO

02/19/2021

BY MAJ BIRKHOLD VIA EMAIL

PM/DM JFH/EC

CHIEF ENG/ARCH

E R

O S

I O

N

A

D

I M

E N

T

C

O N

T R

A

N

A

R E

H A

I T

I A

L

SACSMS MLC

13108380 0 40' 80'20'

SCALE: 1" = 40'

EROSION AND SEDIMENT CONTROL PLAN -

AREA 3 - PHASE 2 INITIAL

SCALE: 1" = 40'

PLAN

NORTH

M A

T C

H

L

I N

E

S

H E

LEGEND

CIP

SIP

SSF

CIP

CURB INLET PROTECTION

STANDARD INLET

PROTECTION

SUPER SILT FENCE

CONSTRUCTION FENCE

TREE PROTECTION

1. SEE SHEETS C-001 AND C-002 FOR SITE NOTES,

LEGENDS, AND ABBREVIATIONS.

2. SEE SHEETS C-750, C-751, C-752, AND C-753 FOR

EROSION AND SEDIMENT CONTROL AND

STANDARD STABILIZATION NOTES.

3. NOTE TO CONTRACTOR: EROSION AND SEDIMENT

CONTROL WILL BE STRICTLY ENFORCED.

4. ALL AREAS WITHIN THE LOD AND OUTSIDE ESC

CONTROL DRAINAGE AREAS WILL BE SUBJECT TO

SAME DAY STABILIZATION AT THE END OF EACH

DAY'S WORK.

5. BID OPTION INCLUDES ALL WORK SHOWN ON THIS

SHEET.

GENERAL NOTES

FOLLOWING INITIAL SOIL DISTURBANCE OR RE-DISTURBANCE, PERMANENT

OR TEMPORARY STABILIZATION MUST BE COMPLETED WITHIN;

a. THREE (3) CALENDAR DAYS AS TO THE SURFACE OF ALL PERIMETER, DIKES, SWALES, DITCHES, PERIMETER SLOPES, AND ALL SLOPES

STEEPER THAN 3 HORIZONTAL TO 1 VERTICAL (3:1); AND

b. SEVEN (7) CALENDAR DAYS AS TO ALL OTHER DISTURBED OR GRADED

AREAS ON THE PROJECT SITE NOT UNDER ACTIVE GRADING.

MDE STANDARD STABILIZATION NOTE

DRAINAGE DIVIDE LINE

AGIP

AT-GRADE INLET

PROTECTION

TERMINAL POINT BETWEEN SSF

AND CONSTRUCTION FENCE

L

O

D

L

O

D

L

O

D

LOD

LOD

LOD

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

SIP

SIP

SIP

SIP

SIP

CIP

CIP

CIP

C

W

S

C

W

S

CIP

S

C

E

S

C

E

SIP

CIP

SIP

CIP

CIP

CIP

SIP

SIP

S

S

F

S

S

F

S

S

F

S

S

F

S

S

F

S

S

F

SSF

SSF

S

S

F

S

S

F

S

S

F

S

S

F

S

S

F

S

S

F

S

S

F

S

S

F

S

S

F

S

S

F

S

S

F

GATE IN

PERIMETER FENCE

SUPER SILT FENCE

AVG. S<10%

MAX SLOPE L = 300'

SSF LF = 1640'

GATE IN

PERIMETER FENCE

SUPER SILT FENCE

AVG. S<10%

MAX SLOPE L = 180'

SSF LF = 210'

SUPER SILT FENCE

AVG. S 10-20%

MAX SLOPE L = 190'

SSF LF = 360'

SUPER SILT FENCE

AVG. S<10%

MAX SLOPE L = 300'

SSF LF = 1640'

D.A. TO SIP

0.03 AC

D.A. TO CIP

0.04 AC

D.A. TO CIP

0.02 AC

D.A. TO CIP

0.03 AC

D.A. TO CIP

0.07 AC

D.A. TO CIP

0.11 AC

D.A. TO CIP

0.11 AC

D.A. TO SIP

0.86 AC

D.A. TO SIP

0.70 AC

D.A. TO SIP

0.55 AC

D.A. TO SIP

0.51 AC

D.A. TO CIP

0.11 AC

D.A. TO SIP

0.05 AC

D.A. TO CIP

0.25 AC

D.A. TO SIP

0.34 AC

D.A. TO SIP

0.61 AC

D.A. TO SIP

0.70 AC

C-722

1553599

FIRE PROTECTION

BRANCH MANAGER

N A

V A

L

F

A C

I L

I T

I E

S

E

N G

I N

E E

R I N

G

C

O M

M A

S

H

W A

S H

I N

G T

O N

C A

R

I N

G S

M

D

J O

I N

T

B

A S

E

A

N D

R E

W S

C A

R

I N

G S

M

D

R E

V D

A T

E

F I

M

E

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR.

EPROJECT NO.

SHEET

NAVFAC DRAWING NO.

DES DRW

N A

V A

L

F

A C

I L I T

I E

S

E

N G

I N

E E

R I N

G

C O

M M

A N

D

D E

P A

R T

M E

T

V

Y

S Y

M D

E S

C R

I P

T I O

N D

A T

E A

P P

R

DRAWFORM REVISION: 31 JANUARY 2017

CDA

JTG

OF

CHK

SATISFACTORY TO DATE

FOR COMMANDER NAVFAC

ACTIVITY

APPROVED

THC

AS NOTED

UNCLASSIFIED/ /FOR OFFICIAL USE ONLY

U N

C L

A S

S I F

I E

D

F

F

I C

I A

L

U

L

Y

U N

C L

A S

S I F

I E

D

F

F

I C

I A

L

U

L

Y

UNCLASSIFIED/ /FOR OFFICIAL USE ONLY

CO

NS

OL

ID

AT

ED

C

OM

MU

NI

CA

TI

ON

C

EN

TE

R

N40080-15-D-0452 TO 004

2850 EISENHOWER AVENUE

SUITE 200

ALEXANDRIA, VA 22314

P-

KEY PLAN:

P R

O F E

S S

I O

N A

L

C

E R

T I F I C

A T I O

E R

E B

Y

C

E R

T I

A T

T H

E S

E

D

O C

U M

E N

R

E

P

R E

P A

R E

D

P

R O

V E

D

B

Y

M

E

A

C

E N

S E

D

P

R O

F E

S S

I O

N A

L

E

N G

I N

E E

R

U

N D

E

L A

T

A

M

A R

Y L

A N

D

L I C

E N

E

X P

I R

A T

I O

N

D

A T

E

I S

S U

N

S T

R U

C T

I O

N

A/E INFO

02/19/2021

BY MAJ BIRKHOLD VIA EMAIL

PM/DM JFH/EC

CHIEF ENG/ARCH

E R

O S

I O

N

A

D

I M

E N

T

C

O N

T R

A

N

A

R E

H A

T E

R I M

SACSMS MLC

13108381 0 40' 80'20'

SCALE: 1" = 40'

EROSION AND SEDIMENT CONTROL PLAN -

AREA 2 - PHASE 2 INTERIM

SCALE: 1" = 40'

PLAN

NORTH

M A

T C

H

L

I N

E

S

H E

1. SEE SHEETS C-001 AND C-002 FOR SITE NOTES,

LEGENDS, AND ABBREVIATIONS.

2. SEE SHEETS C-750, C-751, C-752, AND C-753 FOR

EROSION AND SEDIMENT CONTROL AND

STANDARD STABILIZATION NOTES.

3. NOTE TO CONTRACTOR: EROSION AND SEDIMENT

CONTROL WILL BE STRICTLY ENFORCED.

4. ALL AREAS WITHIN THE LOD AND OUTSIDE ESC

CONTROL DRAINAGE AREAS WILL BE SUBJECT TO

SAME DAY STABILIZATION AT THE END OF EACH

DAY'S WORK.

5. BID OPTION INCLUDES ALL WORK SHOWN ON THIS

SHEET.

GENERAL NOTES

LEGEND

CIP

SIP

SSF

STABILIZED CONSTRUCTION

ENTRANCE

CIP

SIP

CURB INLET PROTECTION

STANDARD INLET

PROTECTION

SUPER SILT FENCE

SCE

CONSTRUCTION FENCE

TREE PROTECTION

CWS

CONCRETE WASHOUT

STRUCTURE

FOLLOWING INITIAL SOIL DISTURBANCE OR RE-DISTURBANCE, PERMANENT

OR TEMPORARY STABILIZATION MUST BE COMPLETED WITHIN;

a. THREE (3) CALENDAR DAYS AS TO THE SURFACE OF ALL PERIMETER, DIKES, SWALES, DITCHES, PERIMETER SLOPES, AND ALL SLOPES

STEEPER THAN 3 HORIZONTAL TO 1 VERTICAL (3:1); AND

b. SEVEN (7) CALENDAR DAYS AS TO ALL OTHER DISTURBED OR GRADED

AREAS ON THE PROJECT SITE NOT UNDER ACTIVE GRADING.

MDE STANDARD STABILIZATION NOTE

DRAINAGE DIVIDE LINE

TERMINAL POINT BETWEEN SSF

AND CONSTRUCTION FENCE

I I I I I I

II

I

II

I

I I I I I I

II

I

II

I

II

I

II

I

III

III

III

III

L

O

D

LOD

L O

D

LOD

L

O

D

LOD

LOD

L

O

D

L

O

D

L

O

D

LOD

L O

D

LOD

L O

D

L

O

D

L

O

D

L O

D L

O D

L O

D

L

O

D

LOD

LOD

LOD

LOD

LOD

LOD

LOD LOD LOD

SUPER SILT FENCE

AVG. S<10%

MAX SLOPE L = 300'

SSF LF = 1640'

D.A. TO SIP

0.37 AC

D.A. TO SIP

0.22 AC

D.A. TO SIP

0.25 AC

D.A. TO SIP

0.25 AC

D.A.TO SIP

0.05 AC

D.A. TO SIP

0.68 AC

SIP

SIP

SIP

SIP

SIP

SIP

S S

F S

S F

S

S

F

SSF

SSF

SSF

S S

F

S

S

F

S

S

F

SSF

SSF

C-723

1553599

FIRE PROTECTION

BRANCH MANAGER

N A

V A

L

F

A C

I L

I T

I E

S

E

N G

I N

E E

R I N

G

C

O M

M A

S

H

W A

S H

I N

G T

O N

C A

R

I N

G S

M

D

J O

I N

T

B

A S

E

A

N D

R E

W S

C A

R

I N

G S

M

D

R E

V D

A T

E

F I

M

E

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR.

EPROJECT NO.

SHEET

NAVFAC DRAWING NO.

DES DRW

N A

V A

L

F

A C

I L I T

I E

S

E

N G

I N

E E

R I N

G

C O

M M

A N

D

D E

P A

R T

M E

T

V

Y

S Y

M D

E S

C R

I P

T I O

N D

A T

E A

P P

R

DRAWFORM REVISION: 31 JANUARY 2017

CDA

JTG

OF

CHK

SATISFACTORY TO DATE

FOR COMMANDER NAVFAC

ACTIVITY

APPROVED

THC

AS NOTED

UNCLASSIFIED/ /FOR OFFICIAL USE ONLY

U N

C L

A S

S I F

I E

D

F

F

I C

I A

L

U

L

Y

U N

C L

A S

S I F

I E

D

F

F

I C

I A

L

U

L

Y

UNCLASSIFIED/ /FOR OFFICIAL USE ONLY

CO

NS

OL

ID

AT

ED

C

OM

MU

NI

CA

TI

ON

C

EN

TE

R

N40080-15-D-0452 TO 004

2850 EISENHOWER AVENUE

SUITE 200

ALEXANDRIA, VA 22314

P-

KEY PLAN:

P R

O F E

S S

I O

N A

L

C

E R

T I F I C

A T I O

E R

E B

Y

C

E R

T I

A T

T H

E S

E

D

O C

U M

E N

R

E

P

R E

P A

R E

D

P

R O

V E

D

B

Y

M

E

A

C

E N

S E

D

P

R O

F E

S S

I O

N A

L

E

N G

I N

E E

R

U

N D

E

L A

T

A

M

A R

Y L

A N

D

L I C

E N

E

X P

I R

A T

I O

N

D

A T

E

I S

S U

N

S T

R U

C T

I O

N

A/E INFO

02/19/2021

BY MAJ BIRKHOLD VIA EMAIL

PM/DM JFH/EC

CHIEF ENG/ARCH

E R

O S

I O

N

A

D

I M

E N

T

C

O N

T R

A

N

A

R E

H A

T E

R I M

SACSMS MLC

13108382 0 40' 80'20'

SCALE: 1" = 40'

EROSION AND SEDIMENT CONTROL PLAN -

AREA 3 - PHASE 2 INTERIM

SCALE: 1" = 40'

PLAN

NORTH

M A

T C

H

L

I N

E

S

H E

LEGEND

SIP

SSF

SIP

STANDARD INLET

PROTECTION

SUPER SILT FENCE

CONSTRUCTION

PERIMETER FENCE

TREE PROTECTION

1. SEE SHEETS C-001 AND C-002 FOR SITE NOTES,

LEGENDS, AND ABBREVIATIONS.

2. SEE SHEETS C-750, C-751, C-752, AND C-753 FOR

EROSION AND SEDIMENT CONTROL AND

STANDARD STABILIZATION NOTES.

3. NOTE TO CONTRACTOR: EROSION AND SEDIMENT

CONTROL WILL BE STRICTLY ENFORCED.

4. ALL AREAS WITHIN THE LOD AND OUTSIDE ESC

CONTROL DRAINAGE AREAS WILL BE SUBJECT TO

SAME DAY STABILIZATION AT THE END OF EACH

DAY'S WORK.

5. BID OPTION INCLUDES ALL WORK SHOWN ON THIS

SHEET

GENERAL NOTES

FOLLOWING INITIAL SOIL DISTURBANCE OR RE-DISTURBANCE, PERMANENT

OR TEMPORARY STABILIZATION MUST BE COMPLETED WITHIN;

a. THREE (3) CALENDAR DAYS AS TO THE SURFACE OF ALL PERIMETER, DIKES, SWALES, DITCHES, PERIMETER SLOPES, AND ALL SLOPES

STEEPER THAN 3 HORIZONTAL TO 1 VERTICAL (3:1); AND

b. SEVEN (7) CALENDAR DAYS AS TO ALL OTHER DISTURBED OR GRADED

AREAS ON THE PROJECT SITE NOT UNDER ACTIVE GRADING.

MDE STANDARD STABILIZATION NOTE

DRAINAGE DIVIDE LINE

TERMINAL POINT BETWEEN SSF

AND CONSTRUCTION FENCE

L

O

D

L

O

D

L

O

D

LOD

LOD

LOD

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

C-724

1553599

FIRE PROTECTION

BRANCH MANAGER

N A

V A

L

F

A C

I L

I T

I E

S

E

N G

I N

E E

R I N

G

C

O M

M A

S

H

W A

S H

I N

G T

O N

C A

R

I N

G S

M

D

J O

I N

T

B

A S

E

A

N D

R E

W S

C A

R

I N

G S

M

D

R E

V D

A T

E

F I

M

E

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR.

EPROJECT NO.

SHEET

NAVFAC DRAWING NO.

DES DRW

N A

V A

L

F

A C

I L I T

I E

S

E

N G

I N

E E

R I N

G

C O

M M

A N

D

D E

P A

R T

M E

T

V

Y

S Y

M D

E S

C R

I P

T I O

N D

A T

E A

P P

R

DRAWFORM REVISION: 31 JANUARY 2017

CDA

JTG

OF

CHK

SATISFACTORY TO DATE

FOR COMMANDER NAVFAC

ACTIVITY

APPROVED

THC

AS NOTED

UNCLASSIFIED/ /FOR OFFICIAL USE ONLY

U N

C L

A S

S I F

I E

D

F

F

I C

I A

L

U

L

Y

U N

C L

A S

S I F

I E

D

F

F

I C

I A

L

U

L

Y

UNCLASSIFIED/ /FOR OFFICIAL USE ONLY

CO

NS

OL

ID

AT

ED

C

OM

MU

NI

CA

TI

ON

C

EN

TE

R

N40080-15-D-0452 TO 004

2850 EISENHOWER AVENUE

SUITE 200

ALEXANDRIA, VA 22314

P-

KEY PLAN:

P R

O F E

S S

I O

N A

L

C

E R

T I F I C

A T I O

E R

E B

Y

C

E R

T I

A T

T H

E S

E

D

O C

U M

E N

R

E

P

R E

P A

R E

D

P

R O

V E

D

B

Y

M

E

A

C

E N

S E

D

P

R O

F E

S S

I O

N A

L

E

N G

I N

E E

R

U

N D

E

L A

T

A

M

A R

Y L

A N

D

L I C

E N

E

X P

I R

A T

I O

N

D

A T

E

I S

S U

N

S T

R U

C T

I O

N

A/E INFO

02/19/2021

BY MAJ BIRKHOLD VIA EMAIL

PM/DM JFH/EC

CHIEF ENG/ARCH

E R

O S

I O

N

A

D

I M

E N

T

C

O N

T R

A

N

A

R E

H A

N

A L

SACSMS MLC

13108383 0 40' 80'20'

SCALE: 1" = 40'

EROSION AND SEDIMENT CONTROL PLAN -

AREA 2 - PHASE 2 FINAL

SCALE: 1" = 40'

PLAN

NORTH

M A

T C

H

L

I N

E

S

H E

1. SEE SHEETS C-001 AND C-002 FOR SITE NOTES,

LEGENDS, AND ABBREVIATIONS.

2. SEE SHEETS C-750, C-751, C-752, AND C-753 FOR

EROSION AND SEDIMENT CONTROL AND

STANDARD STABILIZATION NOTES.

3. NOTE TO CONTRACTOR: EROSION AND SEDIMENT

CONTROL WILL BE STRICTLY ENFORCED.

4. ALL AREAS WITHIN THE LOD AND OUTSIDE ESC

CONTROL DRAINAGE AREAS WILL BE SUBJECT

TO SAME DAY STABILIZATION AT THE END OF

EACH DAY'S WORK.

5. BID OPTION INCLUDES ALL WORK SHOWN ON

THIS SHEET.

GENERAL NOTES

WORK NOTES

1. APPLY TOPSOIL, MULCH ,AND PERMANENT

SEEDING.

FOLLOWING INITIAL SOIL DISTURBANCE OR RE-DISTURBANCE, PERMANENT

OR TEMPORARY STABILIZATION MUST BE COMPLETED WITHIN;

a. THREE (3) CALENDAR DAYS AS TO THE SURFACE OF ALL PERIMETER, DIKES, SWALES, DITCHES, PERIMETER SLOPES, AND ALL SLOPES

STEEPER THAN 3 HORIZONTAL TO 1 VERTICAL (3:1); AND

b. SEVEN (7) CALENDAR DAYS AS TO ALL OTHER DISTURBED OR GRADED

AREAS ON THE PROJECT SITE NOT UNDER ACTIVE GRADING.

MDE STANDARD STABILIZATION NOTE

LEGEND

I I I I I I

II

I

II

I

II

I

I I I I I I

II

I

II

I

II

I

II

I

III

III

III

III

L

O

D

LOD

L O

D

LOD

L

O

D

LOD

LOD

L

O

D

L

O

D

L

O

D

LOD

L O

D

LOD

L O

D

L

O

D

L

O

D

L O

D L

O D

L O

D

L

O

D

LOD

LOD

LOD

LOD

LOD

LOD

LOD LOD LOD

C-725

1553599

FIRE PROTECTION

BRANCH MANAGER

N A

V A

L

F

A C

I L

I T

I E

S

E

N G

I N

E E

R I N

G

C

O M

M A

S

H

W A

S H

I N

G T

O N

C A

R

I N

G S

M

D

J O

I N

T

B

A S

E

A

N D

R E

W S

C A

R

I N

G S

M

D

R E

V D

A T

E

F I

M

E

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR.

EPROJECT NO.

SHEET

NAVFAC DRAWING NO.

DES DRW

N A

V A

L

F

A C

I L I T

I E

S

E

N G

I N

E E

R I N

G

C O

M M

A N

D

D E

P A

R T

M E

T

V

Y

S Y

M D

E S

C R

I P

T I O

N D

A T

E A

P P

R

DRAWFORM REVISION: 31 JANUARY 2017

CDA

JTG

OF

CHK

SATISFACTORY TO DATE

FOR COMMANDER NAVFAC

ACTIVITY

APPROVED

THC

AS NOTED

UNCLASSIFIED/ /FOR OFFICIAL USE ONLY

U N

C L

A S

S I F

I E

D

F

F

I C

I A

L

U

L

Y

U N

C L

A S

S I F

I E

D

F

F

I C

I A

L

U

L

Y

UNCLASSIFIED/ /FOR OFFICIAL USE ONLY

CO

NS

OL

ID

AT

ED

C

OM

MU

NI

CA

TI

ON

C

EN

TE

R

N40080-15-D-0452 TO 004

2850 EISENHOWER AVENUE

SUITE 200

ALEXANDRIA, VA 22314

P-

KEY PLAN:

P R

O F E

S S

I O

N A

L

C

E R

T I F I C

A T I O

E R

E B

Y

C

E R

T I

A T

T H

E S

E

D

O C

U M

E N

R

E

P

R E

P A

R E

D

P

R O

V E

D

B

Y

M

E

A

C

E N

S E

D

P

R O

F E

S S

I O

N A

L

E

N G

I N

E E

R

U

N D

E

L A

T

A

M

A R

Y L

A N

D

L I C

E N

E

X P

I R

A T

I O

N

D

A T

E

I S

S U

N

S T

R U

C T

I O

N

A/E INFO

02/19/2021

BY MAJ BIRKHOLD VIA EMAIL

PM/DM JFH/EC

CHIEF ENG/ARCH

E R

O S

I O

N

A

D

I M

E N

T

C

O N

T R

A

N

A

R E

H A

N

A L

SACSMS MLC

13108384 0 40' 80'20'

SCALE: 1" = 40'

EROSION AND SEDIMENT CONTROL PLAN -

AREA 3 - PHASE 2 FINAL

SCALE: 1" = 40'

PLAN

NORTH

M A

T C

H

L

I N

E

S

H E

WORK NOTES

1. APPLY TOPSOIL, MULCH ,AND PERMANENT

SEEDING.

1. SEE SHEETS C-001 AND C-002 FOR SITE NOTES,

LEGENDS, AND ABBREVIATIONS.

2. SEE SHEETS C-750, C-751, C-752, AND C-753 FOR

EROSION AND SEDIMENT CONTROL AND

STANDARD STABILIZATION NOTES.

3. NOTE TO CONTRACTOR: EROSION AND SEDIMENT

CONTROL WILL BE STRICTLY ENFORCED.

4. ALL AREAS WITHIN THE LOD AND OUTSIDE ESC

CONTROL DRAINAGE AREAS WILL BE SUBJECT

TO SAME DAY STABILIZATION AT THE END OF

EACH DAY'S WORK.

5. BID OPTION INCLUDES ALL WORK SHOWN ON

THIS SHEET.

GENERAL NOTES

FOLLOWING INITIAL SOIL DISTURBANCE OR RE-DISTURBANCE, PERMANENT

OR TEMPORARY STABILIZATION MUST BE COMPLETED WITHIN;

a. THREE (3) CALENDAR DAYS AS TO THE SURFACE OF ALL PERIMETER, DIKES, SWALES, DITCHES, PERIMETER SLOPES, AND ALL SLOPES

STEEPER THAN 3 HORIZONTAL TO 1 VERTICAL (3:1); AND

b. SEVEN (7) CALENDAR DAYS AS TO ALL OTHER DISTURBED OR GRADED

AREAS ON THE PROJECT SITE NOT UNDER ACTIVE GRADING.

MDE STANDARD STABILIZATION NOTE

LEGEND

1553599

FIRE PROTECTION

BRANCH MANAGER

N A

V A

L

F

A C

I L I T

I E

S

E

N G

I N

E E

R I N

G

C

O M

M A

S

H

W A

S H

I N

G T

O N

C A

R

I N

G S

M

D

J O

I N

T

B

A S

E

A

N D

R E

W S

C A

R

I N

G S

M

D

R E

V D

A T

E

F I

M

E

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR.

EPROJECT NO.

SHEET

NAVFAC DRAWING NO.

DES DRW

N A

V A

L

F

A C

I L I T

I E

S

E

N G

I N

E E

R I N

G

C O

M M

A N

D

D E

P A

R T

M E

T

V

Y

S Y

M D

E S

C R

I P

T I O

N D

A T

E A

P P

R

DRAWFORM REVISION: 31 JANUARY 2017

CDA

JTG

OF

CHK

SATISFACTORY TO DATE

FOR COMMANDER NAVFAC

ACTIVITY

APPROVED

THC

AS NOTED

UNCLASSIFIED/ /FOR OFFICIAL USE ONLY

U N

C L

A S

S I F

I E

D

F

F

I C

I A

L

U

L

Y

U N

C L

A S

S I F

I E

D

F

F

I C

I A

L

U

L

Y

UNCLASSIFIED/ /FOR OFFICIAL USE ONLY

CO

NS

OL

ID

AT

ED

C

OM

MU

NI

CA

TI

ON

C

EN

TE

R

N40080-15-D-0452 TO 004

2850 EISENHOWER AVENUE

SUITE 200

ALEXANDRIA, VA 22314

P-

P R

O F E

S S

I O

N A

L

C

E R

T I F I C

A T I O

E R

E B

Y

C

E R

T I

A T

T H

E S

E

D

O C

U M

E N

R

E

P

R E

P A

R E

D

P

R O

V E

D

B

Y

M

E

A

A

T

I

A

C

E N

S E

D

P

R O

F E

S S

I O

N A

L

E

N G

I N

E E

R

U

N D

E

L A

T

A

M

A R

Y L

A N

D

L

I C

E N

E

X P

I R

A T

I O

N

D

A T

E

I S

S U

N

S T

R U

C T

I O

N

A/E INFO

02/19/2021

BY MAJ BIRKHOLD VIA EMAIL

PM/DM JFH/EC

CHIEF ENG/ARCH

C-750

E R

O S

I O

N

A

D

I M

E N

T

C

O N

T R

O L

L E

G E

T

E S

SACSMS MLC

13108385

1. THE CONTRACTOR MUST NOTIFY MDE AT (410) 537-3510 SEVEN (7) DAYS BEFORE

COMMENCING ANY LAND DISTURBING ACTIVITY AND, UNLESS WAIVED BY MDE, MUST BE

REQUIRED TO HOLD A PRE-CONSTRUCTION MEETING BETWEEN PROJECT

REPRESENTATIVES AND A REPRESENTATIVE OF MDE.

2. THE CONTRACTOR MUST NOTIFY MDE IN WRITING AND BY TELEPHONE AT THE FOLLOWING

POINTS:

A. THE REQUIRED PRE-CONSTRUCTION MEETING.

B. FOLLOWING INSTALLATION OF SEDIMENT CONTROL MEASURES.

C. DURING THE INSTALLATION OF SEDIMENT BASINS (TO BE CONVERTED INTO

PERMANENT STORMWATER MANAGEMENT STRUCTURES) AT THE REQUIRED INSPECTION

POINTS (SEE INSPECTION CHECKLIST ON PLAN). NOTIFICATION PRIOR TO COMMENCING

CONSTRUCTION OF EACH STEP IS MANDATORY.

D. PRIOR TO REMOVAL OR MODIFICATION OF ANY SEDIMENT CONTROL STRUCTURE(S).

E. PRIOR TO REMOVAL OF ALL SEDIMENT CONTROL DEVICES.

F. PRIOR TO FINAL ACCEPTANCE.

3. THE PLAN APPROVAL LETTER, APPROVED EROSION AND SEDIMENT CONTROL PLANS, DAILY

LOG BOOKS, AND TEST REPORTS MUST BE AVAILABLE AT THE SITE FOR INSPECTION BY

DULY AUTHORIZED OFFICIALS OF MDE AND THE AGENCY RESPONSIBLE FOR THE PROJECT.

4. THE CONTRACTOR MUST CONSTRUCT ALL EROSION AND SEDIMENT CONTROL MEASURES

PER THE APPROVED PLAN AND CONSTRUCTION SEQUENCE AND MUST HAVE THEM

INSPECTED AND APPROVED BY THE MDE INSPECTOR PRIOR TO BEGINNING ANY OTHER

LAND DISTURBANCES. MINOR SEDIMENT CONTROL DEVICE LOCATION ADJUSTMENTS MAY BE

MADE IN THE FIELD WITH THE APPROVAL OF THE MDE INSPECTOR. THE CONTRACTOR MUST

ENSURE THAT ALL RUNOFF FROM DISTURBED AREAS IS DIRECTED TO THE SEDIMENT

CONTROL DEVICES AND MUST NOT REMOVE ANY EROSION OR SEDIMENT CONTROL

MEASURE WITHOUT PRIOR PERMISSION FROM MDE INSPECTOR. THE CONTRACTOR MUST

OBTAIN PRIOR AGENCY AND MDE APPROVAL FOR MODIFICATIONS TO THE EROSION AND

SEDIMENT CONTROL PLAN AND/OR SEQUENCE OF CONSTRUCTION.

5. THE MDE INSPECTOR HAS THE OPTION OF REQUIRING ADDITIONAL SAFETY OR SEDIMENT

CONTROL MEASURES, IF DEEMED NECESSARY.

6. THE CONTRACTOR MUST PROTECT ALL POINTS OF CONSTRUCTION INGRESS AND EGRESS

TO PREVENT THE DEPOSITION OF MATERIALS ONTO PUBLIC ROADS. ALL MATERIALS

DEPOSITED ONTO PUBLIC ROADS MUST BE REMOVED IMMEDIATELY.

7. THE CONTRACTOR MUST INSPECT DAILY AND MAINTAIN CONTINUOUSLY IN AN EFFECTIVE

OPERATING CONDITION ALL EROSION AND SEDIMENT CONTROL MEASURES UNTIL SUCH

TIME AS THEY ARE REMOVED WITH PRIOR PERMISSION FROM THE MDE INSPECTOR.

8. EROSION AND SEDIMENT CONTROL FOR UTILITY CONSTRUCTION MUST BE PROVIDED IN

ACCORDANCE WITH APPROVED PLANS.

8A. UTILITY CONSTRUCTION MUST ONLY BE FOR AREAS WITHIN THE DELINEATED LIMIT OF

DISTURBANCE. CALL "MISS UTILITY" AT 1-800-257-7777 48 HOURS PRIOR TO THE START OF

WORK. WHEN SAME DAY STABILIZATION IS APPROVED:

A. EXCAVATED TRENCH MATERIAL MUST BE PLACED ON THE HIGH SIDE OF THE

TRENCH.

B. TRENCHES FOR UTILITY INSTALLATION MUST BE BACKFILLED, COMPACTED, AND

STABILIZED AT THE END OF EACH WORKING DAY. NO MORE TRENCH MUST BE OPENED THAN

CAN BE COMPLETED THE SAME DAY.

9. ALL WATER REMOVED FROM EXCAVATED AREAS MUST BE PASSED THROUGH AN MDE

APPROVED DEWATERING PRACTICE OR PUMPED TO A SEDIMENT TRAP OR BASIN PRIOR TO

DISCHARGE TO A FUNCTIONAL STORM DRAIN SYSTEM OR TO STABLE GROUND SURFACE.

10. CONCRETE WASHOUT STRUCTURES MUST BE USED WHEN CONCRETE TRUCKS, DRUMS,

PUMPS, CHUTES, OR OTHER EQUIPMENT IS RINSED OR CLEANED ON-SITE.

11. CONSTRUCTION ACTIVITIES PRODUCING DUST MUST IMPLEMENT CONTROL MEASURES TO

AVOID THE SUSPENSION OF DUST PARTICLES AND/OR PREVENT DUST FROM BLOWING

OFF-SITE OR TO AREAS WITHOUT TREATMENT.

12. FOLLOWING INITIAL SOIL DISTURBANCE OR RE-DISTURBANCE, PERMANENT OR TEMPORARY

STABILIZATION MUST BE COMPLETED WITHIN:

A. THREE (3) CALENDAR DAYS AS TO THE SURFACE OF ALL PERIMETER CONTROLS,

DIKES, SWALES, DITCHES, PERIMETER SLOPES, AND ALL SLOPES STEEPER THAN 3

HORIZONTAL TO 1 VERTICAL (3:1); AND

B. SEVEN (7) CALENDAR DAYS AS TO ALL OTHER DISTURBED OR GRADED AREAS ON

THE PROJECT SITE NOT UNDER ACTIVE GRADING.

13. VEGETATIVE STABILIZATION MUST BE PERFORMED IN ACCORDANCE WITH THE 2011

MARYLAND STANDARDS AND SPECIFICATIONS FOR SOIL EROSION AND SEDIMENT CONTROL.

REFER TO APPROPRIATE SPECIFICATIONS FOR TEMPORARY SEEDING, PERMANENT

SEEDING, MULCHING, SODDING, AND GROUND COVERS.

14. WHEN SEEDING, ALL DISTURBED AREAS WITH SLOPES FLATTER THAN 2:1 MUST BE

STABILIZED WITH 4 INCHES OF TOPSOIL, SEED, AND MULCH. ALL DISTURBED AREAS WITH

SLOPES 2:1 OR STEEPER MUST BE STABILIZED WITH MATTING OVER 2 INCHES OF TOPSOIL

AND SEED.

15. ALL SEDIMENT BASINS, TRAP EMBANKMENTS AND SLOPES, PERIMETER DIKES, SWALES AND

ALL DISTURBED SLOPES STEEPER OR EQUAL TO 3:1 MUST BE STABILIZED WITH SEED AND

ANCHORED STRAW MULCH, SOD, OR OTHER APPROVED STABILIZATION MEASURES, AS

SOON AS POSSIBLE BUT NO LATER THAN THREE (3) CALENDAR DAYS AFTER

ESTABLISHMENT. ALL AREAS DISTURBED OUTSIDE OF THE PERIMETER SEDIMENT CONTROL

SYSTEM MUST BE MINIMIZED. MAINTENANCE MUST BE PERFORMED AS NECESSARY TO

ENSURE CONTINUED STABILIZATION.

16. PERMANENT SWALES OR OTHER POINTS OF CONCENTRATED WATER FLOW MUST BE

STABILIZED WITH SEED AND AN APPROVED EROSION CONTROL MATTING, SOD, RIP-RAP, OR

OTHER APPROVED STABILIZATION MEASURES.

17. FOR STOCKPILE SLOPES STEEPER THAN 3 HORIZONTAL TO 1 VERTICAL (3:1), THE

CONTRACTOR MUST APPLY SEED AND ANCHORED STRAW MULCH, SOD, OR OTHER

APPROVED STABILIZATION MEASURES TO THE FACE OF THE STOCKPILE WITHIN THREE (3)

CALENDAR DAYS OF ACTIVITY HAVING CEASED ON THE RESPECTIVE FACE. FOR SLOPES 3:1

OR FLATTER, THE CONTRACTOR MUST APPLY STABILIZATION MEASURES TO THE FACE OF

THE STOCKPILE WITHIN SEVEN (7) CALENDAR DAYS OF ACTIVITY HAVING CEASED ON THE

RESPECTIVE FACE. MAINTENANCE MUST BE PERFORMED AS NECESSARY TO ENSURE

CONTINUED STABILIZATION.

18. FOR FINISHED GRADING, THE CONTRACTOR MUST PROVIDE ADEQUATE GRADIENTS TO

PREVENT WATER FROM PONDING FOR MORE THAN TWENTY-FOUR (24) HOURS AFTER THE

END OF A RAINFALL EVENT. DRAINAGE COURSES AND SWALE FLOW AREAS MAY TAKE AS

LONG AS FORTY-EIGHT (48) HOURS AFTER THE END OF A RAINFALL EVENT TO DRAIN. AREAS

DESIGNED TO HAVE STANDING WATER MUST NOT BE REQUIRED TO MEET THIS

REQUIREMENT.

19. WHERE DEEMED APPROPRIATE BY THE ENGINEER OR INSPECTOR, SEDIMENT BASINS AND

TRAPS MAY NEED TO BE SURROUNDED WITH AN APPROVED SAFETY FENCE. THE FENCE

MUST CONFORM TO LOCAL ORDINANCES AND REGULATIONS. THE DEVELOPER OR OWNER

MUST CHECK WITH LOCAL BUILDING OFFICIALS ON APPLICABLE SAFETY REQUIREMENTS.

WHERE SAFETY FENCE IS DEEMED APPROPRIATE AND LOCAL ORDINANCES DO NOT SPECIFY

FENCING SIZES AND TYPES, THE FOLLOWING MUST BE USED AS A MINIMUM STANDARD: THE

SAFETY FENCE MUST BE MADE OF WELDED WIRE AND AT LEAST 42 INCHES HIGH, HAVE

POSTS SPACED NO FARTHER APART THAN 8 FEET, HAVE MESH OPENINGS NO GREATER

THAN 2 INCHES IN WIDTH AND 4 INCHES IN HEIGHT WITH A MINIMUM OF 14 GAUGE WIRE.

SAFETY FENCE MUST BE MAINTAINED AND IN GOOD CONDITION AT ALL TIMES.

20. ALL SEDIMENT TRAP DEPTH DIMENSIONS ARE RELATIVE TO THE OUTLET ELEVATION. ALL

TRAPS MUST HAVE A STABLE OUTFALL. ALL TRAPS AND BASINS MUST HAVE STABLE INFLOW

POINTS.

21. SEDIMENT MUST BE REMOVED AND THE TRAP OR BASIN RESTORED TO ITS ORIGINAL

DIMENSIONS WHEN THE SEDIMENT HAS ACCUMULATED TO ONE QUARTER OF THE TOTAL

DEPTH OF THE TRAP OR BASIN. TOTAL DEPTH MUST BE MEASURED FROM THE TRAP OR

BASIN BOTTOM TO THE CREST OF THE OUTLET.

22. SEDIMENT REMOVED FROM TRAPS (AND BASINS) MUST BE PLACED AND STABILIZED IN

APPROVED AREAS, BUT NOT WITHIN A FLOODPLAIN, WETLAND OR TREE-SAVE AREA. WHEN

PUMPING SEDIMENT LADEN WATER, THE DISCHARGE MUST BE DIRECTED TO AN MDE

APPROVED SEDIMENT TRAPPING DEVICE PRIOR TO RELEASE FROM THE SITE. A SUMP PIT

MAY BE USED IF SEDIMENT TRAPS THEMSELVES ARE BEING PUMPED OUT.

23. PRIOR TO REMOVAL OF SEDIMENT CONTROL MEASURES, THE CONTRACTOR MUST STABILIZE

AND HAVE ESTABLISHED PERMANENT STABILIZATION FOR ALL CONTRIBUTORY DISTURBED

AREAS USING SOD OR AN APPROVED PERMANENT SEED MIXTURE WITH REQUIRED SOIL

AMENDMENTS AND AN APPROVED ANCHORED MULCH. WOOD FIBER MULCH MAY ONLY BE

USED IN SEEDING SEASON WHERE THE SLOPE DOES NOT EXCEED 10% AND GRADING HAS

BEEN DONE TO PROMOTE SHEET FLOW DRAINAGE. AREAS BROUGHT TO FINISHED GRADE

DURING THE SEEDING SEASON MUST BE PERMANENTLY STABILIZED AS SOON AS POSSIBLE,

BUT NOT LATER THAN THREE (3) CALENDAR DAYS AFTER ESTABLISHMENT FOR SLOPES

STEEPER THAN 3 HORIZONTAL TO 1 VERTICAL (3:1) AND SEVEN (7) CALENDAR DAYS FOR

FLATTER SLOPES. WHEN PROPERTY IS BROUGHT TO FINISHED GRADE DURING THE MONTHS

OF NOVEMBER THROUGH FEBRUARY, AND PERMANENT STABILIZATION IS FOUND TO BE

IMPRACTICAL, TEMPORARY SEED AND ANCHORED STRAW MULCH MUST BE APPLIED TO

DISTURBED AREAS. THE FINAL PERMANENT STABILIZATION OF SUCH PROPERTY MUST BE

APPLIED BY MARCH 15 OR EARLIER IF GROUND AND WEATHER CONDITIONS ALLOW.

24. TEMPORARY SEDIMENT CONTROL DEVICES MUST BE REMOVED WITH PERMISSION OF THE

MDE INSPECTOR WITHIN THIRTY (30) CALENDAR DAYS FOLLOWING ESTABLISHMENT OF

PERMANENT STABILIZATION IN ALL CONTRIBUTORY DRAINAGE AREAS. UPON REMOVAL OF

SEDIMENT CONTROL DEVICES, THE AREA DISTURBED BY REMOVAL MUST BE STABILIZED

WITH TOPSOIL, SEED, AND MULCH, OR AS SPECIFIED, WITHIN 24 HOURS OF SAID REMOVAL.

STORMWATER MANAGEMENT STRUCTURES USED TEMPORARILY FOR SEDIMENT CONTROL

MUST BE CONVERTED TO THE PERMANENT CONFIGURATION WITHIN THIS TIME PERIOD AS

WELL.

25. OFF-SITE SPOIL OR BORROW AREAS ON STATE OR FEDERAL PROPERTY MUST HAVE PRIOR

APPROVAL BY MDE AND OTHER APPLICABLE STATE, FEDERAL, AND LOCAL AGENCIES;

OTHERWISE APPROVAL MUST BE GRANTED BY THE LOCAL AUTHORITIES. ALL WASTE AND

BORROW AREAS OFF-SITE MUST BE PROTECTED BY SEDIMENT CONTROL MEASURES AND

STABILIZED.

MDE EROSION AND SEDIMENT CONTROL GENERAL NOTES

18.73

TO BE DETERMINED BY

CONTRACTOR

27947

AT-GRADE INLET PROTECTION

COMBINATION INLET PROTECTION

ROCK OUTLET PROTECTION I

ROCK OUTLET PROTECTION II

ROCK OUTLET PROTECTION III

SILT FENCE ON PAVEMENT

STABILIZED CONSTRUCTION ENTRANCE

TEMPORARY GABION OUTLET STRUCTURE

SSD

AGIP

BB

CWD - 12

(DESIGNATION CWD-12

REFERS TO 12" CLEAR

WATER DIVERSION)

COIP

CIP

DF

PLACE DESIGNATION (e.g. A-1) ON

FLOW CHANNEL SIDE OF DIKE.

A-1

ES

FB

FB-A

FB-B

FL-18

DESIGNATION FL-18 REFERS TO

18 INCH DIAMETER FILTER LOG.

GP

GIP

LOD

MIP

MSIP

MB

PDS-1

ST-I

PP

PST

RPS

RRP

ROP1

ROPII

ROPIII

SF

SFOP

SIP

ST-II

ST-III

SP

BENCHING

BENCHING

CWP

CLEAR WATER PIPE

CONCRETE WASHOUT STRUCTURE

CWS

HDDD

TSSMC-lb/ft²

(INCLUDE SHEAR

STRESS)

TSSMS-lb/ft²

(INCLUDE SHEAR

STRESS)

PERMANENT SOIL STABILIZATION

MATTING CHANNEL

PERMANENT SOIL STABILIZATION

MATTING SLOPE

TEMPORARY SOIL STABILIZATION

MATTING CHANNEL

TEMPORARY SOIL STABILIZATION

MATTING SLOPE

PSSMC-lb/ft²

(INCLUDE SHEAR

STRESS)

PSSMS-lb/ft²

(INCLUDE SHEAR

STRESS)

BAFFLE BOARDS

CLEAR WATER DIVERSION PIPE

CURB INLET PROTECTION

DIVERSION FENCE

EARTH DIKE

EMERGENCY SPILLWAY

FILTER BAG

FILTER BERM

FILTER LOG

GABION INFLOW PROTECTION

GABION INLET PROTECTION

HORIZONTAL DRAW-DOWN DEVICE

LIMIT OF DISTURBANCE

MEDIAN INLET PROTECTION

MEDIAN SUMP INLET PROTECTION

MOUNTABLE BERM

PERIMETER DIKE/SWALE

PIPE OUTLET SEDIMENT TRAP ST I

PLUNGE POOL

PORTABLE SEDIMENT TANK

REMOVABLE PUMPING STATION

RIPRAP INFLOW PROTECTION

SILT FENCE

STANDARD INLET PROTECTION

STONE CHECK DAM

STONE/RIPRAP OUTLET SEDIMENT TRAP ST II

RIPRAP OUTLET SEDIMENT TRAP ST III

SUBSURFACE DRAINS

SUMP PIT

SUPER SILT FENCE

TEMPORARY ACCESS BRIDGE

TEMPORARY ACCESS CULVERT

TEMPORARY ASPHALT BERM

TEMPORARY BARRIER DIVERSION

SCE

CD

SSF

TAC

TBD

TGOS

TEMPORARY STONE OUTLET STRUCTURE

WASH RACK OPTION

VERTICAL DRAW-DOWN DEVICE

VDDD

TEMPORARY SWALE

WR

A-1

TSOS

PSD - 12

DESIGNATION PSD-12 REFERS

TO 12 IN PIPE SLOPE DRAIN.

PIPE SLOPE DRAIN

A-1

GP

GIP

LOD

MIP

MSIP

MB

PP

BENCHING

STANDARD SYMBOLS

26. SITE EARTHWORK INFORMATION:

A. AREA DISTURBED ACRES

B. TOTAL CUT CUBIC YARDS

C. TOTAL FILL CUBIC YARDS

D. NET IMPORT CUBIC YARDS

E. UNSUITABLE SOIL UNDERCUT CUBIC YARDS

F. TOTAL SOIL IMPORT CUBIC YARDS

G. OFF-SITE WASTE / BORROW AREA LOCATION:

20759

10000

30759

BRANCH MANAGER

N A

V A

L

F

A C

I L

I T

I E

S

E

N G

I N

E E

R I N

G

C

O M

M A

S

H

W A

S H

I N

G T

O N

C A

R

I N

G S

M

D

J O

I N

T

B

A S

E

A

N D

R E

W S

C A

R

I N

G S

M

D

R E

V D

A T

E

F I

M

E

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR.

EPROJECT NO.

SHEET

NAVFAC DRAWING NO.

DES DRW

N A

V A

L

F

A C

I L I T

I E

S

E

N G

I N

E E

R I N

G

C O

M M

A N

D

D E

P A

R T

M E

T

V

Y

S Y

M D

E S

C R

I P

T I O

N D

A T

E A

P P

R

DRAWFORM REVISION: 31 JANUARY 2017

CDA

JTG

OF

CHK

SATISFACTORY TO DATE

FOR COMMANDER NAVFAC

ACTIVITY

APPROVED

THC

AS NOTED

UNCLASSIFIED/ /FOR OFFICIAL USE ONLY

U N

C L

A S

S I F

I E

D

F

F

I C

I A

L

U

L

Y

U N

C L

A S

S I F

I E

D

F

F

I C

I A

L

U

L

Y

UNCLASSIFIED/ /FOR OFFICIAL USE ONLY

CO

NS

OL

ID

AT

ED

C

OM

MU

NI

CA

TI

ON

C

EN

TE

R

N40080-15-D-0452 TO 004

2850 EISENHOWER AVENUE

SUITE 200

ALEXANDRIA, VA 22314

P-

P R

O F E

S S

I O

N A

L

C

E R

T I F I C

A T I O

E R

E B

Y

C

E R

T I

A T

T H

E S

E

D

O C

U M

E N

R

E

P

R E

P A

R E

D

P

R O

V E

D

B

Y

M

E

A

C

E N

S E

D

P

R O

F E

S S

I O

N A

L

E

N G

I N

E E

R

U

N D

E

L A

T

A

M

A R

Y L

A N

D

L I C

E N

E

X P

I R

A T

I O

N

D

A T

E

I S

S U

N

S T

R U

C T

I O

N

A/E INFO

02/19/2021

BY MAJ BIRKHOLD VIA EMAIL

PM/DM JFH/EC

CHIEF ENG/ARCH

C-751

E R

O S

I O

N

A

D

I M

E N

T

C

O N

T R

T

E S

SACSMS MLC

13108386

FOLLOWING INITIAL SOIL DISTURBANCE OR RE-DISTURBANCE, PERMANENT OR TEMPORARY STABILIZATION MUST BE

COMPLETED WITHIN;

a. THREE (3) CALENDAR DAYS AS TO THE SURFACE OF ALL PERIMETER, DIKES, SWALES, DITCHES, PERIMETER SLOPES, AND ALL SLOPES STEEPER THAN 3 HORIZONTAL TO 1 VERTICAL (3:1); AND

b. SEVEN (7) CALENDAR DAYS DAYS AS TO ALL OTHER DISTURBED OR GRADED AREAS ON THE PROJECT SITE NOT

UNDER ACTIVE GRADING.

M…