About this file

This federal solicitation requests proposals to provide and install a raised access floor system in a data center. The scope of work includes replacing all existing access floor panels with concrete core panels and replacing the entire floor panel support system to support up to 2,500 pounds. The period of performance is 365 days after award. A pre-proposal site visit is scheduled for March 17, 2021, with any questions due by March 24. Proposals are requested from qualified contractors for installing a new raised floor system meeting the structural loading requirements for the data center located in Mechanicsburg, Pennsylvania. The Defense Information Systems Agency is the contracting agency.

View the file

Other files for this federal contract opportunity

Other files attached to MEC Raised Floor, newest first.
File Type Posted
832117746 MEC updated PWS.doc DOC document
HC102821R0024 0001 solicitation amend.docx DOCX document
encl 2cPWS MEC Raised Floor Upgrade 31 Mar 2021.docx DOCX document
Structural Drawings MEC.pdf PDF
NAVFAC Bldg 308 Fire Suppression System Dwgs.pdf PDF
DSCN0715.JPG JPG image
DSCN0707.JPG JPG image
DSCN0716.JPG JPG image
Mechanicsburg Master Floor Plan-203 Existing.pdf PDF
DSCN0717.JPG JPG image
DSCN0710.JPG JPG image
HC102821R0024 solicitation questions and answers.xlsx XLSX spreadsheet
09 69 13 Rigid Grid Access Flooring edited 26 MAR 2021.docx DOCX document
DSCN0709.JPG JPG image
DSCN0714.JPG JPG image
Mechanicsburg Master Floor Plan-214 EXISTING.pdf PDF
Mechanicsburg Master Floor Plan-214 Cable Tray.pdf PDF
DSCN0708.JPG JPG image
MEC CR 203 and 203A Cable Tray.pdf PDF
MEC raised floor RFQ clin pricing sheet.xlsx XLSX spreadsheet
Appendix C - Signal Reference Grid for Grounding.pdf PDF
Appendix D - MIL-STD-188-124B.pdf PDF
Appendix A - Raised Access Floor Plan.pdf PDF
Appendix F - SEC Inventory Format (excel spreadshhet).xlsx XLSX spreadsheet
Appendix E - SRG Grounding System Commissioning.pdf PDF
Appendix B - Rigid Grid Access Flooring.pdf PDF
HC102821R0024 solicitation.docx DOCX document
Appendix G - Contractor NDA.docx DOCX document
encl 4_qasp - MEC Raised Floor Upgrade.docx DOCX document
Pre-Proposal Site Visit Access Clearance_ODP.xls XLS spreadsheet
Pre-Proposal Site Visit Request Instructions (MEC RF).doc DOC document
Pre-Proposal Site Visit Access SECNAV_5512_FORM.pdf PDF
Show all 32

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SHEET

IDENTIFICATION

D

ES

IG

N

B Y:

D R

AW

N

B Y:

SU

BM

IT

TE

D B

Y:

PL

O

T

SC

AL

E:

SI

ZE

AN

SI

D

C H

EC

KE

D B

Y:

PL

O

T D

AT

E:

FI

LE

N

AM

E:

SU

BM

IT

TA

L D

AT

E:

SO

LI

C

IT

AT

IO

N N

O

C O

N

TR

AC

T

N O

FI

LE

N U

M

BE

R

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E:

AP

PR

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E:

AP

PR

B

C

D

1 2 3 4 5

1 2 3 4 5

Defense Information Systems Agency A Combat Support Agency

A

B

D

C

P.

O

.B O

X

G

R

EE

N W

O O

D V

IL

LA

G E

M

PE

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

C O

.8

* FOR OFFICIAL USE ONLY *

* FOR OFFICIAL USE ONLY *

A

N /A

JE

S

N /A

AS

S

H O

W N

JE

S

/2

9/

M

EC

_M D

E -L

G -0

.D

W G

N /A

N /A

N /A

9/

/2

E-001

D

AT

A C

EN

TE

R M

EC

H

AN

IC

SB

U

R G

EL

EC

TR

IC

AL

L

EG

EN

D

S H

EE

T

IN

D

EX

EL

EC

TR

IC

AL

THIS DRAWING HAS BEEN PREPARED BASED UPON INFORMATION VERIFIED IN THE

FIELD AND BY FURNISHED RECORD DRAWINGS. THE CONFORMANCE TO CURRENT

OR PREVAILING CODES OF ANY WORK SHOWN HAS NOT BEEN VERIFIED. THE

LOCATION OF THE FACILITIES AS SHOWN MUST BE VERIFIED IN THE FIELD BEFORE

THIS DRAWING IS USED IN FUTURE CONSTRUCTION PROJECTS.

AS BUILT DRAWINGS ELECTRICAL LEGEND & SHEET INDEX

Sheet List Table Sheet Number Sheet Title

Electrical: 000 - General

E-001 ELECTRICAL LEGEND & SHEET INDEX

Electrical: 100 - Plans: Electrical Power Plan

E-101 FIRST FLOOR POWER PLAN AREA A

E-102 FIRST FLOOR POWER PLAN AREA B

E-103 FIRST FLOOR POWER PLAN AREA C

E-104 FIRST FLOOR POWER PLAN AREA D

E-106 SECOND FLOOR POWER PLAN AREA A

E-107 SECOND FLOOR POWER PLAN AREA B

E-108 SECOND FLOOR POWER PLAN AREA C

E-109 SECOND FLOOR POWER PLAN AREA D

Electrical: 100 - Plans: Lighting Plans

E-111 FIRST FLOOR LIGHTING PLAN AREA A

E-112 FIRST FLOOR LIGHTING PLAN AREA B

E-113 FIRST FLOOR LIGHTING PLAN AREA C

E-114 FIRST FLOOR LIGHTING PLAN AREA D

E-116 SECOND FLOOR LIGHTING PLAN AREA A

E-117 SECOND FLOOR LIGHTING PLAN AREA B

E-118 SECOND FLOOR LIGHTING PLAN AREA C

E-119 SECOND FLOOR LIGHTING PLAN AREA D

Electrical: 100 - Plans: Grounding Plans

E-121 FIRST FLOOR GROUNDING PLAN AREA A

E-122 FIRST FLOOR GROUNDING PLAN AREA B

E-123 FIRST FLOOR GROUNDING PLAN AREA C

E-124 FIRST FLOOR GROUNDING PLAN AREA D

E-126 SECOND FLOOR GROUNDING PLAN AREA A

E-127 SECOND FLOOR GROUNDING PLAN AREA B

E-128 SECOND FLOOR GROUNDING PLAN AREA C

E-129 SECOND FLOOR GROUNDING PLAN AREA D

Electrical: 100 - Plans: Site plan

E-130 ELECTRICAL SITE PLAN

E-131 ELECTRICAL ROOF PLAN

Electrical: 200 - Elevations

E-200 VAULT TUNNEL ELEVATIONS

Electrical: 400 - Enlarged Plans

E-400 SITE GROUNDING PLAN

E-401 ENLARGED CEILING PLAN

E-402 UTILITY TUNNEL FLOOR PLAN

Electrical: 500 - Electrical Details

E-500 SWITCHGEAR ELEVATION DETAIL

E-501 MCC ELEVATION DETAIL

Electrical: 600 - Diagrams: Power Distribution

E-600 SWGR-EG-1, ESWGR-A-1, ESWGR-B-1

E-601 SUBSTATION ESWGR-C-1 & MDP'S

E-602

E-603 UPS-B-1 THRU B-5 & SBM-B-1

E-604 UPP-A-1 & UPP-B-1

E-605 UPP-A & UPP-B SWITCHBOARDS

E-606 MCC-1 & MCC-2

E-607 MCC-3 & MCC-4

Electrical: 600 - Diagrams: Power Distribution: Emergency Power Off

E-700 EPO DETAILS

E-701 EPO DETAILS

E-702 EPO DETAILS

E-703 EPO DETAILS

E-704 EPO DETAILS

E-705 EPO DETAILS

A AMPERES

AC ABOVE COUNTER

AFF ABOVE FINISHED FLOOR

AH AIR HANDLING UNIT

AHU AIR HANDLER UNIT

AIC AMPS INTERRUPT CURRENT

ATS AUTOMATIC TRANSFER SWITCH

AUTO AUTOMATIC

AWG AMERICAN WIRE GAUGE

BLDG BUILDING

BT BUSS TIE

C CONDUIT

CH CHILLER

COND CONDENSER

CRAC COMPUTER ROOM AIR CONDITIONER

CRAH COMPUTER ROOM AIR HANDLER

CRU COMPUTER ROOM UNIT

CWP CONDENSER WATER PUMP

CT COOLING TOWER

DISC DISCONNECT

EBS ESSENTIAL BOLT SWITCH

ECB ENCLOSED CIRCUIT BREAKER

EDP ESSENTIAL DISTRIBUTION

PANELBOARD

EF EXHAUST FAN

EPP ESSENTIAL POWER PANEL

EPO EMERGENCY POWER OFF

ESWBD ESSENTIAL SWITCHBOARD

ET ESSENTIAL TRANSFORMER

EXH EXHAUST

FC FAN COIL

GFI GROUND FAULT INTERRUPTER

GND GROUND

GEN GENERATOR

HP HORSE POWER

HW HOT WATER

HVAC HEATING, VENTILATION, AIR

CONDITIONING

HZ HERTZ

IMP IMPEDANCE

K ONE THOUSAND

KV KILO VOLT

LOC LOCATION

LP LIGHTING PANEL

XXA/XP

M

K

GFI

C.T.

A

AS

VFD

F

J

SYMBOLS

X

PB

ABBREVIATIONS

G

VS

V

XXAF/XXAT

M

M MOTOR

MCC MOTOR CONTROL CENTER

MCM THOUSAND CIRCULAR MILS

MDP MAIN DISTRIBUTION PANEL

MLO MAIN LUGS ONLY

MTS MANUAL TRANSFER SWITCH

MV MEDIUM VOLTAGE

MVSW MEDIUM VOLTAGE SWITCH

NC NORMALLY CLOSED

NO NORMALLY OPEN

P POLE

PCE POWER CONTROL ENCLOSURE

PCHWP PRIMARY CHILLED WATER PUMP

PCWP PRIMARY CONDENSER WATER PUMP

PDU POWER DISTRIBUTION UNIT

PT POWER TRANSFORMER

RDC REMOTE DISTRIBUTION CABINET

RM ROOM

RPM REVOLUTIONS PER MINUTE

SCHWP SECONDARY CHILLED WATER PUMP

SCWP SECONDARY CONDENSER WATER

PUMP

SPD SURGE PROTECTION DEVICE

STS STATIC TRANSFER SWITCH

SW SWITCH

SWBD SWITCHBOARD

TTB TELEPHONE BOARD

TYP TYPICAL

TVSS TRANSIENT VOLTAGE SURGE

SUPPRESSION

UPP UNINTERRUPTIBLE POWER PANEL

UPS UNINTERRUPTIBLE POWER SUPPLY

URP UNINTERRUPTIBLE RECEPTACLE

PANELBOAD

USWBD UNINTERRUPTIBLE SWITCHBOARD

V VOLTS

VFD VARIABLE FREQUENCY DRIVE

W WIRE

WP WEATHER PROOF

XFRM TRANSFORMER

Y WYE

2x2 RECESSED LIGHT FIXTURE

2x4 RECESSED LIGHT FIXTURE

WALL MOUNTED LIGHT FIXTURE

BARE LAMP FLUORESCENT STRIP LIGHT

BARE LAMP FLUORESCENT STRIP LIGHT WITH J-BOX

POLE MOUNTED LIGHT FIXTURE

RECESSED LIGHT FIXTURE

EXIT LIGHT (WITH DIRECTION ARROWS INDICATED)

WALL MOUNTED EXIT LIGHT (WITH DIRECTION

ARROWS INDICATED)

WALL MOUNTED BATTERY PACK EMERGENCY LIGHT

SINGLE HEAD EMERGENCY LIGHT

SPEAKER /INTERCOM

MOTION SENSOR

DUPLEX RECEPTACLE

FLOOR MOUNTED DUPLEX RECEPTACLE

SIMPLEX RECEPTACLE

SPECIAL PURPOSE RECEPTACLE

FUSED DISCONNECT SWITCH

MOTOR STARTER

COMBINATION DISCONNECT

SWITCH AND MOTOR STARTER

JUNCTION BOX

CONTROL PANEL

PANEL BOARD

PCC SWITCHBOARD

SINGLE POLE SWITCH

PULL BOX

SINGLE PUSH BUTTON

TRIPLE PUSH BUTTON

EQUIPMENT TAG

METER

AMP SELECTOR SWITCH

AMP METER

AMPERE RATING/ BREAKER POLES

TRANSFER SWITCH

BATTERY

CURRENT TRANSFORMER

CIRCUIT BREAKER

12.47KV INCOMING SERVICE

DRAW-OUT CIRCUIT BREAKER

ENCLOSED CIRCUIT BREAKER

FILTERS

FUSE

FUSED DISCONNECT SWITCH

GROUND FAULT INDICATOR

GROUND

KIRK KEY INTERLOCK

MOTOR

SIZE 1 MOTOR STARTER

TRANSFORMER

UNINTERRUPTIBLE

POWER SUPPLY UNIT

VARIABLE FREQUECNY DRIVE

WIRE/ CONDUIT GROUP

CONTACT NORMALLY OPEN

CONTACT NORMALLY CLOSED

GENERATOR

AC CIRCUIT BREAKER

VOLT SELECTOR SWITCH

VOLT METER

AMPERE FRAME/AMPERE TRIP

UP

2 3 4 5 6

D

C

B

A

RAMP

DOWN 12"

RAMP

UP 12"

BATTERY ROOM

MECH AND ELEC

UPS ROOM

MECH AND ELEC

CORRIDOR

ADMIN

102A

VESTIBULE

ADMIN

MENS

ADMIN

WOMENS

ADMIN

VESTIBULE

ADMIN

ELECTRICAL ROOM

MECH AND ELEC

JANITOR

ADMIN

117B

CONFERENCE

SECURE ROOM

118A

OFFICE

SECURE ROOM

118B

OFFICE

SECURE ROOM

118C

OFFICE

SECURE ROOM

CORRIDOR

SECURE ROOM

117A

OFFICE

SECURE ROOM

CORRIDOR

SECURE ROOM

BREAK

SECURE ROOM

MECHANICAL ROOM

MECH AND ELEC

CORRIDOR

ADMIN

STAIRS 4

ADMIN

ELEVATOR

ADMIN

VESTIBULE

ADMIN

BATTERY ROOM

UPS ROOM

CORRIDOR

OFFICE

118A

OFFICE

118C

OFFICE

118B

CONFERENCE

117B

VESTIBULE

102A

OFFICE

117A

CORRIDOR

BREAK

ELEVATOR

MECHANICAL ROOM

CORRIDOR

ELECTRICAL ROOM

VESTIBULE

JANITOR

STAIRS

CORRIDOR

MENS

WOMENS

VESTIBULE

PANEL LP-2

PANEL DP-1

XFMR-C-11

75kVA

XFMR

XFMR-C-10

45kVA

XFMR

RF-3

MCC-3

60/3

XFMR-1

15kVA

RP1C-33 RP1C-25 RP1C-33 RP1C-31

PDUA1-17

RP1C-29

RP1C-25

RP1C-33 RP1C-29 RP1C-25 RP1C-33 RP1C-25

RP1C-25

RP1C-29

RP1C-33

RP1C-33

RP1C-33

RP1C-35

RP1C-32

RP1C-34

RP1C-31 RP1C-33

RP1C-36 RP1C-32

RP1C-36 PDUA1-3

PDUA1-2

PDUB1-22,24

RP1D-18

PDUB1-15

RP1C-30

RP1C-26

RP1C-30

PDUA1-24

RP1C-30

RP1C-28

RP1C-26

RP1C-43,45

RP1C-31

RP1C-28

PDUB1-3

PDUB1-4

PDUB1-4

PDUB1-4

RP1C-23

PDUA1-17

RP1C-23

PDUB1-16

RP1C-36

RP1C-32,34

RP1C-34,36

RP1C-32,34

RP1C-39

RP1C-36

RP1C-40

RP1C-42

RP1C-44

RP1C-22

PDUB1-11

RP1C-22

PDUB1-11 RP1C-21

PDUB1-10

RP1C-46,48

PDUB1-13

RP1C-50PDUA1-12 RP1

PDUA1-2

PDUB1-1

PDUA1-1

RP1C-46PDUA1-15

RP

PDUA1-14

PD

RP1D-5

+60" AFF

RP1C-28

RP1C-28

RP1C-22

RP

RP

EF-13

MCC-2

30/3

AHU-3

T T

TAHU-8

M

OVERHEAD

GARAGE

DOOR

J

LP-3-15

+8'-0" AFF

J

PB

J

LP1-5-21

+8'-0" AFF

+10'-0"

AFF

22 21 20

17 23

+60" AFF

+60" AFF

+60" AFF

RP1C-17

RP1D-19

51 50

PB

RP1N-6

RP1C-28

RP1C-26

RP1D-6

RP1D-6 RP1D-5

LENEL

KEY PAD

12 C R

AH

-C -0

C

R

AH

-C

-7

C R

AH

-C -0

C R

AH

-1

-C -7

KW

C R

AH

-1

-C -7

KW

JUNCTION

BOXES

PULL BOX

37 44

SHEET

IDENTIFICATION

D

ES

IG

N

B Y:

D R

AW

N

B Y:

SU

BM

IT

TE

D B

Y:

PL

O

T

SC

AL

E:

SI

ZE

AN

SI

D

C H

EC

KE

D B

Y:

PL

O

T D

AT

E:

FI

LE

N

AM

E:

SU

BM

IT

TA

L D

AT

E:

SO

LI

C

IT

AT

IO

N N

O

C O

N

TR

AC

T

N O

FI

LE

N U

M

BE

R

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E:

AP

PR

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E:

AP

PR

B

C

D

1 2 3 4 5

1 2 3 4 5

Defense Information Systems Agency A Combat Support Agency

A

B

D

C

P.

O

.B O

X

G

R

EE

N W

O O

D V

IL

LA

G E

M

PE

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

C O

.8

* FOR OFFICIAL USE ONLY *

* FOR OFFICIAL USE ONLY *

A

N /A

JE

S

N /A

AS

S

H O

W N

JE

S

/2

9/

M

EC

M D

E -P

P1

.D W

G

N /A

N /A

N /A

9/

/2

E-101

D

AT

A C

EN

TE

R M

EC

H

AN

IC

SB

U

R G

FI

R

ST

F

LO

O

R P

O W

ER

P

LA

N

A R

EA

A

EL

EC

TR

IC

AL

FIRST FLOOR POWER PLAN AREA A

SCALE : 1/8" = 1'-0"

THIS DRAWING HAS BEEN PREPARED BASED UPON INFORMATION VERIFIED IN THE

FIELD AND BY FURNISHED RECORD DRAWINGS. THE CONFORMANCE TO CURRENT

OR PREVAILING CODES OF ANY WORK SHOWN HAS NOT BEEN VERIFIED. THE

LOCATION OF THE FACILITIES AS SHOWN MUST BE VERIFIED IN THE FIELD BEFORE

THIS DRAWING IS USED IN FUTURE CONSTRUCTION PROJECTS.

AS BUILT DRAWINGS

PLAN

REFERENCE

NORTH

N

0 4' 8' 16'

SCALE: NONE

KEY PLAN 1st FLOOR

SCALE: NONE

D

BA

C

M

AT

C H

L

IN

E C

O N

TI

N

U

ES

O N

A R

EA

B

S H

EE

T

PP

MATCH LINE CONTINUES ON AREA C SHEET PP103

R

AM

P D

N

U P

UP 24"

6 7 8 9 10 11

D

C

B

A

RAMP UP

RAMP

UP 12"

R

AM

P

D O

W N

ELECTRICAL ROOM

OFFICE

134A

STAIRS 1

MECHANICAL ROOM

OFFICE

118F

OFFICE

118G

OFFICE

118E

CORRIDOR

CORRIDOR

OR

COMPARTMENTALIZED COMPUTING SPACE

118D

FFICE

18A

ESWGR-A-1

T-NDE2

75kVA

XFMR

PANEL

MCC-2

PANEL

MCC-1

PANEL

MCC-4

PANEL

MCC-3

CH-1

CH-2

CH-3

CH-4

HV-9

MCC-4

200/3

P-3 P-4

EF-4

MCC-3

100/3

EF-3

MCC-3

100/3

EF-1

MCC-4

100/3

HV-10

MCC-4

60/3

EPO

#13

RPA-1 RPA-1 RPA-1

RPA-5

RPA-31,33

RPA-24

RPA-24

RPA-26

RPA-5

RPA-5 RPA-15

RPA-15

RPA-11

RPA-11

RPA-11

RPA-13

RPA-13

RPA-13

RPA-7

RPA-7

RPA-7

RPA-5

RPA-26

RP1C-24

RPA-9

RPA-9

RPA-9

RPA-9

RP1C-24

6-20R

ATC ANNUN.

PANEL

ESWGR-C-1

VFD

VFD

VFD

VFD

P-2

P-1

VFD FOR CT-1

MCC-3

VFD FOR CT-2

MCC-3

VFD FOR CT-3

MCC-4

VFD FOR CT-4

MCC-4

RP1C-26

46,48

RP1C-28 PDUB1-12 RP1C-19

PDUA1-8

PDUA1-1

RP1C-48

RP1C-46PDUA1-13

RP1C-49

PDUB1-8

PDUA1-9

RP1C-20

RP1C-19

RP1C-51

PDUB1-9

PDUA1-10

RP1C-21

RP1C-20D-5

AFF

RP1C-27

RP1C-26

RP1C-30

RP1N-23

RP1N-19RP1N-19

RP1N-19

RP1N-19

RP1N-14

RP1N-14

RP1N-14RP1N-14

RP1N-14

RP1N-16

RP1N-16

RP1N-16

RP1N-16RP1N-18RP1N-18

RP1N-18

RP1N-18

RP1N-27RP1N-27

ECB NDE2

NDE2

NDE2 NDE2

NDE2

T

T

T

T

M

OVERHEAD

GARAGE DOOR

J

-5-21

0" AFF

'-0" F

B

72 77

M

OVERHEAD

GARAGE DOOR

UH-12

30/3

T

104 105

111 112

121122 xxx

127128130

131132133134 135

RP1C-14

RP1C-22

RP1C-22

148149151153

150152154

159 160 162 164

161 163 165 147 168

146 145

FOP#1

FOP#2

+6'

AFF

J

LP1-5-21

+8'-0" AFF

T

ESWGR-B-1

T

ESWGR-D-1

ABOVE

SCALE: NONE

KEY PLAN 1st FLOOR

SCALE: NONE

D

BA

C

SHEET

IDENTIFICATION

D

ES

IG

N

B Y:

D R

AW

N

B Y:

SU

BM

IT

TE

D B

Y:

PL

O

T

SC

AL

E:

SI

ZE

AN

SI

D

C H

EC

KE

D B

Y:

PL

O

T D

AT

E:

FI

LE

N

AM

E:

SU

BM

IT

TA

L D

AT

E:

SO

LI

C

IT

AT

IO

N N

O

C O

N

TR

AC

T

N O

FI

LE

N U

M

BE

R

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E:

AP

PR

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E:

AP

PR

B

C

D

1 2 3 4 5

1 2 3 4 5

Defense Information Systems Agency A Combat Support Agency

A

B

D

C

P.

O

.B O

X

G

R

EE

N W

O O

D V

IL

LA

G E

M

PE

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

C O

.8

* FOR OFFICIAL USE ONLY *

* FOR OFFICIAL USE ONLY *

A

N /A

JE

S

N /A

AS

S

H O

W N

JE

S

/2

9/

M

EC

M D

E -P

P1

.D W

G

N /A

N /A

N /A

9/

/2

E-102

D

AT

A C

EN

TE

R M

EC

H

AN

IC

SB

U

R G

FI

R

ST

F

LO

O

R P

O W

ER

P

LA

N

A R

EA

B

EL

EC

TR

IC

AL

FIRST FLOOR POWER PLAN AREA B

SCALE : 1/8" = 1'-0"

THIS DRAWING HAS BEEN PREPARED BASED UPON INFORMATION VERIFIED IN THE

FIELD AND BY FURNISHED RECORD DRAWINGS. THE CONFORMANCE TO CURRENT

OR PREVAILING CODES OF ANY WORK SHOWN HAS NOT BEEN VERIFIED. THE

LOCATION OF THE FACILITIES AS SHOWN MUST BE VERIFIED IN THE FIELD BEFORE

THIS DRAWING IS USED IN FUTURE CONSTRUCTION PROJECTS.

AS BUILT DRAWINGS 0 4' 8' 16'

M

AT

C H

L

IN

E C

O N

TI

N

U

ES

O N

A R

EA

A

S H

EE

T

PP

MATCH LINE CONTINUES ON AREA D SHEET PP104

PLAN

REFERENCE

NORTH

N

1 2 3 4 5 6

G

F

E

3.42.6

RAMP

UP 12"

CORRIDOR

BREAK

120MECHANICAL ROOM

WOMENS

VESTIBULE

LOBBY

112B

OFFICE

OFFICE

ELECTRICAL ROOM

112A

VESTIBULE

BREAK

OFFICE

OFFICE

OFFICE

OFFICE

STAIRS 3

UPP-AB-4

UPP-AB-3

UPP-AB-2

UPP-AB-1

EPO

#12

EPO

#11

UPP-AB-5

AHU-5

MCC-1

30/3

HV-6

MCC-1

30/3

HV-5

MCC-1

30/3

EF-11

MCC-2

30/3

HV-8

MCC-2

30/3

RF-3

MCC-3

60/3

EF-10

MCC-3

30/3

EF-16

MCC-4

30/3

FIRE ALARM

NAC PANEL

RP-1S-39

AC, GFI

RP-1S-6

AC, GFI

RP-1S-42

RP-1S-6

AC, GFI

RP-1S-4

AC, GFI

RP-1S-10RP-1S-8

RP-1S-13

RP-1S-42

AC, GFI

RP-1S-42

AC, GFI

RP-1S-28

RP-1S-12

RP-1S-28

RP-1S-4

RP-1S-4

RP-1S-4

RP-1S-4

RP-1S-2

RP-1S-6

RP-1S-2

RP-1S-2

RP-1S-2

RP-1S-2

RP-1S-8

RP1C-30

PDUA1-24

RP1C-28

RP1C-36

RP1C-32,34

RP1C-34,36

RP1C-32,34

RP1C-39

RP1C-22

PDUB1-11 RP1C-21

PDUB1-10

RP1C-28

RP1S-20 RP1S-22

RP1S-20 RP1S-20

RP1S-20

RP1S-20

RP1S-24RP1S-22

RP1S-22

+48" AFF

RP1S-24

RP1S-22

RP-1N-17RP-1N-17

RP-1N-17

RP-1N-17

RP-1N-17

RP1

RP1

RP1

+60"

AFF

UPP-AB-4-1

RP1C-28

RP-1S-23 RP-1S-23

FACP-1

120V

FROM

FACP-2

SCALE: NONE

KEY PLAN 1st FLOOR

SCALE: NONE

D

BA

C

SHEET

IDENTIFICATION

D

ES

IG

N

B Y:

D R

AW

N

B Y:

SU

BM

IT

TE

D B

Y:

PL

O

T

SC

AL

E:

SI

ZE

AN

SI

D

C H

EC

KE

D B

Y:

PL

O

T D

AT

E:

FI

LE

N

AM

E:

SU

BM

IT

TA

L D

AT

E:

SO

LI

C

IT

AT

IO

N N

O

C O

N

TR

AC

T

N O

FI

LE

N U

M

BE

R

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E:

AP

PR

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E:

AP

PR

B

C

D

1 2 3 4 5

1 2 3 4 5

Defense Information Systems Agency A Combat Support Agency

A

B

D

C

P.

O

.B O

X

G

R

EE

N W

O O

D V

IL

LA

G E

M

PE

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

C O

.8

* FOR OFFICIAL USE ONLY *

* FOR OFFICIAL USE ONLY *

A

N /A

JE

S

N /A

AS

S

H O

W N

JE

S

/2

9/

M

EC

M D

E -P

P1

.D W

G

N /A

N /A

N /A

9/

/2

E-103

D

AT

A C

EN

TE

R M

EC

H

AN

IC

SB

U

R G

FI

R

ST

F

LO

O

R P

O W

ER

P

LA

N

A R

EA

C

EL

EC

TR

IC

AL

FIRST FLOOR POWER PLAN AREA C

SCALE : 1/8" = 1'-0"

THIS DRAWING HAS BEEN PREPARED BASED UPON INFORMATION VERIFIED IN THE

FIELD AND BY FURNISHED RECORD DRAWINGS. THE CONFORMANCE TO CURRENT

OR PREVAILING CODES OF ANY WORK SHOWN HAS NOT BEEN VERIFIED. THE

LOCATION OF THE FACILITIES AS SHOWN MUST BE VERIFIED IN THE FIELD BEFORE

THIS DRAWING IS USED IN FUTURE CONSTRUCTION PROJECTS.

AS BUILT DRAWINGS 0 4' 8' 16'

PLAN

REFERENCE

NORTH

N

M

AT

C H

L

IN

E C

O N

TI

N

U

ES

O N

A R

EA

D

S H

EE

T

PP

MATCH LINE CONTINUES ON AREA A SHEET PP101

UP 24"

6.7 7

7.8 8

8.6 9 9.4 10 11

G

F

E

HH

P 12" UP 12"

SLOPE DN

CORRIDOR

CORRIDOR

OFFICE

TELECOM/COMM

CONFERENCE

128A

CORRIDOR

CONDITIONED STORAGE

NIPR COMPUTING SPACE

COMPARTMENTALIZED COMPUTING SPACE

132A

CORRIDOR

LOADING DOCKS

STAIRS 2

STORAGE

EPO

#9

EPO

#8

EPO

#10

EPO

#12

HV-2

MCC-1

30/3

HV-1

MCC-1

30/3

EF-12

MCC-2

30/3

EF-2

MCC-3

30/3

AHU-6

MCC-4

30/3

RPA-1 RPA-1 RPA-1

RP1S-24

RP1S-22

+48" AFF

RP1S-24

RP-1N-17

RP1N-22

RP1N-22

RP1N-22

RP1N-22

RP1N-22

RP1N-20

RP1N-22

RP1N-24

RP1N-24 RP1N-24

RP1N-24

RP1N-24

RP1N-24

RP1N-24

RP1N-23

RP1N-23

RP1N-23

RP1N-23

RP1N-21

RP1N-21

RP1N-23

RP1N-21RP1N-21

RP1N-20

RP1N-20

RP1N-20

RP1N-19RP1N-19

RP1N-27RP1N-27

127128130

PDU-B-31

PDU 1-31B

PD

U-

B-

PD

U

1-

B

PD

U-

A-

PD

U

1-

A

PD

U

-A -3

"P

DU

1-

A" IRC

I03 1-L-68

IRC

F07

1-C-69

IRC

M07

1-C-70

UPS_1-C-01

USWGR_1-AB-4

USTS-3

VFD

SCALE: NONE

KEY PLAN 1st FLOOR

SCALE: NONE

D

BA

C

SHEET

IDENTIFICATION

D

ES

IG

N

B Y:

D R

AW

N

B Y:

SU

BM

IT

TE

D B

Y:

PL

O

T

SC

AL

E:

SI

ZE

AN

SI

D

C H

EC

KE

D B

Y:

PL

O

T D

AT

E:

FI

LE

N

AM

E:

SU

BM

IT

TA

L D

AT

E:

SO

LI

C

IT

AT

IO

N N

O

C O

N

TR

AC

T

N O

FI

LE

N U

M

BE

R

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E:

AP

PR

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E:

AP

PR

B

C

D

1 2 3 4 5

1 2 3 4 5

Defense Information Systems Agency A Combat Support Agency

A

B

D

C

P.

O

.B O

X

G

R

EE

N W

O O

D V

IL

LA

G E

M

PE

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

C O

.8

* FOR OFFICIAL USE ONLY *

* FOR OFFICIAL USE ONLY *

A

N /A

JE

S

N /A

AS

S

H O

W N

JE

S

/2

9/

M

EC

M D

E -P

P1

.D W

G

N /A

N /A

N /A

9/

/2

E-104

D

AT

A C

EN

TE

R M

EC

H

AN

IC

SB

U

R G

FI

R

ST

F

LO

O

R P

O W

ER

P

LA

N

A R

EA

D

EL

EC

TR

IC

AL

FIRST FLOOR POWER PLAN AREA D

SCALE : 1/8" = 1'-0"

THIS DRAWING HAS BEEN PREPARED BASED UPON INFORMATION VERIFIED IN THE

FIELD AND BY FURNISHED RECORD DRAWINGS. THE CONFORMANCE TO CURRENT

OR PREVAILING CODES OF ANY WORK SHOWN HAS NOT BEEN VERIFIED. THE

LOCATION OF THE FACILITIES AS SHOWN MUST BE VERIFIED IN THE FIELD BEFORE

THIS DRAWING IS USED IN FUTURE CONSTRUCTION PROJECTS.

AS BUILT DRAWINGS 0 4' 8' 16'

PLAN

REFERENCE

NORTH

N

M

AT

C H

L

IN

E C

O N

TI

N

U

ES

O N

A R

EA

C

S H

EE

T

PP

MATCH LINE CONTINUES ON AREA B SHEET PP102

PDU 2-30B

RDC2-28B-03

PANEL RP2S

RED PANEL

BLACK PANEL

FM200

PANEL

WATER DETECTION

PANEL

EPO

#15

EPO

#14

RP2S-15

RP2S-15

RP2S-15

RP2S-15

RP2S-17

RP2S-21

RP2S-17

RP2S-19 RP2S-25

RP2S-27

RP2S-27RP2S-23

RP2S-23

RP2S-21

RP2S-21

RP2S-29

J J

RP2S-14

RP2S-16

J

RP2S-10

EPO

#7

RP2S-9

RP2S-7

RP2S-7

RP2S-7

RP2S-7

RP2S-7

RP2S-7

RP2S-7

RP2S-7

RP2S-5

RP2S-5

RP2S-5

RP2S-7

RP2S-5

RP2S-9

RP2S-9

RP2N-16

MM

RP2N-26

EPO

#16

93 94

61 62 64 66

63 65 67

52 53 55 57 59

54 56 58 60

32 33 35

34 36

9997 100 77 6

47 48 50

49 51

23 24 26

25 27

28 30

29 31

17 16

20 21

198199 200 201

1 2 3 4 5 6

D

C

B

A

DN

RAMP

DN 6"

COMPARTMENTALIZED COMPUTING SPACE

OFFICE

SIPR OPEN STORAGE/OFFICE

COMPARTMENTALIZED COMPUTING SPACE

JANITOR

ELECTRICAL ROOM

WOMENS

MENS

CORRIDOR

200A

ELECTRICAL ROOM

OFFICE

OFFICE

STAIRS 4

ELEVATOR

VESTIBULE

VESTIBULE

COMPARTMENTALIZED COMPUTING SPACE

ELECTRICAL ROOM

200A

OFFICE

STAIRS 4

VESTIBULE

CORRIDOR

ELECTRICAL ROOM

JANITOR

WOMENS

MENS

VESTIBULE

ELEVATOR

OFFICE

OFFICE

SIPR OPEN STORAGE/OFFICE

COMPARTMENTALIZED COMPUTING SPACE

T TTTT

T T T

RP2S-21

CRAH_2-C-40

15 TONS

"CRAC L-40"

CRAH_2-C-41

15 TONS

"CRAC L-41"

CRAH_2-C-42

30 TONS

"CRAC L-42"

CRAC-22

"CRAC L-22"

C R

AC

-1

"C R

AC

L

-1 8"

CRAH_2-C-23

30 TONS

"CRAC L-23"

C R

AC

-0

C

R

AC

-0

C R

AC

-0

C

R

AC

-0

C R

AC

-0

C

R

AC

-0

C R

AC

-1

C R

AC

-1

C

R

AC

-1

C R

AC

-1

PDU-2-A-18

125KVA

PDU-B-03

"PDU 2-03B"

PDU-A-34 PDU-B-34

PD

U-

2-B -02

"P

DU

2-

B"

PDU-A-12

"PDU 2-12A"

CRAC-66 CRAC-67

PDU-B-30

"PDU 2-30B"

FA-1

RDC-B-28-1

"RDC 2-28B-1"

RDC-B-28-3

"RDC 2-28B-3"

UDP-B-4UDP-A-3

EPO-5

PDU-B-12

"PDU 2-12B"

PDU-B-07

"PDU 2-07B"

PDU-A-03

"PDU 2-03A"

PDU-A

"PDU 2-0

M

AT

C H

L

IN

E C

O N

TI

N

U

ES

O N

AR

EA

B S

H

EE

T

PP

MATCH LINE CONTINUES

ON AREA C SHEET PP108

SHEET

IDENTIFICATION

D

ES

IG

N

B Y:

D R

AW

N

B Y:

SU

BM

IT

TE

D B

Y:

PL

O

T

SC

AL

E:

SI

ZE

AN

SI

D

C H

EC

KE

D B

Y:

PL

O

T D

AT

E:

FI

LE

N

AM

E:

SU

BM

IT

TA

L D

AT

E:

SO

LI

C

IT

AT

IO

N N

O

C O

N

TR

AC

T

N O

FI

LE

N U

M

BE

R

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E:

AP

PR

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E:

AP

PR

B

C

D

1 2 3 4 5

1 2 3 4 5

Defense Information Systems Agency A Combat Support Agency

A

B

D

C

P.

O

.B O

X

G

R

EE

N W

O O

D V

IL

LA

G E

M

PE

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

C O

.8

* FOR OFFICIAL USE ONLY *

* FOR OFFICIAL USE ONLY *

A

AS

S

H O

W N

JE

S

/2

9/

M

EC

_M D

E -P

P1

.D W

G

N /A

N /A

N /A

9/

/2

E-106

SE

C

O N

D F

LO

O

R P

O W

ER

P

LA

N

A R

EA

A

SECOND FLOOR POWER PLAN AREA A

SCALE : 1/8" = 1'-0"

THIS DRAWING HAS BEEN PREPARED BASED UPON INFORMATION VERIFIED IN THE

FIELD AND BY FURNISHED RECORD DRAWINGS. THE CONFORMANCE TO CURRENT

OR PREVAILING CODES OF ANY WORK SHOWN HAS NOT BEEN VERIFIED. THE

LOCATION OF THE FACILITIES AS SHOWN MUST BE VERIFIED IN THE FIELD BEFORE

THIS DRAWING IS USED IN FUTURE CONSTRUCTION PROJECTS.

AS BUILT DRAWINGS

PLAN

REFERENCE

NORTH

N

0 4' 8' 16'

KEY PLAN 2nd FLOOR

SCALE: NONESCALE: NONE

D

BA

C

EPO

#4

CT-1A

MCC-2

60/3

CT-1B

MCC-2

60/3

CT-1C

MCC-2

60/3

CT-2

MCC-2

60/3

RP2N-8RP2N-8

RP2N-8

RP2N-8

RP2N-8

RP2N-8

RP2N-8

RP2N-16

RP2N-24

137 141

161 106

RP2N-28

RP2N-16

RP2N-16

140138

T M

T M

208/24V

2KVA

XFRM

MM

111112 113114

115 116

118119

122 123 124 125

126127

133134

142 143 144

145 146 147 148

151152 153

6 7 8 9 10 11

D

C

B

A

D N

MECHANICAL ROOM

NIPR COMPUTING SPACE

STAIRS 1

200B

ELECTRICAL ROOM

SIPR COMPUTING SPACE

SIPR COMPUTING SPACE

STAIRS 1

MECHANICAL ROOM

NIPR COMPUTING SPACE

ELECTRICAL ROOM

200B

C R

AH

_2

-C -3

T O

N S

"C R

AC

L

-3 1"

PDU-B-13

"PDU 2-13B"

AC-22

C L-22"

CRAH_2-C-49

30 TONS

"CRAC L-49"

CRAH_2-C-38

30 TONS

"CRAC L-38"

CRAH_2-C-50

30 TONS

"CRAC L-50"

CRAH_2-C-39

30 TONS

"CRAC L-39"

CRAH_2-C-26

30 TONS

"CRAC L-26"

CRAH_2-C-25

30 TONS

"CRAC L-25"

CRAH_2-C-24

30 TONS

"CRAC L-24"

CRAH_2-C-28

30 TONS

"CRAC L-28"

CRAH_2-C-27

30 TONS

"CRAC L-27"

CRAH_2-C-29

30 TONS

"CRAC L-29"

CRAH_2-C-30

30 TONS

"CRAC L-30"

CRAH_2-C-34

30 TONS

"CRAC L-34"

CRAH_2-C-35

30 TONS

"CRAC L-35"

CRAH_2-C-33

30 TONS

"CRAC L-33"

CRAH_2-C-32

30 TONS

"CRAC L-32"

PDU_2-B-17

225KVA

PDU-B-09

"PDU 2-09B"

PDU-A-13

"PDU 2-13A"

PDU-B-06

"PDU 2-06B"PD

U-

A-

"P

DU

2-

A"

PDU-A-33

"PDU 2-33A"

PDU-B-33

"PDU 2-33B"

PDU-A-05

"PDU 2-05A"

PDU-B-05

"PDU 2-05B"

PDU-A-04

"PDU 2-04A"

PDU-B-04

"PDU 2-04B"

PDU-A-01

"PDU 2-01A"

PDU-A-07

"PDU 2-07A"

PDU-A-10

"PDU 2-10A"

PDU-B-10

"PDU 2-10B" PDU-A-09

"PDU 2-09A"

PDU-A-11

"PDU 2-11A"

PDU-B-11

"PDU 2-11B"

PDU-B-08

"PDU 2-08B"

PDU-A-08

"PDU 2-08A"

C R

AH

_1

-D -6

UDP-A5 UDP-B5

H U

M _2

-C -1

PD

U

-B -0

"P

DU

-0

1B

UDP-B-3

UDP-A-4

EPO-4

HUM_2-C-XX

FA-2

7B"

PDU-A-02

"PDU 2-02A"

M

AT

C

H L

IN

E

C O

N

TI

N U

ES

O

N

AR

EA

A

S H

EE

T

PP

MATCH LINE CONTINUES

ON AREA D SHEET PP109

SHEET

IDENTIFICATION

D

ES

IG

N

B Y:

D R

AW

N

B Y:

SU

BM

IT

TE

D B

Y:

PL

O

T

SC

AL

E:

SI

ZE

AN

SI

D

C H

EC

KE

D B

Y:

PL

O

T D

AT

E:

FI

LE

N

AM

E:

SU

BM

IT

TA

L D

AT

E:

SO

LI

C

IT

AT

IO

N N

O

C O

N

TR

AC

T

N O

FI

LE

N U

M

BE

R

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E:

AP

PR

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E:

AP

PR

B

C

D

1 2 3 4 5

1 2 3 4 5

Defense Information Systems Agency A Combat Support Agency

A

B

D

C

P.

O

.B O

X

G

R

EE

N W

O O

D V

IL

LA

G E

M

PE

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

C O

.8

* FOR OFFICIAL USE ONLY *

* FOR OFFICIAL USE ONLY *

A

AS

S

H O

W N

JE

S

/2

9/

M

EC

_M D

E -P

P1

.D W

G

N /A

N /A

N /A

9/

/2

E-107

SE

C

O N

D F

LO

O

R P

O W

ER

P

LA

N

A R

EA

B

SECOND FLOOR POWER PLAN AREA B

SCALE : 1/8" = 1'-0"

THIS DRAWING HAS BEEN PREPARED BASED UPON INFORMATION VERIFIED IN THE

FIELD AND BY FURNISHED RECORD DRAWINGS. THE CONFORMANCE TO CURRENT

OR PREVAILING CODES OF ANY WORK SHOWN HAS NOT BEEN VERIFIED. THE

LOCATION OF THE FACILITIES AS SHOWN MUST BE VERIFIED IN THE FIELD BEFORE

THIS DRAWING IS USED IN FUTURE CONSTRUCTION PROJECTS.

AS BUILT DRAWINGS

PLAN

REFERENCE

NORTH

N

0 4' 8' 16'

KEY PLAN 2nd FLOOR

SCALE: NONESCALE: NONE

D

RED PANEL

#2

EPO

#1

EPO

#6

RP2N-2RP2N-2RP2N-2RP2N-2RP2S-9

RP2S-9

RP2S-9

RP2S-9

RP2S-9

RP2S-7

RP2S-7

RP2S-7

RP2S-9

EPO

#5

RP2S-40

217 215

RP2S-40

RP2N-2

MM

RP2N-26

PDU24-41

PEDESTAL

RECEPT

EPO

#6

208 207

TTB

TTB

169 170

179 180

187 188 189

198199 200 201

1 2 3 4 5 6

G

F

E

DN

W1 0X

W1 0X

COMPARTMENTALIZED COMPUTING SPACE

NIPR COMPUTING SPACE

MENS

200A

ELECTRICAL ROOM

203A

SIPR COMPUTING SPACE

OFFICE

OFFICE

STAIRS 3

VESTIBULE

ELECTRICAL ROOM

200A

MENS

VESTIBULE

OFFICE

OFFICE

COMPARTMENTALIZED COMPUTING SPACE

NIPR COMPUTING SPACE

203A

SIPR COMPUTING SPACE

203A

NIPR COMPUTING SPACE

STAIRS 3

XX

CRAC-14

"CRAC L-44"

PD

U

-A -2

"P

DU

-2

7A

CRAH_2-C-40

15 TONS

"CRAC L-40"

CRAH_2-C-41

15 TONS

"CRAC L-41"

CRAH_2-C-42

30 TONS

"CRAC L-42"

C R

AH

_2

-C -4

T O

N S

"C R

AC

L

-4 4"

C R

AH

_2

-C -4

T O

N S

"C R

AC

L

-4 6"

PD

U

-A -2

"P D

U

-2 9A

PDU-B-29

"PDU 2-29B"

C R

AH

_2

-C -4

T O

N S

"C R

AC

L

-4 3"

CRAH_2-C-45

30 TONS

"CRAC L-45"

C R

AC

-1

(C R

AH

_2

-D -1

9)

C R

AC

-2

(C R

AH

_2

-D -2

0)

C R

AC

-2

(C R

AH

_2

-D -2

1)

CRAC-22

"CRAC L-22"

C R

AC

-1

(C R

AH

_2

-C -1

5)

C R

AC

-1

(C R

AH

_2

-C -1

6)

C R

AC

-1

(C R

AH

_2

-C -1

7)

C R

AC

-1

"C R

AC

L

-1 8"

PDU-A-28 PDU-B-28

PDU-A-26

"PDU 2-26A"

PDU-A-25

"PDU 2-25A"

PDU-A-24

"PDU 2-24A"

PDU-A-23

"PDU 2-23A"

PDU-B-18

"PDU 2-18B"

PDU-B-26

"PDU 2-26B"

PDU-B-25

"PDU 2-25B"

PDU-B-24

"PDU 2-24B"

PDU-B-23

"PDU 2-23B"

PDU-2-A-18

125KVA

PDU-2-A-17

225KVA

PDU-A-22

"PDU 2-22A"

HUHUM_2-C-07

HUM_2-C-05

BAS-6

WPS-2

USWGR

AB-02

USWGR

AB-03

PD

U

-A -3

"P D

U

-3 0A

R D

C -B

-2 8-

"R

D C

-2

8B -4

RDC-A-28-1

"RDC 2-28A-1"

PD

U-

B-

"PD

U 2

-27 B"

R D

C -A

-2 8-

"R

D C

-2

8B -4

RDC-B-28-1

"RDC 2-28B-1"

H U

M C

U _2

-C -0

HUM_2-C-06

RDC-A-21-1

UDP-B-4UDP-A-3

EPO-5

M

AT

C H

L

IN

E C

O N

TI

N

U

ES

O N

AR

EA

D S

H

EE

T

PP

MATCH LINE CONTINUES

ON AREA A SHEET PP106

SHEET

IDENTIFICATION

D

ES

IG

N

B Y:

D R

AW

N

B Y:

SU

BM

IT

TE

D B

Y:

PL

O

T

SC

AL

E:

SI

ZE

AN

SI

D

C H

EC

KE

D B

Y:

PL

O

T D

AT

E:

FI

LE

N

AM

E:

SU

BM

IT

TA

L D

AT

E:

SO

LI

C

IT

AT

IO

N N

O

C O

N

TR

AC

T

N O

FI

LE

N U

M

BE

R

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E:

AP

PR

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E:

AP

PR

B

C

D

1 2 3 4 5

1 2 3 4 5

Defense Information Systems Agency A Combat Support Agency

A

B

D

C

P.

O

.B O

X

G

R

EE

N W

O O

D V

IL

LA

G E

M

PE

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

C O

.8

* FOR OFFICIAL USE ONLY *

* FOR OFFICIAL USE ONLY *

A

AS

S

H O

W N

JE

S

/2

9/

M

EC

_M D

E -P

P1

.D W

G

N /A

N /A

N /A

9/

/2

E-108

SE

C

O N

D F

LO

O

R P

O W

ER

P

LA

N

A R

EA

C

SECOND FLOOR POWER PLAN AREA C

SCALE : 1/8" = 1'-0"

THIS DRAWING HAS BEEN PREPARED BASED UPON INFORMATION VERIFIED IN THE

FIELD AND BY FURNISHED RECORD DRAWINGS. THE CONFORMANCE TO CURRENT

OR PREVAILING CODES OF ANY WORK SHOWN HAS NOT BEEN VERIFIED. THE

LOCATION OF THE FACILITIES AS SHOWN MUST BE VERIFIED IN THE FIELD BEFORE

THIS DRAWING IS USED IN FUTURE CONSTRUCTION PROJECTS.

AS BUILT DRAWINGS

PLAN

REFERENCE

NORTH

N

0 4' 8' 16'

KEY PLAN 2nd FLOOR

SCALE: NONESCALE: NONE

D

#3

RP2N-2

RP2N-4 RP2N-4RP2N-2206

RP2N-22

RP2N-22

RP2N-24

137 141

161 106

MM

126127

132 154

167 168

236 237

218227219229228220230233 226 231 222 221

223224232

6 9 10 11

G

F

E

7 8

DN

W1 0X

W1 0X

NIPR COMPUTING SPACE

STAIRS 2

200B

ELECTRICAL ROOM

NIPR COMPUTING SPACE

ELECTRICAL ROOM

200B

STAIRS 2

130 129

C R

AH

_2

-C -5

T O

N S

"C R

AC

L

-5 8"

C R

AH

_2

-C -5

T O

N S

"C R

AC

L

-5 2"

PDU-B-13

"PDU 2-13B"

PD

U-

B-

"P

DU

2-

B"

CRAH_2-C-57

30 TONS

"CRAC L57"

CRAH_2-C-56

30 TONS

(CRAH_2-D-56)

CRAH_2-C-48

30 TONS

(CRAH_2-D-48)

-22

L-22"

CRAH_2-C-49

30 TONS

"CRAC L-49"

CRAH_2-C-38

30 TONS

"CRAC L-38"

CRAH_2-C-50

30 TONS

"CRAC L-50"

CRAH_2-C-39

30 TONS

"CRAC L-39"

PDU-A-21

"PDU 2-21A"

PDU-A-22

"PDU 2-22A"

PDU-B-22

"PDU 2-22B"

PDU-B-16

"PDU 2-16B"

PDU_2-B-17

225KVA

PDU-B-09

"PDU 2-09B"

PDU-A-13

"PDU 2-13A"

PDU-2-A-16

125KVA

FA-3

HUM_2-C-08

PDU_2-A-15

225 KVA

PDU-B-15

"PDU 2-15B"

PDU-2-A-14

"PDU 2-14B"

RDC-B-19-1 "RDC 2-19B-1"

PDU-B-19

"PDU 2-19B"

PDU-A-19

"PDU 2-19A"

PDU-A-20

"PDU 2-20A"

PDU-B-20

"PDU 2-20B"

RDC-B-1-14

"RDC 1-14B-1"

RDC-B-15-1

"RDC 2-15B-1"

R D

C -2

-A -1

5-

"R D

C

-1 5A

-2

RDC-B-22-1

"RDC 2-22B-1"

RDC-B-16-1 "RDC 2-16B-1"

RDC-B-21-1

"RDC 2-21B-1"

H U

M _2

-C -0

HUM_2-C-08

RDC-A-21-1

H U

M

/1

PN

L

HUM_2-C-09

HUMCU_

2-C-01

RDC-2-A-14-1

"RDC-A-14-A"

UDP-B-3

UDP-A-4

EPO-4

PDU-B-14

"PDU 2-14B"

MATCH LINE CONTINUES

ON AREA B SHEET PP107

M

AT

C H

L

IN

E C

O N

TI

N

U

ES

O N

A R

EA

C

S H

EE

T

PP

SHEET

IDENTIFICATION

D

ES

IG

N

B Y:

D R

AW

N

B Y:

SU

BM

IT

TE

D B

Y:

PL

O

T

SC

AL

E:

SI

ZE

AN

SI

D

C H

EC

KE

D B

Y:

PL

O

T D

AT

E:

FI

LE

N

AM

E:

SU

BM

IT

TA

L D

AT

E:

SO

LI

C

IT

AT

IO

N N

O

C O

N

TR

AC

T

N O

FI

LE

N U

M

BE

R

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E:

AP

PR

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E:

AP

PR

B

C

D

1 2 3 4 5

1 2 3 4 5

Defense Information Systems Agency A Combat Support Agency

A

B

D

C

P.

O

.B O

X

G

R

EE

N W

O O

D V

IL

LA

G E

M

PE

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

C O

.8

* FOR OFFICIAL USE ONLY *

* FOR OFFICIAL USE ONLY *

A

AS

S

H O

W N

JE

S

/2

9/

M

EC

_M D

E -P

P1

.D W

G

N /A

N /A

N /A

9/

/2

E-109

SE

C

O N

D F

LO

O

R P

O W

ER

P

LA

N

A R

EA

D

SECOND FLOOR POWER PLAN AREA D

SCALE : 1/8" = 1'-0"

THIS DRAWING HAS BEEN PREPARED BASED UPON INFORMATION VERIFIED IN THE

FIELD AND BY FURNISHED RECORD DRAWINGS. THE CONFORMANCE TO CURRENT

OR PREVAILING CODES OF ANY WORK SHOWN HAS NOT BEEN VERIFIED. THE

LOCATION OF THE FACILITIES AS SHOWN MUST BE VERIFIED IN THE FIELD BEFORE

THIS DRAWING IS USED IN FUTURE CONSTRUCTION PROJECTS.

AS BUILT DRAWINGS

PLAN

REFERENCE

NORTH

N

0 4' 8' 16'

KEY PLAN 2nd FLOOR

SCALE: NONESCALE: NONE

D

10" 2'-111

4"

44'-13 4"

4"

3'-8"

8'

17'-21 2"

14'

13'-01 2"

4'-11"

19'-91 4"

12'-63 4"

1'-33 4"

10'-3"

3'

9'-4" 6'

3'-5"

10 1 16"

19'-2 5 16"

3'

15'-1 7 16"

15'-1011 16"

1'-1"

11'-31 4"

13'-23 8"

3'

9'-91 8"

7'-10"

2'-6"

12'

21'-101 2"

28'-41 8"

10'-6"

10'-61 4"

18'-3"

1'-9"

3'

3'

18'-55 8"

20'-103 8"

6'

21'-37 8"

60'-6"

3'

3'

8'-2"

3'-51 2"

1' 13'-101 4"

6'

10'-6 5 16"

4'-9" 21'-10 5

16"

8'

51'-6"

59'-4"

8'

44'-21 2"

4'

1'-715 16"

17'-2"

12'-2"

48'-51 2"

8'-7"

34'-113 4"

6'-21 4"

16'

26'-2"

59'-4"

5'-61 2"

15'-6"

4'-10"

22'-21 2"

2' 1'

8'-6"

22'-1 7 16"

4'-47 8"

8'-31 2"

2'-3"

10"

5'

7'-51 2"

6"

15'-2"17'-91 2"19'-41

2"

19'-9"

4'-103 8"6'-1"

7'-31 4"

5'

3'-01 2"

5'-1" 5'

2'

8'-3"

1'-10"

10' 4'-8"

1'-6"

6'-1" 1'-6"

5'

2"

3'-9"

5'

1'

4' 4'-10"

3'-5"

4'-7"

6'-8"

6'

7'-41 2"

2'-8"

2'

4'-11" 2'-5"

7'

48'-5 3 16"

6'-6"

7" 3'

7'-1111 16"

36'-2 7 16"

13'-9"

6'-13 8"

73'-11 9 16"

3'-711 16"

2'-5"

6"

7'-01 4"

7'-1 5 16"

9'

16'-6"

69'-3 7 16"

9'-31 2"

13'-9"

89'-10"

59'-11" 44'

2'-71 2"

10'-10"

8'-2"

3'-1" 3'-101

4"

7'-10"

1 2 3 4 5 6

D

C

B

A

7'-31 2"

3'

3'

6'

3'

6'-101 2"

8"5' 2'

3' 8'-71

2"

5'-7"

8'-31 2"

1'-1"

3'

5'-2"

5'-7"

1'-6"

3'-11"

4"5'

5'-101 2"

4" 8'-2"

3'-2"

2'-10" 1'-10"

5'

3'-21 2"5'

3' 3'

1'-5" 5'

1'

5'-01 2"

1'-6"

7'-8"

12'-51 2"

6'-6"

6'-3"

2'-11"

2'-6"

3'

6'-61 2"

2'-6"

3'

6'-3"

6'-6"

11'-3" 4"

1'-10"

2'-101 4"2'-3"

5'

8"

4'

4'

6'-81 4"

5' 2'-4"

6"

BATTERY ROOM

UPS ROOM

CORRIDOR

OFFICE

118A

OFFICE

118C

OFFICE

118B

CONFERENCE

117B

VESTIBULE

102A

OFFICE

117A

CORRIDOR

BREAK

ELEVATOR

MECHANICAL ROOM

CORRIDOR

ELECTRICAL ROOM

VESTIBULE

JANITOR

STAIRS

CORRIDOR

MENS

WOMENS

VESTIBULE

5'-9"

42'-11 3 16"

18'-3"

12'-015 16"

28'-2" 15'-01

2"

19'-811 16"

SHEET

IDENTIFICATION

D

ES

IG

N

B Y:

D R

AW

N

B Y:

SU

BM

IT

TE

D B

Y:

PL

O

T

SC

AL

E:

SI

ZE

AN

SI

D

C H

EC

KE

D B

Y:

PL

O

T D

AT

E:

FI

LE

N

AM

E:

SU

BM

IT

TA

L D

AT

E:

SO

LI

C

IT

AT

IO

N N

O

C O

N

TR

AC

T

N O

FI

LE

N U

M

BE

R

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E:

AP

PR

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E:

AP

PR

B

C

D

1 2 3 4 5

1 2 3 4 5

Defense Information Systems Agency A Combat Support Agency

A

B

D

C

P.

O

.B O

X

G

R

EE

N W

O O

D V

IL

LA

G E

M

PE

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

C O

.8

* FOR OFFICIAL USE ONLY *

* FOR OFFICIAL USE ONLY *

A

N /A

JE

S

N /A

AS

S

H O

W N

JE

S

/2

9/

M

EC

_M D

E -L

P1

.D W

G

N /A

N /A

N /A

9/

/2

E-111

D

AT

A C

EN

TE

R M

EC

H

AN

IC

SB

U

R G

FI

R

ST

F

LO

O

R L

IG

H

TI

N

G P

LA

N

A R

EA

A

EL

EC

TR

IC

AL

FIRST FLOOR LIGHTING PLAN AREA A

SCALE : 1/8" = 1'-0"

THIS DRAWING HAS BEEN PREPARED BASED UPON INFORMATION VERIFIED IN THE

FIELD AND BY FURNISHED RECORD DRAWINGS. THE CONFORMANCE TO CURRENT

OR PREVAILING CODES OF ANY WORK SHOWN HAS NOT BEEN VERIFIED. THE

LOCATION OF THE FACILITIES AS SHOWN MUST BE VERIFIED IN THE FIELD BEFORE

THIS DRAWING IS USED IN FUTURE CONSTRUCTION PROJECTS.

AS BUILT DRAWINGS 0 4' 8' 16'

PLAN

REFERENCE

NORTH

N

SCALE: NONE

KEY PLAN 1st FLOOR

SCALE: NONE

D

BA

C

MATCH LINE CONTINUES ON AREA C SHEET

LP103

M

AT

C H

L

IN

E C

O N

TI

N

U

ES

O N

A R

EA

B

S H

EE

T

LP

41'

20'-103 8"

6'

21'-37 8"

9'-31 2"

3'

4'

6'6'

8'

38'-111 2"4'-21

2"

1'-613 16"1'-1 3

16"

10'-81 2"

15'-5 5 16"14'-4 5

16"

3' 3'

12'-3 3 16"

6" 11'-53

8" 4'-103 4"

3"

8'-11 5 16"

34'-21 8"

39'-11 3 16"

3'

38'-1"

27'-511 16"3'

2'-4 5 16"2'

6'

3' 7'

8'

18'

5' 2'-6"

3'

8'

59'-4"

30'-83 4"

2'-4"

49'-61 2"

8'-1"

27'-91 2"

1' 29'-2"

10"

5'-10 7 16"

3'

20'-9"

3'-6" 8'

44'-21 2"

4'

1'-715 16"

9'-21 2"

48'-5 3 16"

13'-9"

73'-11 9 16"

10'-1015 16"

6"

27'-111 16"

13'-03 4"

109'-101 2"

29'

28'-73 4"

29'-11 9 16"

34'-21 8"

45'-1" 49'-8"

15'-1"

11'-9"

29'-815 16"

29'-9"

9"

89'-10"

1'-21 2"

1'-013 16" 1'-1113

16"

5'-4 3 16"

10'

10'-5"

37'-13 8"

22'-2"

11'-11"

8'-6"

1'-6"8'-101 2"

1'-31 2"

3'-8"

12'-31 8"

8'-61 8"

8'-6" 29'-27 8"7'-11"

69'-3 7 16" 49'-71

8"

9'-31 2"

19'-513 16"

8'-6"

5'-61 2"

6 7 8 9 10 11

D

C

B

A

ELECTRICAL ROOM

OFFICE

134A

STAIRS 1

MECHANICAL ROOM

OFFICE

118F

OFFICE

118G

OFFICE

118E

CORRIDOR

CORRIDOR

CORRIDOR

COMPARTMENTALIZED COMPUTING SPACE

118D

OFFICE

118A

9'-9"

42'-11 3 16"

12'-015 16"

28'-2"

SHEET

IDENTIFICATION

D

ES

IG

N

B Y:

D R

AW

N

B Y:

SU

BM

IT

TE

D B

Y:

PL

O

T

SC

AL

E:

SI

ZE

AN

SI

D

C H

EC

KE

D B

Y:

PL

O

T D

AT

E:

FI

LE

N

AM

E:

SU

BM

IT

TA

L D

AT

E:

SO

LI

C

IT

AT

IO

N N

O

C O

N

TR

AC

T

N O

FI

LE

N U

M

BE

R

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E:

AP

PR

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E:

AP

PR

B

C

D

1 2 3 4 5

1 2 3 4 5

Defense Information Systems Agency A Combat Support Agency

A

B

D

C

P.

O

.B O

X

G

R

EE

N W

O O

D V

IL

LA

G E

M

PE

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

C O

.8

* FOR OFFICIAL USE ONLY *

* FOR OFFICIAL USE ONLY *

A

N /A

JE

S

N /A

AS

S

H O

W N

JE

S

/2

9/

M

EC

_M D

E -L

P1

.D W

G

N /A

N /A

N /A

9/

/2

E-112

D

AT

A C

EN

TE

R M

EC

H

AN

IC

SB

U

R G

FI

R

ST

F

LO

O

R L

IG

H

TI

N

G P

LA

N

A R

EA

B

EL

EC

TR

IC

AL

FIRST FLOOR LIGHTING PLAN AREA B

SCALE 1/8" = 1'-0"

THIS DRAWING HAS BEEN PREPARED BASED UPON INFORMATION VERIFIED IN THE

FIELD AND BY FURNISHED RECORD DRAWINGS. THE CONFORMANCE TO CURRENT

OR PREVAILING CODES OF ANY WORK SHOWN HAS NOT BEEN VERIFIED. THE

LOCATION OF THE FACILITIES AS SHOWN MUST BE VERIFIED IN THE FIELD BEFORE

THIS DRAWING IS USED IN FUTURE CONSTRUCTION PROJECTS.

AS BUILT DRAWINGS 0 4' 8' 16'

PLAN

REFERENCE

NORTH

N

SCALE: NONE

KEY PLAN 1st FLOOR

SCALE: NONE

D

BA

C

M

AT

C H

L

IN

E C

O N

TI

N

U

ES

O N

A R

EA

A

S H

EE

T

LP

MATCH LINE CONTINUES ON AREA D SHEET

LP104

1'-6"

26'-9"

20'-1 3 16"

44'-2"

1'

6'-5"

12'

2'-6"

44'-13 4"

3'-3"

4"

3'-3"

2'-1" 3'

3'-1" 3'

2'-91 8"

5'-115 8"

3'-21 4"

3'

8"

11"

11"

10'-51 2"

19'-2"

19'-83 4"10"29'-2"20'-815

16" 6'

2'-5 1 16"

13'-97 8"

8"

4"

3'-8"

8'

11'-61 2"11'-61

2"

14'-11 8"

29'-11 2" 1'-3"

3'

3'

17'-21 2"

13'-01 2"

4'-11"

19'-91 4"

12'-63 4"

1'-33 4" 3'

9'-4" 6'

3'-5"

10 1 16"

19'-2 5 16"

3'

11 34

9'-91 8"

20'-103 8"

6'

21'-37 8"

6'

2"

1'-107 8"

6'

2'

10"

5'

3'

6'-21 4"

16'

22'-21 2"

2'

10"

5'

7'-51 2"

6"

15'-2"17'-91 2"19'-41

2"

19'-9"

4'-103 8"6'-1"

7'-31 4"

2'

8'-3"

10' 4'-8"

1'-6"

5'

3'-101 2"

3'-9"

1'

4' 4 10

4'-7"

27'-101 4"

4'-11" 2'-5"

7'

6'-6"

7" 3'

7'-1111 16"

36'-2 7 16"

13'-9"

73'-11 9 16"

9'

23'-5"

5'

89'-1"

29'-8" 21'-013

16"

2'-91 4"

9'-5"

32'-6 3 16"

37'-6"

14'-67 8"

2'-515 16"

16'-6"

15'-61 8"

11'-87 8"

12'-01 2"

11" 3'

3'

10'-81 8"

17'-1"

11'-51 2"

3'-2" 5'-0 1 16" 5'-415

16" 1'-9"

11'-51 2"

14'-613 16"

5'

2'-103 4"

4'-33 8"

29'-8"

28'-5"

28'-2"

16'-101 2"

69'-3 7 16"

9'-31 2"

24'-11 3 16"

18'-91 2"17'-41

2"

22'

15'-7"

88'-93 4"

9'-9"

19'-03 4"

4'-11 8"

9'-8"

10'-61 4"

20'-01 4"

19'-10"

2'-111 4"

15'-41 2"

16'-67 8"

2'-11"

2'-53 4"

2'-8"

8'-93 4"

21'-07 8"

5'-4"

23'-5"

8"

5'-51 8"

19'-51 8"

9'-211 16"

8'-5"

19'-83 4"

45'-10"

1'-85 8"

1'-111 4"

3'-87 8"

2'-03 8"

9'-10"

9'-71 8"

3'-01 8" 3'-3"

8'-10 9 16"

2'1'-11"81 4"

4'-4 3 16"

41'-23 4"

11'-4"

2'-5 1 16"

11'-113 16"

20'-1 3 16"

16'-8"

9'-5"

10'-61 4"

1 2 3 4 5 6

G

F

E

H

3.42.6

7'-31 2"

3'

6'

3'

6'-101 2"

8"5' 2'

3' 8'-71

2"

2 -104 2 3

5'

4' 6'-81

4"

5' 2'-4"

17'-91 2"

10"

2'-81 4"

1'-61 2"

3'-5" 10"

4'-6"

10'-33 4"

4"

4'-815 16"

5"

7'-21 4"

2'-10"

6"

3'-11"

2'-1" 3'

19'-6"

8'-41 2"

3'-11 4"

3'

CORRIDOR

BREAK

120MECHANICAL ROOM

WOMENS

VESTIBULE

LOBBY

112B

OFFICE

OFFICE

ELECTRICAL ROOM

112A

VESTIBULE

BREAK

OFFICE

OFFICE

OFFICE

OFFICE

TELECOM/COMM

CONFERENCE

128A

STAIRS 3

5'-9"

9'-11 4"

SHEET

IDENTIFICATION

D

ES

IG

N

B Y:

D R

AW

N

B Y:

SU

BM

IT

TE

D B

Y:

PL

O

T

SC

AL

E:

SI

ZE

AN

SI

D

C H

EC

KE

D B

Y:

PL

O

T D

AT

E:

FI

LE

N

AM

E:

SU

BM

IT

TA

L D

AT

E:

SO

LI

C

IT

AT

IO

N N

O

C O

N

TR

AC

T

N O

FI

LE

N U

M

BE

R

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E:

AP

PR

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E:

AP

PR

B

C

D

1 2 3 4 5

1 2 3 4 5

Defense Information Systems Agency A Combat Support Agency

A

B

D

C

P.

O

.B O

X

G

R

EE

N W

O O

D V

IL

LA

G E

M

PE

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

C O

.8

* FOR OFFICIAL USE ONLY *

* FOR OFFICIAL USE ONLY *

A

N /A

JE

S

N /A

AS

S

H O

W N

JE

S

/2

9/

M

EC

_M D

E -L

P1

.D W

G

N /A

N /A

N /A

9/

/2

E-113

D

AT

A C

EN

TE

R M

EC

H

AN

IC

SB

U

R G

FI

R

ST

F

LO

O

R L

IG

H

TI

N

G P

LA

N

A R

EA

C

EL

EC

TR

IC

AL

FIRST FLOOR LIGHTING PLAN AREA C

SCALE : 1/8" = 1'-0"

THIS DRAWING HAS BEEN PREPARED BASED UPON INFORMATION VERIFIED IN THE

FIELD AND BY FURNISHED RECORD DRAWINGS. THE CONFORMANCE TO CURRENT

OR PREVAILING CODES OF ANY WORK SHOWN HAS NOT BEEN VERIFIED. THE

LOCATION OF THE FACILITIES AS SHOWN MUST BE VERIFIED IN THE FIELD BEFORE

THIS DRAWING IS USED IN FUTURE CONSTRUCTION PROJECTS.

AS BUILT DRAWINGS 0 4' 8' 16'

PLAN

REFERENCE

NORTH

N

SCALE: NONE

KEY PLAN 1st FLOOR

SCALE: NONE

D

BA

C

M

AT

C H

L

IN

E C

O N

TI

N

U

ES

O N

A R

EA

D

S H

EE

T

LP

MATCH LINE CONTINUES ON AREA A SHEET

LP101

20'-1 3 16"

19'-2"

38'-01 2"

5'

12'-51 2"

8'

8'

29'

10"

11'-8"

1'-8"

23' 2'-4"

4'-31 2"

3'

5'-2"

29'-311 16"

8'

18'-93 8"

8'-2 3 16"

12'-91 8"

2'

4'-6" 4'-9"

3'-11" 4'-8"

6'

6'

2'-4"

3'-7 3 16"

12'-6 1 16"

17'-81 2"

5'-13 4"

3'

2'-3"

19'-83 4"10"29'-2"

-103 8"

6'

21'-37 8"

9'-31 2"

3'

4'

6'

19'-41 2"

8'

5'

3'

8'

1'-53 4"

19'-11 4" 19'-61

2" 1'-8"

3'

36'-10"

6'

1'-9"

10"

15'-4"

5'-2"

2'

10"

3'

3'

20'-31 2"

22'-11 2"

11'-111 2"

10'

6'6'

8'

38'-111 2"4'-21

2"

1'-613 16"1'-1 3

16"

3"

8'-11 5 16"

3' 27'-511

16"3'

2'-4 5 16"2'

6'

3' 7'

19'-3"

15'-101 4"

2'-10"

9'-21 2"

13'-9"

73'-11 9 16"

10'-1015 16"

6"

29'-11 9 16"

1'-013 16" 1'-1113

16"

4"

32'-6 3 16"

5'-415 16"

1'-9"

11'-51 2"

4'-33 8"

28'-2"

69'-3 7 16"

24'-11 3 16"

9'-9"

19'-03 4"

4'-11 8"

2'1'-11"

9'-6 1 16"

49'-81 2"

1'-5"

39'

2'-103 4"

60'-9"

8'-11"

49'-71 8"

49'-8"

49'-73 4"

18'-11"

41'-5"

49'-2"

29'-31 2"

19'-61 2"

13'-111 2"

13'-8"

4'-6"

9'-6"

14'-8"

9'-31 2"

19'-513 16"

29'-13 4"

11'-91 2"

23'-91 4"

16'

5'-6"

8'-31 2"

4'-7"4'-8"

8'-6"

20'-1 3 16"

16'-8"

19'-10"

39'-1"

20'-7"

5'-61 2"

6.7 7

7.8 8

8.6 9 9.4 10 11

G

F

E

HH

OFFICE

118E

CORRIDOR

CORRIDOR

CORRIDOR

OFFICE

TELECOM/COMM

CONFERENCE

128A

CORRIDOR

CONDITIONED STORAGE

NIPR COMPUTING SPACE

COMPARTMENTALIZED COMPUTING SPACE

132A

CORRIDOR

LOADING DOCKS

STAIRS 2

STORAGE

9'-9"

8'-10"

6'-21 4"

7'-4"

SHEET

IDENTIFICATION

D

ES

IG

N

B Y:

D R

AW

N

B Y:

SU

BM

IT

TE

D B

Y:

PL

O

T

SC

AL

E:

SI

ZE

AN

SI

D

C H

EC

KE

D B

Y:

PL

O

T D

AT

E:

FI

LE

N

AM

E:

SU

BM

IT

TA

L D

AT

E:

SO

LI

C

IT

AT

IO

N N

O

C O

N

TR

AC

T

N O

FI

LE

N U

M

BE

R

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E:

AP

PR

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E:

AP

PR

B

C

D

1 2 3 4 5

1 2 3 4 5

Defense Information Systems Agency A Combat Support Agency

A

B

D

C

P.

O

.B O

X

G

R

EE

N W

O O

D V

IL

LA

G E

M

PE

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

C O

.8

* FOR OFFICIAL USE ONLY *

* FOR OFFICIAL USE ONLY *

A

N /A

JE

S

N /A

AS

S

H O

W N

JE

S

/2

9/

M

EC

_M D

E -L

P1

.D W

G

N /A

N /A

N /A

9/

/2

E-114

D

AT

A C

EN

TE

R M

EC

H

AN

IC

SB

U

R G

FI

R

ST

F

LO

O

R L

IG

H

TI

N

G P

LA

N

A R

EA

D

EL

EC

TR

IC

AL

FIRST FLOOR LIGHTING PLAN AREA D

SCALE : 1/8" = 1'-0"

THIS DRAWING HAS BEEN PREPARED BASED UPON INFORMATION VERIFIED IN THE

FIELD AND BY FURNISHED RECORD DRAWINGS. THE CONFORMANCE TO CURRENT

OR PREVAILING CODES OF ANY WORK SHOWN HAS NOT BEEN VERIFIED. THE

LOCATION OF THE FACILITIES AS SHOWN MUST BE VERIFIED IN THE FIELD BEFORE

THIS DRAWING IS USED IN FUTURE CONSTRUCTION PROJECTS.

AS BUILT DRAWINGS 0 4' 8' 16'

PLAN

REFERENCE

NORTH

N

SCALE: NONE

KEY PLAN 1st FLOOR

SCALE: NONE

D

BA

C

M

AT

C H

L

IN

E C

O N

TI

N

U

ES

O N

A R

EA

C

S H

EE

T

LP

MATCH LINE CONTINUES ON AREA B SHEET LP102

D

C

B

A

DN

RAMP

DN 6"

COMPARTMENTALIZED COMPUTING SPACE

SECURE ROOM

OFFICE

SECURE ROOM

SIPR OPEN STORAGE/OFFICE

ADMIN

COMPARTMENTALIZED COMPUTING SPACE

SECURE ROOM

JANITOR

ADMIN

ELECTRICAL ROOM

MECH AND ELEC

WOMENS

ADMIN

MENS

ADMIN

CORRIDOR

ADMIN

200A

ELECTRICAL ROOM

MECH AND ELEC

OFFICE

ADMIN

OFFICE

STAIRS 4

ADMIN

ELEVATOR

ADMIN

VESTIBULE

ADMIN

VESTIBULE

ADMIN

COMPARTMENTALIZED COMPUTING SPACE

ELECTRICAL ROOM

200A

OFFICE

STAIRS 4

VESTIBULE

CORRIDOR

ELECTRICAL ROOM

JANITOR

WOMENS

MENS

VESTIBULE

ELEVATOR

OFFICE

OFFICE

SIPR OPEN STORAGE/OFFICE

COMPARTMENTALIZED COMPUTING SPACE

2" RISE FROM 1ST FLOOR

INSPECTOR'S

TEST

INSPECTOR'S

TEST

INSPECTOR'S

TEST

FS

SHEET

IDENTIFICATION

D

ES

IG

N

B Y:

D R

AW

N

B Y:

SU

BM

IT

TE

D B

Y:

PL

O

T

SC

AL

E:

SI

ZE

AN

SI

D

C H

EC

KE

D B

Y:

PL

O

T D

AT

E:

FI

LE

N

AM

E:

SU

BM

IT

TA

L D

AT

E:

SO

LI

C

IT

AT

IO

N N

O

C O

N

TR

AC

T

N O

FI

LE

N U

M

BE

R

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E:

AP

PR

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E:

AP

PR

B

C

D

1 2 3 4 5

1 2 3 4 5

Defense Information Systems Agency A Combat Support Agency

A

B

D

C

P.

O

.B O

X

G

R

EE

N W

O O

D V

IL

LA

G E

M

PE

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

C O

.8

* FOR OFFICIAL USE ONLY *

* FOR OFFICIAL USE ONLY *

A

N /A

JE

S

N /A

AS

S

H O

W N

JE

S

/0

9/

M

EC

_M D

E -L

P1

.D W

G

N /A

N /A

N /A

9/

/2

E-116

D

AT

A C

EN

TE

R M

EC

H

AN

IC

SB

U

R G

SE

C

O N

D F

LO

O

R L

IG

H

TI

N

G P

LA

N

A R

EA

A

EL

EC

TR

IC

AL

THIS DRAWING HAS BEEN PREPARED BASED UPON INFORMATION VERIFIED IN THE

FIELD AND BY FURNISHED RECORD DRAWINGS. THE CONFORMANCE TO CURRENT

OR PREVAILING CODES OF ANY WORK SHOWN HAS NOT BEEN VERIFIED. THE

LOCATION OF THE FACILITIES AS SHOWN MUST BE VERIFIED IN THE FIELD BEFORE

THIS DRAWING IS USED IN FUTURE CONSTRUCTION PROJECTS.

AS BUILT DRAWINGS

PLAN

REFERENCE

NORTH

N

0 4' 8' 16'

KEY PLAN 2nd FLOOR

SCALE: NONESCALE: NONE

D

BA

C

SHEET

IDENTIFICATION

D

ES

IG

N

B Y:

D R

AW

N

B Y:

SU

BM

IT

TE

D B

Y:

PL

O

T

SC

AL

E:

SI

ZE

AN

SI

D

C H

EC

KE

D B

Y:

PL

O

T D

AT

E:

FI

LE

N

AM

E:

SU

BM

IT

TA

L D

AT

E:

SO

LI

C

IT

AT

IO

N N

O

C O

N

TR

AC

T

N O

FI

LE

N U

M

BE

R

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E:

AP

PR

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E:

AP

PR

B

C

D

1 2 3 4 5

1 2 3 4 5

Defense Information Systems Agency A Combat Support Agency

A

B

D

C

P.

O

.B O

X

G

R

EE

N W

O O

D V

IL

LA

G E

M

PE

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

C O

.8

* FOR OFFICIAL USE ONLY *

* FOR OFFICIAL USE ONLY *

A

N /A

JE

S

N /A

AS

S

H O

W N

JE

S

/0

9/

M

EC

_M D

E -L

P1

.D W

G

N /A

N /A

N /A

9/

/2

E-116

D

AT

A C

EN

TE

R M

EC

H

AN

IC

SB

U

R G

SE

C

O N

D F

LO

O

R L

IG

H

TI

N

G P

LA

N

A R

EA

A

EL

EC

TR

IC

AL

SECOND FLOOR LIGHTING PLAN AREA A

SCALE : 1/8" = 1'-0"

THIS DRAWING HAS BEEN PREPARED BASED UPON INFORMATION VERIFIED IN THE

FIELD AND BY FURNISHED RECORD DRAWINGS. THE CONFORMANCE TO CURRENT

OR PREVAILING CODES OF ANY WORK SHOWN HAS NOT BEEN VERIFIED. THE

LOCATION OF THE FACILITIES AS SHOWN MUST BE VERIFIED IN THE FIELD BEFORE

THIS DRAWING IS USED IN FUTURE CONSTRUCTION PROJECTS.

AS BUILT DRAWINGS 0 4' 8' 16'

M

AT

C H

L

IN

E C

O N

TI

N

U

ES

O N

A R

EA

B

S H

EE

T

LP

MATCH LINE CONTINUES ON AREA C SHEET

LP108

6 7 8 9 10 11

C

B

A

D N

MECHANICAL ROOM

MECH AND ELEC

NIPR COMPUTING SPACE

COMPUTER ROOM

STAIRS 1

ADMIN

200B

ELECTRICAL ROOM

MECH AND ELEC

SIPR COMPUTING SPACE

COMPUTER ROOM

SIPR COMPUTING SPACE

STAIRS 1

MECHANICAL ROOM

NIPR COMPUTING SPACE

ELECTRICAL ROOM

200BELECTRICAL ROOM

200A

FLOW SWITCH

(TYP.)

PAS-6

PAS-4

PAS-5

INSPECTOR'S TEST

6" F UP FROM 1ST FLOOR (PAS-6)

4" TO 5" F TRANSITION UP FROM 1ST FLOOR (PAS-4)

4" F UP FROM 1ST FLOOR (PAS-5)

1 1/4" F UP FROM 1ST FLOOR

2 1/2" F UP FROM 1ST FLOOR

KEY PLAN 2nd FLOOR

SCALE: NONESCALE: NONE

D

BA

C

SHEET

IDENTIFICATION

D

ES

IG

N

B Y:

D R

AW

N

B Y:

SU

BM

IT

TE

D B

Y:

PL

O

T

SC

AL

E:

SI

ZE

AN

SI

D

C H

EC

KE

D B

Y:

PL

O

T D

AT

E:

FI

LE

N

AM

E:

SU

BM

IT

TA

L D

AT

E:

SO

LI

C

IT

AT

IO

N N

O

C O

N

TR

AC

T

N O

FI

LE

N U

M

BE

R

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E:

AP

PR

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E:

AP

PR

B

C

D

1 2 3 4 5

1 2 3 4 5

Defense Information Systems Agency A Combat Support Agency

A

B

D

C

P.

O

.B O

X

G

R

EE

N W

O O

D V

IL

LA

G E

M

PE

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

C O

.8

* FOR OFFICIAL USE ONLY *

* FOR OFFICIAL USE ONLY *

A

N /A

JE

S

N /A

AS

S

H O

W N

JE

S

/0

9/

M

EC

_M D

E -L

P1

.D W

G

N /A

N /A

N /A

9/

/2

E-117

D

AT

A C

EN

TE

R M

EC

H

AN

IC

SB

U

R G

SE

C

O N

D F

LO

O

R L

IG

H

TI

N

G P

LA

N

A R

EA

B

EL

EC

TR

IC

AL

SECOND FLOOR LIGHTING PLAN AREA B

SCALE : 1/8" = 1'-0"

THIS DRAWING HAS BEEN PREPARED BASED UPON INFORMATION VERIFIED IN THE

FIELD AND BY FURNISHED RECORD DRAWINGS. THE CONFORMANCE TO CURRENT

OR PREVAILING CODES OF ANY WORK SHOWN HAS NOT BEEN VERIFIED. THE

LOCATION OF THE FACILITIES AS SHOWN MUST BE VERIFIED IN THE FIELD BEFORE

THIS DRAWING IS USED IN FUTURE CONSTRUCTION PROJECTS.

AS BUILT DRAWINGS 0 4' 8' 16'

M

AT

C H

L

IN

E C

O N

TI

N

U

ES

O N

A R

EA

A

S H

EE

T

LP

MATCH LINE CONTINUES ON AREA D SHEET

LP109

PLAN

REFERENCE

G

F

E

DN

W1 0X

W1 0X

COMPARTMENTALIZED COMPUTING SPACE

SECURE ROOM

NIPR COMPUTING SPACE

COMPUTER ROOM

MENS

ADMIN 200A

ELECTRICAL ROOM

MECH AND ELEC

203A

SIPR COMPUTING SPACE

COMPUTER ROOM

OFFICE

ADMIN

OFFICE

ADMIN

STAIRS 3

ADMIN

VESTIBULE

ADMIN

ELECTRICAL ROOM

200A

MENS

VESTIBULE

OFFICE

OFFICE

COMPARTMENTALIZED COMPUTING SPACE

NIPR COMPUTING SPACE

203A

SIPR COMPUTING SPACE

203A

NIPR COMPUTING SPACE

STAIRS 3

INSPECTOR'S TEST INSPECTOR'S TEST

1 1/4" RISE

Up From 1stFlr

2 1/2" RISE

UP FROM 1stFlr

FOR STANDPIPE

W 2 1/2" HOSE VA.

INSPECTOR'S

TEST

2 1/2" HOSE VALVE

BOTH STAIRWELLS

KEY PLAN 2nd FLOOR

SCALE: NONESCALE: NONE

D

BA

C

SHEET

IDENTIFICATION

D

ES

IG

N

B Y:

D R

AW

N

B Y:

SU

BM

IT

TE

D B

Y:

PL

O

T

SC

AL

E:

SI

ZE

AN

SI

D

C H

EC

KE

D B

Y:

PL

O

T D

AT

E:

FI

LE

N

AM

E:

SU

BM

IT

TA

L D

AT

E:

SO

LI

C

IT

AT

IO

N N

O

C O

N

TR

AC

T

N O

FI

LE

N U

M

BE

R

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E:

AP

PR

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E:

AP

PR

B

C

D

1 2 3 4 5

1 2 3 4 5

Defense Information Systems Agency A Combat Support Agency

A

B

D

C

P.

O

.B O

X

G

R

EE

N W

O O

D V

IL

LA

G E

M

PE

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

C O

.8

* FOR OFFICIAL USE ONLY *

* FOR OFFICIAL USE ONLY *

A

N /A

JE

S

N /A

AS

S

H O

W N

JE

S

/0

9/

M

EC

_M D

E -L

P1

.D W

G

N /A

N /A

N /A

9/

/2

E-118

D

AT

A C

EN

TE

R M

EC

H

AN

IC

SB

U

R G

SE

C

O N

D F

LO

O

R L

IG

H

TI

N

G P

LA

N

A R

EA

C

EL

EC

TR

IC

AL

SECOND FLOOR LIGHTING PLAN AREA C

SCALE : 1/8" = 1'-0"

THIS DRAWING HAS BEEN PREPARED BASED UPON INFORMATION VERIFIED IN THE

FIELD AND BY FURNISHED RECORD DRAWINGS. THE CONFORMANCE TO CURRENT

OR PREVAILING CODES OF ANY WORK SHOWN HAS NOT BEEN VERIFIED. THE

LOCATION OF THE FACILITIES AS SHOWN MUST BE VERIFIED IN THE FIELD BEFORE

THIS DRAWING IS USED IN FUTURE CONSTRUCTION PROJECTS.

AS BUILT DRAWINGS 0 4' 8' 16'

PLAN

REFERENCE

NORTH

N

M

AT

C H

L

IN

E C

O N

TI

N

U

ES

O N

A R

EA

D

S H

EE

T

LP

LP106

6 9 10 11

F

E

7 8

DN

W1 0X

W1 0X

NIPR COMPUTING SPACE

COMPUTER ROOM

STAIRS 2

ADMIN

200B

ELECTRICAL ROOM

MECH AND ELEC

NIPR COMPUTING SPACE

ELECTRICAL ROOM

200BECTRICAL ROOM

200A

STAIRS 2

1 1/4" RISE FROM FIRST FLOOR2 1/2" RISE FOR

STANDPIPE W/2 1/2" HOSE VA

INSPECTOR'S TEST

INSPECTOR'S TEST

KEY PLAN 2nd FLOOR

SCALE: NONESCALE: NONE

D

BA

C

SHEET

IDENTIFICATION

D

ES

IG

N

B Y:

D R

AW

N

B Y:

SU

BM

IT

TE

D B

Y:

PL

O

T

SC

AL

E:

SI

ZE

AN

SI

D

C H

EC

KE

D B

Y:

PL

O

T D

AT

E:

FI

LE

N

AM

E:

SU

BM

IT

TA

L D

AT

E:

SO

LI

C

IT

AT

IO

N N

O

C O

N

TR

AC

T

N O

FI

LE

N U

M

BE

R

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E:

AP

PR

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E:

AP

PR

B

C

D

1 2 3 4 5

1 2 3 4 5

Defense Information Systems Agency A Combat Support Agency

A

B

D

C

P.

O

.B O

X

G

R

EE

N W

O O

D V

IL

LA

G E

M

PE

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

C O

.8

* FOR OFFICIAL USE ONLY *

* FOR OFFICIAL USE ONLY *

A

N /A

JE

S

N /A

AS

S

H O

W N

JE

S

/0

9/

M

EC

_M D

E -L

P1

.D W

G

N /A

N /A

N /A

9/

/2

E-119

D

AT

A C

EN

TE

R M

EC

H

AN

IC

SB

U

R G

SE

C

O N

D F

LO

O

R L

IG

H

TI

N

G P

LA

N

A R

EA

D

EL

EC

TR

IC

AL

SECOND FLOOR LIGHTING PLAN AREA D

SCALE : 1/8" = 1'-0"

THIS DRAWING HAS BEEN PREPARED BASED UPON INFORMATION VERIFIED IN THE

FIELD AND BY FURNISHED RECORD DRAWINGS. THE CONFORMANCE TO CURRENT

OR PREVAILING CODES OF ANY WORK SHOWN HAS NOT BEEN VERIFIED. THE

LOCATION OF THE FACILITIES AS SHOWN MUST BE VERIFIED IN THE FIELD BEFORE

THIS DRAWING IS USED IN FUTURE CONSTRUCTION PROJECTS.

AS BUILT DRAWINGS 0 4' 8' 16'

PLAN

REFERENCE

NORTH

N

M

AT

C H

L

IN

E C

O N

TI

N

U

ES

O N

A R

EA

C

S H

EE

T

LP

MATCH LINE CONTINUES ON AREA B SHEET LP107

2 3 4 5 6

D

C

B

A

RAMP

DOWN 12"

RAMP

UP 12"

RAMP

UP 12"

BATTERY ROOM

UPS ROOM

CORRIDOR

OFFICE

118A

OFFICE

118C

OFFICE

118B

CONFERENCE

117B

VESTIBULE

102A

OFFICE

117A

CORRIDOR

BREAK

ELEVATOR

MECHANICAL ROOM

CORRIDOR

ELECTRICAL ROOM

VESTIBULE

JANITOR

STAIRS

CORRIDOR

MENS

WOMENS

VESTIBULE

PANEL LP1S

PANEL RP1S

T-LP-S

75kVA

XFMR

T-RP-S

45kVA

XFMR

9315-750

PCM-1

9315-750

PCM-2

9315-750

PCM-1

9315-750

PCM-2

9315-750

PCM-1

9315-750

PCM-2

9315-750

PCM-1

9315-750

PCM-2

9315-750

PCM-1

9315-750

PCM-2

9315-750

PCM-1

9315-750

PCM-2

C&D BATTERIES MODEL XT2LC-23 2-TIER STRING B3

-7

PC

M

-1

-7

PC

M -2

-7

PC

M

-1

-7

PC

M -2

-7

PC

M

-1

-7

PC

M -2

-7

PC

M

-1

-7

PC

M -2

C&D XT2LC-23 3-TIER STRING A1C&D XT2LC-23 3-TIER STRING A4

C&D XT2LC-23 3-TIER STRING A2C&D XT2LC-23 3-TIER STRING A5

C&D XT2LC-23 3-TIER STRING A3C&D XT2LC-23 3-TIER STRING B4

C&D XT2LC-23 3-TIER STRING B2

C&D XT2LC-23 3-TIER STRING B5

0K

VA

0K

VA

0K

VA

0K

VA

0K

VA

0K

VA

0K

VA

0K

VA

750KVA750KVA750KVA750KVA

750KVA750KVA

750KVA750KVA

750KVA750KVA 750KVA750KVA

C&D XT2LC-23 3-TIER STRING B5

ESWGR-C-

C&D XT2LC-23 3-TIER STRING B1C&D XT2LC-23 3-TIER STRING B1

TO CABLE

TRAY

TO CABLE

TRAY

UPS-A-1 UPS-A-2

UPS-

A-3

SBM-A-1

UPS-B-3 UPS-B-2

BDS-B-1

UPS-B-1

U

PS

-A -4 U

PS

-A -5

SBM-B-1

U

PS

-B -4

U

PS

-B -5

BDS

A-1-2

BDS

A-2-2

BDS

A-3-2

BDS

B-1-2

BDS

B-2-2

BDS

B-3-2

BDS-A-1

BDS-B-2

BDS-A-2

BDS

A-4-2

BDS

A-5-2

BDS

B-4-2

UPP-B-2 UPP-B-1

UPP-A-1

BDS

5-2

UPP-A-2

SWGR-EG-2

USWGR-

A-1

USWGR-

AB-1

USWGR-

B-1

SHEET

IDENTIFICATION

D

ES

IG

N

B Y:

D R

AW

N

B Y:

SU

BM

IT

TE

D B

Y:

PL

O

T

SC

AL

E:

SI

ZE

AN

SI

D

C H

EC

KE

D B

Y:

PL

O

T D

AT

E:

FI

LE

N

AM

E:

SU

BM

IT

TA

L D

AT

E:

SO

LI

C

IT

AT

IO

N N

O

C O

N

TR

AC

T

N O

FI

LE

N U

M

BE

R

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E:

AP

PR

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E:

AP

PR

B

C

D

1 2 3 4 5

1 2 3 4 5

Defense Information Systems Agency A Combat Support Agency

A

B

D

C

P.

O

.B O

X

G

R

EE

N W

O O

D V

IL

LA

G E

M

PE

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

C O

.8

* FOR OFFICIAL USE ONLY *

* FOR OFFICIAL USE ONLY *

A

N /A

JE

S

N /A

AS

S

H O

W N

JE

S

/3

0/

M

EC

M D

E -G

P1

.D W

G

N /A

N /A

N /A

9/

/2

E-121

D

AT

A C

EN

TE

R M

EC

H

AN

IC

SB

U

R G

FI

R

ST

F

LO

O

R G

R O

U N

D

IN

G P

LA

N

A R

EA

A

EL

EC

TR

IC

AL

FIRST FLOOR GROUNDING PLAN AREA A

SCALE : 1/8" = 1'-0"

THIS DRAWING HAS BEEN PREPARED BASED UPON INFORMATION VERIFIED IN THE

FIELD AND BY FURNISHED RECORD DRAWINGS. THE CONFORMANCE TO CURRENT

OR PREVAILING CODES OF ANY WORK SHOWN HAS NOT BEEN VERIFIED. THE

LOCATION OF THE FACILITIES AS SHOWN MUST BE VERIFIED IN THE FIELD BEFORE

THIS DRAWING IS USED IN FUTURE CONSTRUCTION PROJECTS.

AS BUILT DRAWINGS

PLAN

REFERENCE

NORTH

N

0 4' 8' 16'

SCALE: NONE

KEY PLAN 1st FLOOR

SCALE: NONE

D

BA

C

THIS DRAWING HAS BEEN PREPARED BASED UPON INFORMATION VERIFIED IN THE

FIELD AND BY FURNISHED RECORD DRAWINGS. THE CONFORMANCE TO CURRENT

OR PREVAILING CODES OF ANY WORK SHOWN HAS NOT BEEN VERIFIED. THE

LOCATION OF THE FACILITIES AS SHOWN MUST BE VERIFIED IN THE FIELD BEFORE

THIS DRAWING IS USED IN FUTURE CONSTRUCTION PROJECTS.

AS BUILT DRAWINGS

M

AT

C H

L

IN

E C

O N

TI

N

U

ES

O N

A R

EA

B

S H

EE

T

G P1

GP103

R

AM

P D

N

U P

UP 24"

6 7 8 9 10 11

D

C

B

A

RAMP UP

RAMP

UP 12"

RAMP

UP 12"

R

AM

P

D O

W N

ELECTRICAL ROOM

OFFICE

134A

STAIRS 1

MECHANICAL ROOM

OFFICE

118F

OFFICE

118G

OFFICE

118E

CORRIDOR

CORRIDOR

CORRIDOR

COMPARTMENTALIZED COMPUTING SPACE

118D

OFFICE

118A

-7

PC

M

-1

-7

PC

M -2

-7

PC

M

-1

-7

PC

M -2

0K

VA

0K

VA

0K

VA

0K

VA

ESWGR-C-1

PANEL

MCC-2

PANEL

MCC-1

PANEL

MCC-4

PANEL

MCC-3

T

T

T

T

T

ESWGR-A-1

U

PS

-A -5

U

PS

-B -5

UPP-B-2 UPP-B-1

UPP-A-1

UPP-A-2

SWGR-EG-2

USWGR-

A-1

USWGR-

AB-1

USWGR-

B-1

SWGR-EG-1

ESWGR-B-1

SCALE: NONE

KEY PLAN 1st FLOOR

SCALE: NONE

D

BA

C

SHEET

IDENTIFICATION

D

ES

IG

N

B Y:

D R

AW

N

B Y:

SU

BM

IT

TE

D B

Y:

PL

O

T

SC

AL

E:

SI

ZE

AN

SI

D

C H

EC

KE

D B

Y:

PL

O

T D

AT

E:

FI

LE

N

AM

E:

SU

BM

IT

TA

L D

AT

E:

SO

LI

C

IT

AT

IO

N N

O

C O

N

TR

AC

T

N O

FI

LE

N U

M

BE

R

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E:

AP

PR

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E:

AP

PR

B

C

D

1 2 3 4 5

1 2 3 4 5

Defense Information Systems Agency A Combat Support Agency

A

B

D

C

P.

O

.B O

X

G

R

EE

N W

O O

D V

IL

LA

G E

M

PE

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

C O

.8

* FOR OFFICIAL USE ONLY *

* FOR OFFICIAL USE ONLY *

A

N /A

JE

S

N /A

AS

S

H O

W N

JE

S

/3

0/

M

EC

M D

E -G

P1

.D W

G

N /A

N /A

N /A

9/

/2

E-122

D

AT

A C

EN

TE

R M

EC

H

AN

IC

SB

U

R G

FI

R

ST

F

LO

O

R G

R O

U N

D

IN

G P

LA

N

A R

EA

B

EL

EC

TR

IC

AL

FIRST FLOOR GROUNDING PLAN AREA B

SCALE : 1/8" = 1'-0"

THIS DRAWING HAS BEEN PREPARED BASED UPON INFORMATION VERIFIED IN THE

FIELD AND BY FURNISHED RECORD DRAWINGS. THE CONFORMANCE TO CURRENT

OR PREVAILING CODES OF ANY WORK SHOWN HAS NOT BEEN VERIFIED. THE

LOCATION OF THE FACILITIES AS SHOWN MUST BE VERIFIED IN THE FIELD BEFORE

THIS DRAWING IS USED IN FUTURE CONSTRUCTION PROJECTS.

AS BUILT DRAWINGS 0 4' 8' 16'

M

AT

C H

L

IN

E C

O N

TI

N

U

ES

O N

A R

EA

A

S H

EE

T

G P1

MATCH LINE CONTINUES ON AREA D SHEET

GP104

PLAN

REFERENCE

G

F

E

H

3.42.6

RAMP

UP 12"

RAMP

UP 12"

CORRIDOR

BREAK

120MECHANICAL ROOM

WOMENS

VESTIBULE

LOBBY

112B

OFFICE

OFFICE

ELECTRICAL ROOM

112A

VESTIBULE

BREAK

OFFICE

OFFICE

OFFICE

OFFICE

TELECOM/COMM

CONFERENCE

128A

STAIRS 3

UPP-AB-4 UPP-AB-3 UPP-AB-2 UPP-AB-1

SCALE: NONE

KEY PLAN 1st FLOOR

SCALE: NONE

D

BA

C

SHEET

IDENTIFICATION

D

ES

IG

N

B Y:

D R

AW

N

B Y:

SU

BM

IT

TE

D B

Y:

PL

O

T

SC

AL

E:

SI

ZE

AN

SI

D

C H

EC

KE

D B

Y:

PL

O

T D

AT

E:

FI

LE

N

AM

E:

SU

BM

IT

TA

L D

AT

E:

SO

LI

C

IT

AT

IO

N N

O

C O

N

TR

AC

T

N O

FI

LE

N U

M

BE

R

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E:

AP

PR

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E:

AP

PR

B

C

D

1 2 3 4 5

1 2 3 4 5

Defense Information Systems Agency A Combat Support Agency

A

B

D

C

P.

O

.B O

X

G

R

EE

N W

O O

D V

IL

LA

G E

M

PE

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

C O

.8

* FOR OFFICIAL USE ONLY *

* FOR OFFICIAL USE ONLY *

A

N /A

JE

S

N /A

AS

S

H O

W N

JE

S

/3

0/

M

EC

M D

E -G

P1

.D W

G

N /A

N /A

N /A

9/

/2

E-123

D

AT

A C

EN

TE

R M

EC

H

AN

IC

SB

U

R G

FI

R

ST

F

LO

O

R G

R O

U N

D

IN

G P

LA

N

A R

EA

C

EL

EC

TR

IC

AL

FIRST FLOOR GROUNDING PLAN AREA C

SCALE : 1/8" = 1'-0"

THIS DRAWING HAS BEEN PREPARED BASED UPON INFORMATION VERIFIED IN THE

FIELD AND BY FURNISHED RECORD DRAWINGS. THE CONFORMANCE TO CURRENT

OR PREVAILING CODES OF ANY WORK SHOWN HAS NOT BEEN VERIFIED. THE

LOCATION OF THE FACILITIES AS SHOWN MUST BE VERIFIED IN THE FIELD BEFORE

THIS DRAWING IS USED IN FUTURE CONSTRUCTION PROJECTS.

AS BUILT DRAWINGS 0 4' 8' 16'

PLAN

REFERENCE

NORTH

N

M

AT

C H

L

IN

E C

O N

TI

N

U

ES

O N

A R

EA

D

S H

EE

T

G P1

GP101

UP 24"

6.7 7

7.8 8

8.6 9 9.4 10 11

G

F

E

HH

AMP

P 12"

RAMP

UP 12"

R D

SLOPE DN

OFFICE

118E

CORRIDOR

CORRIDOR

CORRIDOR

OFFICE

TELECOM/COMM

CONFERENCE

128A

CORRIDOR

CONDITIONED STORAGE

NIPR COMPUTING SPACE

COMPARTMENTALIZED COMPUTING SPACE

132A

CORRIDOR

LOADING DOCKS

STAIRS 2

STORAGE

T

SCALE: NONE

KEY PLAN 1st FLOOR

SCALE: NONE

D

BA

C

SHEET

IDENTIFICATION

D

ES

IG

N

B Y:

D R

AW

N

B Y:

SU

BM

IT

TE

D B

Y:

PL

O

T

SC

AL

E:

SI

ZE

AN

SI

D

C H

EC

KE

D B

Y:

PL

O

T D

AT

E:

FI

LE

N

AM

E:

SU

BM

IT

TA

L D

AT

E:

SO

LI

C

IT

AT

IO

N N

O

C O

N

TR

AC

T

N O

FI

LE

N U

M

BE

R

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E:

AP

PR

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E:

AP

PR

B

C

D

1 2 3 4 5

1 2 3 4 5

Defense Information Systems Agency A Combat Support Agency

A

B

D

C

P.

O

.B O

X

G

R

EE

N W

O O

D V

IL

LA

G E

M

PE

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

C O

.8

* FOR OFFICIAL USE ONLY *

* FOR OFFICIAL USE ONLY *

A

N /A

JE

S

N /A

AS

S

H O

W N

JE

S

/3

0/

M

EC

M D

E -G

P1

.D W

G

N /A

N /A

N /A

9/

/2

E-124

D

AT

A C

EN

TE

R M

EC

H

AN

IC

SB

U

R G

FI

R

ST

F

LO

O

R G

R O

U N

D

IN

G P

LA

N

A R

EA

D

EL

EC

TR

IC

AL

FIRST FLOOR GROUNDING PLAN AREA D

SCALE : 1/8" = 1'-0"

THIS DRAWING HAS BEEN PREPARED BASED UPON INFORMATION VERIFIED IN THE

FIELD AND BY FURNISHED RECORD DRAWINGS. THE CONFORMANCE TO CURRENT

OR PREVAILING CODES OF ANY WORK SHOWN HAS NOT BEEN VERIFIED. THE

LOCATION OF THE FACILITIES AS SHOWN MUST BE VERIFIED IN THE FIELD BEFORE

THIS DRAWING IS USED IN FUTURE CONSTRUCTION PROJECTS.

AS BUILT DRAWINGS 0 4' 8' 16'

PLAN

REFERENCE

NORTH

N

M

AT

C H

L

IN

E C

O N

TI

N

U

ES

O N

A R

EA

C

S H

EE

T

G P1

MATCH LINE CONTINUES ON AREA B SHEET GP102

C

B

A

DN

RAMP

DN 6"

COMPARTMENTALIZED COMPUTING SPACE

SECURE ROOM

OFFICE

SECURE ROOM

SIPR OPEN STORAGE/OFFICE

ADMIN

COMPARTMENTALIZED COMPUTING SPACE

SECURE ROOM

JANITOR

ADMIN

ELECTRICAL ROOM

MECH AND ELEC

WOMENS

ADMIN

MENS

ADMIN

CORRIDOR

ADMIN

200A

ELECTRICAL ROOM

MECH AND ELEC

OFFICE

ADMIN

OFFICE

ADMIN

STAIRS 4

ADMIN

ELEVATOR

ADMIN

VESTIBULE

ADMIN

VESTIBULE

ADMIN

COMPARTMENTALIZED COMPUTING SPACE

ELECTRICAL ROOM

200A

OFFICE

STAIRS 4

VESTIBULE

CORRIDOR

ELECTRICAL ROOM

JANITOR

WOMENS

MENS

VESTIBULE

ELEVATOR

OFFICE

OFFICE

SIPR OPEN STORAGE/OFFICE

COMPARTMENTALIZED COMPUTING SPACE

PANEL RP-2-S

"CRAC L-40" "CRAC L-41" "CRAC L-42"

"CRAC L-22"

"C R

AC

L

-1 8"

"CRAC L-49"

"CRAC L-24"

"CRAC L-23"

"CRAC L-34

SHEET

IDENTIFICATION

D

ES

IG

N

B Y:

D R

AW

N

B Y:

SU

BM

IT

TE

D B

Y:

PL

O

T

SC

AL

E:

SI

ZE

AN

SI

D

C H

EC

KE

D B

Y:

PL

O

T D

AT

E:

FI

LE

N

AM

E:

SU

BM

IT

TA

L D

AT

E:

SO

LI

C

IT

AT

IO

N N

O

C O

N

TR

AC

T

N O

FI

LE

N U

M

BE

R

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E:

AP

PR

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E:

AP

PR

B

C

D

1 2 3 4 5

1 2 3 4 5

Defense Information Systems Agency A Combat Support Agency

A

B

D

C

P.

O

.B O

X

G

R

EE

N W

O O

D V

IL

LA

G E

M

PE

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

C O

.8

* FOR OFFICIAL USE ONLY *

* FOR OFFICIAL USE ONLY *

A

N /A

JE

S

N /A

AS

S

H O

W N

JE

S

/3

0/

M

EC

M D

E -G

P1

.D W

G

N /A

N /A

N /A

9/

/2

E-126

D

AT

A C

EN

TE

R M

EC

H

AN

IC

SB

U

R G

SE

C

O N

D F

LO

O

R G

R O

U N

D

IN

G P

LA

N

A R

EA

A

EL

EC

TR

IC

AL

SECOND FLOOR GROUNDING PLAN AREA A

SCALE : 1/8" = 1'-0"

THIS DRAWING HAS BEEN PREPARED BASED UPON INFORMATION VERIFIED IN THE

FIELD AND BY FURNISHED RECORD DRAWINGS. THE CONFORMANCE TO CURRENT

OR PREVAILING CODES OF ANY WORK SHOWN HAS NOT BEEN VERIFIED. THE

LOCATION OF THE FACILITIES AS SHOWN MUST BE VERIFIED IN THE FIELD BEFORE

THIS DRAWING IS USED IN FUTURE CONSTRUCTION PROJECTS.

AS BUILT DRAWINGS

PLAN

REFERENCE

NORTH

N

0 4' 8' 16'

KEY PLAN 2nd FLOOR

SCALE: NONESCALE: NONE

D

BA

C

SHEET

IDENTIFICATION

D

ES

IG

N

B Y:

D R

AW

N

B Y:

SU

BM

IT

TE

D B

Y:

PL

O

T

SC

AL

E:

SI

ZE

AN

SI

D

C H

EC

KE

D B

Y:

PL

O

T D

AT

E:

FI

LE

N

AM

E:

SU

BM

IT

TA

L D

AT

E:

SO

LI

C

IT

AT

IO

N N

O

C O

N

TR

AC

T

N O

FI

LE

N U

M

BE

R

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E:

AP

PR

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E:

AP

PR

B

C

D

1 2 3 4 5

1 2 3 4 5

Defense Information Systems Agency A Combat Support Agency

A

B

D

C

P.

O

.B O

X

G

R

EE

N W

O O

D V

IL

LA

G E

M

PE

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

C O

.8

* FOR OFFICIAL USE ONLY *

* FOR OFFICIAL USE ONLY *

A

N /A

JE

S

N /A

AS

S

H O

W N

JE

S

/3

0/

M

EC

M D

E -G

P1

.D W

G

N /A

N /A

N /A

9/

/2

E-126

D

AT

A C

EN

TE

R M

EC

H

AN

IC

SB

U

R G

SE

C

O N

D F

LO

O

R G

R O

U N

D

IN

G P

LA

N

A R

EA

A

EL

EC

TR

IC

AL

THIS DRAWING HAS BEEN PREPARED BASED UPON INFORMATION VERIFIED IN THE

FIELD AND BY FURNISHED RECORD DRAWINGS. THE CONFORMANCE TO CURRENT

OR PREVAILING CODES OF ANY WORK SHOWN HAS NOT BEEN VERIFIED. THE

LOCATION OF THE FACILITIES AS SHOWN MUST BE VERIFIED IN THE FIELD BEFORE

THIS DRAWING IS USED IN FUTURE CONSTRUCTION PROJECTS.

AS BUILT DRAWINGS

M

AT

C H

L

IN

E C

O N

TI

N

U

ES

O N

A R

EA

B

S H

EE

T

G P1

GP108

6 7 8 9 10 11

C

B

A

D N

MECHANICAL ROOM

MECH AND ELEC

NIPR COMPUTING SPACE

COMPUTER ROOM

STAIRS 1

ADMIN

200B

ELECTRICAL ROOM

MECH AND ELEC

SIPR COMPUTING SPACE

COMPUTER ROOM

SIPR COMPUTING SPACE

STAIRS 1

MECHANICAL ROOM

NIPR…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .