Appendix C - Signal Reference Grid for Grounding.pdf

PDF 402 KB Posted

Attached to
MEC Raised Floor Federal contract opportunity
Solicitation number
HC102821R0024
Issued by
Defense Information Systems Agency

About this file

This document provides the minimum technical specifications for installing a signal reference grid (SRG) for grounding in a data center. The specifications require installing a new SRG system or modifying an existing SRG to be in a 2 foot by 2 foot grid configuration secured to access floor pedestals using copper straps or flat metal braids. The SRG must be bonded to equipment enclosures, ducts, pipes, conduits, and cable trays and measured to ensure continuity below 1 ohm of resistance. Additional requirements specify the reference grounding bond grid, connections to perimeter grounding and between computer rooms, and testing and inspection standards.

View the file

Other files for this federal contract opportunity

Other files attached to MEC Raised Floor, newest first.
File Type Posted
HC102821R0024 0001 solicitation amend.docx DOCX document
832117746 MEC updated PWS.doc DOC document
encl 2cPWS MEC Raised Floor Upgrade 31 Mar 2021.docx DOCX document
09 69 13 Rigid Grid Access Flooring edited 26 MAR 2021.docx DOCX document
DSCN0709.JPG JPG image
DSCN0714.JPG JPG image
Mechanicsburg Master Floor Plan-214 EXISTING.pdf PDF
Mechanicsburg Master Floor Plan-214 Cable Tray.pdf PDF
DSCN0708.JPG JPG image
MEC CR 203 and 203A Cable Tray.pdf PDF
Mechanicsburg Master Floor Plan-203 Existing.pdf PDF
DSCN0717.JPG JPG image
DSCN0710.JPG JPG image
HC102821R0024 solicitation questions and answers.xlsx XLSX spreadsheet
Structural Drawings MEC.pdf PDF
NAVFAC Bldg 308 Fire Suppression System Dwgs.pdf PDF
ELECTRICAL DRAWINGS - MECHANICSBURG.pdf PDF
DSCN0715.JPG JPG image
DSCN0707.JPG JPG image
DSCN0716.JPG JPG image
Appendix G - Contractor NDA.docx DOCX document
encl 4_qasp - MEC Raised Floor Upgrade.docx DOCX document
Pre-Proposal Site Visit Access Clearance_ODP.xls XLS spreadsheet
Pre-Proposal Site Visit Request Instructions (MEC RF).doc DOC document
Pre-Proposal Site Visit Access SECNAV_5512_FORM.pdf PDF
Appendix F - SEC Inventory Format (excel spreadshhet).xlsx XLSX spreadsheet
Appendix E - SRG Grounding System Commissioning.pdf PDF
Appendix B - Rigid Grid Access Flooring.pdf PDF
HC102821R0024 solicitation.docx DOCX document
MEC raised floor RFQ clin pricing sheet.xlsx XLSX spreadsheet
Appendix D - MIL-STD-188-124B.pdf PDF
Appendix A - Raised Access Floor Plan.pdf PDF
Show all 32

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UNCLASSIFIED – FOR OFFICIAL USE ONLY

MINIMUM TECHNICAL SPECIFICATION FOR

SIGNAL REFERENCE GRID FOR GROUNDING

DATA CENTER MECHANICSBURG – APPENDIX C

EFFECTIVE DATE: 22 JULY 2020

UNCLASSIFIED – FOR OFFICIAL USE ONLY Page 1 of 4

1. PURPOSE

This specification details the requirements Signal Reference Grid (SRG) for grounding. All DISA data centers are required to utilize SRG systems to prevent excessive impedance and excessive voltage from developing between equipment enclosures.

2. SCOPE

Provide a complete SRG in accordance with applicable codes and standards by installation of a complete new system or by modifying an existing SRG.

3. REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred within the text by the basic designation only. The current revision of the reference, including all issued updates, must be followed.

DEFENSE INFORMATION SYSTEMS AGENCY (DISA)

DISA Facilities Engineering Circular

NATIONAL FIRE PROTECTION AGENCY (NFPA)

NFPA 70 National Electric Code

U.S. DEPARTMENT OF DEFENSE (DOD)

MIL-HDBK-419 Grounding: Bonding, and Shielding for Electronic Equipments and Facilities; Volume 1 (Basic Theory) and Volume 2 (Application)

MIL-STD-188/124 Grounding, Bonding and Shielding

3.1. MODIFICATION OF REFERENCES

The advisory provisions are mandatory. Substitute "must" for "should" wherever it appears and interpret all references to the "authority having jurisdiction" and "owner" to mean the Contracting Officer and DISA.

4. DEFINITIONS

AWG. American Wire Gauge

CRAC. Computer Room Air Conditioning

CRAH. Computer Room Air Handling

PDU. Power Distribution Unit.

DISA. Defense Information Systems Agency, Facilities Engineering Denver.

SRG. Signal Reference Grid.

SIGNAL REFERENCE GRID FOR GROUNDING

UNCLASSIFIED – FOR OFFICIAL USE ONLY Page 2 of 4

5. REQUIREMENTS

5.1. EXISTING CONDITIONS

When modifying an existing SRG, update the SRG to meet the minimum requirements of this standard.

When the installed SRG does not require replacement of components, the modification to the SRG typically uses the same configuration. For computer rooms with access floors, ensure the floor tile metallic underside is not galvanized by an electroplating process. Galvanized by a hot-dipped process is acceptable.

5.2. REFERENCE GROUNDING BOND GRID

As a basis for the SRG, a reference bonding grid shall be installed in accordance with Figure 1 and

MIL-HDBK-419.

Bu ild in g

St ee l

Earth Electrode Subsystem/Counterpoise

IT Cable Tray Above Access Floor

First Floor Computer Room (1), with Access Floor

Access Floor

Pedestals

IT

Equip.

Racks

IT Cable Tray Above Access Floor

Access Floor

Pedestals

IT

Equip.

Racks

Dedicated ground bus bar for SRG use only.

Isolated and prominently labeled

Isolated, Insulated Conductors, 600 KCMIL (typ)

Isolated, Insulated

Conductors 4/0 (typ). Bond

SRGs together when on the same floor

Perimeter 4/0 Bare Copper Conductor

750 KCMIL (typ)

Isolated, Insulated Conductors, 600 KCMIL (typ)

Isolated, Insulated

Conductors 4/0

Isolated, Insulated

Conductors 4/0

First Floor Computer Room (2), with Access Floor

Figure 1: Reference Grounding Bond Grid

The SRGs of different computer rooms are only bonded together when the rooms are on the same floor.

All other connections as shown in Figure 1 apply to all SRGs in the building.

SIGNAL REFERENCE GRID FOR GROUNDING

UNCLASSIFIED – FOR OFFICIAL USE ONLY Page 3 of 4

5.3. SRG CONFIGURATION FOR COMPUTER ROOMS WITH ACCESS FLOORS

Plan the layout of the SRG based on the exact layout of all computer room equipment (i.e., metal power conduits or raceways, equipment cables, floor pedestals, computer equipment). Use of an access floor itself to create the SRG is not acceptable. The incorporation of a separate SRG, located under the access floor, and connected to all equipment as well as the metallic undersurface of the access floor is required.

Figure 2: Integrated Access Floor with Copper Strap SRG

Configure the SRG in 2 foot by 2 foot (maximum) grids in accordance with the following:

5.3.1. Secure SRG to Floor Pedestals (Existing Access Floor)

Connection of the SRG to the Floor Pedestals is permitted for computer rooms where the access floor and equipment are physically in the computer room at the start of the project. Configure a grid arrangement (see Figure 3) in accordance with the following:

2 Feet

2 Feet

Signal Reference Grid Mounted on Floor Pedestals

Figure 3: Grid Pattern Secured to Floor Pedestals

SIGNAL REFERENCE GRID FOR GROUNDING

UNCLASSIFIED – FOR OFFICIAL USE ONLY Page 4 of 4

a. Mount the SRG to the bare metal just below the stanchions on each floor pedestals using UL listed pedestal bonding clamps and one of the following:

(1) Two-inch-wide #26 AWG continuous copper straps (see Figure 4, preferred method)

2-lnch-

Support

Figure 4: Mounting for Copper Straps

(2) One-inch-wide continuous flat metal braids with copper core (see Figure 5).

(3) #6 AWG continuous bare copper conductors (see Figure 5).

Stanchion

Horizontal Stringer

Subfloor

Floor Pedestal

Conductive Pedestal Bonding Clamp

Flat Metal Braid with Copper Core or

Bare Copper Conductors

Figure 5: Mounting for Flat Metal Braids or Bare Copper Conductors

b. Bond the SRG to the 4/0 copper perimeter loop at not less than 6 foot centers.

c. Install the SRG Grounding Bond system in accordance with Figure 1.

d. Additional signal reference grounding conductors are required at the following locations:

(1) Bond SRG to all ducts, metal pipes, metal conduits, and cable trays under the access floor entering the computer room using a #6 AWG (minimum) bare copper conductor.

(2) Bond every 3rd access floor pedestal (minimum, 6 foot centers) to the SRG with a #6 AWG concentric copper conductor (See Figure 2).

(3) Connect to the existing SRG bonding system (See Figure 1).

e. Install grounding conductors between each equipment enclosure (except PDUs, transformers, CRAC or CRAH units) and the SRG using a #6 AWG bare copper conductor with the length as short as possible, not to exceed 24 inches.

f. When the SRG is installed, bonded and grounded, ensure the continuity of the SRG by measuring the resistance. If the resistance exceeds 1 ohm, all connections must be rechecked (between floor pedestals, SRG straps, and equipment enclosures) to ensure the connections are secure.

(1) Record all testing to certify connections are verified and less than 1 ohm.

(2) Once acceptable continuity is confirmed, the remaining floor tiles may be installed.

- - End of Document - -

1. PURPOSE
2. SCOPE
3. References
3.1. Modification of References
4. DEFINITIONS
5. Requirements
5.1. EXISTING CONDITIONS
5.2. REFERENCE GROUNDING BOND GRID
5.3. SRG CONFIGURATION for Computer Rooms with Access Floors
5.3.1. Secure SRG to Floor Pedestals (Existing Access Floor)

File details come from the government source that posted it. Updated .