J-1 SOO revised 15 Sep 11 AM007.doc

DOC document 60 KB Posted

Attached to
Processor Capacity Services
Solicitation number
HC1028-11-R-0104
Issued by

About this file

Atch J-1 SOO revised 15 Sep 11

View the file

Other files

File Type Posted
AM0009 J-5 Processor PWS Template revised 28 Sep 11.docx DOCX document
HC102811R0104 AM 0009 Conformed Copy.doc DOC document
AM 0009 Question Answer 283-297.doc DOC document
AM0009 J-4 DD254 Processor Capacity Services 28 Sep 11.dot DOT file
SF 30 HC102811R0104 AM 0008.pdf PDF
SF 30 HC102811R0104 Am 0007.doc DOC document
J-9 SPARC Chipset Pricing Model —
J-6 IBM System Z Chipset Pricing Model —
J-10 IBM System P Chipset Pricing Model —
J-5 Processor PWS Template revised 19 Sep 11 AM007.docx DOCX document
HC102811R0104 CONFORMED COPY AM 0007.doc DOC document
J-2 Processor Requirements Document 19 Sep 11 AM007.docx DOCX document
Justification for OTFAOC Processor VMWare REDACTED.pdf PDF
AM007 Questions 264-282 19 Sep 11.doc DOC document
J-4 DD254 Processor Capacity Services 19 Sep 11 AM007.doc DOC document
SF 30 HC102811R0104 AM 0006.pdf PDF
AM 0005 Questions 181 through 239.doc DOC document
J-5 Processor PWS Template revised 17 Aug 11 AM005.docx DOCX document
J-3 QASP for Processor revised 11 Aug 11 AM005.docx DOCX document
HC102811R0104 Conformed Copy AM0005.doc DOC document
AM 0005 Questions 240 through 263.doc DOC document
AM 0004 SF 30 HC102811R0104.doc DOC document
AM 0004 Questions 075 through 156 final.docx DOCX document
AM 0004 Questions 157 through 180.doc DOC document
J-5 Processor PWS Template revised 11 Aug 11 AM004.docx DOCX document
HC102811R0104 Conformed Copy Amd 0004.doc DOC document
J-9 SPARC Chipset Pricing Model —
J-2 Processor Requirements Document 26 Jul 11 AM 0003.doc DOC document
J-10 IBM System P Chipset Pricing Model —
AM 0003 Questions 045 through 074.docx DOCX document
HC102811R0104 Conformed Copy AM0003.doc DOC document
J-5 Processor PWS Template revised 26 Jul 11 AM003.docx DOCX document
AM 0003 Questions 026 through 044 —
J-7 x86 Chipset Pricing Model —
AM 002 Questions 006 through 025.doc DOC document
J-6 IBM System Z Chipset Pricing Model revised 14 jul 11 AM002.xls XLS spreadsheet
J-5 Processor PWS Template revised 13 Jul 11 AM002.docx DOCX document
SF 30 HC102811R0104 AM 0001.doc DOC document
HC102811R0104 conformed copy AM 0002.doc DOC document
AMD 0001 HC102811R0104.doc DOC document
J-11 Question Answer Submission Template.doc DOC document
J-8 Itanium Chipset Pricing Model 2 Jun 2011.xls XLS spreadsheet
J-3 QASP for Processor revised 9 May 11.docx DOCX document
J-1 SOO revised 11 May 11.doc DOC document
J-6 IBM System Z Chipset Pricing Model 2 Jun 11.xls XLS spreadsheet
J-2 Requirements Document revised 11 May 11.doc DOC document
J-9 SPARC Chipset Pricing Model 2 Jun 2011.xls XLS spreadsheet
J-7 X-86 Chipset Pricing Model 2 Jun 2011.xls XLS spreadsheet
J-5 Processor PWS Template revised 10 May 11.docx DOCX document
J-4 DD254 Processor Capacity Services 2 Jun 11.doc DOC document
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Acquisition Sensitive

Attachment J-1

HC1028-11-R-0104

Amendment 0007 Acquisition Sensitive

Attachment J-1

HC1028-11-R-0104

STATEMENT OF OBJECTIVES

PROCESSOR ENVIRONMENT

1.0 INTRODUCTION

Defense Information Systems Agency (DISA) Computing Services (CSD) is a provider of information technology solutions for the Department of Defense (DoD). DISA’s DoD customers require processing capacity services for a variety of application and processing environments. DISA CSD must have the ability to provide processing capacity in a timely manner whenever and wherever the requirements occur. The purpose of this contract is to provide state-of-the-art processing capacity to meet new and emerging customer requirements and the ability to replace existing DISA processing capacity that has exceeded its technical life as determined by the Government.

DISA is required by the DoD to enhance processor effectiveness through improved information interoperability. The Assistant Secretary of Defense for Networks and Information Integration (ASD/NII) has articulated a vision for transforming the information environment in the DoD. This vision calls for a move from the centralized thinking and planning currently reflected in the Task, Process, Exploit, Disseminate (TPED) paradigm, to an edge-centered Task, Post, Process, Use (TPPU) approach to information sharing and availability. The envisioned changes represent a fundamental paradigm shift from providing platform centric applications to platform independent, web-enabled, Net-Centric services requiring the support of a diverse processing environment, that meets the requirements of the end users, and which is highly available, secure, and reliable. As a result of the shift to Net-Centric services, DISA CSD will also need to provide processing capabilities at DISA-owned and other approved processing locations.

2.0 PURPOSE

The purpose of this contract is to obtain reliable, responsive, and cost effective processor infrastructure services of “on-demand” processing capabilities for specified chipset architecture in both DISA and other DISA-approved locations, which are both in the continental United States (CONUS) and outside of the continental United States (OCONUS). DISA's goal is to obtain a dynamically scalable processing capability utilizing an on-demand service approach, for new equipment, that will readily adjust to changes in processing and throughput requirements, both increases and decreases, and is priced on a utility ("as used") basis or tiered structure.

The service provider will acquire, install, deinstall, transport, configure, and provide the necessary hardware (including cabinets/racks/cabling/cable management/PDUs), hardware maintenance, operating system software, VMWare, as well as, any other software required for the offeror solution to operate, and services to support the processor infrastructure associated with this contract. The Government will maintain day-to-day operational control of the processing environment and complete oversight responsibility. This operational control includes the installation of all software updates after the initial delivery. However, all operating system software, VMWare, as well as, any other software required for the offeror solution to operate, including software maintenance and licensing shall be included under this contract.

3.0 SCOPE

3.1 The scope of this project includes the hardware/Chipset, hardware maintenance, operating systems software, VMWare, as well as, any other software required for the offeror solution to operate, and services to deliver processing capacity for DISA at the CSD processing facilities, CONUS, OCONUS, and other DISA or DISA approved locations worldwide in which DISA CSD may acquire an operational responsibility. The hardware/Chipsets are:

3.1.1 IBM System z (IBM z/OS, IBM z/VM, Red Hat Enterprise Linux, SUSE Linux Enterprise Server)

3.1.2 X-86 (Windows Server, Red Hat Enterprise Linux, SUSE Linux Enterprise Server, Solaris, VMware vSphere Enterprise Plus 5.0 or higher)

3.1.2.1 VMWare is only required for the X-86 chipset.

3.1.3 Itanium (HP-UX)

3.1.4 SPARC (Solaris)

3.1.5 IBM System p (AIX)

3.1.6 This also includes any other operating system software that DISA may require in the future.

The objective is for the offeror to provide processing services using a “utility contract concept”. This utility concept requires that the offeror provide all assets needed for the processing service.

3.2 OS Image. Provide an “image” of the CSD operating environment. This image should include all operating system software, monitoring software, etc that would normally be provisioned via the service.

3.3 Additional Hardware Components: Provide ability to add generic add on devices or peripherals to the hardware (for example: Crypto card, fax card, MUX card, more RAM, etc.).

3.4 Virtual Environments: Provide solution that recognizes Virtual VMware environment as standard infrastructure for the X-86 environment.

3.5 IBM System z: The System z operating system is not required for this contract. The offeror will not provide any Z-Series operating system software. DISA will provide and maintain all Z-Series operating system software.

3.6 Performance/Availability. Processor capacity that delivers 99.95% system availability per orderable system with options to deliver up to 99.999 % availability per orderable system.

3.7 Capacity. Provide processing capacity that is scalable to adjust to increases and decreases in required workload. This includes but is not limited to, CPU utilization, MIPs, memory utilization, network interfaces (i.e. OSA, HBA, and network interface cards (NIC), sysplex hardware, channels and channel infrastructure).

3.8 Release Management. Provide release management for all operating system software.

3.9 Integration/Interfaces. Provide hardware/chipset solution/s that work seamlessly within the existing DISA infrastructure and network.

3.10 Facilities – Racks. Provide standard racks for hardware. Additional “high density” cooling technologies may be proposed by the offeror.

3.11 Technical Assistance and Consulting Support. Technical support may be provided on as needed basis to provide flexibility to modify services to meet the needs of DISA and its customers.

4.0 Technology Refresh Program. The Technology Refresh Program (Tech Refresh) is a consolidated DISA effort to select, acquire, and install processor hardware and software on a scheduled basis to prevent obsolescence and increase data processing and functionality within DISA’s NIPR and SIPR networks.

Tech Refresh Program is designed to replace aging and out of date processors hardware in order to minimize obsolescence in advance of loss of service or hardware failure. DISA estimates the Tech Refresh Program will replace the oldest processor equipment as required, but generally processor hardware will have a 3 year service life. The Government can decide to refresh hardware based on functions and technology updates, at any point in time during the first five years. This is not common place but the flexibility must be available. Likewise, technical or cost efficiencies and advantages on keeping hardware for longer than 3 years should be clearly defined. Without a viable Tech Refresh Program, DISA will be at risk due to the fact that the processors equipment cannot be serviced beyond its lifecycle. No new equipment will be ordered, or added to the list, by the incumbent in the option years since they will be treated as a transition and exit period. It is the Government’s desire that the option years will be exercised for sustainment only. However, the Government can place new orders on the new contract in the extension years should the need arise for the following purposes the existing contract ends, the equipment is technically refreshed, or the equipment is no longer required by the Government.

5.0 Approach. Proof-of-concept demonstration of the offeror’s proposed solution will be required for all offerors in the competitive range. The proof-of-concept is to determine whether the solution meets DISA’s processing objectives. The offeror(s) will provide all resources required for the proof-of-concept demonstration.

6.0 All other specific objectives are identified in the Requirements Document.

Acquisition Sensitive

PAGE

SOO