AM 0005 Questions 240 through 263.doc

DOC document 201 KB Posted

Attached to
Processor Capacity Services
Solicitation number
HC1028-11-R-0104
Issued by

About this file

Questions and Answers 240 through 263

View the file

Other files

File Type Posted
AM0009 J-2 Processor Requirements Document 28 Sep 11.docx DOCX document
AM0009 J-4 DD254 Processor Capacity Services 28 Sep 11.dot DOT file
AM 0009 Question Answer 283-297.doc DOC document
J-7 x86 Chipset Pricing Model —
J-1 SOO revised 15 Sep 11 AM007.doc DOC document
J-8 Itanium Chipset Pricing Model —
AM007 Questions revised 28 30 and 186 194 208 236 244 15 Sep 11.doc DOC document
Justification for OTFAOC Processor VMWare REDACTED.pdf PDF
AM007 Questions 264-282 19 Sep 11.doc DOC document
J-4 DD254 Processor Capacity Services 19 Sep 11 AM007.doc DOC document
HC102811R0104 CONFORMED COPY AM 0007.doc DOC document
J-2 Processor Requirements Document 19 Sep 11 AM007.docx DOCX document
SF 30 HC102811R0104 Am 0007.doc DOC document
J-9 SPARC Chipset Pricing Model —
J-6 IBM System Z Chipset Pricing Model —
SF 30 HC102811R0104 AM 0006.pdf PDF
SF 30 HC102811R0104 AM 0005.doc DOC document
J-2 Processor Requirements Document 17 Aug 11 AM005.doc DOC document
J-3 QASP for Processor revised 11 Aug 11 AM005.docx DOCX document
HC102811R0104 Conformed Copy AM0005.doc DOC document
AM 0005 Questions 181 through 239.doc DOC document
HC102811R0104 Conformed Copy Amd 0004.doc DOC document
J-3 QASP for Processor revised 8 Aug 11 AM004.docx DOCX document
AM 0004 Questions 157 through 180.doc DOC document
J-5 Processor PWS Template revised 11 Aug 11 AM004.docx DOCX document
AM 0004 Questions 075 through 156 final.docx DOCX document
J-6 IBM System Z Chipset Pricing Model —
J-8 Itanium Chipset Pricing Model —
J-5 Processor PWS Template revised 26 Jul 11 AM003.docx DOCX document
AM 0003 Questions 026 through 044 —
J-7 x86 Chipset Pricing Model —
AM 0003 Questions 045 through 074.docx DOCX document
HC102811R0104 Conformed Copy AM0003.doc DOC document
J-9 SPARC Chipset Pricing Model —
J-2 Processor Requirements Document 18 Jul 11 AM002.doc DOC document
J-5 Processor PWS Template revised 13 Jul 11 AM002.docx DOCX document
SF 30 HC102811R0104 AM 0001.doc DOC document
HC102811R0104 conformed copy AM 0002.doc DOC document
J-6 IBM System Z Chipset Pricing Model revised 14 jul 11 AM002.xls XLS spreadsheet
HC102811R0104 RFP AMEND 0001 Conformed Copy.doc DOC document
AMD 0001 HC102811R0104.doc DOC document
J-11 Question Answer Submission Template.doc DOC document
J-4 DD254 Processor Capacity Services 2 Jun 11.doc DOC document
J-10 IBM System P Chipset Pricing Model 2 Jun 2011.xls XLS spreadsheet
HC1028-11-R-0104.doc DOC document
J-7 X-86 Chipset Pricing Model 2 Jun 2011.xls XLS spreadsheet
J-5 Processor PWS Template revised 10 May 11.docx DOCX document
J-2 Requirements Document revised 11 May 11.doc DOC document
J-9 SPARC Chipset Pricing Model 2 Jun 2011.xls XLS spreadsheet
J-8 Itanium Chipset Pricing Model 2 Jun 2011.xls XLS spreadsheet
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Amendment 0005 - Questions and Answers for 240 through 263

RFP HC1028-11-R-0104

QUESTION #
240
DOCUMENT
HC1028-11-R-0104 conformed copy modified July 22
PAGE
51 of 75
SECTION NO.
7.3.4
SECTION NAME
Required Submittals
SECTION TEXT
2) Non-Disclosure Agreement for Offeror employees (Attachment J-4)
QUESTION
Attachment J-4 is the DD- Form 254 – Contract Security Classification Specification. There is no “Non-Disclosure Agreement for Offeror employees.” If this is required, please provide the Non-Disclosure Agreement.
ANSWER
The Non-Disclosure Agreement will be provided at time of award.
QUESTION #
241
DOCUMENT
HC1028-11-R-0104; Amendment 002; revised 22 July 2011
PAGE
69
SECTION NO.
M002
SECTION NAME
Evaluation Factors; specifically Subfactor 1: Technical Solution; 1.2 Capacity Service; 1.2.1
SECTION TEXT
1.2.1

The Government will assess the technical solution proposed to provide for an “On Demand” environment for scale-up and scale-down of capacity and component changes while minimizing the impacts those changes will impose. This includes such items as reducing or eliminating disruption to processing schedules necessary to implement the solution, the impact on current software licensing, the impact to existing peripherals, and the impacts on facilities with a heterogeneous hardware environment.

QUESTION
In context of this solicitation, the statement, “…the impact on current software licensing” implies the specified operating environment software exists on incumbent capacity services contracts *and* is NOT presumed to be provided as an operating system pre-loaded/ included in the base price of the computing hardware (e.g., VMWare). Plus, In J-1 Statement of Objectives, Page 2, Section 3.5, DISA states that it will provide the Z-Series operating software, therefore this software is not required to be provided (or priced) in the RFP. What are the current software licensing scenarios, as relates to the incumbents on the HC1013-07-D-2xxx series contracts (on a per-software, per-chipset basis)?
ANSWER
The offeror is responsible for all Operating System software required for the chipsets with the exception of Z-series. The statement “impact on current software licensing” relates to all other Independent Software Vendors (ISVs) licensed by the Government on the processors, including the Z-Series.
QUESTION #
242
DOCUMENT
HC1028-11-R-0104; Amendment 002; revised 22 July 2011
PAGE
69
SECTION NO.
M002
SECTION NAME
Evaluation Factors; specifically Subfactor 1: Technical Solution; 1.2 Capacity Service; 1.2.1
SECTION TEXT
1.2.1

The Government will assess the technical solution proposed to provide for an “On Demand” environment for scale-up and scale-down of capacity and component changes while minimizing the impacts those changes will impose. This includes such items as reducing or eliminating disruption to processing schedules necessary to implement the solution, the impact on current software licensing, the impact to existing peripherals, and the impacts on facilities with a heterogeneous hardware environment.

QUESTION
What are the existing peripherals (on a per-chipset basis)?
ANSWER
X86: SAN attached storage devices, HBAs and NICs

System z: FICON Directors (mostly Brocade) to include tape drive connectivity, ESCON for legacy 36-track tape drives and Visara console controllers, OSA attached comm devices, Hitachi USP-V DASD, Luminex DataDomain devices

UNIX: SAN attached storage, NIC's, HBA's, and specialized interface components

QUESTION #
243
DOCUMENT
HC1028-11-R-0104; Amendment 002; revised 22 July 2011
PAGE
69
SECTION NO.
M002
SECTION NAME
Evaluation Factors; specifically Subfactor 1: Technical Solution; 1.2 Capacity Service; 1.2.1
SECTION TEXT
1.2.1

The Government will assess the technical solution proposed to provide for an “On Demand” environment for scale-up and scale-down of capacity and component changes while minimizing the impacts those changes will impose. This includes such items as reducing or eliminating disruption to processing schedules necessary to implement the solution, the impact on current software licensing, the impact to existing peripherals, and the impacts on facilities with a heterogeneous hardware environment.

QUESTION
What quantity of DISA datacenter facilities do *NOT* have heterogeneous hardware environments?
ANSWER
All DISA datacenters contain a heterogeneous environment.
QUESTION #
244
DOCUMENT
HC1028-11-R-0104; Amendment 002; revised 22 July 2011
PAGE
69
SECTION NO.
M002
SECTION NAME
Evaluation Factors; specifically Subfactor 1: Technical Solution; 1.2 Capacity Service; 1.2.1
SECTION TEXT
1.2.1

The Government will assess the technical solution proposed to provide for an “On Demand” environment for scale-up and scale-down of capacity and component changes while minimizing the impacts those changes will impose. This includes such items as reducing or eliminating disruption to processing schedules necessary to implement the solution, the impact on current software licensing, the impact to existing peripherals, and the impacts on facilities with a heterogeneous hardware environment.

QUESTION
Does VMWare software purchased subsequent to the original award of HC1013-07-D-2xxx contracts convey to DISA in similar fashion to the IBM Z-Series operating system software, or do(es) the incumbent(s) retain title? If the incumbent(s) retain title, how does DISA propose to conduct a fair and open competition considering the $10 mil - $15 mil pricing advantage to the incumbent(s) – especially considering none of the offerors who originally bid VMWare on HC1013-07-D-2xxx contract won the pricing aspect of the competition, only the incumbent(s) who did not bit VMWare originally?
ANSWER
The Government will be answering this question in another amendment.
QUESTION #
245
DOCUMENT
J-2, Amendment 002
PAGE
2 (of 38)
SECTION NO.
1.2.1.3 Image of CSD operating environment
SECTION NAME
1.2. Technical Requirements and Architecture
SECTION TEXT
“Provide an “image” of the CSD operating environment. The “image” will not run on the capacity services hardware. The “image” will be purchased for customers in the IT development stage prior to transitioning their projects to CSD. Purchase of the “image” for customers is intended to reduce transition issues. This image should include all operating system software, monitoring software, etc that would normally be provisioned via service. This service should be priced as a one-time purchase.”
QUESTION
DISA CSD owns the Computer Associates/ iTKO “Lisa” virtual dev/test application. iTKO describes its LISA solution thusly, “enables organizations to “mock up” a service at enterprise speed and enterprise scale—even if the application is unfinished or unstable or the physical resource is unavailable. LISA virtualizes an environment by simulating the behavior of external services without actually invoking them.” This includes the mockup of the operating environment in context of the hardware, operating system, virtual instances of operating environments, platforms, software, etc. Is there an unforeseen reason to preclude DISA CSD from leveraging this existing asset, and/or providing it to bidders GFE?
ANSWER
DISA CSD will not be providing CA iTKO "Lisa" software for use with this contract.
QUESTION #
246
DOCUMENT
J-1 *and* J-2
PAGE
1 (in J-1), and 25 (in J-2, Amendment 002)
SECTION NO.
2.0 (in J-1), and ATTACHMENT THREE (in J-2, Amendment 002)
SECTION NAME
Purpose (in J-1), and Enterprise Management Products for Servers (in J-2, Amendment 002)
SECTION TEXT
“The service provider will acquire, install, deinstall, transport, configure, and provide the necessary hardware (including cabinets/racks/cabling/cable management/PDUs), hardware maintenance, operating system software, VMWare, as well as, any other software required for the offeror solution to operate, and services to support the processor infrastructure associated with this contract.”
QUESTION
Is it the Government’s intention that the offerors will purchase the server-side and/or agent software for any of the software solutions listed in ATTACHMENT THREE, Enterprise Management Products for Servers in Attachment J-2, Amendment 002, of HC1028-11-R-0104; and, if yes, specifically which categories and software solutions?
ANSWER
All software identified on Attachment Three is owned by the Government.
QUESTION #
247
DOCUMENT
J-2
PAGE
2 (of 38)
SECTION NO.
1.2.3
SECTION NAME
Virtual Environments
SECTION TEXT
Provide solution that recognizes Virtual VMware environment as standard infrastructure for the x86 environment. The Government support staff will manage the ESX environment (hosts), placements, relocating environments (vmotion), and the VIC. The Virtual Environment software for all platforms will be included in the processor utility service. Offeror will provide the underlying infrastructure, tools, software, licensing, and licensing agreements to support the VMware Virtual infrastructure as well as native virtual capabilities for HP-UX and Solaris.
QUESTION
Oracle no longer sells or supports the Sun Solaris operating system as an independent OS offering on the X-86 platform; is it the Government’s intention that support for Solaris virtualization be on the “bare-metal” X-86 environment, or the VMWare virtual environment only?
ANSWER
Government requires support for Solaris virtualization on both "bare-metal" X-86 and the VMware virtual environment.
QUESTION #
248
DOCUMENT
J-2, Amendment 002
PAGE
11 (of 46)
SECTION NO.
13.3
SECTION NAME
Acceptance
SECTION TEXT
The acceptance of equipment by the Government will start the billing cycle for this service. The offeror will work with DISA to develop an acceptance testing methodology to smoothly transition equipment into the DISA production environment. The official acceptance documentation will be provided by the Government after the contract award.
QUESTION
Certain areas of the RFP documents, e.g., J-2 Section 6.6, Section B Pricing Models, specify monthly billing for compute capacity turned on (or off) by the contractor at Government direction. Not all call orders will result in new equipment being delivered, rather compute capacity, plus operating and virtual environments being turned on (or off). Therefore, will the standard capacity services “Ready for use” order/delivery acceptance policy suffice to initiate and authorize billing? Will the government revise all areas of the RFP to indicate “ready for use” is an acceptable means to initiate monthly billing?
ANSWER
Once the vendor provides and installs the equipment as specified in the call order the Government will verify and provide acceptance for billing to begin. The Government will not revise the RFP.
QUESTION #
249
DOCUMENT
J-2, Amendment 002
PAGE
9 (of 38)
SECTION NO.
7.0
SECTION NAME
Install and Configuration
SECTION TEXT
All installation, uninstallation, and power-up configuration will be completed by the Offeror based upon Government approval. The Government will perform final configuration as required.
QUESTION
How does the Government define and measure “final configuration” and performance, plus a delivery acceptance methodology suitable to enable and authorize the Offeror to initiate timely billing for capacity services delivered?
ANSWER
See Question 136, Amendment 0004. For installations, a checklist is used to validate and accept the delivered configuration/call order. Once the vendor provides and installs the equipment as specified in the call order the Government will verify and provide acceptance for billing to begin.
QUESTION #
250
DOCUMENT
J-2, Amendment 002
PAGE
9 (of 38)
SECTION NO.
10.3
SECTION NAME
Delivery & Installation (after hours requirement)
SECTION TEXT
Normal equipment installations should be accomplished during normal business hours, 0600-1800 local time, Monday through Friday. Under certain conditions, the offeror may be required to perform an installation/update after normal business hours during evenings and weekends. Although the Government will try to minimize this requirement, the offeror must plan to work after hours, weekends, and or holidays for delivery and installation of new or updated orders.
QUESTION
What is the historical data to use for pricing each of the five categories of compute capacity, specifically the number of instances per year that occurred after normal business hours during evenings and weekend, and the number of hours expended to complete each equipment installation during these instances? And how are these service hours being evaluated for award?
ANSWER
Historical information is not available; however the vendor must plan to complete some installations after hours. Such cases may be when a production system is in need of additional resources and installation must occur within the customer defined maintenance window. See J-2, para 1.3.1 - All maintenance requirements are included in the “utility” pricing. See revision to J-2 para 10.3 and J-5, para 6.2.4.4.1 - All installation requirements should be included in the “utility” pricing.
QUESTION #
251
DOCUMENT
J-2, Amendment 002
PAGE
15
SECTION NO.
16.3
SECTION NAME
DoD Directive 8500.1, Information Assurance & DoD Directive 8500.2, Information Assurance (IA) Implementation
SECTION TEXT
Department of Defense (DoD) Directive 8500.1, Information Assurance, and DoD Instruction 8500.2, "Information Assurance (IA) Implementation requires that "all IA and IA-enabled IT products incorporated into DoD information systems shall be configured in accordance with DoD-approved security configuration guidelines." DISA Instruction 630-230- 31 assigns the DISA Deputy Director for Operations with the responsibility to develop and maintain Security Technical Implementation Guides (STIGs). These STIGs (or Addendum, as appropriate) serve as the security configuration guidelines required by DoDD 8500.1. DoDD 8500.1 has been supplemented with additional information concerning specific operating system environments including the Microsoft Windows NT, Windows 2000, Windows 2003, and Windows XP operating systems.

Additionally, all equipment that provides an information assurance function, such as SSL termination meet specific guidelines such as Federal Information Protection Standards (FIPS) 140-2, or National Institute of Standards and Technology (NIST) Common Criteria EAL-4 evaluation. The service provider and Government will work together to ensure that all equipment provided meets all required federal, DoD, and/or DISA standards as appropriate.

QUESTION
Microsoft Windows NT, 2000, XP, and to some extent 2003 products are end-of-life. Will the Government consider restating the requirement in terms of current Microsoft Windows O/S offerings?
ANSWER
The specific operating system environments identified relate to security for workstations and any revisions can be found in DoD 8500.1.
QUESTION #
252
DOCUMENT
J-2, Amendment 002
PAGE
15 (of 38)
SECTION NO.
16.4
SECTION NAME
Classified and controlled unclassified information
SECTION TEXT
DISA utilizes classified and controlled unclassified information to accomplish mission objectives. Contractor personnel exposed to this level of information must protect the data through the use of the security features inherent to software loaded, strong authentication and physical constraints as outlined below. Any deviation from standard practices may compromise data resulting in harm to the government.
QUESTION
DFARS Case No. 2011-D039 (Safeguarding Unclassified DoD Information) states, “DoD is proposing to amend the Defense Federal Acquisition Regulation Supplement (DFARS) to add a new subpart and associated contract clauses to address requirements for safeguarding unclassified DoD information.” In addition, the associated preceding DFARS Case No. 2008-D028 (Safeguarding Unclassified Information), states its intention thusly, “Amends the Defense FAR Supplement to address requirements for the safeguarding, proper handling, and cyber intrusion reporting of unclassified defense information within industry.” These proposed changes to the laws are anticipated to take effect before or during the initial delivery phases of the Processor Capacity Services contract, the anticipation is these changes to standard practices will be quite costly to Government and Offeror alike. Will the Government be willing to factor the proposed changes to the DFARS into the requirements called out in Sections 16.5 to 16.10?
ANSWER
We cannot include proposed changes in the RFP. If the proposed changes are incorporated into DFARS, we will add them via amendment or contract modification as soon as we are notified of the inclusion into DFARS.
QUESTION #
253
DOCUMENT
J-2, Amendment 002
PAGE
22 (of 38)

SECTION NO.

SECTION NAME
P-Series Tier Definitions
SECTION TEXT
Tier 1 (Blade)

2-16 Cores

(Power 7)

Up to 64 GB RAM

Little or no local storage required. Redundancy for internal/SAN storage required.

Standalone, partitioned and virtual machines. Clustering is optional.

Application Servers Database servers

Web Server Farms

Virtual machines

Redundant power supplies

Mirrored boot disks Redundant disk controllers (minimum 2 per OE), Redundant network controllers (minimum 4 per OE).

Green systems.

Supports AIX and/or Linux

Supports AIX 5.3, 6.x

Ability to move workload

QUESTION
It is not necessarily in the Government’s best interest to have a P-Series chipset on a Blade Server. Will the Government be willing to remove the word “Blade” from the Tier 1 requirements definition?
ANSWER
Yes. J-2, Requirements Document, Attachment One, Server Chipset Definitions for P-series has been revised.
QUESTION #
254
DOCUMENT
J-2, Amendment 002
PAGE
22 (of 38)

SECTION NO.

SECTION NAME
P-Series Tier Definitions
SECTION TEXT
Tier 1 (Blade)

2-16 Cores

(Power 7)

Up to 64 GB RAM

Little or no local storage required. Redundancy for internal/SAN storage required.

Standalone, partitioned and virtual machines. Clustering is optional.

Application Servers Database servers

Web Server Farms

Virtual machines

Redundant power supplies

Mirrored boot disks Redundant disk controllers (minimum 2 per OE), Redundant network controllers (minimum 4 per OE).

Green systems.

Supports AIX and/or Linux

Supports AIX 5.3, 6.x

Ability to move workload

QUESTION
DISA standards currently emphasize booting servers from SAN-attached storage. The processor OEM does not require local boot drives (on the server). In consideration of these two facts as stated, will the Government consider changing the specification to require or allow for booting the servers from SAN-attached storage – and – remove the requirement for mirrored boot disks with redundant disk controllers?
ANSWER
No, the Government cannot change the specification.
QUESTION #
255
DOCUMENT
Requirements Document Processor Environnent, Attachment J-2
PAGE
22
SECTION NO.
N/A
SECTION NAME
P-Series Tier Definitions – Tier 1 thru 3
SECTION TEXT
N/A
QUESTION
Is there a definition for Tier 4 for SLIN 5001AD?
ANSWER
See Question 34, Amendment 0003.
QUESTION #
256
DOCUMENT
Requirements Document, Attachment J-2 & Attachment J-10
PAGE
J-2, Page 22 and J-10, Tab Monthly Rates
SECTION NO.
P-Series Tier Descriptions
SECTION NAME
N/A
SECTION TEXT
CPU Capacity/Type
QUESTION
Given, that the offeror must strictly adhere to the SLINs in the Pricing Model, how does DISA intend to increase the number of cores in any Tier after initial Call Order? Additionally, the Offeror believes the range of cores DISA has indicated in each POWER Capacity Tier (2-16 cores for Tier 1; 8-64 cores for Tier 2; and 32-256 cores for Tier 3) are not practical for developing a single price in any of the POWER Capacity Tiers.
ANSWER
See Question 34, Amendment 0003.
QUESTION #
257
DOCUMENT
Requirements Document, Attachment J-2 & Attachment J-7
PAGE
J-7 Worksheet Tab “EVALUATION PURPOSES – Scenario 1”
SECTION NO.
Cell E4 - Qty for Month 1 for SLIN 2001AA
SECTION NAME
Qty for Month 1 for SLIN 2001AA
SECTION TEXT
2001AA – tier One - Blade
QUESTION
What is it that DISA intends the Offeror to price:

A. A Two-Socket Blade with a minimum of 96 GB of RAM IAW the X-86 Tier Definitions in J-2, OR

B. 5 Operating environments (Windows, Red Hat Linux, SUSE Linux, or Solaris) whose underlying hardware is a Two-Socket Blade with a minimum of 96 GB of RAM IAW the X-86 Tier Definitions in J-2

ANSWER
See Question 212.
QUESTION #
258
DOCUMENT
Attachment J-1, Statement of Objectives
PAGE
1
SECTION NO.
2.0
SECTION NAME
Purpose
SECTION TEXT
The purpose of this contract is to obtain reliable, responsive, and cost-effective processor infrastructure services of “on-demand” processing capabilities for specified chipset architecture in both DISA and other DISA-approved locations, which are both in the continental United States (CONUS) and outside of the continental United States (OCONUS).
QUESTION
How much money has DISA spent on each of the currently awarded SPE contracts over the life of the contract?
ANSWER
That information would only be obtainable through the Freedom of Information Act (FOIA) process.
QUESTION #
259
DOCUMENT
Attachment J-1, Statement of Objectives
PAGE
1
SECTION NO.
2.0
SECTION NAME
Purpose
SECTION TEXT
The purpose of this contract is to obtain reliable, responsive, and cost effective processor infrastructure services of “on-demand” processing capabilities for specified chipset architecture in both DISA and other DISA-approved locations, which are both in the continental United States (CONUS) and outside of the continental United States (OCONUS).
QUESTION
The 5-year ordering period for the current contracts expire on September 30th. Will the incumbent vendors be allowed to supply “net new” equipment after the expiration of the base period?
ANSWER
Yes, capacity orders will continue to be placed against existing contracts until a new contract has been awarded.
QUESTION #
260
DOCUMENT
Attachment J-2, Requirements Document
PAGE
8
SECTION NO.
8.0
SECTION NAME
Transition and Exit Strategy
SECTION TEXT
The transition and exit strategy will begin at the end of the base contract.
QUESTION
Will DISA publish each response to Paragraph 5.6, Exit Strategy, for each of the originally awarded SPE contracts?
ANSWER
No. That information would only be obtainable through the Freedom of Information Act (FOIA) process.
QUESTION #
261
DOCUMENT
Attachment J-1, Statement of Objectives
PAGE
2
SECTION NO.
3.4
SECTION NAME
Virtual Environments
SECTION TEXT
Provide solution that recognizes Virtual VMware environment as standard infrastructure for the x86 environment.
QUESTION
What was the date of the first call order for VMware? How much money was paid for VMware and to whom was it paid?
ANSWER
That information would only be obtainable through the Freedom of Information Act (FOIA) process.
QUESTION #
262
DOCUMENT
J2, Attachment 5
PAGE
30 of 38 in footer

SECTION NO.

SECTION NAME
Facilities Rack and Power Details

SECTION TEXT

QUESTION
Assuming the supplied rack conforms to all requested EIA, NEMA, and associated specifications, if the dimensions of the rack exceed height by less than one inch and depth by less than two inches, would that still be considered compliant?
ANSWER
DISA is seeking to establish rack size standards. Vendors may submit deviations to the standard rack configurations IAW Attachment 5 which must be validated and approved by DISA.
QUESTION #
263
DOCUMENT
Requirements document (Attachment J-2)
PAGE
7 of 36
SECTION NO.
3.7
SECTION NAME
Capacity
SECTION TEXT
Capacity can be cancelled at any time at no cost to the Government.
QUESTION
The size and structure of this opportunity (> $400M, monthly fees, etc.) has caused this offeror to work with financial institutions in the development of our solution. The requirement which allows the Government to cancel capacity at any time and at no cost makes financing, under standard terms and conditions, with these institutions impossible, especially for small and medium sized businesses. The answer to Question #006, where the Government also indicated that they can migrate to new capacity and cancel the original capacity, again at any time and at no cost, is also not supported by these standard terms and conditions. These financial partners have further indicated they deem these as unacceptable risk, and as such, are preventing this offeror from submitting a proposal. Question: Request the government reconsider this requirement and remove from the RFP, and revise their answer to Question #006.
ANSWER
In order to meet the tenants of a capacity on demand contract, the govt requires scaleabilty and can cancel capacity when it is no longer needed.