AM 002 Questions 006 through 025.doc

DOC document 168 KB Posted

Attached to
Processor Capacity Services
Solicitation number
HC1028-11-R-0104
Issued by

About this file

Questions and Answers 006 through 025

View the file

Other files

File Type Posted
AM0009 J-4 DD254 Processor Capacity Services 28 Sep 11.dot DOT file
AM0009 J-2 Processor Requirements Document 28 Sep 11.docx DOCX document
AM 0009 Question Answer 283-297.doc DOC document
Justification for OTFAOC Processor VMWare REDACTED.pdf PDF
AM007 Questions 264-282 19 Sep 11.doc DOC document
J-4 DD254 Processor Capacity Services 19 Sep 11 AM007.doc DOC document
J-7 x86 Chipset Pricing Model —
J-1 SOO revised 15 Sep 11 AM007.doc DOC document
J-8 Itanium Chipset Pricing Model —
AM007 Questions revised 28 30 and 186 194 208 236 244 15 Sep 11.doc DOC document
HC102811R0104 CONFORMED COPY AM 0007.doc DOC document
J-2 Processor Requirements Document 19 Sep 11 AM007.docx DOCX document
SF 30 HC102811R0104 Am 0007.doc DOC document
J-9 SPARC Chipset Pricing Model —
J-6 IBM System Z Chipset Pricing Model —
SF 30 HC102811R0104 AM 0006.pdf PDF
SF 30 HC102811R0104 AM 0005.doc DOC document
J-2 Processor Requirements Document 17 Aug 11 AM005.doc DOC document
J-3 QASP for Processor revised 11 Aug 11 AM005.docx DOCX document
HC102811R0104 Conformed Copy AM0005.doc DOC document
AM 0005 Questions 240 through 263.doc DOC document
AM 0005 Questions 181 through 239.doc DOC document
AM 0004 Questions 157 through 180.doc DOC document
J-5 Processor PWS Template revised 11 Aug 11 AM004.docx DOCX document
HC102811R0104 Conformed Copy Amd 0004.doc DOC document
J-3 QASP for Processor revised 8 Aug 11 AM004.docx DOCX document
AM 0004 Questions 075 through 156 final.docx DOCX document
J-5 Processor PWS Template revised 26 Jul 11 AM003.docx DOCX document
AM 0003 Questions 026 through 044 —
J-7 x86 Chipset Pricing Model —
J-6 IBM System Z Chipset Pricing Model —
J-8 Itanium Chipset Pricing Model —
AM 0003 Questions 045 through 074.docx DOCX document
HC102811R0104 Conformed Copy AM0003.doc DOC document
J-9 SPARC Chipset Pricing Model —
J-5 Processor PWS Template revised 13 Jul 11 AM002.docx DOCX document
SF 30 HC102811R0104 AM 0001.doc DOC document
HC102811R0104 conformed copy AM 0002.doc DOC document
J-2 Processor Requirements Document 18 Jul 11 AM002.doc DOC document
J-6 IBM System Z Chipset Pricing Model revised 14 jul 11 AM002.xls XLS spreadsheet
AMD 0001 HC102811R0104.doc DOC document
J-11 Question Answer Submission Template.doc DOC document
HC102811R0104 RFP AMEND 0001 Conformed Copy.doc DOC document
J-7 X-86 Chipset Pricing Model 2 Jun 2011.xls XLS spreadsheet
J-5 Processor PWS Template revised 10 May 11.docx DOCX document
J-4 DD254 Processor Capacity Services 2 Jun 11.doc DOC document
J-10 IBM System P Chipset Pricing Model 2 Jun 2011.xls XLS spreadsheet
HC1028-11-R-0104.doc DOC document
J-2 Requirements Document revised 11 May 11.doc DOC document
J-9 SPARC Chipset Pricing Model 2 Jun 2011.xls XLS spreadsheet
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT 0002 - Questions and Answers for 006 through 025 for RFP HC1028-11-R-0104

QUESTION #
006
DOCUMENT
J-1 SOO, revised 11 May 11
PAGE
3 of 3
SECTION NO.
4.0
SECTION NAME
Technology Refresh Program
SECTION TEXT
“The Government can decide to refresh hardware based on functions and technology updates, at any point in time during the first five years.”
QUESTION
If the Government is not buying hardware, but rather capacity services or “processor infrastructure services” as stated in the Scope in Section 2, how does the Government intend to “refresh hardware?”
ANSWER
When the Government decides to tech refresh capacity, a new call order will be issued. The Government will migrate to the new capacity and cancel the original call order.
QUESTION #
007
DOCUMENT
J-2 Requirements Document, revised 11 May 11
PAGE
4 of 36
SECTION NO.
1.3.1
SECTION NAME
Maintenance Response and Repair Time
SECTION TEXT
“The offeror will provide a multi-level solution for response after being notified by the Government,…. Each orderable system will be identified to a level of response based on Government need.”
QUESTION
The CLIN list only identifies hardware tiers, and not an option for a response level that the government will stipulate. How would Offerors accommodate the varying government needs in a constant price structure?
ANSWER
The Offeror’s multi-level solution must meet the availability requirement (99.95%) in a constant price structure.
QUESTION #
008
DOCUMENT
J-2 Requirements Document, revised 11 May 11
PAGE
6 of 36
SECTION NO.
1.4.3
SECTION NAME
Asset Management
SECTION TEXT
“An established process for handling asset recovery and redeployment shall be developed by the offeror.”
QUESTION
Since the Government can cancel and place Call Orders at any time, what is the need for this process?
ANSWER
It is the offeror’s responsibility to reclaim/recover the physical assets from a canceled call order.
QUESTION #
009
DOCUMENT
J-2 Requirements Document, revised 11 May 11
PAGE
6 of 36
SECTION NO.
3.1
SECTION NAME
Capacity
SECTION TEXT
“Provide provisioning servers to support the infrastructure . “
QUESTION
1. Will the Government order the provisioning servers or is it expected they be included in the overall Capacity rate?

2. Are the provisioning server(s) required for the Z Chipset?

3. If so, will the Government order the provisioning servers for the Z Chipset or is it expected they be included in the overall Capacity rate?

ANSWER
1. Provisioning servers should be included in the overall Capacity rate.

2. Provisioning servers are not required for the Z Chipset.

3. Provisioning servers are not required for the Z Chipset.

QUESTION #
010
DOCUMENT
J-2 Requirements Document, revised 11 May 11
PAGE
6 of 36
SECTION NO.
3.3
SECTION NAME
Capacity
SECTION TEXT
“Provide IBM Mainframe Capacity Backup (CBU) feature for the temporary activation of Central Processors for Disaster Recovery. Annually, DISA routinely conducts 50-70 days of testing for each of the two sites. Testing days will be included in the processor utility service. Invocation fees will be identified and priced separately.”
QUESTION
1. Are these two sites Mechanicsburg and Ogden?

2. Are these to be separate machines from production machines?

ANSWER
1. Disaster recovery site locations and number of sites will not be identified. J2, Requirements Document, para 3.3 and J-5, PWS para 6.3.4 is revised.

2. Yes, the machines for disaster recovery must be separate from production machines.

QUESTION #
011
DOCUMENT
J-2 Requirements Document, revised 11 May 11
PAGE
7 of 36
SECTION NO.
5.0, 5.1, 5.2
SECTION NAME
Release Management

SECTION TEXT

QUESTION
1. Do these subsections include all mainframes OS’s?

2. Would the Government specifically state what is required by the offeror as it pertains to Mainframe OS (z/OS, z/VM, Red Hat and SuSE on Linux on System z) for Sections 5.0, 5.1, and 5.2?

ANSWER
1. Section 5.1 and 5.2 does not apply to mainframe OS. Section 5.3 does apply to mainframe OS. J-2, Requirements Document, para 5.3 has been added. J-5, Requirements Document, para 6.5.2 has been revised slightly.

2. Section 5.1 and 5.2 does not apply to mainframe OS. Section 5.3 does apply to mainframe OS. J-2, Requirements Document, para 5.3 has been added. J-5, Requirements Document, para 6.5.2 has been revised slightly.

QUESTION #
012
DOCUMENT
J-2 Requirements Document, revised 11 May 11
PAGE
8 of 36
SECTION NO.
6.3
SECTION NAME
Facilities
SECTION TEXT
“Equipment will be connected to BAS system for control and monitoring”
QUESTION
What is the BAS system?
ANSWER
BAS is BioAnalytical System. J-2, Requirements Document, para 6.3 and J-5, PWS, para 6.8.2.3 have been revised.
QUESTION #
013
DOCUMENT
J-2 Requirements Document, revised 11 May 11
PAGE
10 of 36
SECTION NO.
13.2
SECTION NAME
Call Order Management System
SECTION TEXT
“This system will be utilized to create and place call orders”
QUESTION
Will this system be used by the Offeror after receipt of a “Call Order” from DISA or will DISA have direct access to the Call Order management System?
ANSWER
DISA will have direct access to the Call Order Management System.
QUESTION #
014
DOCUMENT
J-2 Requirements Document, revised 11 May 11
PAGE
11 of 36
SECTION NO.
13.2.2
SECTION NAME
Call Order Management
SECTION TEXT
“The offeror call order management system will manage excess hardware, and software licenses. Excess hardware and software will be defined as any hardware and/or software that has received a 'cancelation' request via the call order process. This equipment will be marked in the call order management system appropriately to include cancelation date and date removed from DISA location.”
QUESTION
What is the purpose of this subsection?

“Excess hardware and software licenses” will not be owned by the Government, so what is the necessity of tracking them?

ANSWER
In order for the Government to verify the vendor billing against call order cancellation dates, the Offeror must maintain the configuration management files for what has been deployed.
QUESTION #
015
DOCUMENT
J-2 Requirements Document, revised 11 May 11
PAGE
11 of 36
SECTION NO.
13.2.2
SECTION NAME
Call Order Management System
SECTION TEXT
“After contract award, contractor will collaborate with DISA to finalize format and information required.”
QUESTION
Does the Call Order Management System need to be fully operational at the Proof of Concept?
ANSWER
Offerors must be able to demonstrate the Call Order Management System at the Proof of Concept.
QUESTION #
016
DOCUMENT
J-2 Requirements Document, revised 11 May 11
PAGE
15 of 36
SECTION NO.
16.4 and 16.5
SECTION NAME
Security
SECTION TEXT
16.4: “…the media will be retained by the government.” and 16.5: “…the media may or may not be returned to the Contractor in an unusable state.”
QUESTION
Will the media be retained by the government or not and under what circumstances?
ANSWER
When hardware is no longer required, the Government will ensure the media (tapes, hard drives, mass storage devices, etc.) is sanitized or destroyed in accordance with appropriate regulations. If the media cannot be sanitized and rendered to the unclassified level, the media may or may not be returned to the Contractor in an unusable state. This process is to ensure the protection of controlled both sensitive but unclassified and classified information. J-2 – Processor Requirements Document, para 16.4 is revised accordingly. J-5 PWS, para 13.3 is revised accordingly.
QUESTION #
017
DOCUMENT
J-2 Requirements Document, revised 11 May 11
PAGE
16 of 36
SECTION NO.
16.7
SECTION NAME
Security
SECTION TEXT
“IAW DoD Cybercom USB Flash Media Communication Tasking Order (CTO) 10-084, USB Flash Media/Thumb drive devices are prohibited in DoD”
QUESTION
Please provide a hyperlink or reference to where the CTO can be found.
ANSWER
Requires additional information that the govt will publish as soon as it is resolved.
QUESTION #
018
DOCUMENT
J-2 Requirements Document, revised 11 May 11
PAGE
16 of 36
SECTION NO.
16.8.2
SECTION NAME
Security
SECTION TEXT
“Security Managers will submit requests for investigative service to DISA Security (MPS6) utilizing the attached format”
QUESTION
Where is the attached format?
ANSWER
The format will be provided at contract award. J-2, Requirements Document, para 16.8.2 is revised accordingly. J-5, PWS, para 13.7.2 is revised accordingly.
QUESTION #
019
DOCUMENT
J-2 Requirements Document, revised 11 May 11 and J-6 IBM System z Chipset Pricing Model
PAGE
23 of 36
SECTION NO.
J-2 Attachment 2 and J-6 All Scenario Tabs
SECTION NAME
System Z Tier Definitions
SECTION TEXT
The J2 Attachment 2 specifies Tier 4 as having >2,500 MIPS.
QUESTION
The Evaluation scenario tabs of the J6 show a quantity of 200 MIPS in Tier 4 in several months.

Please explain how this could be if Tier 4 by definition has a minimum of 2,500 MIPS?

ANSWER
J-6 All scenario tabs are revised for Tier Zero and Tier 4.
QUESTION #
020
DOCUMENT
J-5 Processor PWS Template revised 10 May 11.docx
PAGE
8 of 31
SECTION NO.
Section 6.2.2.5.1 and Section 6.2.4
SECTION NAME
Template Submitted as a Draft for Offeror to Work From

SECTION TEXT

QUESTION
Document goes from 6.2.2.5.1 to 6.2.4. There is no 6.2.3. Is something missing?
ANSWER
Para 6.2.3 was inadvertently left out. J-5 PWS is revised accordingly.
QUESTION #
021
DOCUMENT
J-6 IBM Chipset Pricing Model 2 Jun 2011
PAGE
Tab “Evaluation Price – All Scenarios”

SECTION NO.

SECTION NAME

SECTION TEXT
CLINS 1001AA through AE, 1002AA through AP, and 1005AA through AC
QUESTION
The formula for all months in CLINs 1001AA-AE, 1002AA-AP, and 1005AA-AC seem to contain an error. Please review the formulas as they pertain to Scenario 3. As an example, the formula in cell E4 contains a reference to cell EVALUATION PURPOSES - Scenario3'!AL4 that should reference cell EVALUATION PURPOSES - Scenario3'!E4. Similar errors seem to occur for all months and all CLINs in the referenced set.
ANSWER
J-6 IBM Chipset Pricing Model has been revised to correct the error.
QUESTION #
022
DOCUMENT
HC1028-11-R-0104
PAGE
23 and SLINs 1001 AA – 1001 AE
SECTION NO.
Section J-2 and Section J-6
SECTION NAME
Requirements Document – Processor Environment
SECTION TEXT
Characteristic – Tiers 1-4
QUESTION
Section J-2 page 23 describes the characteristics of the System z Tier Definitions as having four tiers. The CLIN/SLIN structure for System z in Section J-6 has five tiers (1001 AA – 1001 AE). Which is correct?
ANSWER
J-6 IBM Chipset Pricing Model has been revised to correct the error.
QUESTION #
023
DOCUMENT
HC1028-11-R-0104
PAGE
50 of 75
SECTION NO.
Section L.7.1.3
SECTION NAME
Section F
SECTION TEXT
“Proposed Delivery Schedule. If Offerors propose an alternative schedule, the government may not accept or evaluate this alternative, unless it is in the best interest of the government. The Offeror must propose their alternative delivery schedule by completing the blanks in Section F of the solicitation.”
QUESTION
How can offerors propose an alternate schedule of Section F if the RFP says N/A for the delivery schedule?
ANSWER
The “Proposed Delivery Schedule” in Section F is automatically generated by our system and is based on the CLINs/SLINs. At contract award, Section F will reflect the effective dates for the base period and

option years for the CLINs/SLINs.

Para L.7.1.3 incorrectly references Section F. Per J-2, Requirements Document, para 10.2 and J-5, PWS, para 6.2.4.2 the Government requires 30 day delivery of capacity by issuance of a Call Order. Offerors will be evaluated for their ability to deliver capacity within 30 days, per Section M002, "Evaluation of Offers", Paragraph B, Subfactor 2, subparagraph 2.3. If offerors propose an alternate schedule, they need to include that in their PWS response.

Para L.7.1.3 has been reserved.

QUESTION #
024
DOCUMENT
HC1028-11-R-0104
PAGE
70 of 75
SECTION NO.
Section M Subfactor 4
SECTION NAME
Release Management

SECTION TEXT

QUESTION
All other subfactors say “specifically, the evaluators will consider…” but this subfactor does not. Was this an oversight?
ANSWER
No.
QUESTION #
025
DOCUMENT
Attachment J-2

PAGE

SECTION NO.
1.3.2.1, 1.3.2.2, and 1.3.2

SECTION NAME

SECTION TEXT

QUESTION
The first and third paragraphs make reference to paragraph 3.2.1, 3.2.3, and 2.2.2; however, there is no section with that number in the document.
ANSWER
J-2, Requirements Document, paras 1.3.2.1, 1.3.2.2, and 1.3.2.3 are revised accordingly. J-5, PWS, 6.2.2.1, 6.2.2.2.1, 6.2.2.3, and 6.2.2.4.2 are revised accordingly.