AMD 0001 HC102811R0104.doc
DOC document 183 KB Posted
- Attached to
- Processor Capacity Services
- Solicitation number
- HC1028-11-R-0104
- Issued by
-
Defense Information Systems Agency
About this file
Amendment 0001 SF 30
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
The following have been modified:
LIST OF ATTACHMENTS
ATTACHMENT
DESCRIPTION
J-1
Statement of Objectives (SOO)
J-2
Requirements Document
J-3
Quality Assurance Surveillance Plan (QASP)
J-4
DD Form 254 – Contract Security Classification Specification
J-5
Performance Work Statement (PWS) Template
J-6
CLIN 0001 - IBM System Z Pricing Model (Excel)
J-7
CLIN 0002 - X-86 Pricing Model (Excel)
J-8
CLIN 0003 - Itanium Pricing Model (Excel)
J-9
CLIN 0004 - SPARC Pricing Model (Excel)
J-10
CLIN 0005 - IBM System P Pricing Model (Excel)
J-11
Question/Answer Submission Template
SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS
The following have been modified:
INSTRUCTIONS TO OFFERORS
Section L
INFORMATION TO OFFERORS AND INSTRUCTIONS FOR PROPOSAL PREPARATION
1.0 Program Structure and Objectives
The purpose of this contract is to obtain reliable, responsive, and cost effective processor infrastructure services of “on-demand” processing capabilities for specified chipset architecture in both DISA and other DISA-approved locations, which are both in the continental United States (CONUS) and outside of the continental United States (OCONUS). DISA's goal is to obtain a dynamically scalable processing capability utilizing an on-demand service approach, for new equipment, that will readily adjust to changes in processing and throughput requirements, both increases and decreases, and is priced on a utility ("as used") basis or tiered structure.
The service provider will acquire, install, deinstall, transport, configure, and provide the necessary hardware (including cabinets/racks/cabling/cable management/PDUs), hardware maintenance, operating system software, VMWare, as well as, any other software required for the offeror solution to operate, and services to support the processor infrastructure associated with this contract. The Government will maintain day-to-day operational control of the processing environment and complete oversight responsibility. This operational control includes the installation of all software updates after the initial delivery. However, all operating system software, VMWare, as well as, any other software required for the offeror solution to operate, maintenance, and licensing shall be included under this contract.
2.0 General Instructions
(a) This section of the Information to Offerors provides general guidance for preparing proposals, as well as, specific instructions on the format and content of the proposal. The Offeror's proposal must include all data and information requested by the RFP and must be submitted in accordance with these instructions. The offer must be compliant with the requirements as stated in the Statement of Objectives (SOO) and Requirements Document. Non-conformance with the instructions provided in this Information to Offerors may result in an unfavorable proposal evaluation.
(b) The proposal should be clear, concise, and must include sufficient detail for effective evaluation and for substantiating the validity of stated claims. The proposal should not simply rephrase or restate the Government's requirements but rather provide a convincing rationale to address how the Offeror intends to meet these requirements. Offerors should assume that the Government has no prior knowledge of their facilities and experience and will base its evaluation on the information presented in the Offeror's proposal.
(c) Elaborate brochures or documentation, binding, detailed art work, or other embellishments are unnecessary and are not desired.
(d) The proposal acceptance period is specified in Section A of the solicitation. The Offeror must make a clear statement in Section A of the proposal documentation volume that the proposal is valid through this date.
(e) In accordance with FAR Subpart 4.8 (Government Contract Files), the Government will retain one copy of all unsuccessful proposals. Unless the Offeror requests otherwise, the Government will destroy extra copies of such unsuccessful proposals.
(f) Please note: The Government anticipates conducting discussions as part of the evaluation process, but reserves the right to award without discussions.
2.1 General Information
2.1.1. Point s of Contact
The Contracting Officer (KO), Anne Hellman (Anne.Hellman@disa.mil), and Contract Specialist (CS), Lisa O’Donnell (Lisa.ODonnell@disa.mil), are the only points of contact for this procurement. Address any questions or concerns you may have to the KO and CS. Requests for clarification must be sent electronically to the KO and CS at the email addresses located in Section A of the solicitation. All questions must be submitted using the template provided as Atch J-11, Question/Answer Submission Template.
2.1.2. Debriefings
The KO and CS will promptly notify Offerors of any decision to exclude them from the competitive range; whereupon, they may request and receive a debriefing in accordance with FAR 15.505. Offerors excluded from the competitive range may request a pre-award debriefing or they may choose to wait until after the source selection decision to request a post-award debriefing. However, Offerors excluded from the competitive range are entitled to no more than one debriefing for each proposal. The KO and CS will notify unsuccessful Offerors in the competitive range of the source selection decision in accordance with FAR 15.506. Upon such notification, unsuccessful Offerors may request and receive a debriefing. Offerors desiring a debriefing must make their request in accordance with the requirements of FAR 15.505 or 15.506, as applicable.
2.1.3. Discrepancies
If an Offeror believes that the requirements in these instructions contain an error, omission, or are otherwise unsound, the Offeror should immediately notify the KO or CS in writing with supporting rationale, as well as, the remedies the Offeror is asking the KO or CS to consider as related to the omission or error. The Offeror is reminded that the Government reserves the right to award this effort based on the initial proposal, as received, without discussion. This reservation includes matters of additional or substitute pages of the initial proposal.
2.1.4. Electronic Reference Documents
All referenced documents for this solicitation are available on the Federal Business Opportunities (FedBizOpps) web site at http://www.fedbizopps.gov. Potential Offerors are encouraged to subscribe for real-time e-mail notifications when information has been posted to the FedBizOps website for this solicitation. Also, potential Offerors must also be registered on the DITCO Contracting Opportunities web site, https://www.ditco.disa.mil/dcop. If the Offeror has an existing account (i.e. registered with DITCO for a prior solicitation) it is not necessary to re-register. The Offeror may use that existing account to upload this proposal. If the Offeror is required to register on the DITCO web site, during the registration process, choose the option for “The solicitation requires offeror registrations for eligibility.” The Offeror will then be prompted to enter the Request for Proposal (RFP) number. The RFP number entered at this point is only used to help DITCO prioritize the order in which to review and approve the registration requests. Upon completion of the on-line registration process, a DITCO representative will review and approve the registration request before the Offeror will be given access to the protected areas of the web site. As soon as the registration has been approved, an email will be sent to the email address of the person who registered. The email will contain a user id and password that will be needed when uploading proposals. The approval of the registration request usually takes about one business day. This registration process allows DITCO to precisely track when proposals are uploaded (or attempted to be uploaded). Offerors are strongly encouraged to register a minimum of one week prior to uploading a proposal to ensure the proposal upload is accomplished by the closing date and time. Offerors should also attempt to upload their proposal as early as possible to ensure no problems arise at the last minute. If you have any problems, please contact the DITCO customer service center at (618)229-9333.
In order to respond to this solicitation, the Offeror must upload a complete proposal to the DITCO web site at https://www.ditco.disa.mil/dcop no later than the time and date specified in Section A. It will be necessary to use a web browser with 128-bit (domestic strength) encryption. Secure Sockets Layer (SSL), ensuring the confidentiality of the submission, will protect the proposal submission web session. The DITCO Contracting Opportunities web site provides a link for Offerors to test the upload process. This test link can be found on the web site’s home page, https://www.ditco.disa.mil/dcop, in the right side menu under the heading, Test the Upload Process, RFP Number, HC1028-11-R-0104. If you have any problems the DITCO Customer Service Center at (618) 229-9333. The DISA Computing Services Directorate (CSD) Information Technology (IT) Engineering Support ServicesFedBizOpps web page is http://www.fedbizopps.gov/ and https://www.ditco.disa.mil/dcop.
2.1.6 Communications
Exchanges of source selection information between Government and Offerors will be controlled by the contracting officer and/or contract specialist. Formal communications such as requests for clarification and/or information concerning this solicitation should be submitted by electronic mail addressed to each of the following: Anne.Hellman@disa.mil and Lisa.ODonnell@disa.mil. Email may be used to transmit such information to Offerors only if the email can be sent and received encrypted and includes “Source Selection Information – See FAR 2.101 & 3.104” in the Subject line.
2.2 Organization/ Page Limits
The Offeror must prepare the proposal as set forth in the Proposal Organization Table (Table 2.2 below). The titles and contents of the volumes will be as defined in this table, all of which must be within the required page limits and with the number of copies as specified in Table 2.2.
Table 2.2 - Proposal Organization
| VOLUME |
| RFP Paragraph |
Number
| VOLUME TITLE |
| PAGE LIMIT |
I
| Executive Summary |
| 10 |
II
Section L & RFP Attachment J-5
| Technical/Management - Response to SOO (PWS Template) |
| 75 pages |
III
| Relevant Past Performance |
| 40 pages |
Complete Attachment L-3 for a minimum of two references for the offeror/prime, teaming partner, and/or joint venture partner (within the same division or cost center) and a minimum of two references for each subcontractor as stated in L-2 para b. Can not exceed a total of 10 maximum, , 4 pages each
IV
| Cost/Price |
| No page limit |
V
| Contract Documentation |
| No page limit |
Proof of Concept
3 days
2.2.1 Page Limitations
Page limitations will be treated as maximums. If exceeded, the excess pages will not be read or considered in the evaluation of the proposal and excess paper copies will be returned to the Offeror as soon as practicable. Page limitations may be placed on responses to Evaluation Notices (ENs). The specified page limits for EN responses will be identified in the letters forwarding the ENs to the Offerors. Each page will be counted except the following: Cover pages, tables of contents, tabs, glossaries.
2.2.1.1. Page Size and Format
(a) Pages should be typed with 1.5 line spacing. Except for the reproduced sections of the solicitation document, the text size will be no less than 10 point. Tracking, kerning, and leading values should not be changed from the default values of the word processing or page layout software. Use at least 1 inch margins on the top and bottom and ¾-inch side margins. Pages should be numbered sequentially by volume. These page format restrictions also apply to responses to ENs.
(b) Legible tables, charts, graphs and figures may be used wherever practical to depict organizations, systems and layout, implementation schedules, plans, etc. These displays should be uncomplicated, legible, and may not exceed 11 by 17 inches in size. For tables, charts, graphs and figures, the text should be no smaller than 10 point.
2.2.2 Cost or Pricing Information
All cost or pricing information should be addressed ONLY in the Cost/Price Proposal and Contract Documentation Volumes. Cost trade‑off information, work‑hour estimates, and material kinds and quantities may be used in other volumes only as appropriate for presenting rationale for alternatives or design and trade‑off decisions.
2.2.3 Classified Information
No classified requirements exist for Processor Capacity Services. Security requirements, however are outlined in the DD254.
2.2.4 Cross-Referencing
To the greatest extent possible, each volume should be written on a stand‑alone basis so that its contents may be evaluated with a minimum of cross referencing to other volumes of the proposal. Information required for proposal evaluation which is not found in its designated volume will be assumed to have been omitted from the proposal. Cross-referencing within a proposal volume is permitted where its use would conserve space without impairing clarity.
The Offeror should fill out the cross reference matrix at Attachment L-1 of this Instruction to Offerors indicating the proposal reference information as it relates to the RFP, SOO, Requirements Document, PWS, and CLIN/SLIN numbers references found therein.
2.2.5 Glossary of Abbreviations and Acronyms
Each volume should contain a glossary of all abbreviations and acronyms used, and with an explanation for each. Glosaries do not count against the page limitations for their respective volumes.
2.3 Electronic Offers
a. The Government will evaluate ONLY softcopy versions of the Offeror’s proposal over the Internet using a web-based source selection tool. Use of the software and procedures described in this section will reduce the amount of time and effort needed by the Government to receive and install proposals into an electronic evaluation system and will help to ensure that proposals are suitable for reading electronically. Information regarding electronic products listed herein should not be construed as Government endorsement for such products.
b. As indicated above, and except as otherwise identified, all proposals must be submitted in Adobe Acrobat PDF, Version 9.0 or newer. Offerors may use the Acrobat Link feature for cross-references that are electronically linked, and linked files must be contained in the same directory. The Acrobat Bookmark feature may also be used for document navigation; however use of the Acrobat Notes feature is prohibited. Offerors may use the ‘Optimize’ feature of Adobe Acrobat to decrease file size and prepare them for viewing on the Internet. Offerors are encouraged to limit file size to 1MB to reduce delay in downloading proposals over the Internet.
The Offeror should prepare a “readme” file, which describes the organization and layout of the proposal’s softcopy submission. Exceptions to Adobe Acrobat. Proposal documents required to be submitted in other than Adobe Acrobat PDF media are described in paragraph above.
Page Numbering. The Offeror must use a standard page numbering system to facilitate proposal references. Consecutive page numbering within sections is preferred, e.g. Page I-2-5, indicates Part I, Section 2, page 5. Charts, graphs and other insert materials should be page-numbered as part of the page numbering system.
3.0 Volume I ‑ Executive Summary
In the executive summary volume, the Offeror will provide the following information:
3.1 Narrative Summary
The narrative summary of the entire proposal should be concise, to include addressing the significant risks, and highlighting any key or unique features, excluding cost/price. . Discussion of the salient features should tie in with Section M evaluation factors/subfactors in the following order: Technical Management Factor 1 -- Subfactor 1 (Technical Solution); Subfactor 2 (Performance Availability); Subfactor 3 (Ordering Process); and Subfactor 4 (Release Management); Past Performance Factor 2 and Cost/Price Factor 3. Any summary material presented here will not be considered as meeting the requirements for any portions of other volumes of the proposal.
3.2 Table of Contents
Include a master table of contents of the entire proposal.
4.0 Volume II – Technical/Management
4.1 General
The Technical/Management Volume should be specific and complete. Legibility, clarity, and coherence are very important. Your responses will be evaluated against the technical/management subfactors defined in Section M, Evaluation Factors for Award. Using the instructions provided below, provide as specifically as possible the actual methodology you would use for accomplishing/satisfying these subfactors. All the requirements specified in the solicitation are mandatory. By your proposal submission, you are representing that your firm will perform all the requirements specified in the solicitation. It is not necessary or desirable for you to tell us so in your proposal. Do not merely reiterate the objectives or reformulate the requirements specified in the solicitation.
4.2 Format and Specific Content
Please construct and present your responses according to the PWS template. Ensure your responses in the PWS template address the following:
Volume II-
Technical/Management -Factor 1
Subfactor 1: Technical Solution
1.1 Chipset
1.2 Capacity Service
1.3 Integration/Interfaces
1.4 Facilities - Racks
1.5 Quality
Subfactor 2: Performance/Availability
2.1 24x7x365 problem escalation/resolution support
2.2 99.95% availability
2.3 Ability to delivery capacity within 30 days
2.4 Response time
2.5 Support after hours, weekends, and or holidays
2.6 Process to track and address escalation procedures for technical problems, customer complaints, requests for clarification or other requests for information.
Subfactor 3: Ordering Process
3.1 Ease of Use
3.2 All Government required data is addressed
3.3 The Offeror’s understanding of the contract requirements, and also the level of “out-of-the box” thinking demonstrating an innovative approach for the solution.
Subfactor 4: Release Management
4.1 Offeror approach and infrastructure provided to support centralized repository for release of CSD-standard O/S images.
4.2 Offeror approach to facilitate delivery of STIG-compliant O/S images as well as methods employed for collaboration between offeror and Government to ensure O/S images are compliant with CSD enterprise standards.
4.2.1 Technical/Management
In the Technical/Management volume, address your proposed approach to meeting or exceeding the minimum performance or capability requirements of each technical/management subfactor, as well as, the risks in your proposed approach in terms of technical/performance, cost, and/or schedule. Offerors should discuss any technical or cost efficiencies and advantages, if any, for keeping hardware longer than 3 years. The PWS is the Technical/Management volume. All information for your approach will be identified directly in the PWS template (RFP Attachment J-5).
4.2.1.1. Technical/Management Risk
Address technical/management risk by identifying those aspects of the proposal you consider to have the potential for disruption of schedule, increased cost, poor performance, the need for increased Government oversight, and/or the likelihood of unsuccessful contract performance. Classify each risk in accordance with the table below.
TABLE 4.1 – TECHNICAL/MANAGEMENT RISK RATINGS
| Rating |
| Description |
| Low |
| Has little potential to cause disruption of schedule, increased cost or degradation of performance. Normal Offeror effort and normal Government monitoring will likely be able to overcome any difficulties. |
| Moderate |
| Can potentially cause disruption of schedule, increased cost or degradation of performance. Special Offeror emphasis and close Government monitoring will likely be able to overcome difficulties. |
| High |
| Likely to cause significant disruption of schedule, increased cost or degradation of performance. Extraordinary Offeror emphasis and rigorous Government monitoring may be able to overcome difficulties. |
| Unacceptable |
| The existence of a significant weakness or combination of weaknesses that is very likely to cause unmitigated disruption of schedule, drastically increased cost or severely degraded performance. Proposals with an unacceptable rating are not awardable. |
Provide the rationale for each risk and its rating, including quantitative estimates of the impact on cost, schedule, and performance. Describe the impact of each identified risk in terms of its potential to interfere with or prevent the successful accomplishment of other contract requirements (e.g., SOO, PWS, or specification requirements), whether or not those requirements are identified as subfactors. Propose a realistic “workaround” or risk mitigators for identified risks that will eliminate or reduce risk to an acceptable level. Identify and classify any new risks introduced by such risk mitigation.
4.2.2 Proof of Concept. Offerors in the competitive range will be required to demonstrate their proposed solution to members of the SSET at the Offeror's own demonstration location. The Proof of Concept demonstration is at the offeror’s own expense. The Proof of Concept Demonstration is designed to validate the Offeror's solution in the following areas: Technical Solution, Performance Availability, Ordering Process, and Release Management. A detailed test plan, together with any government provided data required to be used in the demonstration, will be provided to each Offeror 14 calendar days prior to the demonstration. Offerors will be given up to three days to present their solution.
4.2.3 Volume II Organization
The Technical/Management volume II must be organized according to the following general outline:
(1) Table of Contents
(2) PWS Template
5.0 Volume III – Past Performance – Factor 2
5.1 General
Each Offeror must submit a past performance volume with its proposal, containing past performance information in accordance with the format contained in Attachment L-2, Past and Present Performance Information. This information is required on the Offeror and all subcontractors, teaming partners, and/or joint venture partners who are proposed to perform any percentage of the proposed effort based on the total proposed price or perform aspects of the effort the Offeror considers critical to overall successful performance. Offerors are cautioned that the Government will use data provided by each Offeror in this volume and data obtained from other sources in the evaluation of past performance.
Offerors may identify efforts for which they were the prime Offeror, teaming partner, or a significant subcontractor. Experience as a prime or teaming partner may carry more weight than experience as a subcontractor. Past efforts in which the Offeror was a teaming partner will not be evaluated unless the team arrangement met the definition in FAR 9.601(1): “Two or more companies form a partnership or joint venture to act as a potential prime Offeror.” Offerors submitting past performance efforts meeting this definition must be able to demonstrate how their performance on the effort directly contributed to the overall outcome. Experience as a teaming partner, as defined above and fully supported with information about the Offeror’s contributions, will carry equal weight to experience as a prime contractor.
Along with the information required in this paragraph, the Offeror must submit a consent letter executed by each subcontractor, teaming partner, and/or joint venture partner, authorizing release of adverse past performance information to the Offeror so the Offeror can respond to such information. For each identified effort for a commercial customer, the Offeror should also submit a client authorization letter, authorizing release to the Government of requested information on the Offeror's performance. See Attachments L-6 and L-7 for sample consent and client authorization letters.
5.2 Relevant Contracts
Submit information in accordance with the past performance information using the format contained in Attachment L-2, Past and Present Performance Information for the offeror/prime, teaming partner, and/or joint venture (within the same division or cost center) on a minimum of 2 recent (within the past two years from the date of the solicitation) contracts or orders in all task areas or two contracts or orders with substantial capacity services and /or processor capability. Also include Past and Present Performance Information on 2 recent contracts performed by each major or critical subcontractor. This information is required on the offeror/prime, teaming partner, and /or joint venture partners, and subcontractors proposed to perform at least 20% of the proposed effort based on the total proposed price, or perform aspects of the effort the offeror considers relevant to overall successful performance. The total of Past and Present Performance Information references will not exceed 10 of which 2 must be for the offeror/prime. Total page count will not exceed 40 pages. Include rationale supporting your assertion of relevance. For a description of the characteristics or aspects the Government will consider in determining recency and relevance, see Section M, provision M002 - Evaluation Factors, paragraph M002c - Past Performance Factor.
5.2.1 Specific Content
Offerors are required to explain what aspects of the contracts are deemed relevant to the proposed effort and to what aspects of the proposed effort they relate. This may include a discussion of efforts accomplished by the Offeror to resolve problems encountered on prior contracts, as well as, past efforts to identify and manage program risk. Merely having problems does not automatically equate to a limited or no confidence rating, since the problems encountered may have been on a more complex program, or an Offeror may have subsequently demonstrated the ability to overcome the problems encountered. The Offeror is required to clearly demonstrate management actions employed in overcoming problems and the effects of those actions in terms of improvements achieved or problems rectified. This may allow the Offeror to be considered a higher confidence candidate. For example, submittal of quality performance indicators or other management indicators that clearly support that an Offeror has overcome past problems is required. Categorize the relevant information into the specific technical/management subfactors and cost/price factor used to evaluate the proposal.
5.2.2 Organizational Structure Change History
Many companies have acquired, been acquired by, or otherwise merged with other companies, and/or reorganized their divisions, business groups, subsidiary companies, etc. In many cases, these changes have taken place during the time of performance of relevant past efforts or between conclusion of recent past efforts and this source selection. As a result, it is sometimes difficult to determine what past performance is relevant to this procurement. To facilitate this relevancy determination, include in this proposal volume a "roadmap" describing all such changes in the organization of your company. A pamphlet or other commercial document describing such reorganizations may suffice. As part of this explanation, show how these changes impact the relevance of any efforts you identify for past performance evaluation/performance confidence assessment. Since the Government intends to consider past performance information provided by other sources, as well as, that provided by the Offerors, your "roadmap" should be both specifically applicable to the efforts you identify and general enough to apply to efforts on which the Government receives information from other sources.
6.0 Volume IV - Cost/Price
6.1 General Instructions
6.1.1 Cost/Price Reasonableness
This section is to assist you in submitting information other than cost or pricing data that is required to evaluate the reasonableness of your proposed cost/price. Compliance with these requirements is mandatory and failure to comply may result in rejection of your proposal. Note that unreasonably low or high proposed costs or prices, initially or subsequently, may be grounds for eliminating a proposal from competition either on the basis that the Offeror does not understand the requirement or has submitted an unrealistic proposal. Additionally, unbalanced pricing poses an unacceptable risk to the Government and may be a reason to reject an Offeror’s proposal. Offers should be sufficiently detailed to demonstrate their reasonableness. The burden of proof for credibility of proposed costs/prices rests with the Offeror.
6.1.2 Cost/Price Information
Information beyond that required should not be submitted, unless you consider it essential to document or support your cost/price position. All information relating to the proposed price, including all required supporting documentation must be included in the section of the proposal designated as the Cost/Price volume. Under no circumstances should this information and documentation be included elsewhere in the proposal.
6.1.3 Cost or Pricing Information Requirements
In accordance with FAR 15.403-1(b) and 15.403-3(a), information other than cost or pricing data may be required to support price reasonableness. Information shall be provided in accordance with FAR 15.403-5. If, after receipt of proposals, the CO determines that there is insufficient information available to determine price reasonableness and none of the exceptions in FAR 15.403-1 apply, the Offeror shall be required to submit cost or pricing data.
6.1.4 Format for Cost and Pricing Data
Offeror should stringently follow the Government’s Schedule of Supplies or Services (Schedule B) construct and calculations and should not deviate from this format.
6.1.5 The virtualization tiers for the X-86 environment (Tier one and Tier Two) are meant to cover the virtual environment running VMWare software. Included in the tiers should be all costs to operate a VMWare environment (at the least to include, but not limited to Vsphere software licensing, 4 VIC licenses (primary and backup for NIPR and SIPR), and virtual OE licensing for Microsoft operating systems, Redhat Linux operating systems, SUSE Linux operating systems, and switching infrastructure components).
6.2 Volume Organization
The Cost/Price volume shall consist of a price/cost proposal outlining the proposed prices for each of the Contract Line Item Number (CLIN)/Sub-Contract Line Item Number (SLIN) in MS Excel Version 2000 or newer. The Government has provided a baseline ‘Pricing Models’ in Section B for the Offerors to utilize in pricing their proposal. Within the Section B ‘Pricing Models’, Offerors are required to provide monthly unit prices for all contract years for all CLINs/SLINs,on the worksheet tab entitled “Monthly Rates.” The provided “Monthly Rates” will be multiplied by the government provided ‘scenario’ quantities (as detailed in the three tabs within the pricing models) and weightings to arrive at a Total Evaluated Price on the model’s ‘Evaluation Summary’ tab.
7.0 Volume V ‑ Contract Documentation
7.1 Representations and Certifications
The purpose of this volume is to provide information to the Government for preparing the contract document and supporting file. The Offeror's proposal must include a signed copy of the solicitation and completion of Sections A through K.
7.1.1 Section A - Solicitation/Contract Form
Completion of blocks 15A and 16 and signature and date for blocks 17 and 18 of the Standard Form 33. Signature by the Offeror on the SF33 constitutes an offer, which the Government may accept. The "original" copy should be clearly marked under separate cover and should be provided without any punched holes.
7.1.2 Section B - Supplies or Services and Costs/Prices
Completed pricing information in Section B of the solicitation.
7.1.3 Section F - Deliveries or Performance
Proposed Delivery Schedule. If Offerors propose an alternative schedule, the government may not accept or evaluate this alternative, unless it is in the best interest of the government. The Offeror must propose their alternative delivery schedule by completing the blanks in Section F of the solicitation.
7.1.4 Section G - Contract Administrative Data
See RFP
7.1.5 Section H - Special Contract Requirements
See RFP
7.1.6 Section I - Contract Clauses
See RFP
7.1.7 Section K - Representations, Certifications, and other Statements of Offerors
Offerors are required to complete annual representations and certifications electronically via the Online Representations and Certifications Application (ORCA) website at http://orca.bpn.gov. After reviewing the ORCA database information, the Offeror verifies by submission of the offer that the representations and certifications currently posted electronically have been entered or updated within the last 12 months, are current, accurate, complete, and applicable to this solicitation (including the business size standard applicable to the NAICS code referenced for this solicitation), as of the date of this offer and are incorporated in their offer by reference.
7.2 Exceptions to Solicitation Requirements
Offerors are required to meet all solicitation requirements, such as terms and conditions, representations and certifications, and technical requirements, in addition to those identified as evaluation factors or subfactors. Failure to meet a requirement may result in an offer being ineligible for award. Offerors must clearly identify any exception to the solicitation terms and conditions and provide complete accompanying rationale. Each exception should be specifically related to each paragraph and/or specific part of the solicitation to which the exception is taken. Provide rationale in support of the exception and fully explain its impact, if any, on the performance, schedule, cost, and specific requirements of the solicitation. This information should be provided in the format and content of Table 7.2.
Table 7.2 - Solicitation Exceptions
Solicitation Document Page/ Paragraph Requirement/ Portion Rationale
| RFP, SOO, etc. |
| Applicable |
Page and Paragraph
Numbers
| Identify the requirement or portion to which exception is taken |
| Describe |
why the requirement can/will not be met
7.3 Other Information Required
7.3.1 Authorized Offeror Personnel
Provide the name, title, and telephone number of the company/division point of contact and an alternate regarding decisions made with respect to your proposal and who can obligate your company contractually. Also, identify those individuals authorized to negotiate with the Government.
7.3.2 Company/Division Address, Identifying Codes, and Applicable Designations
Provide company/division's street address, county and facility code; CAGE code; DUNS code; TIN; size of business (large or small); and labor surplus area designation. This same information must be provided if the work for this contract will be performed at any other locations. List all locations where work is to be performed and indicate whether such facility is a division, affiliate, or subOfferor, and the percentage of work to be performed at each location.
7.3.3 Subcontracting Plan - Participation of Small Businesses (SB).
If the offeror is other than a small business, the offeror shall submit a Small Business Subcontracting Plan in accordance with FAR 52.219-9 that also identifies and specifies the extent of offeror's commitment to the participation of small businesses (SB), whether as joint venture members, teaming arrangement partners, or subcontractors. If applicable, submit a copy of your approved Master Plan. In the event the offeror has negotiated a comprehensive subcontracting plan pursuant to DFARS 219.702, the offeror must submit the information that identifies and specifies the extent of its commitment to the participation of SB. Vendors should attempt to meet the current Department of Defense (DoD) published Small Business Goals as follows: Small Business (SB)- 31.7%; Historically Underutilized Business Zone (HUBZONE) - 3.0%; Service-Disabled Veteran Owned Small Business (SDVOSB) -3.0%; Small Disadvantaged Business (SDB) - 5.0%; and Women Owned Small Business (WOSB) - 5.0%. Offerors should use these goals as guidelines and to propose the maximum extent of subcontracting possible. Offerors should also provide justification on areas where they do not meet the guidelines.
7.3.4 Required Submittals
The Offeror must provide the following submittals in response to the RFP:
1) Transmittal Letter, Form SF33, Solicitation, Offer and Award
2) Non-Disclosure Agreement for Offeror employees (Attachment J-4)
3) On-Line Representations and Certifications (www.bpn.gov/orca)
4) Section 508 - Offeror Certification – Not Applicable.
5) Cross-Reference Matrix
6) Past Performance Information Sheets
7) Technical/Management Document- Performance Work Statement (Section L, Paragraph 4.0 and RFP Attachment J-5)
8) Section B-Pricing Models (Attachments J-6 through J-10)
9) Subcontracting Plan
SECTION L ATTACHMENTS
Attachment L-1 Cross Reference Matrix
Attachment L-2 Past and Present Performance Information Format
Attachment L-3 Past Performance Information Sheet Format (requirement described in Attachment L-2)
Attachment L-4 Past Performance Questionnaire (requirement described in
Attachment L-2)
Attachment L-5 Sample Questionnaire Cover letter
Attachment L-6 SubOfferor/Teaming Partner Consent Letter for the Release of Past and Present Performance Information to the Prime Offeror
Attachment L-7 Client Authorization Letter
ATTACHMENT L-1
CROSS REFERENCE MATRIX
The offeror shall fill out the following Compliance and Cross Reference Matrix indicating the proposal reference information as it relates to the SOO/Requirements Document, PWS, CLIN numbers, Sections L and M references found therein, and the corresponding paragraph in the Technical volume which addresses the referenced item.
The offeror can also add rows to the matrix as they see fit to provide clarity to their submittal. If this matrix conflicts with any other requirement, direction, or provision of this solicitation, the other reference shall take precedence over this matrix. In addition, to the extent this matrix discloses details as to the extent or manner by which the Government intends to evaluate the offeror’s proposals for award, Section M references in the matrix are for information purposes only and the Government shall be obligated to evaluate proposals solely in conformance with the provisions of Section M of the solicitation.
SOO/
Requirements Document
| Desc. |
| CLIN |
| Section |
L
Instructions to Offerers Section
M
Factors
And
Subfactors
| Proposal |
| PWS |
| 1.0 thru 10.4, 12.0 |
| Technical Performance/Mgmt |
| 4.0 thru 4.2.1 |
| F1 |
| 1.0 thru 1.4.4 |
| Technical Performance/Mgmt |
| CLINs 0001 - 0005 |
| 4.0 thru 4.2.1 |
| SF1, SF2, SF4 |
| 13.0 thru 13.7 |
| Ordering/Payment Process |
| CLINs 0001 - 0006 |
| 4.0 thru 4..2.1 |
| SF3, |
| 11.0 thru 11.2 |
| Technical Assistance |
| CLINs |
| 13.8 thru 13.8.1.2 |
| Invoices |
| 14.0 thru 14.5 |
| Meeting Requirements |
| 15.0 thru 15.3 |
| Reporting Requirements |
| 16.0 thru 16.10 |
| Security/Information Assurance |
Past Performance
| 5.0 |
| F2 |
Cost/Price
| 6.0 |
| F3 |
ATTACHMENT L-2
Past and Present Performance Information Format
Volume III- Past Performance
a. Contents. The offeror must submit a Past Performance Volume containing the following:
1. Table of Contents
2. Summary Page describing the role of the offeror and each subcontractor, teaming partner, and /or joint venture partner that the offeror is required to provide Past Performance Information Sheets on in accordance with paragraph b. below.
3. Past Performance Information Sheets in accordance with Attachment L-3.
4. Subcontractor/Teaming Partner Consent Letters executed by each subcontractor, teaming partner, and/or joint venture partner, authorizing the release of past performance information so the offeror can respond to such information. A sample consent letter is Attachment L-6.
5. Client Authorization Letters for each identified effort for a commercial customer authorizing release to the Government of requested information on the offeror’s performance.
6. Organization Structure Change History—See paragraph e below.
b. Past and Present Performance Information Sheets. Submit information on contracts you consider most relevant in demonstrating your ability to perform the proposed effort. The offeror must submit Performance Information Sheets in accordance with the format contained in Attachment L-3. This information is required on the offeror/prime, teaming partners, and/or joint venture partners and subcontractors proposed to perform at least 20% of the proposed effort based on the total proposed price, or perform aspects of the effort the offeror considers relevant to overall successful performance.
The offeror must submit:
1. TWO - Performance Information Sheets (Attachment L-3) identifying active or completed contracts, either Government or commercial, for each prime, teaming partner, and/or joint venture partner (within the same division or cost center).
2. TWO- Performance Information Sheets (Attachment L-3) for each major or critical subcontractor. Each relevant contract must have been performed during the past 2 years from the date of issuance of this solicitation. Each Performance Information Sheet for each contract is limited to 4 pages. Offerors are cautioned that the Government will use data provided by each offeror in this volume and data obtained from other sources in the evaluation of past performance.
3. The total Performance Information sheets will not exceed ten (10)- two of which must be from the offeror/prime. Total page count will not exceed 40 pages.
c. Relevant Contracts. Submit information on contracts that you consider relevant in demonstrating your ability to perform the proposed effort. Include rationale supporting your assertion of relevance. For a description of the characteristics or aspects the Government will consider in determining relevance, see Section M, provision M002, paragraph (C)(2)(ii). Note that the Government generally will not consider performance on an effort that concluded more than 2 years prior to the issuance date of this solicitation. Offerors are required to explain what aspects of the contracts are deemed relevant to the proposed effort, and to what aspects of the proposed effort they relate. To clearly link the past performance information to the technical/management subfactors, the offeror should identify which contracts are relevant indicators of performance against a technical/management subfactor. Categorize the relevance information into the specific evaluation subfactors used to evaluate the proposal:
(1) Subfactor 1 - Technical Solution
(2) Subfactor 2 – Performance Availability
(3) Subfactor 3 – Ordering
(4) Subfactor 4 – Release Management
d. Specific Content. Offerors may include a discussion of efforts accomplished by the offeror to resolve problems encountered on prior contracts, as well as, past efforts to identify and manage program risk. Merely having problems does not automatically equate to a Limited or a No Confidence rating, since the problems encountered may have been on a more complex program, or an offeror may have subsequently demonstrated the ability to overcome the problems encountered. The offeror is required to clearly demonstrate management actions employed in overcoming problems and the effects of those actions, in terms of improvements achieved or problems rectified. This may allow the offeror to be considered a Substantial Confidence or Satisfactory Confidence candidate.
e. Organizational Structure Change History. Many companies have acquired, been acquired by, or otherwise merged with other companies, and/or reorganized their divisions, business groups, subsidiary companies, etc. In many cases, these changes have taken place during the time of performance of relevant present or past efforts or between conclusion of recent past efforts and this source selection. As a result, it is sometimes difficult to determine what past performance is relevant to this procurement. To facilitate this relevancy determination, include in this proposal volume a "roadmap" describing all such changes in the organization of your company. As part of this explanation, show how these changes impact the relevance of any efforts you identify for past performance evaluation/performance confidence assessment. Since the Government intends to consider present and past performance information provided by other sources, as well as, that provided by the offerors, your "roadmap" should be both specifically applicable to the efforts you identify and general enough to apply to efforts on which the Government receives information from other sources.
f. Questionnaires. The Government requests the offeror send Past Performance Questionnaires (Attachment L-4) to each of the Points of Contact (POCs) identified in the Past Performance Volume. POC should submit completed questionnaires (see Attachment L-4) DIRECTLY to the Government. Once the Past Performance Questionnaires are completed by the POCs; the information contained therein will be considered sensitive and will not be released to you, the Offeror. A cover letter for transmitting the questionnaire to each POC is provided.
g. Page Limitations. Page limitations will be treated as maximums. If exceeded, the excess pages will not be read or considered in the evaluation of the proposal and excess paper copies will be returned to the offeror as soon as practicable. Page limitations may be placed on responses to Evaluation Notices (ENs). The specified page limits for EN responses will be identified in the letters forwarding the ENs to the Offerors. Each page will be counted except the following: Cover pages, tables of contents, tabs, glossaries.
h. Page Size and Format. Pages should be typed with 1.5 line spacing. Except for the reproduced sections of the solicitation document, the text size will be no less than 10 point. Tracking, kerning, and leading values should not be changed from the default values of the word processing or page layout software. Use at least 1 inch margins on the top and bottom and ¾-inch side margins. Pages should be numbered sequentially by volume. These page format restrictions also apply to responses to ENs.
ATTACHMENT L-3
PAST PERFORMANCE INFORMATION SHEET FORMAT
Provide the information requested in this form for each contract/program (citation) being described. Provide frank, concise comments regarding your performance on the contracts you identify. Provide a separate completed form for each contract/program submitted. Limit the number of citations submitted and the length of each submission to the limitations set forth at paragraphs 5.0. thru 5.2.2, respectively, of Section L-III of this solicitation.
A.
Offeror Name (Company/Division):
CAGE Code:
DUNS Number:
(NOTE: If the company or division performing this effort is different than the offeror or the relevance of this effort to the instant procurement is impacted by any company/corporate organizational change, note those changes. Refer to the "Organizational Structure Change History" you provided as part of your Past Performance Volume.)
B.
Program Title:
C.
Contract Specifics:
1. Contracting Agency or Customer
2. Contract Number
3. Contract Type
4. Period of Performance
5. Initial Contract Cost/Price
6. Current/final Contract Cost/Price
7. Annual Contract $ Value _________________
8. If Amounts for 5 and 6 above are different, provide a brief description of the reason ________________________________________________________________________________________________________________________________________________________________ D.
Brief Description of Effort as __Prime or __Subcontractor
(Please indicate whether it was development and/or production, or other acquisition phase and highlight portions considered most relevant to current procurement)
E.
Completion Date:
1. Original date:
2. Current Schedule:
3. Estimate at Completion:
4. How Many Times Changed:
5. Primary Causes of Change:
F.
Primary Customer Points of Contact: (For Government contracts, provide current information on both individuals. For commercial contracts, provide points of contact fulfilling these same roles.)
1. Program Manager:
Name
Office
Address____________________
Telephone ____________________
2. Contracting Officer:
Name
Office
Address____________________
Telephone ____________________ G. Address any technical/management (or other) area about this contract/program considered unique.
H.
For each of the applicable subfactors under the technical/management factor in Section M, illustrate how your experience on this program applies to that subfactor.
I.
Specify, by name, any key individuals who participated in this program and are proposed to support the instant procurement. Also, indicate their contractual roles for both procurements.
J. Include relevant information concerning your compliance with subcontracting plan goals for small disadvantaged business (SDB) concerns, monetary targets for SDB participation, and notifications submitted under FAR 52.219-25, Small Disadvantaged Business Participation Program—Disadvantaged Status and Reporting.
K.
Include relevant information concerning your compliance with FAR 52.219-8, Utilization of Small Business Concerns, on the contract you are submitting.
L.
Identify whether a subcontracting plan in accordance with FAR 52.219-9, Small Business Subcontracting Plan, was required by the contract you are submitting. If one was required, identify, in percentage terms, the planned versus achieved goals during contract performance. If goals were not met, please explain.
M.
Describe the nature or portion of the work on the proposed effort to be performed by the business entity being reported here. Also, estimate the percentage of the total proposed effort to be performed by this entity and whether this entity will be performing as the prime, subcontractor, or a corporate division related to the prime (define relationship).
N. Identify any Earned Value Management (EVM) or…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .