This is a Questions and Answers document for RFQ HC101925R0007, a Defense Information Systems Agency (DISA) Pacific (PAC) video wall solicitation.

The solicitation concerns a new video wall requirement with no incumbent contractor. Prospective contractors requested clarification on site visit availability, existing infrastructure, and control system integration. The government confirmed that no site visits will be scheduled. Technical details provided include: mounting surfaces and structural support are documented in attached "AV Wall Drawing"; cables can be routed under the raised false floor throughout the facility; and the current control system is AMX, which will be replaced by an Extron system in a separate project with equipment to be installed in the Storage room (Section D-1, Sheet 35, drawing A-110). The facility includes three video wall locations: East Video Wall, West Video Wall, and an unlabeled wall, with dimensions of 11'10" height and varying widths (41'6" to 45'). Architectural drawings are provided showing wall sections, structural details, raised floor construction, and mechanical duct routing specifications. Contractors must rely on provided documentation rather than on-site assessment to develop technical solutions and cost estimates.

View the file

Other files

Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFQ HC101925R0007 – DISA-PAC VIDEO WALL – Questions and Answers (Q+A)

Q1: We would like to know if this is a brand new contract or if there is (was) an incumbent performing these services.

A1: This is a new requirement. Refer to the table at the top of page 25 of the solicitation

(PWS).

Q2: If not brand new, could you please provide the current / previous contract number?

A2: N/A. Refer to the table at the top of page 25 of the solicitation (PWS).

Q3: To ensure our technical solution and incidental installation costs are as accurate as possible, our technical team has requested a site visit.

A3: There is no scheduled site visit.

Q4: Confirm the existing mounting surfaces and structural support for the new video walls.

A4: Please see attached drawing, “AV Wall Drawing”.

Q5: Verify cable pathway feasibility for the new fiber and HDMI runs.

A5: The entire area has a false floor so cables can be run under the raised floor.

Q6: Review the current Extron control system integration points.

A6: The Extron control system is not yet installed. The current control system is an AMX and will be replaced by an Extron system in a separate project. The Extron control system equipment will be installed in the “Storage” room in Section D-1 of the attached drawing on Sheet 35 (A-110).

Q7: Could you please let us know if there is a scheduled site visit for this solicitation or if a walkthrough can be arranged for our team?

A7: There is no scheduled site visit.

Q8: If a visit is possible, please let us know the required lead time for security vetting so we can provide the necessary personnel details for access to Building 77.

A8: There is no scheduled site visit.

228 231

11' 10"

11' 10"

45'

41' 6"10' 6"

229EAST VIDEO WALL

WEST VIDEO WALL

18 RFQ HC101925R0007 Q+A 1-8_4.24.26.pdf
AV Wall Drawing (002).pdf
DNC Drawing
AV Wall Section
Pages from DISA_Drawings_Final_20110905-3.pdf

File details come from the government source that posted it. Updated .