- HEMP Protected Fiber Optic Cable System
- Solicitation number
- HC101318R0016
- Issued by
-
Defense Information Systems Agency
About this file
RFP amendment 1. The RFP includes attached files for revised PWS, price template, and Q&A. The RFP also extends the proposal due date to 11 July 2018. The attachments will be uploaded separately also (outside of the RFP amendment 0001 PDF).
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The pupose of this amendment is to:
a. Revise PWS 6.7 and 6.1.2 to address the installation of the new fourth node.
b. Remove “priced per w avelength of service” from the price template for CLINs 5 thru 8 including out-years.
c. Answ er questions received from industry as of 6 June 2018 to 12 June 2018
d. Update PWS 11 to reflect that secret clearance is required.
e. Extend the proposal due date to 11 July 2018, 2PM CST.
f. Provide a diagram of the service as requested in the questions.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 12-Jun-2018
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X HC101318R0016
X 9B. DATED (SEE ITEM 11)
30-May-2018
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
12-Jun-2018
CODE
DISA/DITCO-SCOTT
2300 EAST DRIVE
BLDG 3600
SCOTT AFB IL 62225-5406
HC1013 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
HC101318R0016
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 1449 - CONTINUATION SHEET
SOLICITATION/CONTRACT FORM
The required response date/time has changed from 13-Jun-2018 02:00 PM to 11-Jul-2018 02:00 PM.
(End of Summary of Changes)
RFQ Questions & Answers
Reference
Questions
Government Response
CLINS/Technical
CLINS 1-4 state “Unprotected East and West (E & W) required, per site, per OC-48, will include 4-ports.” Is the OC-48 a line/NNI port and are the 4-ports sub-rate client/UNI (OC3/12) ports to be mapped into the line or NNI port?
Requirement is for Two OC-48’s on each path. The fiber is required to meet HEMP protection.
CLINs mention East and West (as in SONET). Those terms typically reflect some sort of protection switching back to the UPSR era. Does the system have or require Linear 1+1 or some type of ring protection?
The fiber has to be HEMP protected by the contractor. The circuit protection/switching is performed by the Government equipment.
CLINS 5-8 state - Turn up and support two wavelengths which will support two full duplex OC-48's between x and y. Are the two aforementioned wavelengths in addition to the OC-48s detailed in CLINS 1-4?
True.
General
What is the maximum bandwidth/ service rate requirement per link between locations?
Two OC-48’s worth.
The CLINS reflect the desire for two OC-48 lambdas or wavelengths. In event the existing system and equipment becomes unsupportable during the period of performance, is it acceptable to provide two OC-48s of capacity over a 10G lambda or wavelength? In other words, are OC-192/10G/OTU-4 waves an acceptable equivalent provided the solution can hand off a OC-48 client?
Yes.
CLINS 5-8 state - Turn up and support two wavelengths which will support two full duplex OC-48's between x and y. Assuming an upgrade will be required during the POP, will two OC-48s of capacity over a 10G lambda or wavelength be acceptable or would two 10G lambda/wavelengths be required to provide the two full duplex OC-48's between x and y?
Two OC-48s of capacity.
All CLINS – refer to OC-48 lambdas or wavelengths. Are newer technologies such as OTN, Carrier Ethernet or Circuit Emulation acceptable?
Optical is required.
CLINs 1-4, and associated out-year CLINs, do not appear to be consistent with the provided PWS. The PWS calls for 3 links whereas these non-optional CLINs call for four (4) links. Which requirement is correct?
Add room 3101 to PWS 6.7. Also reference PWS 6.1.2. CLIN 0004 is for the second node (node 2) at CMAFS.
CLINs 1-4, and associated out-year CLINs, do not appear to be consistent with the provided PWS. The PWS. Para 5 (Scope), states “This PWS is for 2 OC-48 lambda services at each location constituting a system with a working and protected path in opposite directions” whereas solicitation pages 3 of 91 & 4 of 91, CLINs 1-4 (not optional), state a requirement of “Unprotected East and West (E & W) required, per site, per OC-48.” Can this apparent conflict be clarified? Are the OC-48s to be provided as Unprotected OC-48s as the CLIN suggests or are they to be configured as Working and Protected path OC-48s as per the PWS? Which is the correct requirement?
These must be configured in a Working and Protect configuration. See question 1.
PWS, CLIN, Technical
PWS requirement description on page 5 (scope) calls for “The Contractor shall provide network/system/service and equipment terminating at the 3 bases, that have the capability of supporting Wave Division Multiplexing (WDM); and have the ability to provide the initial two lambda services with working and protected paths in opposite directions and at least two additional capacity of OC-48 wavelengths terminating at each location with no electronic breakouts outside of the terminating HEMP facilities at the 3 bases. Does PWS statement - “provide the initial two lambda services with working and protected paths in opposite directions” refer to CLINs 1-4, and associated out-year CLINs, and does the PWS statement - “at least two additional capacity of OC-48 wavelengths terminating at each location with no electronic breakouts outside of the terminating HEMP facilities at the 3 bases” meant to refer to CLINs 5-8, and associated out-year CLINs, or is there to be a different understanding of what parts of the PWS refer to the non-optional CLIN requirement and optional CLIN requirement?
The initial requirement to provide service refers to CLINS 1-4 and out-years and the two additional capacity refers to CLINS 5-8 and out-years.
CLIN/Technical
Are Optional CLINs 5-8, and associated out-year CLINs, intended for the contractor to identify cost to provide a second wavelength between each site pair to bring the total of OC48 wavelengths to four (4) at each node consisting of two (2) OC48 wavelengths as working and protected to the east and two (2) OC-48 wavelengths as working and protected to the west? Or are they to be understood differently?
True.
CLIN/Technical
Price Template for “optional CLINs” stipulates for them to be “priced per wavelength of service”. Is the Government’s intent to exercise these “optional CLINs” in addition to, exercise non-optional CLINs 1-4, and the out-years, in the event the Government chooses to acquire the two wavelengths configured for two full duplex OC-48 services? If not, shouldn’t the contractor enter in these optional CLINs the cost for two wavelengths vice price per wavelength of service?
The verbiage for “priced per wavelength of service” will be removed from the price template.
Solicitation
Subfactor 1 states “the contractor must propose a plan that demonstrates the ability to meet the immediate requirement of providing service for the three existing nodes and HEMP protected OC-48 service from day one of the contract.” However, the CLINs provided in the price template and also the solicitation CLINs starting on pages 3 of 91 calls for four (4) nodes and at no place can a configuration or corresponding CLINs be found in the solicitation that identifies the specific three (3) nodes and corresponding three (3) links so they can be addressed and proposed. Will the Government please clarify the requirement?
There are 3 existing nodes (one at each base). The existing nodes need to be in service from day 1 of the POP. The 4th node will also be at CMAFS (a second node for this location). See PWS 6.1.2, 6.24. This fourth node will need to be installed within One year after Award.
PWS, DD254
Security Classification: The PWS states Unclassified and the solicitation DD-254 states Secret. It is assumed the solicitation DD-254 overrules the PWS. Would that be correct?
The PWS will be updated to reflect "secret" clearance is required.
PWS
PWS paragraph 13.23 states “The system is comprised of 2 OC-48 wavelengths.” Will the Government provide a diagram of this service requirement?
Diagram provided.
Pricing Template
The Pricing Template does not provide a place for the contractor to submit Non-Recurring Costs (NRCs). Is it the Governments intent to prohibit NRC’s on this contract for project NRC expenses (ex., construction at CMAS and procurement and install of any necessary node equipment during the 10-year POP) and for those to instead be provided as part of the MRC prices submitted?
The government intends to pay a monthly cost (MRC) for the requirements of the PWS. The contractor is to propose all cost as MRC.
Pricing Template
Both the Pricing template and solicitation pages starting at 3 of 91 indicate places to provide cost. Does the Government intend for the contractor to enter their price in both documents or only the pricing template excel document? If the Government intends for the contractor to enter a price in solicitation pages starting with 3 of 91 how does the Government want the contractor to enter their price in that document?
Prices should be entered into the pricing template.
In event the existing service becomes end of life or unsupportable during the required 10-year POP, will the Government accept in this proposal an offer that includes upgrade to the existing system? If so, should that cost be proposed in the appropriate out year CLINs that correspond to the required upgrade date and would the Government accept different CLIN pricing for those years or must the contractor structure their CLIN prices to be uniform across all 10-years? Additionally, does the Government have space available in existing racks or space for an additional rack at each Government node site and will the Government provide the power and environmental support?
The contractor shall select equipment that will be maintainable for the life of the contract or replace EOL/EOS equipment as needed. Government will provide rack space, power and environmental support.
Solicitation
In regard to compliance with the LOS restrictions of 52.219-14. Would treatment of the telecommunication infrastructure as an ODC remove that cost element from the LOS restriction cost basis and calculation in determining compliance with 52.219-14? As you are likely aware, telecom infrastructure is largely owned and operated by large business (CenturyLink/Level3, ATT, Verizon, Etc.). It is not practical for small businesses to own telecom infrastructure due to the cost burden of owning and operating such telecom infrastructure. Therefore, a small business will have to acquire that cost element from a large business. If the cost of providing this telecom infrastructure were subject to the cost basis of LOS restrictions a small business would be unable to comply. If the required telecommunications infrastructure were provided as an ODC would it be excluded from the LOS basis and calculation? If so, the resulting requirement for LOS compliance would be “(1) Services (except construction) - At least 50 percent of the cost of contract performance incurred for personnel shall be expended for employees of the concern” and similar situated small business concerns. Would this be correct?
As this contract is for services, the LOS clause requires an offeror to agree that at least 50 percent of its personnel costs under the contract will be based upon work of its own employees. 48 C.F.R. § 52.219-14. The treatment of infrastructure should not impact this calculation.
Given this solicitation is a small business set aside, and small businesses do not possess the resources or proposal staff of a large business, we request a three (3) week extension to the proposal submission date. Due to numerous areas in the solicitation material requiring clarification or possible revision, we respectfully request a three (3) week extension be applied from date of a revised proposal or the date when all questions have posted.
The proposal due date will be extended until July 11, 2018
Table of Revisions of the PWS for
HIGH ALTITUDE ELECTROMAGNETIC PULSE PROTECTED
OPTIC CABLE SYSTEM BETWEEN
Revision Date
PWS Reference
Change/revision
12 June 2018
PWS 6.7
Added “CMAFS room 3101 (new node to be installed)”
12 June 2018
PWS 6.1.2
Added, “The new Node in room 3101 will need to be installed within one year after start of the period of performance.”
12 June 2018
PWS 11
Replaced “Unclassified” with “Secret clearance required”
PERFORMANCE WORK STATEMENT (PWS)
HIGH ALTITUDE ELECTROMAGNETIC PULSE PROTECTED
OPTIC CABLE SYSTEM BETWEEN
CHEYENNE MOUNTAIN AIR FORCE STATION,
PETERSON AIR FORCE BASE and SCHRIEVER AIR FORCE BASE
Solicitation Number:
HC1013-18-R-0016
Task Order Number:
1. Contracting Officer’s Representative (COR) and general information.
a. Primary COR.
Name:
TBD
Organization:
Department of Defense Activity
Address Code (DODAAC):
Address:
Phone Number:
Fax Number:
E-Mail Address:
b. General Information.
Requirement Order Type
Firm Fixed Price (FFP)
ODCs / Travel
N/A
Incumbent Contractor
Qwest d.b.a CenturyLink. (HC1013-13-D-0001)
Section 508 Applicable
No
Method of Evaluation
Lowest Price Technically Acceptable (LPTA)
Performance Based
Yes
Available Funds
No, Commitment Letter (SAF)
DD254 Required
Yes
2. Contract Title. Steelpipe High Altitude Electromagnetic Pulse (HEMP) Protected Fiber Optic Cable System
3. Background. This procurement is a follow-on contract to existing HEMP Protected Fiber Optic Cable Link system comprised of 3 links.
4. Objectives. This Performance Work Statement (PWS) is to establish the requirements and quality assurance provisions for a Contractor to provide, operate, and maintain a HEMP protected system between Schriever AFB (SAFB), Peterson AFB (PAFB) and Cheyenne Mountain Air Force Station (CMAFS).
5. Scope. The Contractor shall provide network/system/service and equipment terminating at the 3 bases, that have the capability of supporting Wave Division Multiplexing (WDM); and have the ability to provide the initial two lambda services with working and protected paths in opposite directions and at least two additional capacity of OC-48 wavelengths terminating at each location with no electronic breakouts outside of the terminating HEMP facilities at the 3 bases. This requirement is part of the Colorado Springs Survivable Communications Network. This PWS and the associated system specifications/requirements identified in this PWS establish the requirements and quality assurance provisions for a contractor to provide, operate, and maintain HEMP protected fiber optic links between CMAFS, PAFB and SAFB. The government's initial requirement is for the Contractor to activate two wavelengths equipped with OC-48, Intermediate Reach (IR), single mode fiber interfaces with no electronic breakouts outside of identified HEMP protected shelters/terminating locations. The network shall provide local, stand-alone, services capable of sustained operation during the presence of the threats encountered by the Command and Control facilities at SAFB, PAFB and CMAFS. The network shall employ path diversity, communications site dispersal and modern systems (technical control) techniques. This PWS is for 2 OC-48 lambda services at each location constituting a system with a working and protected path in opposite directions. The contractor shall be responsible for the system as a whole and shall ensure availability of each OC-48 is maintained.
5.1 The Colorado Springs Survivable Communications Network: The fiber optic cable link is part of the Colorado Springs Survivable Communications Network.
5.2 Description of Requirement
5.2.1 General: The Colorado Springs Survivable Communications Network is required to comply with current National Security and Joint Chiefs of Staff (JCS) directives. The Chairman Joint Chiefs of Staff (CJCSI) 6811.01 requires command and control communications systems to be hardened to the same level of the facilities they support. Memorandum in the Name of the Chairman (MCM) 72-91 and CJCSI 6811.01 delineate specific missions and supported systems which require survivable communications, include missions and systems being supported within the Colorado Springs area. These directives require that communications connectivity for the survivable facilities at CMAFS, PAFB and SAFB be HEMP protected.
5.2.2 Missions Supported: The required communications connectivity supports the Integrated Tactical Warning and Attack Assessment (ITW/AA) mission of North American Aerospace Defense (NORAD) Command and US Strategic Air Command (STRATCOM) missions.
6. Specific Tasks. All tasks are included in the contract’s firm fixed price.
6.1 Fiber Optic Requirements: Air Force studies and analysis show that the following general criteria must be met to satisfy mission requirements. The Contractor shall meet or exceed performance requirements stated in this PWS. The Contractor shall provide a performance report quarterly or when requested by the CO or COR which demonstrates the Contractor has met all performance criteria identified in Section 7 of this PWS. If performance thresholds were not met the Contractor shall provide reason for not meeting performance criteria and methods for mitigating repeating unacceptable performance.
6.1.1 HEMP Protection: This service provided by the Contractor is designated to support the Colorado Springs Survivable Network and shall be protected against HEMP. All Contractor provided service shall terminate within Government HEMP protected facilities at the 3 bases.
6.1.2 Interface Requirements: The demarcation point will be a Contractor provided Fiber Distribution Panel (FDP). The Government will interface with the Contractor's equipment at the optical OC-48 level at the following locations:
Cheyenne Mountain Air Force Station (Two interconnected Nodes. One Node in Room 3301 and second Node in room 3101). The new Node in room 3101 will need to be installed within one year after start of the period of performance.
Peterson AFB (One Node in HEMP facility Building 1040)
Schriever AFB (One Node in HEMP facility in Building 700)
6.1.3 Path Diversity: All links supporting this system between CMAFS, PAFB and SAFB must have path diversity. Paths will be diverse until access arrives at government HEMP facilities at these bases. Each OC-48 will have a working and protected path in opposite directions on the ring.
6.2 Steelpipe Conduit: The north portal access to CMAFS shall be used by the Contractor using the existing cable entryway (Steelpipe) conduit to PAFB and SAFB with a diverse path to be used by the Contractor using the south portal concrete incased conduit to SAFB.
6.3 Repeaterless Link: Contractor fiber optic cable service to be provided shall span the entire distance without repeaters/regenerators or any electronic devices.
6.4 Service Capacity: This service shall support Optical Wave Division Multiplexing (WDM). The initial requirement is for activation of 2 OC-48 wavelengths, 1310 nm, Intermediate Reach (IR), single mode fiber interfaces at all 4 HEMP facilities with expansion capability of 2 additional wavelengths at all 4 locations. The Government reserves the right of activating this additional wavelength(s).
6.6 Government Management of Wavelengths: The Space Command Digital Integrated Network (SDIN) Network Management Cell (NMC) will provide government centralized network management of this service. The Contractor shall coordinate with the SDIN NMC at 719 567-SDIN regarding any potential impacts to service (i.e. fiber system upgrades/downtime).
6.7 Fiber Termination: The Contractor shall provide a HEMP-protected fiber optic cable service between CMAFS Technical Control Facility (Room 3301), CMAFS room 3101 (new node to be installed), PAFB Bldg. 1040 and Bldg. 700 at SAFB. The contractor shall install electronic equipment in Government-furnished HEMP-protected facilities at CMAFS, PAFB and SAFB.
6.8 Commercial Off-The-Shelf Technology: The contractor shall use commercial off-the shelf technology whenever possible. The Contractor shall select equipment that will be maintainable for the life of the contract.
6.9 Electromagnetic Compatibility: The Contractor shall ensure that the provided contractor equipment is electronically compatible with the existing OC-48 communications services at each terminal location.
6.10 Right-of-Way Acquisition: The contractor shall obtain all necessary rights-of-way. To obtain easements on Government installations, the contractor shall submit a request in writing to the base Real Property Officer. Real Property Managers can be contacted at: SAFB 50 CES/CEOE 719 567-7136 and CMAFS 721 CES/CED 719 474-3740/2047.
6.11 Scheduled Maintenance: Link down time shall not exceed two hours per maintenance action for scheduled maintenance purposes. Scheduled maintenance down time shall not exceed 12 hours per year. Scheduled maintenance downtime shall be coordinated with the NMC not less than 45 days prior to maintenance occurrence in order to re-route circuits for duration of downtime. A primary and alternate date shall be coordinated by the Government for user approval and will be rescheduled based upon user real-world requirements.
6.12 Maintainability: The Contractor shall maintain the OC-48 links including end equipment on a 24-hour, 7-day a week basis.
6.13 Fault Isolation Time: Fault isolation time is defined as the time required for the contractor to identify the failure of an active service by Contractor maintained equipment or equipment maintained by others. Fault isolation time begins when the Government representative requests the Contractor to isolate the fault. The mean fault isolation time is defined as the ratio of the total fault isolation time to the total number of requests encountered. Mean fault isolation time shall not exceed 0.5 hours.
6.14 Response Time: Defined as the time elapsed from the time fault isolation is accomplished to the time the Contractor arrives at the site ready to begin repair work. Authorized stand-down time does not count against response time. Response time shall not exceed 2.5 hours.
6.15 Timing and Frequency Standard: The existing SDIN timing standard shall be used for reference clock. The SDIN timing standard is a Stratum Level 1 timing standard, based on cesium beam clocks located inside HEMP shields at CMAFS and SAFB.
6.16 Service Life: The equipment shall be designed / configured for continuous operation and shall have a service life for the length of the contract with normal maintenance.
6.17 Cable Depth: Cable shall be buried to a depth of at least four feet. It is the Contractor's responsibility to ensure cable depth is maintained.
6.18 HEMP Protection: The HEMP facilities at CMAFS, PAFB and SAFB require periodic HEMP recertification and testing to ensure the equipment and communications inside the facility are protected from damage in the event of an High Altitude Electromagnetic event. Any installation or construction that affects the HEMP protection requires the facility to be recertified. The contractor shall ensure HEMP integrity of the facility is maintained during and after the installation of Contractor Furnished Equipment in Government HEMP-protected facilities. Any construction or penetration that could compromise the HEMP protection of the facility will require repair and recertification. The Government will maintain HEMP protection of CMAFS, PAFB, and SAFB HEMP sites after the installation has been completed and the Contractor has sealed any penetrations in accordance with MIL STD 188-125A. The Government is responsible for HEMP facility sustainment and testing and all three terminating locations are considered government-furnished facilities. Penetrations to HEMP shields shall be non-conductive fiber only. The Contractor will be notified by the HEMP Program Manager prior to facility HEMP testing to ensure Contractor equipment is not adversely affected.
6.19 HEMP Protection Configuration Control: The Contractor shall ensure that work on and inside HEMP-protected facilities does not degrade the HEMP integrity of the facility. The Contractor shall coordinate with and obtain approval from the Quality Assurance Evaluator, at each terminal location, on the installation of the service, prior to starting the installation.
6.20 Facility Access: The Contractor shall ensure that all unescorted personnel at CMAFS, Peterson AFB, and SAFB meet the personnel security requirement of Section 13.11 of this PWS.
6.21 Permits: The Contractor shall obtain all necessary permits, agreements, licenses, and site approvals required to meet the requirements of this contract. Coordination shall be accomplished with the local Commander's Facility Engineer on all plans concerning use of Government facilities and utilities and all plans concerning construction of and provisioning of new facilities on Government sites. Additionally, plans concerning the use of existing communications facilities and communications cable systems shall be coordinated and approved by the Government. Points of contact for coordination are as follows:
Cheyenne Mountain Air Force Station
721 CES/CEOW
1 NORAD Rd.
Cheyenne Mountain AFS, CO 80916
(719) 474-3740/2047
Quality Assurance Evaluator
721 CS/SCBQ
(719) 474-3202
Schriever AFB
50 CES/SCPM
Schriever AFB, CO 80912-5017
(719) 567-7136
Quality Assurance Evaluator
50SCS/SCQ
(719) 567-3561
Peterson AFB
21 CES/CERR
Peterson AFB, CO 80914
(719) 556-4901
21 SFS/S5B
(719) 556-4678
6.22 Contractor Provided Information: The Contractor shall provide the following information in their standard commercial format.
6.23 Installation Engineering Plan (IEP): The contractor shall provide an IEP which shall define and explain the engineering method and procedures used to design, engineer, provide and install the required service as defined in this PWS.
6.24 The IEP shall also contain all tasks, milestones and their projected completion dates for all actions required to furnish, install and test the service. The contractor is required to have minimum services up and running on day one of the contract. The minimum services are defined as the three existing OC-48 nodes at CMAFS, PAFB and SAFB. Any equipment or fiber replacement activities under this contract are required to be defined in the IEP, including the addition of the new node at CMAFS.
6.25 The IEP shall contain a brief listing and functional description of each item that will be provided and installed by the Contractor.
6.26 The IEP shall contain floor plan drawings identifying the terminal locations by base, building, and room numbers. The requirements for floor space, power, and air conditioning inside and outside plant etc. for contractor provided equipment.
6.27 The IEP shall contain cable route drawings. The Government realizes that the Contractor may require the Government to sign a confidentiality statement. The drawings shall have sufficient detail to ensure all diversity requirements have been met.
6.28 The IEP shall be provided with the proposal.
6.29 One copy of the IEP shall be provided to each office listed below:
DITCO/ 50 SCS/SCXP (Attn: Michael Hamilton)
Bldg. 3600 300 O’Malley Av, Ste. 37
2300 East Dr. Schriever AFB, CO 80912
Scott AFB, IL 62225-5406
7. Performance Standards.
7.1 Optical Performance Requirements: The Contractor shall provide service within the following specified parameters IAW DISAC 310-175-9 Table 3.2 : Bit-Error-Rate (BER), Errored Seconds (ES), Error-Free Seconds (EFS), Severely Errored Seconds (SES), consecutively severely errored seconds (CSES) , and delay as defined in the following paragraphs.
7.2 Bit-Error-Rate: The Contractor shall provide service which will have a BER of less than 5 X 10 -9.
7.3 Errored Seconds: An errored second is any on-second period with one or more bit errors. The number of errored seconds shall not exceed 400 per day.
7.4 Error-free Seconds: Defined as the percentage of error-free second in any 24-hour period. This service shall exceed 99.54 percent.
7.5 Severely Errored Seconds: Defined as any one-second period in which the BER is greater than 10-3. This service shall not exceed four SES per day.
7.6 Consecutive Severely Errored Seconds (CSES): Defined as an event of 3 to 9 consecutive SESs. There is a close correlation between a CSES event and a Carrier Group Alarm (CGA)/Carrier Failure Alarm (CFA) event. To allow measurement flexibility, both CSES and CGA/CFA shall be considered equivalent. The number of CSES events shall not exceed two per calendar month.
7.7 Delay: Round trip delay on a single line shall not exceed 10 milliseconds.
7.8 Reliability: Reliability is measured by two parameters: Mean time Between Critical Failures (MTBCF) and Mean Time Between Hardware Failures (MTBHF).
7.9 Mean Time Between Critical Failures (MTBCF): A critical failure is equivalent to a link failure. By definition, this service will have failed and an outage will have occurred whenever there are ten or more CSESs, regardless of the cause. The MTBCF shall exceed 2000 hours.
7.10 Mean Time Between Hardware Failures (MTBHF): The MTBF for system hardware components shall exceed 10,000 hours. All equipment installed by the Contractor shall be included, regardless of redundancy. Hardware furnished by the Government and hardware furnished by others is excluded from the MTBF calculations.
7.11 Service Availability: System service availability shall exceed 99.975 percent. Availability is defined as the following ration:
MTBCF
Availability = ___________________ x 100%
MTBCF + MTTR
MTBCF is the mean time between link failures as defined in paragraph 7.9. When the link recovers automatically from an outage (defined as 10 or more consecutive SESs) and no repair action is required, outage time shall count as repair time for the purpose of computing availability. Periods when the Government denies access to the system do not count as outage or repair time for the purpose of computing availability.
7.12 Maximum Continuous Downtime: If a catastrophic failure occurs, the Contractor shall restore services within six hours of the failure (Telecommunications Service Priority of TSP9QMS-01, as assigned by the Manager of the National Communication System). Restoration time starts when the Government notifies the Contractor that a malfunction has occurred and ends when the service is available for Government use.
7.13 Catastrophic Failure: Catastrophic failure is a loss of all services at one or more of the sites.
7.14 System Testing: The contractor shall use established test and reporting methods in lieu of developing new methods. Authorized Government personnel shall witness testing and may require that tests be re-accomplished if test methods and/or results are deemed unsatisfactory.
7.15 Link Acceptance Testing: As a minimum, the Government requires the following parameters to be measured at the OC-48 level for link acceptance testing: bit-error-rate, errored seconds, error-free seconds, severely errored seconds, consecutive severely errored seconds, availability and delay. These parameters are defined in Section 7 of this PWS. The link shall meet or exceed the performance requirements in this PWS. The Contractor shall monitor the link for a sufficiently long period to ensure confidence in the test results, but the monitoring period shall be no less than 72 hours. Testing is required when a new OC link is activated or when equipment/media is replaced.
7.16 Test Reporting: The Contractor shall provide a report of the results of the link acceptance test to the Government QAE within ten business days of completion of the test. The link acceptance test report shall be in the Contractors' standard format and will address performance parameters described in section 7.15. Link acceptance testing shall occur within 10 calendar days of new link installations.
8. Place of Performance. Management of the network and oversight of equipment/service performance shall be accomplished at the Contractor's facility. Contractor's terminating equipment and touch maintenance shall be housed/accomplished at the following sites: PAFB Bldg. 1040, CMAFS Rm. 3301, and SAFB Bldg. 700. System management shall be accomplished remotely at the Contractor's site.
9. Period of Performance. The base year period of performance is 12 months with 9 12 month options. As directed by the COR, the contractor shall continue performance in emergency or mission essential conditions.
Period of Performance
Base Period: September 30, 2018 - September 29, 2019
Option Period 1: September 30, 2019 - September 29, 2020
Option Period 2: September 30, 2020 - September 29, 2021
Option Period 3: September 30, 2021 - September 29, 2022
Option Period 4: September 30, 2022 - September 29, 2023
Option Period 5: September 30, 2023 - September 29, 2024
Option Period 6: September 30, 2024 - September 29, 2025
Option Period 7: September 30, 2025 - September 29, 2026
Option Period 8: September 30, 2026 - September 29, 2027
Option Period 9: September 30, 2027 - September 29, 2028
10. Delivery Schedule. The Contractor shall meet the requirements of this PWS according to a Contractor developed and Government approved schedule. The schedule shall contain timelines for preparation, equipment installation, radio frequency interference studies, system testing, operational verification, and other applicable milestones to meet the required service date of 30 Sep 2018.
PWS Task#
Deliverable Title
CDRL/DID#
Due Date
Copies
Distribution
Frequency and Remarks
7.16
Test Report
A001
10 calendar days after POP start
Two Copies to COR; 1 Copy to KO
POP start or with major equip/system modifications
6.25
Installation Engineering
Plan
A002
Within 30 days after contract award
Two Copies to COR; 1 Copy to KO
Contract start or with major equip/system modifications
6.11
Scheduled Maintenance Request
A003
+ 45 days prior to occurrence
SDIN Network Management Cell
45 days Prior to occurrence
6.0
Outage
Report
A004
Within 5 calendar days after restoration
COR
When performance parameter thresholds are not met.
6.0
Performance Report
A005
Within 10 days after option year award
Two Copies to COR; 1 Copy to KO
Annually
13.19
Access Badge Inventory
A006
Annually
13.21
PMI/Corrective Maintenance Log
A007
Quarterly
11. Security. Secret clearance is required, DD Form 254 included.
12. Government-Furnished Equipment (GFE)/Government-Furnished Information (GFI). None
13. Other Pertinent Information or Special Considerations.
13.1 Impact on Operations: Installation of equipment at CMAFS, PAFB and at SAFB shall be accomplished without adversely affecting mission operation. The Government will ensure that the Contractor has sufficient access to these facilities to perform installation without interruption.
13.2 Installation at Government HEMP Facilities: The Government is responsible for the level of HEMP protection at Government-owned HEMP protected, global shielded facilities. The Government owned HEMP protected, global shielded facilities are Bldg. 3 at CMAFS, Bldg. 1040 at PAFB and Bldg. 700 at SAFB. The Contractor installation of the service, in the Government-owned facilities shall not degrade their HEMP integrity; and shall be IAW MIL STD 188/125A.
13.3 Host Tenant Station Agreements: When construction is required on Government property or when the Contractor requires Government resources, the Contractor shall properly execute a Letter of Agreement with the host installation commander prior to construction of facilities. The Letter of Agreement shall contain (1) a description of the site location, (2) type of construction required, (3) responsibilities for installation and operation, (4) installation of utility and communications cables, (5) method of burial and routing, (6) deactivation of site restoration responsibilities, and (7) power demarcation point. The Contractor shall provide a copy of the Letter of Agreement to the Contracting Officer within five calendar days after signatories affix their signature to the document.
13.4 Cable Routing: The fiber optic cable route between CMAFS and SAFB shall pass no closer than two miles to the following buildings on PAFB: Bldg. 1, Bldg. 1470 and Bldg. 1040. The fiber optic cable shall at no point utilize existing right of ways between PAFB and SAFB along Colorado State Highway 94 or between PAFB and CMAFS. The path shall be established between CMAFS, PAFB and SAFB such that the path does not traverse the same path as the other paths of this system between the 3 bases/HEMP facilities.
The Government acknowledges that this service requirement path cannot avoid convergence to the existing route as both links enter CMAFS within the CMAFS tunnel, the manhole outside of Bldg. 1040 on PAFB and shall enter Bldg. 700 at SAFB from different sides of Bldg. 700.
13.5 Slack for Ground Motion: Once outside the 2 mile radius from CMAFS, 20 feet of extra slack shall be included in each manhole (if manholes are used) to allow for stretching caused by ground motion.
13.6 Government Furnished Facilities/Equipment: Government furnished facilities are the cable ducts, and the HEMP facilities in CMAFS, SAFB, and PAFB. Electrical power, heating and air conditioning will be provided by the Government at all HEMP sites.
13.7 Government Locations and Cabinet Size: Cabinets supporting equipment at all locations, CMAFS, PAFB and SAFB, will be standard 19" width. The space allocated will be 20" in height within a single 19" wide cabinet. The vendor shall ensure its equipment does not impact overall heat dissipation and ventilation by placing its equipment to close to existing equipment. Floor space must be approved by the Government at both locations. Cabinets shall be marked with current phone number of 24x7 operations support function.
13.8 Work Sites: The contractor is responsible for maintaining work sites in a clean, safe, and presentable manner without any excess of scrap and residual material during the contractor's time on site.
13.9 Restoration: Upon completion of work, the Contractor shall restore all work sites to a clean and orderly configuration. All trash and debris shall be removed; the landscape shall be restored to its original lines and grades; all disturbed areas shall be grass seeded in accordance with their original state; all fences shall be restored; and all access roads damaged by the Contractor shall be restored to original state.
13.10 Security: Physical security at PAFB, CMAFS and SAFB is the responsibility of the Government.
13.11 Personnel Security: The Contractor is responsible for meeting the Personnel Security requirements of AFI 31-501 at the following restricted areas: CMAFS, Bldg. 700 at SAFB and PAFB. The Contractor shall develop and manage a security program that meets the following requirements:
13.12 Classified/Restricted Areas: The provisions of DoD 5220.22-M, National Industrial Security Program Operating Manual, shall be directive on the Contractor. The Contractor shall obtain appropriate personnel security clearances only for employees whose duties will require access to classified or restricted areas at both sites.
13.13 Facility Access at Government Installations: The Contractor shall comply with circulation controls established for USAF restricted and controlled areas IAW AFI 31-101, AFI 31-209 and local directives at each installation. Compliance includes enforcing these controls in areas where the Contractor Controls entry. The Contractor shall limit requests for restricted area unescorted entry authority to employees whose duties require frequent entry to such areas and who have been the subject of favorable, completed National Agency Checks (NACs). The Contractor may use a visit request sent under the provisions of the ISM as proof of a favorable completed NAC. Only Defense Industrial Security Clearance Office (DISCO) granted interim or final security clearances of SECRET or above are acceptable.
13.14 Incident Reporting: The Contractor shall immediately notify the Security Points of Contact of the names of site employees involved and the circumstances surrounding the submission of any report required by DoD 5220.22-M, Chapter 1 Section 3, Reporting Requirements. The Contractor shall establish procedures which will assure immediate execution of an installation commander's written order to bar an employee's access to parts or all of an installation.
13.15 Security Points of Contact:
SAFB: 50 SCS/SCPM
Schriever AFB, CO 80912-5017
719 567-3562
CMAFS: 721 SFS/S-5
Cheyenne Mtn. AFS, CO 80916
719 474-2317
PAFB: 21 SFS/S5B
Peterson AFB, CO 80914
719 556-4678
13.16 Escort Requirements: The Contractor shall comply with AFI 31-101 in the provision of escorts for employees who do not meet the requirements for or need unescorted entry authority. Employees who have not been granted unescorted entry authority will be continuously escorted while in a restricted area. With the concurrence of the applicable Security Officer and Contracting Quality Assurance Evaluator (CQAE), the Contractor may establish free zones in accordance with AFI 31-101.
13.17 Issue of Badges: Where badges are issued and used for circulation control, the Contractor shall prepare/process AF Forms 2586, Unescorted Entry Authorization Certificate, for all employees who will need and are qualified for, unescorted entry. The completed AF Forms 2586 will be processed IAW established site procedures.
13.18 Badge Retrieval: The Contractor shall establish controls which assure the retrieval of badges issued to employees who strike, quit (with or without notice), die, or are barred by an installation commander's written order.
13.19 Inventory Requirements: The Contractor's security officer shall annually conduct a "hands-on" inventory of all restricted area badges issued to Contractor employees. The Contractor will comply with the badge issuing agency's instruction on when to conduct the inventory and how to report results.
13.20 Safety: The design, fabrication, and installation of communications equipment and supporting facilities shall provide convenience and safety to personnel during installation, operation, and maintenance. The Contractor shall comply with AFOSH Standards applicable to the type of construction required to satisfy this PWS. The Contractor shall follow NFPA 101, Life Safety Code, at all sites.
13.21 Maintenance: To assure high quality service, the contractor shall perform preventive and corrective maintenance to meet the reliability and maintainability requirements of the system as defined in this PWS.
13.22 Removal of Property: Upon Expiration of the lease of any or all items in this PWS, the Contractor agrees to remove such property from all sites within 60 days. Additionally, in the event that the Contractor's property has not been removed within 60 days, the property will be considered abandoned in place and subject to Government disposal.
13.23 Leased Circuits Associated with the system: The system is comprised of 2 OC-48 wavelengths. Each OC-48 wavelength shall be given a Government circuit identifier (CCSD). The Contractor shall provide the SDIN NMC and the base TCFs at each location the Contractor circuit identifier and the Contractor’s associated 24x7 help desk telephone number.
Page 1 of 11 Pages
Page 11 of 11 Pages
Template revisions
Revision Date Template reference Change/Revision
12-Jun-18 CLINS 5-8 to include out-years The verbiage for “priced per wavelength of service” was removed
Instructions
INSTRUCTIONS TO CONTRACTOR:
ALL FORMULAS, QTY'S, UNITS ARE TO REMAIN INTACT AND UNEDITED.
PLEASE ENTER IN YOUR "UNIT MRC" PRICE FOR THE MONTHLY CHARGES
ANY SURCHARGES AND/OR FEES (IF APPLICABLE) should be included in the CLIN price/
Base Year
Base Year
CLIN Type Performance Area QTY Unit Unit MRC Total MRC FY19
0001 FFP Wave Division Multiplex (WDM) Cheyenne Mt AFS, CO / Schriever AFB, CO $ - 0
Unprotected East and West (E & W) required, per site, per OC-48. Monthly charge will include 4 ports. 12 Months $ - 0 $ - 0
Interoffice Transport, per mile. Monthly recurring charge includes 19 miles 12 Months $ - 0 $ - 0
Wave Division Multiplex (WDM) Fiber Optic Cable Equipment Lease Room R3301 12 Months $ - 0 $ - 0
0002 FFP Wave Division Multiplex (WDM) Peterson AFB, CO / Schriever AFB, CO $ - 0 $ - 0
Unprotected East and West (E & W) required, per site, per OC-48. Monthly charge will include 4 ports. 12 Months $ - 0 $ - 0
Interoffice Transport, per mile. Monthly recurring charge includes 14 miles. 12 Months $ - 0 $ - 0
Wave Division Multiplex (WDM) Fiber Optic Cable Equipment Lease Room B1038. 12 Months $ - 0 $ - 0
0003 FFP Wave Division Multiplex (WDM) Peterson AFB, CO / Cheyenne Mt AFS, CO $ - 0 $ - 0
Unprotected East and West (E & W) required, per site, per OC-48. Monthly charge will include 4 ports. 12 Months $ - 0 $ - 0
Interoffice Transport, per mile. Monthly recurring charge includes 5 miles. 12 Months $ - 0 $ - 0
Wave Division Multiplex (WDM) Fiber Optic Cable Equipment Lease Room B700. 12 Months $ - 0 $ - 0
0004 FFP Wave Division Multiplex (WDM) Cheyenne Mt AFS, CO (Node 2) / Schriever AFB, CO $ - 0 $ - 0
Unprotected East and West (E & W) required, per site, per OC-48. Monthly charge will include 4 ports. 12 Months $ - 0 $ - 0
Interoffice Transport, per mile. Monthly recurring charge includes 19 miles 12 Months $ - 0 $ - 0
Wave Division Multiplex (WDM) Fiber Optic Cable Equipment Lease Room R3101 12 Months $ - 0 $ - 0
Subtotal Total Yearly cost without optional CLINS $ - 0
0005 (OPTIONAL CLIN) FFP OPTIONAL CLIN - Wave Division Multiplex (WDM) Cheyenne Mt AFS, CO / Schriever AFB, CO $ - 0 $ - 0
Turn up two wavelengths which will support two full duplex OC-48's between Schriever AFB (SAFB) and Cheyenne Mtn. AFS (CMAFS) of service per month. 12 Months $ - 0 $ - 0
0006 (OPTIONAL CLIN) FFP OPTIONAL CLIN - Wave Division Multiplex (WDM) Peterson AFB, CO / Schriever AFB, CO $ - 0 $ - 0
Turn up two wavelengths which will support two full duplex OC-48's between Peterson AFB (PAFB) and Schriever AFB (SAFB) of service per month. 12 Months $ - 0 $ - 0
0007 (OPTIONAL CLIN) FFP OPTIONAL CLIN - Wave Division Multiplex (WDM) Cheyenne Mt AFS, CO (Node 2) / Schriever AFB, CO $ - 0 $ - 0
Turn up two wavelengths which will support two full duplex OC-48's between Schriever AFB (SAFB) and Cheyenne Mtn. AFS Node 2 (CMAFS) of service per month. 12 Months $ - 0 $ - 0
0008 (OPTIONAL CLIN) FFP OPTIONAL CLIN - Wave Division Multiplex (WDM) Peterson AFB, CO / Cheyenne Mt AFS, CO $ - 0 $ - 0
Turn up two wavelengths which will support two full duplex OC-48's between Peterson AFB (PAFB) and Cheyenne Mtn. AFS (CMAFS) of service per month. 12 Months $ - 0 $ - 0
Total Total Yearly cost with optional CLINS $ - 0
Option Year 1
OY 1
CLIN Type Performance Area QTY Unit Unit MRC Total MRC FY20
0001 FFP Wave Division Multiplex (WDM) Cheyenne Mt AFS, CO / Schriever AFB, CO $ - 0
Unprotected East and West (E & W) required, per site, per OC-48. Monthly charge will include 4 ports. 12 Months $ - 0 $ - 0
Interoffice Transport, per mile. Monthly recurring charge includes 19 miles 12 Months $ - 0 $ - 0
Wave Division Multiplex (WDM) Fiber Optic Cable Equipment Lease Room R3301 12 Months $ - 0 $ - 0
0002 FFP Wave Division Multiplex (WDM) Peterson AFB, CO / Schriever AFB, CO $ - 0 $ - 0
Unprotected East and West (E & W) required, per site, per OC-48. Monthly charge will include 4 ports. 12 Months $ - 0 $ - 0
Interoffice Transport, per mile. Monthly recurring charge includes 14 miles. 12 Months $ - 0 $ - 0
Wave Division Multiplex (WDM) Fiber Optic Cable Equipment Lease Room B1038. 12 Months $ - 0 $ - 0
0003 FFP Wave Division Multiplex (WDM) Peterson AFB, CO / Cheyenne Mt AFS, CO $ - 0 $ - 0
Unprotected East and West (E & W) required, per site, per OC-48. Monthly charge will include 4 ports. 12 Months $ - 0 $ - 0
Interoffice Transport, per mile. Monthly recurring charge includes 5 miles. 12 Months $ - 0 $ - 0
Wave Division Multiplex (WDM) Fiber Optic Cable Equipment Lease Room B700.