RFP_HC1013-18-R-0016_HEMP_Re-award.pdf
PDF 801 KB Posted
- Attached to
- HEMP Protected Fiber Optic Cable System
- Solicitation number
- HC101318R0016
- Issued by
-
Defense Information Systems Agency
About this file
HEMP RFP HC1013-18-R-0016. The solicitation document contains one (1) attached file. Please see bottom of the "commercial solicitation and award basis" document for additional attachments.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEE ADDENDUM
(No Collect Calls)
HC101318R0016 30-May-2018
b. TELEPHONE NUMBER
618-229-9129
8. OFFER DUE DATE/LOCAL TIME
02:00 PM 13 Jun 2018
5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA – FAR (48 CFR) 53.212
(TYPE OR PRINT)
(SIGNATURE OF CONTRACTING OFFICER)
ADDENDA ARE
26. TOTAL AWARD AMOUNT (For Gov t. Use Only )
23.
CODE 10. THIS ACQUISITION IS
SUCH ADDRESS IN OFFER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT
BELOW IS CHECKED
TELEPHONE NO.
HC10139. ISSUED BY
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME
ROBERT R SKIPPER
2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER
(TYPE OR PRINT)
30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA
0 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.
25. ACCOUNTING AND APPROPRIATION DATA
1. REQUISITION NUMBER
20.
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
ARE NOT ATTACHED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
. YOUR OFFER ON SOLICITATION
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
% FOR:SET ASIDE:UNRESTRICTED OR X
SMALL BUSINESSX
17a.CONTRACTOR/ CODE FACILITY
OFFEROR CODE
DISA/DITCO-SCOTT
2300 EAST DRIVE
BLDG 3600
SCOTT AFB IL 62225-5406
18a. PAYMENT WILL BE MADE BY CODE
RATED ORDER UNDER
DPAS (15 CFR 700)
13a. THIS CONTRACT IS A
13b. RATING
CODE15. DELIVER TO CODE 16. ADMINISTERED BY
SEE SCHEDULE
12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
14. METHOD OF SOLICITATION
RFQ IFB RFPX
FAX:
TEL: SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
8(A)
HUBZONE SMALL
BUSINESS
SIZE STANDARD:
1,500
NAICS:
517311
X
OFFER DATED
29. AWARD OF CONTRACT: REF.
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
EMAIL:
TEL:
31c. DATE SIGNED
SEE SCHEDULE
SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT
24.22.21.19.
WOMEN-OWNED SMALL BUSINESS (WOSB)
ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
(CONTINUED)
PAGE 2 OF91
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
37. CHECK NUMBER
FINALPARTIALCOMPLETE
36. PAYMENT35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER
FINAL
33. SHIP NUMBER
PARTIAL
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
STANDARD FORM 1449 (REV. 2/2012) BACK
Prescribed by GSA – FAR (48 CFR) 53.212
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
SEE SCHEDULE
20.
SCHEDULE OF SUPPLIES/ SERVICES
21.
QUANTITY UNIT
22. 23.
UNIT PRICE
24.
AMOUNT
19.
ITEM NO.
HC101318R0016
Section SF 1449 - CONTINUATION SHEET
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 12 Months Cheyenne Mt AFS, CO / Shriever AFB, CO
FFP
Wave Division Multiplex (WDM) Cheyenne Mt AFS, CO / Schriever AFB, CO.
Unprotected East and West (E & W) required, per site, per OC-48, will include 4 ports. Interoffice Transport, per mile, includes 19 miles. Wave Division Multiplex (WDM) fiber optic cable equipment lease room R3301.
FOB: Destination
NET AMT
0002 12 Months Peterson AFB, CO / Schriever AFB, CO
FFP
Wave Division Multiplex (WDM) Peterson AFB, CO / Schriever AFB, CO.
Unprotected East and West (E & W) required, per site, per OC-48, will include 4 ports. Interoffice Transport, per mile, includes 14 miles. Wave Division Multiplex (WDM) fiber optic cable equipment lease room B1038.
0003 12 Months Peterson AFB, CO / Cheyenne Mt AFS, CO
FFP
Wave Division Multiplex (WDM) Peterson AFB, CO / Cheyenne Mt. AFS, CO.
Unprotected East and West (E & W) required, per site, per OC-48, will include 4 ports. Interoffice Transport, per mile, includes 5 miles. Wave Division Multiplex (WDM) fiber optic cable equipment lease room B700.
0004 12 Months Cheyenne Mt AFS, CO (Node 2) / Schriever
FFP
Wave Division Multiplex (WDM) Cheyenne Mt AFS, CO / Schriever AFB, CO.
Unprotected East and West (E & W) required, per site, per OC-48, will include 4 ports. Interoffice Transport, per mile, includes 19 miles. Wave Division Multiplex (WDM) fiber optic cable equipment lease room R3101.
0005 12 Months OPTION Cheyenne Mt AFS, CO / Schriever AFB, CO
FFP
Optional CLIN - Turn up and support two wavelengths which will support two full duplex OC-48's between Schriever AFB (SAFB) and Cheyenne Mtn. AFS (CMAFS) of service per month.
0006 12 Months OPTION Peterson AFB, CO / Schriever AFB, CO
FFP
Optional CLIN - Turn up and support two wavelengths which will support two full duplex OC-48's between Peterson AFB (PAFB) and Schriever AFB (SAFB) of service per month.
0007 12 Months OPTION Peterson AFB, CO / Cheyenne Mt AFS, CO
FFP
Optional CLIN - Turn up and support two wavelengths which will support two full duplex OC-48's between Peterson AFB (PAFB) and Cheyenne Mtn. AFS
0008 12 Months OPTION Cheyenne Mt AFS, CO (Node 2) / Schriever
FFP
Optional CLIN - Turn up and support two wavelengths which will support two full duplex OC-48's between Schriever AFB (SAFB) and Cheyenne Mtn. AFS Node 2
1001 12 Months OPTION Cheyenne Mt AFS, CO / Shriever AFB, CO
FFP
Wave Division Multiplex (WDM) Cheyenne Mt AFS, CO / Schriever AFB, CO.
Unprotected East and West (E & W) required, per site, per OC-48, will include 4
1002 12 Months OPTION Peterson AFB, CO / Schriever AFB, CO
FFP
Wave Division Multiplex (WDM) Peterson AFB, CO / Schriever AFB, CO.
Unprotected East and West (E & W) required, per site, per OC-48, will include 4 ports. Interoffice Transport, per mile, includes 14 miles. Wave Division Multiplex
1003 12 Months OPTION Peterson AFB, CO / Cheyenne Mt AFS, CO
FFP
Wave Division Multiplex (WDM) Peterson AFB, CO / Cheyenne Mt. AFS, CO.
Unprotected East and West (E & W) required, per site, per OC-48, will include 4 ports. Interoffice Transport, per mile, includes 5 miles. Wave Division Multiplex
1004 12 Months OPTION Cheyenne Mt AFS, CO (Node 2) / Schriever
FFP
Wave Division Multiplex (WDM) Cheyenne Mt AFS, CO / Schriever AFB, CO.
Unprotected East and West (E & W) required, per site, per OC-48, will include 4 ports. Interoffice Transport, per mile, includes 19 miles. Wave Division Multiplex
1005 12 Months OPTION Cheyenne Mt AFS, CO / Schriever AFB, CO
FFP
Optional CLIN - Turn up and support two wavelengths which will support two full duplex OC-48's between Schriever AFB (SAFB) and Cheyenne Mtn. AFS
1006 12 Months OPTION Peterson AFB, CO / Schriever AFB, CO
FFP
Optional CLIN - Turn up and support two wavelengths which will support two full duplex OC-48's between Peterson AFB (PAFB) and Schriever AFB (SAFB) of
1007 12 Months OPTION Peterson AFB, CO / Cheyenne Mt AFS, CO
FFP
Optional CLIN - Turn up and support two wavelengths which will support two full duplex OC-48's between Peterson AFB (PAFB) and Cheyenne Mtn. AFS
1008 12 Months OPTION Cheyenne Mt AFS, CO (Node 2) / Schriever
FFP
Optional CLIN - Turn up and support two wavelengths which will support two full duplex OC-48's between Schriever AFB (SAFB) and Cheyenne Mtn. AFS Node 2
2001 12 Months OPTION Cheyenne Mt AFS, CO / Shriever AFB, CO
FFP
Wave Division Multiplex (WDM) Cheyenne Mt AFS, CO / Schriever AFB, CO.
Unprotected East and West (E & W) required, per site, per OC-48, will include 4
2002 12 Months OPTION Peterson AFB, CO / Schriever AFB, CO
FFP
Wave Division Multiplex (WDM) Peterson AFB, CO / Schriever AFB, CO.
Unprotected East and West (E & W) required, per site, per OC-48, will include 4 ports. Interoffice Transport, per mile, includes 14 miles. Wave Division Multiplex
2003 12 Months OPTION Peterson AFB, CO / Cheyenne Mt AFS, CO
FFP
Wave Division Multiplex (WDM) Peterson AFB, CO / Cheyenne Mt. AFS, CO.
Unprotected East and West (E & W) required, per site, per OC-48, will include 4 ports. Interoffice Transport, per mile, includes 5 miles. Wave Division Multiplex
2004 12 Months OPTION Cheyenne Mt AFS, CO (Node 2) / Schriever
FFP
Wave Division Multiplex (WDM) Cheyenne Mt AFS, CO / Schriever AFB, CO.
Unprotected East and West (E & W) required, per site, per OC-48, will include 4 ports. Interoffice Transport, per mile, includes 19 miles. Wave Division Multiplex
2005 12 Months OPTION Cheyenne Mt AFS, CO / Schriever AFB, CO
FFP
Optional CLIN - Turn up and support two wavelengths which will support two full duplex OC-48's between Schriever AFB (SAFB) and Cheyenne Mtn. AFS
2006 12 Months OPTION Peterson AFB, CO / Schriever AFB, CO
FFP
Optional CLIN - Turn up and support two wavelengths which will support two full duplex OC-48's between Peterson AFB (PAFB) and Schriever AFB (SAFB) of
2007 12 Months OPTION Peterson AFB, CO / Cheyenne Mt AFS, CO
FFP
Optional CLIN - Turn up and support two wavelengths which will support two full duplex OC-48's between Peterson AFB (PAFB) and Cheyenne Mtn. AFS
2008 12 Months OPTION Cheyenne Mt AFS, CO (Node 2) / Schriever
FFP
Optional CLIN - Turn up and support two wavelengths which will support two full duplex OC-48's between Schriever AFB (SAFB) and Cheyenne Mtn. AFS Node 2
3001 12 Months OPTION Cheyenne Mt AFS, CO / Shriever AFB, CO
FFP
Wave Division Multiplex (WDM) Cheyenne Mt AFS, CO / Schriever AFB, CO.
Unprotected East and West (E & W) required, per site, per OC-48, will include 4
3002 12 Months OPTION Peterson AFB, CO / Schriever AFB, CO
FFP
Wave Division Multiplex (WDM) Peterson AFB, CO / Schriever AFB, CO.
Unprotected East and West (E & W) required, per site, per OC-48, will include 4 ports. Interoffice Transport, per mile, includes 14 miles. Wave Division Multiplex
3003 12 Months OPTION Peterson AFB, CO / Cheyenne Mt AFS, CO
FFP
Wave Division Multiplex (WDM) Peterson AFB, CO / Cheyenne Mt. AFS, CO.
Unprotected East and West (E & W) required, per site, per OC-48, will include 4 ports. Interoffice Transport, per mile, includes 5 miles. Wave Division Multiplex
3004 12 Months OPTION Cheyenne Mt AFS, CO (Node 2) / Schriever
FFP
Wave Division Multiplex (WDM) Cheyenne Mt AFS, CO / Schriever AFB, CO.
Unprotected East and West (E & W) required, per site, per OC-48, will include 4 ports. Interoffice Transport, per mile, includes 19 miles. Wave Division Multiplex
3005 12 Months OPTION Cheyenne Mt AFS, CO / Schriever AFB, CO
FFP
Optional CLIN - Turn up and support two wavelengths which will support two full duplex OC-48's between Schriever AFB (SAFB) and Cheyenne Mtn. AFS
3006 12 Months OPTION Peterson AFB, CO / Schriever AFB, CO
FFP
Optional CLIN - Turn up and support two wavelengths which will support two full duplex OC-48's between Peterson AFB (PAFB) and Schriever AFB (SAFB) of
3007 12 Months OPTION Peterson AFB, CO / Cheyenne Mt AFS, CO
FFP
Optional CLIN - Turn up and support two wavelengths which will support two full duplex OC-48's between Peterson AFB (PAFB) and Cheyenne Mtn. AFS
3008 12 Months OPTION Cheyenne Mt AFS, CO (Node 2) / Schriever
FFP
Optional CLIN - Turn up and support two wavelengths which will support two full duplex OC-48's between Schriever AFB (SAFB) and Cheyenne Mtn. AFS Node 2
4001 12 Months OPTION Cheyenne Mt AFS, CO / Shriever AFB, CO
FFP
Wave Division Multiplex (WDM) Cheyenne Mt AFS, CO / Schriever AFB, CO.
Unprotected East and West (E & W) required, per site, per OC-48, will include 4
4002 12 Months OPTION Peterson AFB, CO / Schriever AFB, CO
FFP
Wave Division Multiplex (WDM) Peterson AFB, CO / Schriever AFB, CO.
Unprotected East and West (E & W) required, per site, per OC-48, will include 4 ports. Interoffice Transport, per mile, includes 14 miles. Wave Division Multiplex
4003 12 Months OPTION Peterson AFB, CO / Cheyenne Mt AFS, CO
FFP
Wave Division Multiplex (WDM) Peterson AFB, CO / Cheyenne Mt. AFS, CO.
Unprotected East and West (E & W) required, per site, per OC-48, will include 4 ports. Interoffice Transport, per mile, includes 5 miles. Wave Division Multiplex
4004 12 Months OPTION Cheyenne Mt AFS, CO (Node 2) / Schriever
FFP
Wave Division Multiplex (WDM) Cheyenne Mt AFS, CO / Schriever AFB, CO.
Unprotected East and West (E & W) required, per site, per OC-48, will include 4 ports. Interoffice Transport, per mile, includes 19 miles. Wave Division Multiplex
4005 12 Months OPTION Cheyenne Mt AFS, CO / Schriever AFB, CO
FFP
Optional CLIN - Turn up and support two wavelengths which will support two full duplex OC-48's between Schriever AFB (SAFB) and Cheyenne Mtn. AFS
4006 12 Months OPTION Peterson AFB, CO / Schriever AFB, CO
FFP
Optional CLIN - Turn up and support two wavelengths which will support two full duplex OC-48's between Peterson AFB (PAFB) and Schriever AFB (SAFB) of
4007 12 Months OPTION Peterson AFB, CO / Cheyenne Mt AFS, CO
FFP
Optional CLIN - Turn up and support two wavelengths which will support two full duplex OC-48's between Peterson AFB (PAFB) and Cheyenne Mtn. AFS
4008 12 Months OPTION Cheyenne Mt AFS, CO (Node 2) / Schriever
FFP
Optional CLIN - Turn up and support two wavelengths which will support two full duplex OC-48's between Schriever AFB (SAFB) and Cheyenne Mtn. AFS Node 2
5001 12 Months OPTION Cheyenne Mt AFS, CO / Shriever AFB, CO
FFP
Wave Division Multiplex (WDM) Cheyenne Mt AFS, CO / Schriever AFB, CO.
Unprotected East and West (E & W) required, per site, per OC-48, will include 4
5002 12 Months OPTION Peterson AFB, CO / Schriever AFB, CO
FFP
Wave Division Multiplex (WDM) Peterson AFB, CO / Schriever AFB, CO.
Unprotected East and West (E & W) required, per site, per OC-48, will include 4 ports. Interoffice Transport, per mile, includes 14 miles. Wave Division Multiplex
5003 12 Months OPTION Peterson AFB, CO / Cheyenne Mt AFS, CO
FFP
Wave Division Multiplex (WDM) Peterson AFB, CO / Cheyenne Mt. AFS, CO.
Unprotected East and West (E & W) required, per site, per OC-48, will include 4 ports. Interoffice Transport, per mile, includes 5 miles. Wave Division Multiplex
5004 12 Months OPTION Cheyenne Mt AFS, CO (Node 2) / Schriever
FFP
Wave Division Multiplex (WDM) Cheyenne Mt AFS, CO / Schriever AFB, CO.
Unprotected East and West (E & W) required, per site, per OC-48, will include 4 ports. Interoffice Transport, per mile, includes 19 miles. Wave Division Multiplex
5005 12 Months OPTION Cheyenne Mt AFS, CO / Schriever AFB, CO
FFP
Optional CLIN - Turn up and support two wavelengths which will support two full duplex OC-48's between Schriever AFB (SAFB) and Cheyenne Mtn. AFS
5006 12 Months OPTION Peterson AFB, CO / Schriever AFB, CO
FFP
Optional CLIN - Turn up and support two wavelengths which will support two full duplex OC-48's between Peterson AFB (PAFB) and Schriever AFB (SAFB) of
5007 12 Months OPTION Peterson AFB, CO / Cheyenne Mt AFS, CO
FFP
Optional CLIN - Turn up and support two wavelengths which will support two full duplex OC-48's between Peterson AFB (PAFB) and Cheyenne Mtn. AFS
5008 12 Months OPTION Cheyenne Mt AFS, CO (Node 2) / Schriever
FFP
Optional CLIN - Turn up and support two wavelengths which will support two full duplex OC-48's between Schriever AFB (SAFB) and Cheyenne Mtn. AFS Node 2
6001 12 Months OPTION Cheyenne Mt AFS, CO / Shriever AFB, CO
FFP
Wave Division Multiplex (WDM) Cheyenne Mt AFS, CO / Schriever AFB, CO.
Unprotected East and West (E & W) required, per site, per OC-48, will include 4
6002 12 Months OPTION Peterson AFB, CO / Schriever AFB, CO
FFP
Wave Division Multiplex (WDM) Peterson AFB, CO / Schriever AFB, CO.
Unprotected East and West (E & W) required, per site, per OC-48, will include 4 ports. Interoffice Transport, per mile, includes 14 miles. Wave Division Multiplex
6003 12 Months OPTION Peterson AFB, CO / Cheyenne Mt AFS, CO
FFP
Wave Division Multiplex (WDM) Peterson AFB, CO / Cheyenne Mt. AFS, CO.
Unprotected East and West (E & W) required, per site, per OC-48, will include 4 ports. Interoffice Transport, per mile, includes 5 miles. Wave Division Multiplex
6004 12 Months OPTION Cheyenne Mt AFS, CO (Node 2) / Schriever
FFP
Wave Division Multiplex (WDM) Cheyenne Mt AFS, CO / Schriever AFB, CO.
Unprotected East and West (E & W) required, per site, per OC-48, will include 4 ports. Interoffice Transport, per mile, includes 19 miles. Wave Division Multiplex
6005 12 Months OPTION Cheyenne Mt AFS, CO / Schriever AFB, CO
FFP
Optional CLIN - Turn up and support two wavelengths which will support two full duplex OC-48's between Schriever AFB (SAFB) and Cheyenne Mtn. AFS
6006 12 Months OPTION Peterson AFB, CO / Schriever AFB, CO
FFP
Optional CLIN - Turn up and support two wavelengths which will support two full duplex OC-48's between Peterson AFB (PAFB) and Schriever AFB (SAFB) of
6007 12 Months OPTION Peterson AFB, CO / Cheyenne Mt AFS, CO
FFP
Optional CLIN - Turn up and support two wavelengths which will support two full duplex OC-48's between Peterson AFB (PAFB) and Cheyenne Mtn. AFS
6008 12 Months OPTION Cheyenne Mt AFS, CO (Node 2) / Schriever
FFP
Optional CLIN - Turn up and support two wavelengths which will support two full duplex OC-48's between Schriever AFB (SAFB) and Cheyenne Mtn. AFS Node 2
7001 12 Months OPTION Cheyenne Mt AFS, CO / Shriever AFB, CO
FFP
Wave Division Multiplex (WDM) Cheyenne Mt AFS, CO / Schriever AFB, CO.
Unprotected East and West (E & W) required, per site, per OC-48, will include 4
7002 12 Months OPTION Peterson AFB, CO / Schriever AFB, CO
FFP
Wave Division Multiplex (WDM) Peterson AFB, CO / Schriever AFB, CO.
Unprotected East and West (E & W) required, per site, per OC-48, will include 4 ports. Interoffice Transport, per mile, includes 14 miles. Wave Division Multiplex
7003 12 Months OPTION Peterson AFB, CO / Cheyenne Mt AFS, CO
FFP
Wave Division Multiplex (WDM) Peterson AFB, CO / Cheyenne Mt. AFS, CO.
Unprotected East and West (E & W) required, per site, per OC-48, will include 4 ports. Interoffice Transport, per mile, includes 5 miles. Wave Division Multiplex
7004 12 Months OPTION Cheyenne Mt AFS, CO (Node 2) / Schriever
FFP
Wave Division Multiplex (WDM) Cheyenne Mt AFS, CO / Schriever AFB, CO.
Unprotected East and West (E & W) required, per site, per OC-48, will include 4 ports. Interoffice Transport, per mile, includes 19 miles. Wave Division Multiplex
7005 12 Months OPTION Cheyenne Mt AFS, CO / Schriever AFB, CO
FFP
Optional CLIN - Turn up and support two wavelengths which will support two full duplex OC-48's between Schriever AFB (SAFB) and Cheyenne Mtn. AFS
7006 12 Months OPTION Peterson AFB, CO / Schriever AFB, CO
FFP
Optional CLIN - Turn up and support two wavelengths which will support two full duplex OC-48's between Peterson AFB (PAFB) and Schriever AFB (SAFB) of
7007 12 Months OPTION Peterson AFB, CO / Cheyenne Mt AFS, CO
FFP
Optional CLIN - Turn up and support two wavelengths which will support two full duplex OC-48's between Peterson AFB (PAFB) and Cheyenne Mtn. AFS
7008 12 Months OPTION Cheyenne Mt AFS, CO (Node 2) / Schriever
FFP
Optional CLIN - Turn up and support two wavelengths which will support two full duplex OC-48's between Schriever AFB (SAFB) and Cheyenne Mtn. AFS Node 2
8001 12 Months OPTION Cheyenne Mt AFS, CO / Shriever AFB, CO
FFP
Wave Division Multiplex (WDM) Cheyenne Mt AFS, CO / Schriever AFB, CO.
Unprotected East and West (E & W) required, per site, per OC-48, will include 4
8002 12 Months OPTION Peterson AFB, CO / Schriever AFB, CO
FFP
Wave Division Multiplex (WDM) Peterson AFB, CO / Schriever AFB, CO.
Unprotected East and West (E & W) required, per site, per OC-48, will include 4 ports. Interoffice Transport, per mile, includes 14 miles. Wave Division Multiplex
8003 12 Months OPTION Peterson AFB, CO / Cheyenne Mt AFS, CO
FFP
Wave Division Multiplex (WDM) Peterson AFB, CO / Cheyenne Mt. AFS, CO.
Unprotected East and West (E & W) required, per site, per OC-48, will include 4 ports. Interoffice Transport, per mile, includes 5 miles. Wave Division Multiplex
8004 12 Months OPTION Cheyenne Mt AFS, CO (Node 2) / Schriever
FFP
Wave Division Multiplex (WDM) Cheyenne Mt AFS, CO / Schriever AFB, CO.
Unprotected East and West (E & W) required, per site, per OC-48, will include 4 ports. Interoffice Transport, per mile, includes 19 miles. Wave Division Multiplex
8005 12 Months OPTION Cheyenne Mt AFS, CO / Schriever AFB, CO
FFP
Optional CLIN - Turn up and support two wavelengths which will support two full duplex OC-48's between Schriever AFB (SAFB) and Cheyenne Mtn. AFS
8006 12 Months OPTION Peterson AFB, CO / Schriever AFB, CO
FFP
Optional CLIN - Turn up and support two wavelengths which will support two full duplex OC-48's between Peterson AFB (PAFB) and Schriever AFB (SAFB) of
8007 12 Months OPTION Peterson AFB, CO / Cheyenne Mt AFS, CO
FFP
Optional CLIN - Turn up and support two wavelengths which will support two full duplex OC-48's between Peterson AFB (PAFB) and Cheyenne Mtn. AFS
8008 12 Months OPTION Cheyenne Mt AFS, CO (Node 2) / Schriever
FFP
Optional CLIN - Turn up and support two wavelengths which will support two full duplex OC-48's between Schriever AFB (SAFB) and Cheyenne Mtn. AFS Node 2
9001 12 Months OPTION Cheyenne Mt AFS, CO / Shriever AFB, CO
FFP
Wave Division Multiplex (WDM) Cheyenne Mt AFS, CO / Schriever AFB, CO.
Unprotected East and West (E & W) required, per site, per OC-48, will include 4
9002 12 Months OPTION Peterson AFB, CO / Schriever AFB, CO
FFP
Wave Division Multiplex (WDM) Peterson AFB, CO / Schriever AFB, CO.
Unprotected East and West (E & W) required, per site, per OC-48, will include 4 ports. Interoffice Transport, per mile, includes 14 miles. Wave Division Multiplex
9003 12 Months OPTION Peterson AFB, CO / Cheyenne Mt AFS, CO
FFP
Wave Division Multiplex (WDM) Peterson AFB, CO / Cheyenne Mt. AFS, CO.
Unprotected East and West (E & W) required, per site, per OC-48, will include 4 ports. Interoffice Transport, per mile, includes 5 miles. Wave Division Multiplex
9004 12 Months OPTION Cheyenne Mt AFS, CO (Node 2) / Schriever
FFP
Wave Division Multiplex (WDM) Cheyenne Mt AFS, CO / Schriever AFB, CO.
Unprotected East and West (E & W) required, per site, per OC-48, will include 4 ports. Interoffice Transport, per mile, includes 19 miles. Wave Division Multiplex
9005 12 Months OPTION Cheyenne Mt AFS, CO / Schriever AFB, CO
FFP
Optional CLIN - Turn up and support two wavelengths which will support two full duplex OC-48's between Schriever AFB (SAFB) and Cheyenne Mtn. AFS
9006 12 Months OPTION Peterson AFB, CO / Schriever AFB, CO
FFP
Optional CLIN - Turn up and support two wavelengths which will support two full duplex OC-48's between Peterson AFB (PAFB) and Schriever AFB (SAFB) of
9007 12 Months OPTION Peterson AFB, CO / Cheyenne Mt AFS, CO
FFP
Optional CLIN - Turn up and support two wavelengths which will support two full duplex OC-48's between Peterson AFB (PAFB) and Cheyenne Mtn. AFS
9008 12 Months OPTION Cheyenne Mt AFS, CO (Node 2) / Schriever
FFP
Optional CLIN - Turn up and support two wavelengths which will support two full duplex OC-48's between Schriever AFB (SAFB) and Cheyenne Mtn. AFS Node 2
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
0001 N/A N/A N/A Government 0002 N/A N/A N/A Government 0003 N/A N/A N/A Government 0004 N/A N/A N/A Government 0005 N/A N/A N/A Government 0006 N/A N/A N/A Government 0007 N/A N/A N/A Government 0008 N/A N/A N/A Government
1001 N/A N/A N/A Government 1002 N/A N/A N/A Government 1003 N/A N/A N/A Government 1004 N/A N/A N/A Government 1005 N/A N/A N/A Government 1006 N/A N/A N/A Government 1007 N/A N/A N/A Government 1008 N/A N/A N/A Government 2001 N/A N/A N/A Government 2002 N/A N/A N/A Government 2003 N/A N/A N/A Government 2004 N/A N/A N/A Government 2005 N/A N/A N/A Government 2006 N/A N/A N/A Government 2007 N/A N/A N/A Government 2008 N/A N/A N/A Government 3001 N/A N/A N/A Government 3002 N/A N/A N/A Government 3003 N/A N/A N/A Government 3004 N/A N/A N/A Government 3005 N/A N/A N/A Government 3006 N/A N/A N/A Government 3007 N/A N/A N/A Government 3008 N/A N/A N/A Government 4001 N/A N/A N/A Government 4002 N/A N/A N/A Government 4003 N/A N/A N/A Government 4004 N/A N/A N/A Government 4005 N/A N/A N/A Government 4006 N/A N/A N/A Government 4007 N/A N/A N/A Government 4008 N/A N/A N/A Government 5001 N/A N/A N/A Government 5002 N/A N/A N/A Government 5003 N/A N/A N/A Government 5004 N/A N/A N/A Government 5005 N/A N/A N/A Government 5006 N/A N/A N/A Government 5007 N/A N/A N/A Government 5008 N/A N/A N/A Government 6001 N/A N/A N/A Government 6002 N/A N/A N/A Government 6003 N/A N/A N/A Government 6004 N/A N/A N/A Government 6005 N/A N/A N/A Government 6006 N/A N/A N/A Government 6007 N/A N/A N/A Government 6008 N/A N/A N/A Government 7001 N/A N/A N/A Government 7002 N/A N/A N/A Government 7003 N/A N/A N/A Government 7004 N/A N/A N/A Government 7005 N/A N/A N/A Government 7006 N/A N/A N/A Government 7007 N/A N/A N/A Government
7008 N/A N/A N/A Government 8001 N/A N/A N/A Government 8002 N/A N/A N/A Government 8003 N/A N/A N/A Government 8004 N/A N/A N/A Government 8005 N/A N/A N/A Government 8006 N/A N/A N/A Government 8007 N/A N/A N/A Government 8008 N/A N/A N/A Government 9001 N/A N/A N/A Government 9002 N/A N/A N/A Government 9003 N/A N/A N/A Government 9004 N/A N/A N/A Government 9005 N/A N/A N/A Government 9006 N/A N/A N/A Government 9007 N/A N/A N/A Government 9008 N/A N/A N/A Government
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
0001 POP 30-SEP-2018 TO
29-SEP-2019
N/A N/A
0002 POP 30-SEP-2018 TO
29-SEP-2019
0003 POP 30-SEP-2018 TO
0004 POP 30-SEP-2018 TO
0005 POP 30-SEP-2018 TO
0006 POP 30-SEP-2018 TO
0007 POP 30-SEP-2018 TO
0008 POP 30-SEP-2018 TO
1001 POP 30-SEP-2019 TO
29-SEP-2020
1002 POP 30-SEP-2019 TO
1003 POP 30-SEP-2019 TO
1004 POP 30-SEP-2019 TO
1005 POP 30-SEP-2019 TO
1006 POP 30-SEP-2019 TO
1007 POP 30-SEP-2019 TO
1008 POP 30-SEP-2019 TO
2001 POP 30-SEP-2020 TO
29-SEP-2021
2002 POP 30-SEP-2020 TO
2003 POP 30-SEP-2020 TO
2004 POP 30-SEP-2020 TO
2005 POP 30-SEP-2020 TO
2006 POP 30-SEP-2020 TO
2007 POP 30-SEP-2020 TO
2008 POP 30-SEP-2020 TO
3001 POP 30-SEP-2021 TO
29-SEP-2022
3002 POP 30-SEP-2021 TO
3003 POP 30-SEP-2021 TO
3004 POP 30-SEP-2021 TO
3005 POP 30-SEP-2021 TO
3006 POP 30-SEP-2021 TO
3007 POP 30-SEP-2021 TO
3008 POP 30-SEP-2021 TO
4001 POP 30-SEP-2022 TO
29-SEP-2023
4002 POP 30-SEP-2022 TO
4003 POP 30-SEP-2022 TO
4004 POP 30-SEP-2022 TO
4005 POP 30-SEP-2022 TO
4006 POP 30-SEP-2022 TO
4007 POP 30-SEP-2022 TO
4008 POP 30-SEP-2022 TO
5001 POP 30-SEP-2023 TO
29-SEP-2024
5002 POP 30-SEP-2023 TO
5003 POP 30-SEP-2023 TO
5004 POP 30-SEP-2023 TO
5005 POP 30-SEP-2023 TO
5006 POP 30-SEP-2023 TO
5007 POP 30-SEP-2023 TO
5008 POP 30-SEP-2023 TO
6001 POP 30-SEP-2024 TO
29-SEP-2025
6002 POP 30-SEP-2024 TO
6003 POP 30-SEP-2024 TO
6004 POP 30-SEP-2024 TO
6005 POP 30-SEP-2024 TO
6006 POP 30-SEP-2024 TO
6007 POP 30-SEP-2024 TO
6008 POP 30-SEP-2024 TO
7001 POP 30-SEP-2025 TO
29-SEP-2026
7002 POP 30-SEP-2025 TO
7003 POP 30-SEP-2025 TO
7004 POP 30-SEP-2025 TO
7005 POP 30-SEP-2025 TO
7006 POP 30-SEP-2025 TO
7007 POP 30-SEP-2025 TO
7008 POP 30-SEP-2025 TO
8001 POP 30-SEP-2026 TO
29-SEP-2027
8002 POP 30-SEP-2026 TO
8003 POP 30-SEP-2026 TO
8004 POP 30-SEP-2026 TO
8005 POP 30-SEP-2026 TO
8006 POP 30-SEP-2026 TO
8007 POP 30-SEP-2026 TO
8008 POP 30-SEP-2026 TO
9001 POP 30-SEP-2027 TO
29-SEP-2028
9002 POP 30-SEP-2027 TO
9003 POP 30-SEP-2027 TO
9004 POP 30-SEP-2027 TO
9005 POP 30-SEP-2027 TO
9006 POP 30-SEP-2027 TO
9007 POP 30-SEP-2027 TO
9008 POP 30-SEP-2027 TO
CLAUSES INCORPORATED BY REFERENCE
52.202-1 Definitions NOV 2013 52.203-12 Limitation On Payments To Influence Certain Federal
Transactions
OCT 2010
52.203-17 Contractor Employee Whistleblower Rights and Requirement To Inform Employees of Whistleblower Rights
APR 2014
52.204-4 Printed or Copied Double-Sided on Postconsumer Fiber Content Paper
MAY 2011
52.204-7 System for Award Management OCT 2016 52.204-14 Service Contract Reporting Requirements OCT 2016 52.204-19 Incorporation by Reference of Representations and
Certifications.
DEC 2014
52.204-22 Alternative Line Item Proposal JAN 2017 52.209-6 Protecting the Government's Interest When Subcontracting
With Contractors Debarred, Suspended, or Proposed for Debarment
OCT 2015
52.209-7 Information Regarding Responsibility Matters JUL 2013 52.212-4 Contract Terms and Conditions--Commercial Items JAN 2017 52.215-2 Audit and Records--Negotiation OCT 2010 52.215-8 Order of Precedence--Uniform Contract Format OCT 1997 52.222-50 Combating Trafficking in Persons MAR 2015 52.225-25 Prohibition on Contracting with Entities Engaging in Certain
Activities or Transactions Relating to Iran-- Representation and Certifications.
OCT 2015
52.228-5 Insurance - Work On A Government Installation JAN 1997 52.232-17 Interest MAY 2014 52.232-18 Availability Of Funds APR 1984 52.232-23 Alt I Assignment of Claims (May 2014) - Alternate I APR 1984 52.232-39 Unenforceability of Unauthorized Obligations JUN 2013 52.232-40 Providing Accelerated Payments to Small Business
Subcontractors
DEC 2013
52.233-1 Disputes MAY 2014 52.237-2 Protection Of Government Buildings, Equipment, And
Vegetation
APR 1984
52.237-11 Accepting and Dispensing of $1 Coin SEP 2008 252.204-7000 Disclosure Of Information OCT 2016 252.204-7003 Control Of Government Personnel Work Product APR 1992 252.204-7004 Alt A System for Award Management Alternate A FEB 2014 252.204-7006 Billing Instructions OCT 2005 252.204-7009 Limitations on the Use or Disclosure of Third-Party
Contractor Reported Cyber Incident Information
OCT 2016
252.204-7012 Safeguarding Covered Defense Information and Cyber Incident Reporting
OCT 2016
252.205-7000 Provision Of Information To Cooperative Agreement Holders DEC 1991 252.209-7004 Subcontracting With Firms That Are Owned or Controlled By
The Government of a Country that is a State Sponsor of Terrorism
OCT 2015
252.222-7007 Representation Regarding Combating Trafficking in Persons JAN 2015 252.223-7004 Drug Free Work Force SEP 1988 252.223-7006 Prohibition On Storage, Treatment, and Disposal of Toxic or
Hazardous Materials
SEP 2014
252.225-7048 Export-Controlled Items JUN 2013 252.226-7001 Utilization of Indian Organizations and Indian-Owned
Economic Enterprises, and Native Hawaiian Small Business Concerns
SEP 2004
252.232-7010 Levies on Contract Payments DEC 2006
252.237-7010 Prohibition on Interrogation of Detainees by Contractor Personnel
JUN 2013
252.239-7000 Protection Against Compromising Emanations JUN 2004 252.239-7001 Information Assurance Contractor Training and Certification JAN 2008 252.239-7004 Orders For Facilities And Services NOV 2005 252.239-7005 Rates, Charges, And Services NOV 2005 252.239-7006 Tariff Information JUL 1997 252.239-7008 Reuse Arrangements DEC 1991 252.239-7010 Cloud Computing Services OCT 2016 252.239-7011 Special Construction And Equipment Charges DEC 1991 252.239-7012 Title To Telecommunication Facilities And Equipment DEC 1991 252.243-7002 Requests for Equitable Adjustment DEC 2012 252.244-7000 Subcontracts for Commercial Items JUN 2013 252.247-7023 Transportation of Supplies by Sea APR 2014 252.247-7024 Notification Of Transportation Of Supplies By Sea MAR 2000
CLAUSES INCORPORATED BY FULL TEXT
52.209-2 PROHIBITION ON CONTRACTING WITH INVERTED DOMESTIC CORPORATIONS--
REPRESENTATION (NOV 2015)
(a) Definitions. Inverted domestic corporation and subsidiary have the meaning given in the clause of this contract entitled Prohibition on Contracting with Inverted Domestic Corporations (52.209-10).
(b) Government agencies are not permitted to use appropriated (or otherwise made available) funds for contracts with either an inverted domestic corporation, or a subsidiary of an inverted domestic corporation, unless the exception at 9.108-2(b) applies or the requirement is waived in accordance with the procedures at 9.108-4.
(c) Representation. The Offeror represents that--
(1) It [ ___ ] is, [ ___ ] is not an inverted domestic corporation; and
(2) It [ ___ ] is, [ ___ ] is not a subsidiary of an inverted domestic corporation.
(End of provision)
52.209-9000 ORGANIZATIONAL AND CONSULTANT CONFLICTS OF INTEREST (OCCI) (DEC 2014)
(a) An offeror shall identify in its proposal, quote, bid or any resulting contract, any potential or actual Organizational and Consultant Conflicts of Interest (OCCI) as described in FAR Subpart 9.5. This includes actual or potential conflicts of interests of proposed subcontractors. If an offeror identifies in its proposal, quote, bid or any resulting contract, a potential or actual conflict of interests the offeror shall submit an Organizational and Consultant Conflicts of Interest Mitigation Plan to the contracting officer. The Organizational and Consultant Conflicts of Interest Mitigation Plan shall describe how the offeror addresses potential or actual conflicts of interest and identify how they will avoid, neutralize, or mitigate present or future conflicts of interest.
(b) Offerors must consider whether their involvement and participation raises any OCCI issues, especially in the following areas when:
(1) Providing systems engineering and technical direction.
(2) Preparing specifications or work statements and/or objectives.
(3) Providing evaluation services.
(4) Obtaining access to proprietary information.
(c) If a prime contractor or subcontractor breaches any of the OCCI restrictions, or does not disclose or misrepresents any relevant facts concerning its conflict of interest, the government may take appropriate action, including terminating the contract, in additional to any remedies that may be otherwise permitted by the contract or operation of law.
(End of clause)
52.212-1 INSTRUCTIONS TO OFFERORS--COMMERCIAL ITEMS (JAN 2017)
(a) North American Industry Classification System (NAICS) code and small business size standard. The NAICS code and small business size standard for this acquisition appear in Block 10 of the solicitation cover sheet (SF 1449). However, the small business size standard for a concern which submits an offer in its own name, but which proposes to furnish an item which it did not itself manufacture, is 500 employees.
(b) Submission of offers. Submit signed and dated offers to the office specified in this solicitation at or before the exact time specified in this solicitation. Offers may be submitted on the SF 1449, letterhead stationery, or as otherwise specified in the solicitation. As a minimum, offers must show--
(1) The solicitation number;
(2) The time specified in the solicitation for receipt of offers;
(3) The name, address, and telephone number of the offeror;
(4) A technical description of the items being offered in sufficient detail to evaluate compliance with the requirements in the solicitation. This may include product literature, or other documents, if necessary;
(5) Terms of any express warranty;
(6) Price and any discount terms;
(7) "Remit to" address, if different than mailing address;
(8) A completed copy of the representations and certifications at FAR 52.212-3 (see FAR 52.212-3(b) for those representations and certifications that the offeror shall complete electronically);
(9) Acknowledgment of Solicitation Amendments;
(10) Past performance information, when included as an evaluation factor, to include recent and relevant contracts for the same or similar items and other references (including contract numbers, points of contact with telephone numbers and other relevant information); and
(11) If the offer is not submitted on the SF 1449, include a statement specifying the extent of agreement with all terms, conditions, and provisions included in the solicitation. Offers that fail to furnish required representations or information, or reject the terms and conditions of the solicitation may be excluded from consideration.
(c) Period for acceptance of offers. The offeror agrees to hold the prices in its offer firm for 30 calendar days from the date specified for receipt of offers, unless another time period is specified in an addendum to the solicitation.
(d) Product samples. When required by the solicitation, product samples shall be submitted at or prior to the time specified for receipt of offers. Unless otherwise specified in this solicitation, these samples shall be submitted at no expense to the Government, and returned at the sender's request and expense, unless they are destroyed during preaward testing.
(e) Multiple offers. Offerors are encouraged to submit multiple offers presenting alternative terms and conditions, including alternative line items (provided that the alternative line items are consistent with subpart 4.10 of the Federal Acquisition Regulation), or alternative commercial items for satisfying the requirements of this solicitation.
Each offer submitted will be evaluated separately.
(f) Late submissions, modifications, revisions, and withdrawals of offers:
(1) Offerors are responsible for submitting offers, and any modifications, revisions, or withdrawals, so as to reach the Government office designated in the solicitation by the time specified in the solicitation. If no time is specified in the solicitation, the time for receipt is 4:30 p.m., local time, for the designated Government office on the date that offers or revisions are due.
(2)(i) Any offer, modification, revision, or withdrawal of an offer received at the Government office designated in the solicitation after the exact time specified for receipt of offers is “late” and will not be considered unless it is received before award is made, the Contracting Officer determines that accepting the late offer would not unduly delay the acquisition; and--
(A) If it was transmitted through an electronic commerce method authorized by the solicitation, it was received at the initial point of entry to the Government infrastructure not later than 5:00 p.m. one working day prior to the date specified for receipt of offers; or
(B) There is acceptable evidence to establish that it was received at the Government installation designated for receipt of offers and was under the Government's control prior to the time set for receipt of offers; or
(C) If this solicitation is a request for proposals, it was the only proposal received.
(ii) However, a late modification of an otherwise successful offer, that makes its terms more favorable to the Government, will be considered at any time it is received and may be accepted.
(3) Acceptable evidence to establish the time of receipt at the Government installation includes the time/date stamp of that installation on the offer wrapper, other documentary evidence of receipt maintained by the installation, or oral testimony or statements of Government personnel.
(4) If an emergency or unanticipated event interrupts normal Government processes so that offers cannot be received at the Government office designated for receipt of offers by the exact time specified in the solicitation, and urgent Government requirements preclude amendment of the solicitation or other notice of an extension of the closing date, the time specified for receipt of offers will be deemed to be extended to the same time of day specified in the solicitation on the first work day on which normal Government processes resume.
(5) Offers may be withdrawn by written notice received at any time before the exact time set for receipt of offers.
Oral offers in response to oral solicitations may be withdrawn orally. If the solicitation authorizes facsimile offers, offers may be withdrawn via facsimile received at any time before the exact time set for receipt of offers, subject to the conditions specified in the solicitation concerning facsimile offers. An offer may be withdrawn in person by an offeror or its authorized representative if, before the exact time set for receipt of offers, the identity of the person requesting withdrawal is established and the person signs a receipt for the offer.
(g) Contract award (not applicable to Invitation for Bids). The Government intends to evaluate offers and award a contract without discussions with offerors. Therefore, the offeror's initial offer should contain the offeror's best terms from a price and technical standpoint. However, the Government reserves the right to conduct discussions if later determined by the Contracting Officer to be necessary. The Government may reject any or all offers if such action is in the public interest; accept other than the lowest offer; and waive informalities and minor irregularities in offers received.
(h) Multiple awards. The Government may accept any item or group of items of an offer, unless the offeror qualifies the offer by specific limitations. Unless otherwise provided in the Schedule, offers may not be submitted for quantities less than those specified. The Government reserves the right to make an award on any item for a quantity less than the quantity offered, at the unit prices offered, unless the offeror specifies otherwise in the offer.
(i) Availability of requirements documents cited in the solicitation. (1)(i) The GSA Index of Federal Specifications, Standards and Commercial Item Descriptions, FPMR Part 101-29, and copies of specifications, standards, and commercial item descriptions cited in this solicitation may be obtained for a fee by submitting a request to--GSA Federal Supply Service Specifications Section, Suite 8100, 470 East L'Enfant Plaza, SW, Washington, DC 20407, Telephone (202) 619-8925, Facsimile (202) 619-8978.
(ii) If the General Services Administration, Department of Agriculture, or Department of Veterans Affairs issued this solicitation, a single copy of specifications, standards, and commercial item descriptions cited in this solicitation may be obtained free of charge by submitting a request to the addressee in paragraph (i)(1)(i) of this provision.
Additional copies will be issued for a fee.
(2) Most unclassified Defense specifications and standards may be downloaded from the following ASSIST websites:
(i) ASSIST (https://assist.dla.mil/online/start/).
(ii) Quick Search (http://quicksearch.dla.mil/).
(iii) ASSISTdocs.com (http://assistdocs.com).
(3) Documents not available from ASSIST may be ordered from the Department of Defense Single Stock Point (DoDSSP) by--
(i) Using the ASSIST Shopping Wizard (https://assist.dla.mil/wizard/index.cfm);
(ii) Phoning the DoDSSP Customer Service Desk (215) 697-2179, Mon-Fri, 0730 to 1600 EST; or
(iii) Ordering from DoDSSP, Building 4, Section D, 700 Robbins Avenue, Philadelphia, PA 19111-5094, Telephone
(215) 697-2667/2179, Facsimile (215) 697-1462.
(4) Nongovernment (voluntary) standards must be obtained from the organization responsible for their preparation, publication, or maintenance.
(j) Unique entity identifier. (Applies to all offers exceeding $3,500, and offers of $3,500 or less if the solicitation requires the Contractor to be registered in the System for Award Management (SAM) database.) The Offeror shall enter, in the block with its name and address on the cover page of its offer, the annotation ``Unique Entity Identifier'' followed by the unique entity identifier that identifies the Offeror's name and address. The Offeror also shall enter its Electronic Funds Transfer (EFT) indicator, if applicable. The EFT indicator is a four-character suffix to the unique entity identifier. The suffix is assigned at the discretion of the Offeror to establish additional SAM records for identifying alternative EFT accounts (see subpart 32.11) for the same entity. If the Offeror does not have a unique entity identifier, it should contact the entity designated at www.sam.gov for unique entity identifier establishment directly to obtain one. The Offeror should indicate that it is an offeror for a Government contract when contacting the entity designated at www.sam.gov for establishing the unique entity identifier.
(k) System for Award Management. Unless exempted by an addendum to this solicitation, by submission of an offer, the offeror acknowledges the requirement that a prospective awardee shall be registered in the SAM database prior to award, during performance and through final payment of any contract resulting from this solicitation. If the Offeror does not become registered in the SAM database in the time prescribed by the Contracting Officer, the Contracting Officer will proceed to award to the next otherwise successful registered Offeror. Offerors may obtain information on registration and annual confirmation requirements via the SAM database accessed through https://www.acquisition.gov.
(l) Debriefing. If a post-award debriefing is given to requesting offerors, the Government shall disclose the following information, if applicable:
(1) The agency's evaluation of the significant weak or deficient factors in the debriefed offeror's offer.
(2) The overall evaluated cost or price and technical rating of the successful and the debriefed offeror and past performance information on the debriefed offeror.
(3) The overall ranking of all offerors, when any ranking was developed by the agency during source selection.
(4) A summary of the rationale for award;
(5) For acquisitions of commercial items, the make and model of the item to be delivered by the successful offeror.
(6) Reasonable responses to relevant questions posed by the debriefed offeror as to whether source-selection procedures set forth in the solicitation, applicable regulations, and other applicable authorities were followed by the agency.
52.212-2 EVALUATION--COMMERCIAL ITEMS (OCT 2014)
(a) The Government will award a contract resulting from this solicitation to the responsible offeror whose offer conforming to the solicitation will be most advantageous to the Government, price and other factors considered. The following factors shall be used to evaluate offers:
See attached addendum to FAR 52.212-2 for the significant evaluation factors, such as (i) technical capability of the item offered to meet the Government requirement; (ii) price; and include them in the relative order of importance of the evaluation factors, such as in descending order of importance.
Technical and past performance, when combined, are: See attached addendum to FAR 52.212-2.
(b) Options. The Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. The Government may determine that an offer is unacceptable if the option prices are significantly unbalanced. Evaluation of options shall not obligate the Government to exercise the option(s).
(c) A written notice of award or acceptance of an offer, mailed or otherwise furnished to the successful offeror within the time for acceptance specified in the offer, shall result in a binding contract without further action by either party. Before the offer's specified expiration time, the Government may accept an offer (or part of an offer), whether or not there are negotiations after its receipt, unless a written notice of withdrawal is received before award.
52.212-3 OFFEROR REPRESENTATIONS AND CERTIFICATIONS--COMMERCIAL ITEMS (NOV 2017)
ALTERNATE I (OCT 2014)
The offeror shall complete only paragraphs (b) of this provision if the Offeror has completed the annual representations and certification electronically via the System for Award Management (SAM) Web site located at https://www.sam.gov/portal . If the Offeror has not completed the annual representations and certifications electronically, the Offeror shall complete only paragraphs (c) through (u) of this provision.
(a) Definitions. As used in this provision--
“Economically disadvantaged women-owned small business (EDWOSB) concern” means a small business concern that is at least 51 percent directly and unconditionally owned by, and the management and daily business operations of which are controlled by, one or more women who are citizens of the United States and who are economically disadvantaged in accordance with 13 CFR part 127. It automatically qualifies as a women-owned small business eligible under the WOSB Program.
“Forced or indentured child labor” means all work or service—
(1) Exacted from any person under the age of 18 under the menace of any penalty for its nonperformance and for which the worker does not offer himself voluntarily; or
(2) Performed by any person under the age of 18 pursuant to a contract the enforcement of which can be accomplished by process or penalties.
“Highest-level owner” means the entity that owns or controls an immediate owner of the offeror, or that owns or controls one or more entities that control an immediate owner of the offeror. No entity owns or exercises control of the highest level owner.
“Immediate owner” means an entity, other than the offeror, that has direct control of the offeror. Indicators of control include, but are not limited to, one or more of the following: Ownership or interlocking management, identity of interests among family members, shared facilities and equipment, and the common use of employees.
“Inverted domestic corporation,” means a foreign incorporated entity that meets the definition of an inverted domestic corporation under 6 U.S.C. 395(b), applied in accordance with the rules and definitions of 6 U.S.C. 395(c).
“Manufactured end product” means any end product in product and service codes (PSCs) 1000-9999, except—
(1) PSC 5510, Lumber and Related Basic Wood Materials;
(2) Product or Service Group (PSG) 87, Agricultural Supplies;
(3) PSG 88, Live Animals;
(4) PSG 89, Subsistence;
(5) PSC 9410, Crude Grades of Plant Materials;
(6) PSC 9430, Miscellaneous Crude Animal Products, Inedible;
(7) PSC 9440, Miscellaneous Crude Agricultural and Forestry Products;
(8) PSC 9610, Ores;
(9) PSC 9620, Minerals, Natural and Synthetic; and
(10) PSC 9630, Additive Metal Materials.
“Place…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.