PRAWS_RFP_HC101316R0005_0001.pdf
PDF 384 KB Posted
- Attached to
- Puerto Rico Area Wideband System (PRAWS)
- Solicitation number
- HC1013-16-R-0005
- Issued by
-
Defense Information Systems Agency
About this file
RFP Amendment 0001
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
A. The purpose of this amendment is to update the follow ing attachments.
Attachment 1 - PWS. Updates based on Contractor questions and to include Coast Guard sites.
Attachment 5 - Pricing Spreadsheet. Updates to inlcude CLINS for Coast Guard sites
Attachment 6 - RFP Questions. Provide answ ers to Contractor questions.
Attachment 7 - Instructions to Offerrors. Removed subfactor 4.
Attachment 8 - Evaluation Factors. Removed subfactor 4.
B. The response due date has been extended from 29-Feb-2016 12:00 PM to 01-Apr-2016 12:00 PM.
1. CONTRACT ID CODE PAGE OF PAGES
S 1 27
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 01-Mar-2016
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X HC1013-16-R-0005
X 9B. DATED (SEE ITEM 11)
28-Jan-2016
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
01-Mar-2016
CODE
DISA/DITCO-SCOTT
2300 EAST DRIVE - BLDG 3600
SCOTT AFB IL 62225-5406
HC1013 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
HC1013-16-R-0005
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 1449 - CONTINUATION SHEET
SOLICITATION/CONTRACT FORM
The required response date/time has changed from 29-Feb-2016 12:00 PM to 01-Apr-
2016 12:00 PM.
SUPPLIES OR SERVICES AND PRICES
SUBCLIN 0025AC
The CLIN description has changed from OPERATIONS AND MAINTENANCE to USCG LEASES.
The CLIN extended description has changed from:
6.3 Task 3 – Operations and Maintenance Requirements
To:
6.2.1 Subtask 1 - Leases and Permit Requirements.
SUBCLIN 1001AC
The pricing detail quantity has decreased by 12.00 from 12.00 to 0.00.
SUBCLIN 1002AB
SUBCLIN 1003AA
SUBCLIN 1025AC
SUBCLIN 2001AC
SUBCLIN 2002AB
SUBCLIN 2003AA
SUBCLIN 2025AC
SUBCLIN 0025AD is added as follows:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0025AD 12 Months
OPERATIONS AND MAINTENANCE
FFP
6.3 task 3 - Operations and Maintenance requirements
FOB: Destination
NET AMT
CLIN 0032 is added as follows:
USCG RFF El Yunque
FFP
SUBCLIN 0032AA is added as follows:
0032AA 12 Months
PROJECT MANAGEMENT
FFP
6.1 Task 1 - Project Management
SUBCLIN 0032AB is added as follows:
0032AB 12 Months
OPERATIONS AND MAINTENANCE
FFP
6.3 Task 3 - Operations and Maintenance Requirements
CLIN 0033 is added as follows:
USCG RFF Monte Del Estado
SUBCLIN 0033AA is added as follows:
0033AA 12 Months
PROJECT MANAGEMENT
FFP
SUBCLIN 0033AB is added as follows:
0033AB 12 Months
OPERATIONS AND MAINTEANCE
FFP
CLIN 0034 is added as follows:
USCG RFF Cerro Maravilla
SUBCLIN 0034AA is added as follows:
0034AA 12 Months
PROJECT MANAGEMENT
FFP
SUBCLIN 0034AB is added as follows:
0034AB 12 Months
OPERATIONS AND MAINTENANCE
FFP
CLIN 0035 is added as follows:
USCG RFF St. George's Hill St. Croix
SUBCLIN 0035AA is added as follows:
0035AA 12 Months
PROJECT MANAGEMENT
FFP
SUBCLIN 0035AB is added as follows:
0035AB 12 Months
OPERATIONS AND MAINTENANCE
FFP
CLIN 0036 is added as follows:
USCG RFF Crown Mountain, St Thomas
SUBCLIN 0036AA is added as follows:
0036AA 12 Months
PROJECT MANAGEMENT
FFP
SUBCLIN 0036AB is added as follows:
0036AB 12 Months
USCG LEASES
FFP
6.2.1 Subtask 1- Leases and Permit Requirements
SUBCLIN 0036AC is added as follows:
0036AC 12 Months
OPERATIONS AND MAINTENANCE
FFP
CLIN 0037 is added as follows:
OPTION SUPPLEMENTAL (Optional)
6.5 Task 5- Optional Services
CLIN 0038 is added as follows:
TRAVEL
FFP
6.5.2 Subtask 2 - Travel
CLIN 1032 is added as follows:
OPTION USCG RFF El Yunque
SUBCLIN 1032AA is added as follows:
1032AA 12 Months
OPTION PROJECT MANAGEMENT
FFP
SUBCLIN 1032AB is added as follows:
1032AB 12 Months
OPTION OPERATIONS AND MAINTENANCE
FFP
6.3 Task 3- Operations and Maintenance Requirements
CLIN 1033 is added as follows:
OPTION USCG RFF Monte Del Estado
SUBCLIN 1033AA is added as follows:
1033AA 12 Months
OPTION PROJECT MANAGEMENT
FFP
SUBCLIN 1033AB is added as follows:
1033AB 12 Months
OPTION OPERATIONS AND MAINTENANCE
FFP
CLIN 1034 is added as follows:
OPTION USCG RFF Cerro Maravilla
SUBCLIN 1034AA is added as follows:
1034AA 12 Months
OPTION PROJECT MANAGEMENT
FFP
SUBCLIN 1034AB is added as follows:
1034AB 12 Months
OPTION OPERATIONS AND MAINTENANCE
FFP
6.3 Task 3 Operations and Maintenance Requirements
CLIN 1035 is added as follows:
OPTION USCG RFF St. George's Hill St. Croix
SUBCLIN 1035AA is added as follows:
1035AA 12 Months
OPTION PROJECT MANAGEMENT
FFP
SUBCLIN 1035AB is added as follows:
1035AB 12 Months
OPTION OPERATIONS AND MAINTENANCE
FFP
CLIN 1036 is added as follows:
OPTION USCG RFF Crown Mountain. St Thomas
SUBCLIN 1036AA is added as follows:
1036AA 12 Months
OPTION PROJECT MANAGEMENT
FFP
SUBCLIN 1036AB is added as follows:
1036AB 12 Months OPTION USCG Leases
FFP
6.2.1 Subtask 1 - Leases and Permit Requirements
SUBCLIN 1036AC is added as follows:
1036AC 12 Months
OPTION OPERATIONS AND MAINTENANCE
FFP
CLIN 1037 is added as follows:
OPTION Supplemental (Optional)
6.5 Task 5- Optional Services
CLIN 1038 is added as follows:
OPTION USCG Travel
FFP
SUBCLIN 2025AD is added as follows:
2025AD 12 Months
OPTION OPERATIONS AND MAINTENANCE
FFP
CLIN 2032 is added as follows:
OPTION USCG RFF El Yunque
SUBCLIN 2032AA is added as follows:
2032AA 12 Months
OPTION PROJECT MANAGEMENT
FFP
SUBCLIN 2032AB is added as follows:
2032AB 12 Months
OPTION OPERATIONS AND MAINTENANCE
FFP
CLIN 2033 is added as follows:
OPTION USCG RFF Monte Del Estado
SUBCLIN 2033AA is added as follows:
2033AA 12 Months
OPTION PROJECT MANAGEMENT
FFP
SUBCLIN 2033AB is added as follows:
2033AB 12 Months
OPTION OPERATIONS AND MAINTENANCE
CLIN 2034 is added as follows:
OPTION USCG RFF Cerro Maravilla
SUBCLIN 2034AA is added as follows:
2034AA 12 Months
OPTION PROJECT MANAGEMENT
6.1 Task 1 – Project Management
SUBCLIN 2034AB is added as follows:
2034AB 12 Mole
(mol)
OPTION OPERATIONS AND MAINTENANCE
CLIN 2035 is added as follows:
OPTION USCG RFF St. George's Hill St. Croix
SUBCLIN 2035AA is added as follows:
2035AA 12 Months
OPTION PROJECT MANAGEMENT
SUBCLIN 2035AB is added as follows:
2035AB 12 Months
OPTION OPERATIONS AND MAINTENANCE
CLIN 2036 is added as follows:
OPTION USCG RFF Crown Mountain, St. Thomas
SUBCLIN 2036AA is added as follows:
2036AA 12 Months
OPTION PROJECT MANAGEMENT
SUBCLIN 2036AB is added as follows:
2036AB 12 Months
OPTION USCG LEASES
6.2.1 Subtask 1 - Leases and Permit Requirements
SUBCLIN 2036AC is added as follows:
2036AC 12 Months
OPTION OPERATIONS AND MAINTENANCE
CLIN 2037 is added as follows:
OPTION SUPPLEMENTAL (Optional)
6.5 Task 5 - Optional Services
CLIN 2038 is added as follows:
OPTION USCG TRAVEL
INSPECTION AND ACCEPTANCE
The following Acceptance/Inspection Schedule was added for SUBCLIN 0025AD:
INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
N/A N/A N/A Government
The following Acceptance/Inspection Schedule was added for CLIN 0032:
The following Acceptance/Inspection Schedule was added for SUBCLIN 0032AA:
The following Acceptance/Inspection Schedule was added for SUBCLIN 0032AB:
The following Acceptance/Inspection Schedule was added for CLIN 0033:
The following Acceptance/Inspection Schedule was added for SUBCLIN 0033AA:
The following Acceptance/Inspection Schedule was added for SUBCLIN 0033AB:
The following Acceptance/Inspection Schedule was added for CLIN 0034:
The following Acceptance/Inspection Schedule was added for SUBCLIN 0034AA:
The following Acceptance/Inspection Schedule was added for SUBCLIN 0034AB:
The following Acceptance/Inspection Schedule was added for CLIN 0035:
The following Acceptance/Inspection Schedule was added for SUBCLIN 0035AA:
The following Acceptance/Inspection Schedule was added for SUBCLIN 0035AB:
The following Acceptance/Inspection Schedule was added for CLIN 0036:
The following Acceptance/Inspection Schedule was added for SUBCLIN 0036AA:
The following Acceptance/Inspection Schedule was added for SUBCLIN 0036AB:
The following Acceptance/Inspection Schedule was added for SUBCLIN 0036AC:
The following Acceptance/Inspection Schedule was added for CLIN 0037:
The following Acceptance/Inspection Schedule was added for CLIN 0038:
The following Acceptance/Inspection Schedule was added for CLIN 1032:
The following Acceptance/Inspection Schedule was added for SUBCLIN 1032AA:
The following Acceptance/Inspection Schedule was added for SUBCLIN 1032AB:
The following Acceptance/Inspection Schedule was added for CLIN 1033:
The following Acceptance/Inspection Schedule was added for SUBCLIN 1033AA:
The following Acceptance/Inspection Schedule was added for SUBCLIN 1033AB:
The following Acceptance/Inspection Schedule was added for CLIN 1034:
The following Acceptance/Inspection Schedule was added for SUBCLIN 1034AA:
The following Acceptance/Inspection Schedule was added for SUBCLIN 1034AB:
The following Acceptance/Inspection Schedule was added for CLIN 1035:
The following Acceptance/Inspection Schedule was added for SUBCLIN 1035AA:
The following Acceptance/Inspection Schedule was added for SUBCLIN 1035AB:
The following Acceptance/Inspection Schedule was added for CLIN 1036:
The following Acceptance/Inspection Schedule was added for SUBCLIN 1036AA:
The following Acceptance/Inspection Schedule was added for SUBCLIN 1036AB:
The following Acceptance/Inspection Schedule was added for SUBCLIN 1036AC:
The following Acceptance/Inspection Schedule was added for CLIN 1037:
The following Acceptance/Inspection Schedule was added for CLIN 1038:
The following Acceptance/Inspection Schedule was added for SUBCLIN 2025AD:
The following Acceptance/Inspection Schedule was added for CLIN 2032:
The following Acceptance/Inspection Schedule was added for SUBCLIN 2032AA:
The following Acceptance/Inspection Schedule was added for SUBCLIN 2032AB:
The following Acceptance/Inspection Schedule was added for CLIN 2033:
The following Acceptance/Inspection Schedule was added for SUBCLIN 2033AA:
The following Acceptance/Inspection Schedule was added for SUBCLIN 2033AB:
The following Acceptance/Inspection Schedule was added for CLIN 2034:
The following Acceptance/Inspection Schedule was added for SUBCLIN 2034AA:
The following Acceptance/Inspection Schedule was added for SUBCLIN 2034AB:
The following Acceptance/Inspection Schedule was added for CLIN 2035:
The following Acceptance/Inspection Schedule was added for SUBCLIN 2035AA:
The following Acceptance/Inspection Schedule was added for SUBCLIN 2035AB:
The following Acceptance/Inspection Schedule was added for CLIN 2036:
The following Acceptance/Inspection Schedule was added for SUBCLIN 2036AA:
The following Acceptance/Inspection Schedule was added for SUBCLIN 2036AB:
The following Acceptance/Inspection Schedule was added for SUBCLIN 2036AC:
The following Acceptance/Inspection Schedule was added for CLIN 2037:
The following Acceptance/Inspection Schedule was added for CLIN 2038:
(End of Summary of Changes)
File details come from the government source that posted it. Updated .