RFP Responses with Amend 001

PRAWS RFP Question Format
Line IDOfferor NameComment NumberDocument (PWS, Eval Factors etc.)Page ReferenceParagraph ReferenceSection, Text,
or Terminology in QuestionQuestion, Comment or Other ObservationsGovernment ResponseRFP Change Required?
1PWS66.2.1.2Facility Leases….the contractor, in cooperation with the Government, shall timely renegotiate or negotiate each lease. Please clarify the government's role in the leases if the contractor is expected to be financialy responsible for the leases.The Contractor is financially responsible for the leases.No
2PWS66.2.1.2Facility LeasesWill the government provide details for each of the existing leases as to content/scope? [floor space, power, etc.]Floor space and power are the responsibility of the Contractor. This should be coordianted with the commercial facility.No
3PWS86.3.2.3maintenance officeis the voice, data, e-mail, and fax capability provided by government or contractor?The communication capabilities are to be provided by the Contractor within commercial facilities.Yes
4PWS106.3.3maintenanceWill a detailed equipment list be provided for each PRAWS site, including the warehouse spares inventory?Yes, equipment list of current inventory will be provided to include spares.Yes
5PWS106.3.3.1.2end of life / end of support equipment itemsHow will the government address equipment that is end of life and end of support? What responsibility does the contractor have for those items?The Government will provide replacements for end of life equipment - Contractor will schedule the installation and install EOL equipment.Yes
6PWS106.3.3.1.2power backup systemsWill the government provide additional clarity on the number and type of backup systems?The offeror is responsible for providing adequate facilities include uninterrupted power, environmental conditioning, and required physical security to ensure the Government equipment operates per its specifications. The Government will provide a list of equipment to be maintained.Yes
7PWS106.3.3.1.3sparesHow many spares are presently allocated for each site?See response to comment #4.Yes
8PWS106.3.3.1.3The contractor shall maintain the GFE spares…Future spares and all expendable items will be the responsibility of the contractor.Without current information on spares inventories, this is difficult to provide FFP pricing.See response to comment #4.Yes
9PWS106.3.3.1.3The contractor shall maintain the GFE spares…Future spares and all expendable items will be the responsibility of the contractor.What responsibility will the contractor have for future spares including spares for items refurbished or replaced under future technology refreshment?The Government will provide the spares as GFE to be shipped to the Contractor as needed. The Contractor can provide sparing recommendations based on site locations. The Contractor shall provide a Maintenance Plan outlining two (2) types of maintenance support; Corrective and Preventative.Yes
10PWS106.3.3.1.7maintenance inventoryWill the government provide a current inventory report as a baseline to support FFP pricing ?Yes, see response to comment #4.Yes
11PWS116.3.4.1Structural AnalysesWho performs the Structural Analyses of towers today? Will the government provide a sample?The incubment performs the structure analysis of the towers today. The quarterly antenna inspection report is a Contractor-determined format, no sample at this time.No
12PWS116.3.4.1Tower maintenancePlease define the scope of "tower maintenance" under this contract with respect to "acceptable to the government at all times"6.3.4.1 The Contractor shall maintain the Government PRAWS owned antennas and antenna towers in a state of preservation and structural integrity acceptable to the Government at all times. This shall include painting, monitoring structural integrity and cross member replacements (hardware). All lights and operating devices shall be maintained in continuous working order on Government provided towers. The antennas and towers shall be maintained, at a minimum, to the same level of condition as noted at contract award. The Contractor shall be responsible for material costs and structural engineering costs.Yes
13PWS116.3.4.1Table 6-3Can the government provide more detail in the type of towers listed ?Equipment list will provide additional detail.Yes
14PWS116.3.4.4System Power RequirementsAre there listings of non-government and government owned facilities absent from the RFP?Additional facilities added to include Coast Guard sites.Yes
15PWS116.3.4.4Ft Allen backup powerWill the government provide additional clarity on the scope of maintenance on the backup generator system?The Contractor preventive maintenance plan shall include generator run test schedules, quarterly maintenance and semi-annual load tests at full load capacity at FT. Allen.Yes
16PWS116.3.4.4non-government installationsDefine AC power requirements at non-government faciliities.Equipment list will clarify.Yes
17PWS116.3.4.6UPSWill the government provide a listing of UPS capacity, type, age for pricing purposes?UPS capacity and type will be listed with the equipment list, not age.Yes
18PWS138optional servicesHow does the government propose to calculate reductions in contract price for activity related to unpriced optional services?Any Government request to be made under Task 5 will be negotiated and mutually agreed upon via contract modification.No
19PWS146.5.2travelIs estimated travel to be priced, or will the government provide a "plug number" for proposal purposes?Travel is not to be priced during the RFP. Travel is associated with 6.5 Task 5- Optional Services. Travel is a cost-reimbursable CLIN that will be authorized on an “as needed” basis and will be issued by contract modification(s) to cover the necessary travel cost to support this contract.No
20PWS2114.hSCRMIs the SCRM Plan to be delivered within the Technical Volume page count?The SCRM plan will not be considered as part of the Technical Volume page count and can be delivered as a separate attachment.No
21PWS6.3.2.9Appendix BAppendix B lists standards and specifications - was an equipment listing intended as part of this Appendix?Yes, see response to comment #4.Yes
22Section L3 of 82.2.1Executive SummaryIf the proposal includes an executive summary, is that included in the Tech Volume page count limit?Yes, the executive summary is not required and would count against the volume that inlcudes it.No
23Section L3 of 82.2.2font sizeWhat is the allowed font size for plain text not in tables, etc?Per Section L, 2.2.2.1, font size shall be no smaller than 10 point Times New Roman or Arial Narrow.No
24PWS2 of 226frequency bandWhat frequency band is being used at present and is the government using multiple bands?Equipment list will clarify.Yes
25PWS2 of 226parabolic dish antenas, wave guidesWhat size of parabolic dish antennas and size of wave guides are being used? How old is the equipment?Equipment list will clarify, with exception to the equipment age.Yes
26PWS2 of 226equipment brands and modelsWill the government provide the brand and model of all equipment being used, current and old? Harris/Farinon? Promina Multiplexer?To be provided with equipment listYes
27PWS2 of 226network downtimeWhat is the allowable downtime for the network and expected turnaround time for repair and restoration of service?Reference Section 7 Performance Standards of the PWS. The Availability Objective of 99.95% as calculated in Section 3.2 the FRS. The network must be available 99.5% of the time. If repairs take longer than 24 hours and it is not due to the negligence of the government a credit of 1/30 monthly maintenance charges will be taken from the contractor.No
28PWS7 of 226.3Tower maintenanceCan the government provide tower height? How are sites accessed and with what types of transport?Tower height will be provided in equipment list. Access to sites is determined by the Contractor.Yes
29PWS7 of 226.3Equipment replacementIf equipment is no longer supported by the manufacturer, does the government allow the contractor to replace with equipment from a new manufacturer?Contractor shall notify the Government and the Government will identify replacement.No
30PWS7 of 226.3Equipment replacementDoes the contractor provide new equipment replacement if spares are not onsite?The Government will provide spares for GFE.No
31PWS10 of 226.3.3.1.3SparesWill the government provide a list of available spares?See response to comment #4.Yes
32PWS7 of 226.3Preventative maintenanceIs there a required PMI schedule per site per year?Yes, see 6.3.3.1.5 The Contractor’s preventive maintenance plan shall include a preventive maintenance inspection schedule for each site on the network.Yes
33PWS7 of 226.3System failureHow often does the government experience failure on the system network?UnkwnownNo
34PWS106.3.3maintenanceWill a detailed equipment list be provided for each PRAWS site, including the warehouse spares inventory?See resposne to comment #4.Yes
35PWS66.2.1.2Facility Leases"….the contractor, in cooperation with the Government, shall timely renegotiate or negotiate each lease." Please clarify the government's role in the leases if the contractor is expected to be financialy responsible for the leases.See response to comment #1.No
36PWS106.3.3.1.2end of life / end of support equipment itemsHow will the government address equipment that is end of life and end of support? What responsibility does the contractor have for those items?See response to comment #5.Yes
37PWS106.3.3.1.3sparesHow many spares are presently allocated for each site?See response to comment #4.Yes
38PWS86.3.2.3maintenance officeis the voice, data, e-mail, and fax capability provided by government or contractor?See response to comment #3.Yes
39PWS116.3.4.1Table 6-3Can the government provide more detail in the type of towers listed ?To be provided with equipment listYes
40PWS106.3.3.1.3"The contractor shall maintain the GFE spares…Future spares and all expendable items will be the responsibility of the contractor."What responsibility will the contractor have for future spares including spares for items refurbished or replaced under future technology refreshment?See response to comment #9.Yes
41PWS66.2.1.2Facility LeasesWill the government provide details for each of the existing leases as to content/scope? [floor space, power, etc.]See response to comment #2.No
42PWS116.3.4.1Structural AnalysesPlease provide additional clarity on tower maintenance. What structural changes are expected that require these analyses?Yes, See 6.3.4.1 The Contractor shall maintain the Government PRAWS owned antennas and antenna towers in a state of preservation and structural integrity acceptable to the Government at all times. This shall include painting, structure analysismonitoring structural integrity and cross member replacements (hardware). AYes
43PWS106.3.3.1.3"The contractor shall maintain the GFE spares…Future spares and all expendable items will be the responsibility of the contractor."Will the government provide a listing of current spares?See response to comment #4.Yes
44PWS116.3.4.1Tower maintenancePlease define "acceptable to the government at all times"See response to comment #12.Yes
45PWS106.3.3.1.7maintenance inventoryWill the government provide a current inventory report as a baseline to support FFP pricing ?To be provided with equipment listYes
46PWS116.3.4.4System Power RequirementsAre there listings of non-government and government owned facilities absent from the RFP?See response to comment #14.Yes
47PWS116.3.4.4Ft Allen backup powerWill the government provide additional clarity on the scope of maintenance on the backup generator system?See response to comment #15.Yes
48PWS116.3.4.6UPSWill the government provide a listing of UPS capacity, type, age for pricing purposes?Yes, UPS capacity and type will be provided, with the exception to age.Yes
49PWS138optional servicesHow would the government calculate reductions to in-scope contract price for activity related to unpriced Task 5 area subjects?Any Government request to be made under Task 5 will be negotiated and mutually agreed upon via contract modification.No
50PWS146.5.2travelis estimated travel to be priced, or will the government provide a "plug number" for proposal purposes?See response to question #19.No
51PWS116.3.4.4non-government installationsdefine AC power requirements at non-government faciliitiesSee response to question #15.Yes
52Section L3 of 82.2.2font sizeWhat is the allowed font size for plain text that is not included in tables?See response to question #23No
53PWS2114.hSCRMIs this within the page count for the Tech Volume?No, see response to question #20.No
54PWS66.2.1.2Table 6.2.1 Facilities Leasing RequirementsCan the Government proved the points of contact for the vednors listed in Table 6.2.1?NoNo
55PWS1812.1the company must have a final Secret Facility Clearance (FCL) from the Defense Security Service (DSS) Facility Clearance Branch (FCB) at time of award.Will the Government consider allowing the awardee to obtain an interim FCL and subsequently obtain the final FCL?Yes. See Section 12.2.3 which reads in part "The following types of positions require a minimum interim SECRET security clearance and interim IT-II eligibility when performance starts"No
56PWSFinal PRAWS hardware inventoryWhen does the Government anticipate completing the final hardware inventory?Inventory included in amended RFP.Yes
57PWS136.4.4The Contractor shall provide the secure operation of all aspects of the backbone transmission services. This relates to the day-to-day operations of PRAWS service management facilities, and interconnected devices and associated cables and signaling devices.Can the Government provide a detailed description of current physical and network security systems such as building / antenna physical security and network firewalls, encryption, access control?No, PWS section removed from requirement.Yes
58PWS14The DISA Continental United States (CONUS) Global NetOps Support Center (GNSC) exercises Operational Con-trol (OPCON) of all DISN CONUS and PRAWS day-to-day operations, including Information Assurance (IA).Has the PRAWS completed IA certification in accordance with DoD Instruction 8510.01?YesNo
59PWS126Minimum a SECRET clearanceCan the Prime be in a JV agreement approved by SBA to provide the clearance requirement?Pending legal reviewNo
60PWS126Minimum a SECRET clearanceCan the Prime submit the sub-contractors clearance to fulfill the requirement?Pending legal reviewNo