Text version

RFP Responses with Amend 001

PRAWS RFP Question Format
Line IDOfferor NameComment NumberDocument (PWS, Eval Factors etc.)Page ReferenceParagraph ReferenceSection, Text,
or Terminology in QuestionQuestion, Comment or Other ObservationsGovernment ResponseRFP Change Required?
1PWS66.2.1.2Facility Leases….the contractor, in cooperation with the Government, shall timely renegotiate or negotiate each lease. Please clarify the government's role in the leases if the contractor is expected to be financialy responsible for the leases.The Contractor is financially responsible for the leases.No
2PWS66.2.1.2Facility LeasesWill the government provide details for each of the existing leases as to content/scope? [floor space, power, etc.]Floor space and power are the responsibility of the Contractor. This should be coordianted with the commercial facility.No
3PWS86.3.2.3maintenance officeis the voice, data, e-mail, and fax capability provided by government or contractor?The communication capabilities are to be provided by the Contractor within commercial facilities.Yes
4PWS106.3.3maintenanceWill a detailed equipment list be provided for each PRAWS site, including the warehouse spares inventory?Yes, equipment list of current inventory will be provided to include spares.Yes
5PWS106.3.3.1.2end of life / end of support equipment itemsHow will the government address equipment that is end of life and end of support? What responsibility does the contractor have for those items?The Government will provide replacements for end of life equipment - Contractor will schedule the installation and install EOL equipment.Yes
6PWS106.3.3.1.2power backup systemsWill the government provide additional clarity on the number and type of backup systems?The offeror is responsible for providing adequate facilities include uninterrupted power, environmental conditioning, and required physical security to ensure the Government equipment operates per its specifications. The Government will provide a list of equipment to be maintained.Yes
7PWS106.3.3.1.3sparesHow many spares are presently allocated for each site?See response to comment #4.Yes
8PWS106.3.3.1.3The contractor shall maintain the GFE spares…Future spares and all expendable items will be the responsibility of the contractor.Without current information on spares inventories, this is difficult to provide FFP pricing.See response to comment #4.Yes
9PWS106.3.3.1.3The contractor shall maintain the GFE spares…Future spares and all expendable items will be the responsibility of the contractor.What responsibility will the contractor have for future spares including spares for items refurbished or replaced under future technology refreshment?The Government will provide the spares as GFE to be shipped to the Contractor as needed. The Contractor can provide sparing recommendations based on site locations. The Contractor shall provide a Maintenance Plan outlining two (2) types of maintenance support; Corrective and Preventative.Yes
10PWS106.3.3.1.7maintenance inventoryWill the government provide a current inventory report as a baseline to support FFP pricing ?Yes, see response to comment #4.Yes
11PWS116.3.4.1Structural AnalysesWho performs the Structural Analyses of towers today? Will the government provide a sample?The incubment performs the structure analysis of the towers today. The quarterly antenna inspection report is a Contractor-determined format, no sample at this time.No
12PWS116.3.4.1Tower maintenancePlease define the scope of "tower maintenance" under this contract with respect to "acceptable to the government at all times"6.3.4.1 The Contractor shall maintain the Government PRAWS owned antennas and antenna towers in a state of preservation and structural integrity acceptable to the Government at all times. This shall include painting, monitoring structural integrity and cross member replacements (hardware). All lights and operating devices shall be maintained in continuous working order on Government provided towers. The antennas and towers shall be maintained, at a minimum, to the same level of condition as noted at contract award. The Contractor shall be responsible for material costs and structural engineering costs.Yes
13PWS116.3.4.1Table 6-3Can the government provide more detail in the type of towers listed ?Equipment list will provide additional detail.Yes
14PWS116.3.4.4System Power RequirementsAre there listings of non-government and government owned facilities absent from the RFP?Additional facilities added to include Coast Guard sites.Yes
15PWS116.3.4.4Ft Allen backup powerWill the government provide additional clarity on the scope of maintenance on the backup generator system?The Contractor preventive maintenance plan shall include generator run test schedules, quarterly maintenance and semi-annual load tests at full load capacity at FT. Allen.Yes
16PWS116.3.4.4non-government installationsDefine AC power requirements at non-government faciliities.Equipment list will clarify.Yes
17PWS116.3.4.6UPSWill the government provide a listing of UPS capacity, type, age for pricing purposes?UPS capacity and type will be listed with the equipment list, not age.Yes
18PWS138optional servicesHow does the government propose to calculate reductions in contract price for activity related to unpriced optional services?Any Government request to be made under Task 5 will be negotiated and mutually agreed upon via contract modification.No
19PWS146.5.2travelIs estimated travel to be priced, or will the government provide a "plug number" for proposal purposes?Travel is not to be priced during the RFP. Travel is associated with 6.5 Task 5- Optional Services. Travel is a cost-reimbursable CLIN that will be authorized on an “as needed” basis and will be issued by contract modification(s) to cover the necessary travel cost to support this contract.No
20PWS2114.hSCRMIs the SCRM Plan to be delivered within the Technical Volume page count?The SCRM plan will not be considered as part of the Technical Volume page count and can be delivered as a separate attachment.No
21PWS6.3.2.9Appendix BAppendix B lists standards and specifications - was an equipment listing intended as part of this Appendix?Yes, see response to comment #4.Yes
22Section L3 of 82.2.1Executive SummaryIf the proposal includes an executive summary, is that included in the Tech Volume page count limit?Yes, the executive summary is not required and would count against the volume that inlcudes it.No
23Section L3 of 82.2.2font sizeWhat is the allowed font size for plain text not in tables, etc?Per Section L, 2.2.2.1, font size shall be no smaller than 10 point Times New Roman or Arial Narrow.No
24PWS2 of 226frequency bandWhat frequency band is being used at present and is the government using multiple bands?Equipment list will clarify.Yes
25PWS2 of 226parabolic dish antenas, wave guidesWhat size of parabolic dish antennas and size of wave guides are being used? How old is the equipment?Equipment list will clarify, with exception to the equipment age.Yes
26PWS2 of 226equipment brands and modelsWill the government provide the brand and model of all equipment being used, current and old? Harris/Farinon? Promina Multiplexer?To be provided with equipment listYes
27PWS2 of 226network downtimeWhat is the allowable downtime for the network and expected turnaround time for repair and restoration of service?Reference Section 7 Performance Standards of the PWS. The Availability Objective of 99.95% as calculated in Section 3.2 the FRS. The network must be available 99.5% of the time. If repairs take longer than 24 hours and it is not due to the negligence of the government a credit of 1/30 monthly maintenance charges will be taken from the contractor.No
28PWS7 of 226.3Tower maintenanceCan the government provide tower height? How are sites accessed and with what types of transport?Tower height will be provided in equipment list. Access to sites is determined by the Contractor.Yes
29PWS7 of 226.3Equipment replacementIf equipment is no longer supported by the manufacturer, does the government allow the contractor to replace with equipment from a new manufacturer?Contractor shall notify the Government and the Government will identify replacement.No
30PWS7 of 226.3Equipment replacementDoes the contractor provide new equipment replacement if spares are not onsite?The Government will provide spares for GFE.No
31PWS10 of 226.3.3.1.3SparesWill the government provide a list of available spares?See response to comment #4.Yes
32PWS7 of 226.3Preventative maintenanceIs there a required PMI schedule per site per year?Yes, see 6.3.3.1.5 The Contractor’s preventive maintenance plan shall include a preventive maintenance inspection schedule for each site on the network.Yes
33PWS7 of 226.3System failureHow often does the government experience failure on the system network?UnkwnownNo
34PWS106.3.3maintenanceWill a detailed equipment list be provided for each PRAWS site, including the warehouse spares inventory?See resposne to comment #4.Yes
35PWS66.2.1.2Facility Leases"….the contractor, in cooperation with the Government, shall timely renegotiate or negotiate each lease." Please clarify the government's role in the leases if the contractor is expected to be financialy responsible for the leases.See response to comment #1.No
36PWS106.3.3.1.2end of life / end of support equipment itemsHow will the government address equipment that is end of life and end of support? What responsibility does the contractor have for those items?See response to comment #5.Yes
37PWS106.3.3.1.3sparesHow many spares are presently allocated for each site?See response to comment #4.Yes
38PWS86.3.2.3maintenance officeis the voice, data, e-mail, and fax capability provided by government or contractor?See response to comment #3.Yes
39PWS116.3.4.1Table 6-3Can the government provide more detail in the type of towers listed ?To be provided with equipment listYes
40PWS106.3.3.1.3"The contractor shall maintain the GFE spares…Future spares and all expendable items will be the responsibility of the contractor."What responsibility will the contractor have for future spares including spares for items refurbished or replaced under future technology refreshment?See response to comment #9.Yes
41PWS66.2.1.2Facility LeasesWill the government provide details for each of the existing leases as to content/scope? [floor space, power, etc.]See response to comment #2.No
42PWS116.3.4.1Structural AnalysesPlease provide additional clarity on tower maintenance. What structural changes are expected that require these analyses?Yes, See 6.3.4.1 The Contractor shall maintain the Government PRAWS owned antennas and antenna towers in a state of preservation and structural integrity acceptable to the Government at all times. This shall include painting, structure analysismonitoring structural integrity and cross member replacements (hardware). AYes
43PWS106.3.3.1.3"The contractor shall maintain the GFE spares…Future spares and all expendable items will be the responsibility of the contractor."Will the government provide a listing of current spares?See response to comment #4.Yes
44PWS116.3.4.1Tower maintenancePlease define "acceptable to the government at all times"See response to comment #12.Yes
45PWS106.3.3.1.7maintenance inventoryWill the government provide a current inventory report as a baseline to support FFP pricing ?To be provided with equipment listYes
46PWS116.3.4.4System Power RequirementsAre there listings of non-government and government owned facilities absent from the RFP?See response to comment #14.Yes
47PWS116.3.4.4Ft Allen backup powerWill the government provide additional clarity on the scope of maintenance on the backup generator system?See response to comment #15.Yes
48PWS116.3.4.6UPSWill the government provide a listing of UPS capacity, type, age for pricing purposes?Yes, UPS capacity and type will be provided, with the exception to age.Yes
49PWS138optional servicesHow would the government calculate reductions to in-scope contract price for activity related to unpriced Task 5 area subjects?Any Government request to be made under Task 5 will be negotiated and mutually agreed upon via contract modification.No
50PWS146.5.2travelis estimated travel to be priced, or will the government provide a "plug number" for proposal purposes?See response to question #19.No
51PWS116.3.4.4non-government installationsdefine AC power requirements at non-government faciliitiesSee response to question #15.Yes
52Section L3 of 82.2.2font sizeWhat is the allowed font size for plain text that is not included in tables?See response to question #23No
53PWS2114.hSCRMIs this within the page count for the Tech Volume?No, see response to question #20.No
54PWS66.2.1.2Table 6.2.1 Facilities Leasing RequirementsCan the Government proved the points of contact for the vednors listed in Table 6.2.1?NoNo
55PWS1812.1the company must have a final Secret Facility Clearance (FCL) from the Defense Security Service (DSS) Facility Clearance Branch (FCB) at time of award.Will the Government consider allowing the awardee to obtain an interim FCL and subsequently obtain the final FCL?Yes. See Section 12.2.3 which reads in part "The following types of positions require a minimum interim SECRET security clearance and interim IT-II eligibility when performance starts"No
56PWSFinal PRAWS hardware inventoryWhen does the Government anticipate completing the final hardware inventory?Inventory included in amended RFP.Yes
57PWS136.4.4The Contractor shall provide the secure operation of all aspects of the backbone transmission services. This relates to the day-to-day operations of PRAWS service management facilities, and interconnected devices and associated cables and signaling devices.Can the Government provide a detailed description of current physical and network security systems such as building / antenna physical security and network firewalls, encryption, access control?No, PWS section removed from requirement.Yes
58PWS14The DISA Continental United States (CONUS) Global NetOps Support Center (GNSC) exercises Operational Con-trol (OPCON) of all DISN CONUS and PRAWS day-to-day operations, including Information Assurance (IA).Has the PRAWS completed IA certification in accordance with DoD Instruction 8510.01?YesNo
59PWS126Minimum a SECRET clearanceCan the Prime be in a JV agreement approved by SBA to provide the clearance requirement?Pending Legal Review
60PWS126Minimum a SECRET clearanceCan the Prime submit the sub-contractors clearance to fulfill the requirement?Pending Legal Review

MDM/MAS Draft Documents Comments

&P of &N

RFP Responses with Amend 002

PRAWS RFP Question Format
Line IDOfferor NameComment NumberDocument (PWS, Eval Factors etc.)Page ReferenceParagraph ReferenceSection, Text,
or Terminology in QuestionQuestion, Comment or Other ObservationsGovernment ResponseRFP Change Required?
1Attachment 7 Instructions to Offerors.Price VolumeThere are no references to the Defense Base Act (DBA) in the documents from the government. Would the government prefer DBA costs to be included in the Firm Fixed price CLINs or proposed separately as a cost reimbursable line item? It appears that FAR 52.228-3 should be listed in the RFP documents and may have been an oversight. Even if this is not included, under the Christian Doctrine, we would still be required to secure this coverage.

The Defense Base Act (DBA), 42 U.S.C. §1651 et seq., provides workers’ compensation benefits pursuant to the provisions of the Longshore Act for the injury or death of any employee engaged in any employment outside the continental U.S.: (1) at any military base acquired from a foreign government after January 1, 1940; or (2) upon lands used by the U.S. for military purposes in any Territory or possession; or (3) upon any public work in any Territory or possession if such employee is working under the contract of a contractor with the U.S.; (4) under a contract with the United States or an agency thereof, or any subcontract to such a contract, for the purpose of “public work;” (5) under a contract approved and financed by the U.S. or any agency thereof, or any subordinate contract under the Mutual Security Act of 1954; (6) by an American employer providing welfare or similar services for the benefit of the Armed Forces. Source: 42 U.S.C. §1651(a)(1)-(6).

Several Court Cases has also affirmed that DBA coverage must be applied to employees within Puerto Rico:

• The First Circuit affirmed the grant of summary judgment for employer on the ground that employer was immune from a personal injury suit brought by the family of decedent who died in explosion at a naval station in Puerto Rico, holding that Puerto Rico is considered a “territory” for purposes of DBA coverage. The Act is therefore the sole remedy. Source: Davila-Perez v. Lockheed Martin Corp., 202 F.3d 464, 34 BRBS 67(CRT) (1st Cir. 2000).

• The district court held that the DBA applied to employees who work on United States military bases in Puerto Rico and that an employer that secures insurance coverage for its employees as required by the DBA is entitled to tort immunity under the Longshore Act. Source: Colon v. U.S. Dept. of Navy, 223 F.Supp.2d 368 (D.P.R. 2002).

FAR 52.228-3 has been included in the contract. Any associated costs should be included in the FFP CLINS.Yes
2Attachment 8 - Evaluation Factorspage 3LPTA proceduresWill the Government please confirm that the intended source selection process for this LPTA procurement will be as follows: 1) arrange all bids by total price, from lowest to highest; 2) perform a technical evaluation of the lowest price proposal; 3) if the lowest priced proposal reviewed is deemed technically acceptable, stop evaluations and make award; 4) if deemed unacceptable, the process will continue with each higher priced proposal in sequence until a proposal is deemed technically acceptable.
3PWSPage 176.3.3Maintenance PlanIs the draft Maintenance Plan to be included as an Appendix, and outside of the page count limit? Will the content of the Maintenance Plan be evaluated?Requirement of a draft Maintenance Plan to be provided with proposl has been removed as a deliverable.Yes
4PWSPage 176.3.1.3System Operations PlanIs the draft System Operations Plan to be included as an Appendix, and outside of the page count limit? Will the content of the Plan be evaluated?Requirement of a draft System Operations Plan to be provided with proposl has been removed as a deliverable.Yes
5Attachment 5EXCELPricingCLIN structureThe pricing template issued under Amendment 1 includes new site CLINs, but does not include a Lease SLIN in 4 of the 5 new CLINs. Was this an oversight?Attachment 5, CLIN X035 was updated to read Blue Mountain. In attachment 5, CLIN X035AB was added for leases. USCG RFF Cerro Maravilla requires its own commercial tower space lease, connecting to CLIN X025 (DISA Cerro De Punta #2 via m/w). A USCG tower space lease is listed on CLIN X025AB. Additionally, USCG RFF Crown Mountain, St. Thomas, CLIN X036AB requires a commerical tower space lease. USCG RFF St. Thomas connects to DHS-ICE St. Thomas via short-range m/w. The tower space for the USCG m/w equipment at the DHS-ICE PRAWS lcoation is mutually agreed upon between USCG and DHS-ICE.Yes
6PWSPage 4-5Figure 1 and Table 1Figure 1 depicts the added USCG link (per Amendment 1) as St. Croix / Blue Mountain while Table 1 lists St. Croix / St. George's Hill. Please clarify which is accurate.All References to USCG RFF St. Croix should reflect Blue Mountain. PWS Figure 1 and Table 1 have been updated to read Blue Mountain.Yes
7PWSpage 76.3Operations & MaintenanceCan the Maintenance Plan be combined with the System Operation Plan into a single document (draft) for submittal with the proposal?Drafts no longer required to be submitted with proposal, but they should remain two separate documents when submitted after award.Yes
9Attachment 8page 3LPTA methodologyPlease confirm if the following accurately describes the source selection process for this LPTA procurement. First, all proposals received are reviewed and those deemed technically acceptable are selected and ranked in price order. The lowest priced proposal from this pool of technically acceptable proposals will receive the award.Attachment 7, Instructions to Offerors has been updated with the following language, "After receipt of proposals, the Government will first evaluate the lowest price proposal. If the lowest price proposal is determined to be technically acceptable and otherwise properly awardable, no further evaluations will be conducted, and award will be made. If, however, the lowest price proposal is determined to be technically unacceptable and/or otherwise not properly awardable, further evaluations will be conducted."Yes
10Attachment 5EXCELPricingCLIN structureThe pricing template issued under Amendment 1 includes new site CLINs, but does not include a Lease SLIN in 4 of the 5 new CLINs. Was this an oversight?Attachment 5, CLIN X035 was updated to read Blue Mountain. In attachment 5, CLIN X035AB was added for leases. USCG RFF Cerro Maravilla is on USCG-leased space, connecting to CLIN X025 via m/w. The tower space lease on CLIN X025AB and tower space lease CLIN X035AB are the only two of the five USCG locations requiring a tower space lease.Yes
11Attachment 5EXCELPricingCLIN structureUnder CLIN 0025 one of the SLINs listed is 0026AC. Is the correct SLIN 0025AC?0Yes
12Is the contractor required to provide any equipment or tools as part of this solicitation?Yes, the contracotr should have their own test equipment, tools and software in order to keep the network operational.No
13PWSpage 36.1Project ManagementDoes the contractor provided project manager need to be on island or can be located remotely?Contractor provided project manager can be located remotely.No
14For existing facility leases, will the details of those leases be provided and the company currently servicing them?NoNo
15Will the contractor be required to procure any hardware, software, or tools?Yes, the contractor should have their own test equipment, tools and software in order to keep the network operational.No
16PWSpage 1812Security RequirementsIn section 12, it states “the work to be conducted under this PWS is Unclassified”. However further down the second paragraph it state “ a. A SECRET clearance is required for this contract” can you please clarify what security level must the on-site technician posses in order to maintain the equipment and the encprytion devices?A Secret clearance is required to work on this network.No
17PWS126Minimum a SECRET clearanceCan the Prime be in a JV agreement approved by SBA to provide the clearance requirement?According to the PWS, the prime themselves must have a secret facility clearance. Therefore, only having a sub with the clearance and not the prime is not acceptable.No
18PWS126Minimum a SECRET clearanceCan the Prime submit the sub-contractors clearance to fulfill the requirement?In an actual SBA recognized JV, both members of the JV serve as the prime. Therefore, if any one member of the JV has the required clearance, then the JV is considered to have the clearance or meet the requirement.No

RFP Responses with Amend 003

PRAWS RFP Question Format
Line IDOfferor NameComment NumberDocument (PWS, Eval Factors etc.)Page ReferenceParagraph ReferenceSection, Text,
or Terminology in QuestionQuestion, Comment or Other ObservationsGovernment ResponseRFP Change Required?
1Attachment 5EXCELPricingCLIN structureAre facility leases required at Cerro Maravilla, Cerro De Punta 2, and Crown Mountain for the USCG requirements? The amendment 0002 Question answer for question #5 states that they are but Attachment 5 PRAWS Pricing Spread Sheet does not address these cost SubCLINs.Yes, facility leases are required at USCG RFF Cerro Maravilla (X034AB), Cerro De Punta #2 (CLIN X025AC) and USCG RFF Crown Mountain (X036AB). The spreadsheet has been corrected.Yes
2PWS86.3.2.36.3.2.3 The Contractor shall operate and maintain a maintenance office with a minimum capacity of voice and, data,e-mail and facsimile communications, within commercial facilities. Government will provide office spaces with sufficient HVAC, power, and access to telecommunications within Government facilities.Are the Government provided facilities refering to the Network Operations Center? Will contractor personnel have office space available at the Network Operations Center?PWS section updated to remove reference to the Network Operations Center.Yes

RFP Responses with Amend 004

PRAWS RFP Question Format
Line IDOfferor NameComment NumberDocument (PWS, Eval Factors etc.)Page ReferenceParagraph ReferenceSection, Text,
or Terminology in QuestionQuestion, Comment or Other ObservationsGovernment ResponseRFP Change Required?
1PWS86.3.2.36.3.2.3 The Contractor shall operate and maintain a maintenance office with a minimum capacity of voice and e-mail and facsimile communications, within commercial facilities. Government will provide office spaces with sufficient HVAC, power, and access to telecommunications within Government facilities. The Contractor shall have personnel available in the network operations center and maintenance office within a commercial facility Monday through Friday, 0800 to 1600 Puerto Rico time, including US Government Holidays.Please clarify the Government's intent with respect to the two facilities referenced in the Amendment 003 changes.
Is the contractor now required to provide office space in addition to the Government provided facilities?No, the Contractor is not required to provide space in addition to the Government provided space. PWS section has been updated.Yes

RFP Responses 18 March 2016

PRAWS RFP Question Format
Line IDOfferor NameComment NumberDocument (PWS, Eval Factors etc.)Page ReferenceParagraph ReferenceSection, Text,
or Terminology in QuestionQuestion, Comment or Other ObservationsGovernment ResponseRFP Change Required?
1Instructions, Conditions and Notices to Offerors53.1.33.1.3 states that the SF1449 must contain an original signature in block 30Is it reasonable to assume that an electronic signature is sufficient on the SF 1449, since we are required to submit this Volume electronically?Yes.No
2Instructions, Conditions and Notices to Offerors3Table 2.2Table 2.2 states to provide the Cost/Price Volume in MS ExcelTable 2.2 requires us to submit Volume III - Cost/Price in MS Excel. Our cover, table of contents and glossary are not in an MS Excel format. Would it be acceptable to include our entire Volume III - Cost/Price in a .pdf format along with the MS Excel file of Attachment 5?Yes, this would be acceptable.No
3Instructions, Conditions and Notices to Offerors55.1.55.1.5 Format for Cost and Pricing Data5.1.5 states "the cost/price proposal must be submitted in compliance with the CLIN structure contained in the RFP". Does this mean that we need to include pricing in the CLIN of the RFP (pages 3 through 125) in addition to providing Attachment 5 - PRAWS Pricing Spreadsheet?No, pricing in the Attachment 5 spreadsheet is acceptableNo
4PWS186.3.2.3The Amendment removed the network operations center requirement. Is this being replaced by the subsequent requirement the RFI is addressing. Has SBA concurred with this scope change.There was no requirement for the contractor to have personnel available in the network operations center and was therefore removed. There is no requirement to have SBA concur with this removal.No

RFP Responses 31 March 2016

PRAWS RFP Question Format
Line IDOfferor NameComment NumberDocument (PWS, Eval Factors etc.)Page ReferenceParagraph ReferenceSection, Text,
or Terminology in QuestionQuestion, Comment or Other ObservationsGovernment ResponseRFP Change Required?
1Attachment 5 and RFP Amendment 0001SUBCLIN 1001ACAttachment 5 prevails, only provide pricing in the Attachment 5 pricing spreadsheet. The SUBCLIN quantity reduction from 12 to 0 on Amendment 0001 was an error and will be corrected at a later date. A revised schedule B will not be provided at this time.No
The pricing detail quantity has decreased by 12.00 from 12.00 to 0.00.
SUBCLIN 1002AB
The pricing detail quantity has decreased by 12.00 from 12.00 to 0.00.
SUBCLIN 1003AA
The pricing detail quantity has decreased by 12.00 from 12.00 to 0.00.
SUBCLIN 2001AC
The pricing detail quantity has decreased by 12.00 from 12.00 to 0.00.
SUBCLIN 2002AB
The pricing detail quantity has decreased by 12.00 from 12.00 to 0.00.
SUBCLIN 2003AA
The pricing detail quantity has decreased by 12.00 from 12.00 to 0.00
Attachment 5 – Pricing Spreadsheet_Amend_004 has not been changed to reflect the revisions provided in Amendment 1. What prevails, Pricing Spreadsheet_Amend_004 or Amendment 1 or will a revised Schedule B be provided?