20100402_AMEND0004_MSC_NGW_Section_J_Attachment_C_Cross_Reference_Matrix.doc

DOC document 463 KB Posted

Attached to
Military Sealift Command Next Generation Wideband
Solicitation number
HC1013-09-R-2004
Issued by

About this file

20100402_AMEND0004_MSC_NGW_Section_J_Attachment_C_Cross_Reference_Matrix.doc

View the file

Other files

File Type Posted
20100422_AMEND0009_MSC_NGW_Section_J_Attachment_Q_Pricing_Schedule.xls XLS spreadsheet
20100422_AMEND0009_MSC_NGW_Section_L.pdf PDF
HC1013-09-R-2004_Amend_0009.pdf PDF
20100422_AMEND009_MSC_NGW_Section_M.pdf PDF
HC1013-09-R-2004_Amend_0008.pdf PDF
20100416_AMEND0007_MSC_NGW_RFP_QA_.pdf PDF
HC1013-09-R-2004_Amend_0007.pdf PDF
20100416_AMEND0007_MSC_NGW_Section_J_Attachment_Q_Pricing_Schedule.xls XLS spreadsheet
HC1013-09-R-2004_AMEND_6.pdf PDF
HC1013-09-R-2004_AMEND_5.pdf PDF
20100412_AMEND0005_MSC_NGW_Section_J_Attachment_Q_Pricing_Schedule.xls XLS spreadsheet
20100402_AMEND0004_MSC_NGW_Section_J_Attachment_Q_Pricing_Schedule.xls XLS spreadsheet
20100402_AMEND0004_MSC_NGW_Section_L.pdf PDF
20100402_AMEND0004_MSC_NGW_Section_M.pdf PDF
20100323_AMEND0003_MSC_NGW_RFP_QA_.pdf PDF
HC1013-09-R-2004_Amend_3.pdf PDF
20100323_AMEND0003_MSC_NGW_Section_J_Attachment_A_SOO.pdf PDF
20100323_AMEND0003_MSC_NGW_Section_L.pdf PDF
20100324__AMEND0003_MSC_NGW_Section_J_Attachment_C_Cross_Reference_Matrix.pdf PDF
20100317_AMEND0002_MSC_NGW_Section_J_Attachment_I_QASP_Template.doc DOC document
20100317_AMEND0002_MSC_NGW_Section_J_Attachment_U_DD254.pdf PDF
20100317_AMEND0002_MSC_NGW_Section_M.doc DOC document
20100317_AMEND0002_MSC_NGW_Section_J_Attachment_C_Cross_Reference_Matrix.doc DOC document
T-AKE_7488830_B.pdf PDF
20100317_AMEND0002_MSC_NGW_RFP_Q A.doc DOC document
20100317_AMEND0002_MSC_NGW_Section_J_Attachment_H_PWS_Template.doc DOC document
HC1013-09-R-2004_Amend_1.doc DOC document
Section_L_04-March-2010.doc DOC document
ngw Installation Checkout Spares Data cdrl item 9 dd1423.pdf PDF
20100210_NGW_CDRL_Item_12_Support_Service_Report_dd1423-2_FINAL.pdf PDF
20100210_NGW_CDRL_Item_5_Classroom_Training_Report_dd1423-2_FINAL.pdf PDF
20100210_NGW_CDRL_Item_7_Technical_Manual_dd1423-2_FINAL.pdf PDF
20100210_NGW_CDRL_Item_1_Monthly_Reports_dd1423-2_FINAL.pdf PDF
20100210_NGW_CDRL_Item_8_Onboard_Repair_Parts_Data_dd1423-2_FINAL.pdf PDF
20100210_NGW_CDRL_Item_4_Ship_Support_Visit_Report_dd1423-2_FINAL.pdf PDF
20100210_NGW_CDRL_Item_10_Configuration_Baseline_Data_dd1423-2 FINAL.pdf PDF
20100210_NGW_CDRL_Item_6_Engineering_Reference_Package_dd1423-2_FINAL.pdf PDF
20100210_NGW_CDRL_Item_2_Installation_Report_CDRL_dd1423-2_FINAL.pdf PDF
20100210_NGW_Section_J_Attachment_F_Standards_and_Specifications_FINAL.doc DOC document
20100210_NGW_Section_J_Attachment_K_Questionnaire_ Cover_Letter_FINAL.doc DOC document
20100210_NGW_Section_J_Attachment_C_Cross_Reference_Matrix_FINAL.doc DOC document
20100210_NGW_Section_J_Attachment_I_QASP_Template_FINAL.doc DOC document
20100210_NGW_Section_J_Att_N_Past_Performance_Info_Sheet_FINAL.doc DOC document
20100210_NGW_Section_J_Attachment_A_SOO_FINAL.doc DOC document
Section_M_.doc DOC document
Section_L_.doc DOC document
Questions 28-Oct-09.pdf PDF
Att C MSC Ships by Location.pdf PDF
Att G Past Performance Questionnaire.pdf PDF
Att B NGW Afloat Background.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment C: Compliance and Cross Reference Matrix The offeror shall fill out the following Compliance and Cross Reference Matrix indicating the proposal reference information as it relates to the SOO, CLIN numbers, Sections L and M, CDRL references found therein, and the corresponding paragraph in the Technical volume which addresses the referenced item.

The offeror can also add rows to the matrix as they see fit to provide clarity to their submittal. If this matrix conflicts with any other requirement, direction, or provision of this solicitation, the other reference shall take precedence over this matrix. In addition, to the extent this matrix discloses details as to the extent or manner by which the Government intends to evaluate the offeror’s proposals for award, Section M references in the matrix are for information purposes only and the Government shall be obligated to evaluate proposals solely in conformance with the provisions of Section M of the solicitation.

Objectives, Constraints and Related Documentation
Technical Proposal Volume

Evaluation Criteria

Section M, Subfactors for Technical/ Management Factor

SOO
Instructions to Offerors

Section L

CDRL
CLIN
SAS
PWS
QASP
Transition Plan
Technical Proposal
Risk Matrix
1
2a
SF1

CLINs 0001–0078

1
2d
SF1
1
2f
SF1
1a, 1b, 1c,1d,1e,1f
5a
SF1
1
CLINs 0001–0032
1f
5b
SF1

CLIN 0078

1g
5c
SF1

Even CLINs 0002–0032

1
6.2a
SF1

CLINs 0001–0032

1
6.2b
SF1
1
6.2c
SF1
1
6.2d
SF1
1
6.2e
SF1
1
6.2f
SF1
1
6.2g
SF1
1
6.2h
SF1
1
1
6.2i
SF1
1
1
6.2j
SF1
1
6.3a
SF1

CLINs 0035–0065 pertaining to terminal equipment

1
6.3b
SF1
1
6.3c
SF1
1
6.4.1a
SF1

CLINs 0035–0065 pertaining to terminal equipment

1
6.4.1b
SF1
1
6.4.2a
SF1
1
6.4.2b
SF1
1
6.4.2c
SF1
1
6.4.2d
SF1
1
6.5
SF1

CLINs 0035–0065 pertaining to terminal equipment

1
6.5.1a
SF1
1
6.5.1b
SF1
1
6.5.2a
SF1
1
6.5.2b
SF1
2
2c
SF2

CLINs 0035–0065 pertaining to installation services

2
2d
SF2
2d
2e
SF2
2a
5b
SF2

CLIN 0078

2a
5d
SF2
1
2b
5e
SF2
2
5g
SF2d
5
CLIN 0073
2
5h
SF2d

CLINs 0035–0065 pertaining to training in SOO 5h

2
5i
SF2
10
2
6.2b
SF2
2
6.2c
SF2
2
6.2d
SF2
2
6.2e
SF2
2
6.2f
SF2
2
6.2g
SF2
2
6.2h
SF2
1
2
6.2i
SF2
1
2
6.7a
SF2

CLINs 0066–0069 pertaining to Deployment/ Installation

2
6.7b
SF2
4, 5, 8, 11, 12
2
6.7c
SF2
2
6.7d
SF2
2c
6.1a
SF2
2c
6.1b
SF2
2c
6.1c
SF2
2c
6.1d
SF2

CLIN 0074

2c
6.1e
SF2

CLIN 0074

2c
6.1f
SF2
2c
6.1.g
SF2
3
2b
SF3

CLINs 0035–0065 pertaining to installation services as part of the transition plan

3
2c
SF3

CLINs 0035–0065 pertaining to installation services

3
5f
SF3
2, 11
CLINs 0035–0075, 0075
3
5g
SF2d
5
CLIN 0073 pertaining to role of training in SOO 5g as part of the transition plan
3
5h
SF2d

CLINs 0035–0065 pertaining to role of training in SOO 5h as part of the transition plan

3
6.6
SF3
2, 3, 6, 7, 9
CLIN 0035–0065 pertaining to Deployment/

Installation

4
2
SF4
4
5
SF4
2, 11
CLINs 0035–0075, 0077
4
6.1
SF4
4
6.2
SF4
4
6.6
SF4
4
6.7
SF4

Evaluation Criteria

Section M, Factor 1

Reference
Factor 1 Evaluation Criteria
1
Subfactor 1-1: System Performance: The evaluation of Subfactor 1-1 will include an assessment of voice and data communications capacity, including efficiency and cost effectiveness of System Performance.
1a
Subfactor 1-1: System Performance, Standard a: Service availability and service quality per-mobile-platform.
1b
Subfactor 1-1: System Performance, Standard b: Total primary Committed Information Rate (CIR) and secondary Burstable Information Rate (BIR) bandwidth available to each mobile platform (ship or MSOC van). The preferred per-ship CIR is 64 Kbps (symmetric), ideally providing assured access without contention, whether during session initiation or information transfer. The preferred per-ship minimum for BIR is 256 Kbps downlink/128 Kbps uplink.
1c
Subfactor 1-1: System Performance, Standard c: Ability to multicast large data packages (estimated maximum size of 500MB) to the fleet (e.g., software updates/patches/service packs) per-mobile-platform.
1d
Subfactor 1-1: System Performance, Standard d: Coverage area with emphasis on the concentration areas (see SOO Section 6.8), commercial sea routes, and areas of publicly disclosed major Naval operations. Land mass coverage is littoral with the exception of the Mobile Sealift Operations Center (MSOC) vans, which operate inland occasionally (98% littoral, 2% inland).
1e
Subfactor 1-1: System Performance, Standard e: Service delivery, as necessary, to provide highest data rates in the aforementioned concentration areas (see SOO Section 6.8), commercial sea routes, areas of publicly disclosed major Naval operations, and land mass coverage where MSOC vans operate. Best effort service delivery provided in all other covered regions.
1f
Subfactor 1-1: System Performance, Standard f: Flexibility in allocating primary and contingent space segment resources to maintain full service across the MSC fleet as ship deployments change locations.
1g
Subfactor 1-1: System Performance, Standard g: The means to acquire additional satellite bandwidth to support unanticipated growth in fleet size or per-ship consumption as it pertains to scalability, capacity, and allocation of contingent space segment resources (i.e., surge).
1h
Subfactor 1-1: System Performance, Standard h: The effectiveness of terminals and other proposed equipment to provide service requested in the SOO.
2
Subfactor 1-2: Operations and Maintenance: The evaluation of Subfactor 1-2 will include an assessment of the following elements of Operations and Maintenance.
2a
Subfactor 1-2: Operations and Maintenance, Standard a: Flexibility to maintain full system support process and team service across the MSC fleet as ship deployments change locations.
2b
Subfactor 1-2: Operations and Maintenance, Standard b: Offeror’s ability to minimize the role of shore and shipboard personnel in satellite communication (SATCOM) sustainment activities.
2c
Subfactor 1-2: Operations and Maintenance, Standard c: Offeror’s ability to meet DoD information assurance requirements as defined in the SOO.
2d
Subfactor 1-2: Operations and Maintenance, Standard d: Policy for warranties and non-obsolescence. This includes a process for addressing parts obsolescence, including periodic technology updates for commercial hardware and software changes through the operational life of the system.
3
Subfactor 1-3: Transition Plan: The evaluation includes an assessment of the following elements of the Transition Plan.
3a
Subfactor 1-3: Transition Plan, Standard a: Efficient integration strategy
3b
Subfactor 1-3: Transition Plan, Standard b: Performance metrics and means to meet them
3c
Subfactor 1-3: Transition Plan, Standard c: Utilization of government and contractor resources to accomplish the work
3d
Subfactor 1-3: Transition Plan, Standard d: Articulation of risks and ways to mitigate the risks
3e
Subfactor 1-3: Transition Plan, Standard e: Clear understanding of MSC operational and mission requirements and how they impact the transition
4
Subfactor 4: Management: The evaluation of Subfactor 1-4 will include an assessment of the following elements of the Management Approach.
4a
Subfactor 4: Management Approach: Standard a: A comprehensive and effective management structure for the NGW program.
4b
Subfactor 4: Management Approach: Standard b: An effective resource management structure to include key personnel and subcontractors.

Instructions to Offerors Section L

Reference
Instructions to Offerors, Section L

The relevant instructions to address the SOO subject specified in the row are in section:

SF1
“Subfactor 1: System Performance”
SF2
“Subfactor 2: Operations and Maintenance”
SF3
“Subfactor 3: Transition Plan”
SF4
“Subfactor 4: Management Approach”

CLIN

Reference
Description
CLINs 0001–0032
Bandwidth CLINs
CLIN 0033
Terrestrial Circuits (MSC PoPs for all NGW active ships)—(inclusive CLIN providing all circuit costs from Teleport to the PoP)
CLIN 0034
Management
CLINs 0035–0065
Shipboard/Van Equipment/Deployment: Offerors shall provide a detailed listing of the equipment (including spares) with prices required to support each type of ship
CLINs 0066–0069
Shipboard/Van Equipment Maintenance (Depot level maintenance starts after warranty expires)
CLINs 0070–0071
NOCs: Fleet SATCOM System Equipment
CLIN 0072
Personnel Support Services
CLIN 0073
Training
CLIN 0074
End-to-end DIACAP Certification and Accreditation
CLIN 0075
Travel (Government Directed Only): Will not be paid via this CLIN; travel costs will be paid in accordance with the Joint Travel Regulations
CLIN 0076
CDRLs
CLIN 0077
Upgrades/Enhancements
CLIN 0078
Portability
CLIN 0079
OCD Demonstration
CLIN 0080
Ordering Fee
CLIN 0081
Custom Duty/Taxes
CLIN 0082
Intergration/Engineering
CLIN 0083
Ship-Board Lab
CLIN 0084
MSOC Van Lab

CDRL

Reference
CDRL Item Name
1
Monthly metrics report and bandwidth usage reports
2
Installation Report
3
Material List for each ship package
4
Ship Support Visit Report
5
Classroom Training Report
6
Engineering Reference Package
7
Technical Manuals
8
Onboard Repair Parts (OBRPs) Data
9
Installation and Checkout Spares (INCOs) Data
10
Configuration Baseline Data
11
List of Support Equipment
12
Monthly Support Service Report
13
Cost Summary Report

PAGE

Section J, Attachment C: Compliance and Cross Reference Matrix v 2.0

File details come from the government source that posted it. Updated .