20100323_AMEND0003_MSC_NGW_RFP_QA_.pdf

PDF 25 KB Posted

Attached to
Military Sealift Command Next Generation Wideband
Solicitation number
HC1013-09-R-2004
Issued by

About this file

20100323_AMEND0003_MSC_NGW_RFP_QA_.pdf

View the file

Other files

File Type Posted
HC1013-09-R-2004_Amend_0009.pdf PDF
20100422_AMEND009_MSC_NGW_Section_M.pdf PDF
20100416_AMEND0007_MSC_NGW_Section_J_Attachment_Q_Pricing_Schedule.xls XLS spreadsheet
20100416_AMEND0007_MSC_NGW_Section_M.pdf PDF
20100412_AMEND0005_MSC_NGW_Section_M.pdf PDF
20100412_AMEND0005_MSC_NGW_Section_J_Attachment_Q_Pricing_Schedule.xls XLS spreadsheet
20100402_AMEND0004_MSC_NGW_Section_J_Attachment_A_SOO.pdf PDF
20100402_AMEND0004_MSC_NGW__RFP_QA.pdf PDF
HC1013-09-R-2004_Amend_4.pdf PDF
20100402_AMEND0004_MSC_NGW_Section_J_Attachment_C_Cross_Reference_Matrix.doc DOC document
20100402_AMEND0004_MSC_NGW_Section_M.pdf PDF
20100323_AMEND0003_MSC_NGW_Section_J_Attachment_A_SOO.pdf PDF
20100323_AMEND0003_MSC_NGW_Section_L.pdf PDF
20100324__AMEND0003_MSC_NGW_Section_J_Attachment_C_Cross_Reference_Matrix.pdf PDF
20100317_AMEND0002_MSC_NGW_Section_L.doc DOC document
HC1013-09-R-2004_Amend_2.doc DOC document
20100317_AMEND0002_MSC_NGW_Section_J_Attachment_Q_Pricing_Schedule.xls XLS spreadsheet
20100317_AMEND0002_MSC_NGW_Section_M.doc DOC document
20100317_AMEND0002_MSC_NGW_Section_J_Attachment_C_Cross_Reference_Matrix.doc DOC document
T-AKE_7488830_B.pdf PDF
20100317_AMEND0002_MSC_NGW_RFP_Q A.doc DOC document
20100317_AMEND0002_MSC_NGW_Section_J_Attachment_H_PWS_Template.doc DOC document
Section_M_04-March-2010.doc DOC document
HC1013-09-R-2004_Amend_1.doc DOC document
Section_L_04-March-2010.doc DOC document
MSC NGW Drawings.zip ZIP file
20100210_NGW_CDRL_Item_13_Cost_Summary_Report_dd1423-2_FINAL.pdf PDF
ngw Material list per ship package cdrl item 3 dd1423.pdf PDF
20100210_NGW_Section_J_Attachment_E_CDRLs_FINAL.doc DOC document
20100210_NGW_CDRL_Item_4_Ship_Support_Visit_Report_dd1423-2_FINAL.pdf PDF
20100210_NGW_CDRL_Item_10_Configuration_Baseline_Data_dd1423-2 FINAL.pdf PDF
20100210_NGW_CDRL_Item_6_Engineering_Reference_Package_dd1423-2_FINAL.pdf PDF
20100210_NGW_CDRL_Item_2_Installation_Report_CDRL_dd1423-2_FINAL.pdf PDF
20100210_NGW_Section_J_Attachment_D_Ships_by_Location_FINAL.xls XLS spreadsheet
20100210_NGW_Section_J_Attachment_L_Client_Authorization_Letter_FINAL.doc DOC document
20100301__NGW Section_J_Attachment_Q_Pricing Schedule.xls XLS spreadsheet
20100210_NGW_Section_J_Attachment_G_Acronyms_FINAL.doc DOC document
20100210_NGW_Section_J_Att_N_Past_Performance_Info_Sheet_FINAL.doc DOC document
20100210_NGW_Section_J_Attachment_A_SOO_FINAL.doc DOC document
Section_M_.doc DOC document
Section_L_.doc DOC document
List of Attachments.doc DOC document
HC101309R2004.doc DOC document
20100210_NGW_Section_J_Attachment_B_Afloat_Background_FINAL.doc DOC document
20100210_NGW_Section_J_Attachment_J_PCA_Questionnaire.doc DOC document
Draft SF33.pdf PDF
Att G Past Performance Questionnaire.pdf PDF
Att B NGW Afloat Background.pdf PDF
Att E Format for NGW System PWS.pdf PDF
Att A NGW SOO.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

HC1013-09-R-2004 MSC NGW RFP

QUESTIONS AND REVISED RESPONSES

23-March 2010

QUESTION # 16

Can the contractor reuse existing equipment (such cabling, BEST rack space, BEST rack power [ship power and UPS])?

ANSWER # 16

Yes. The contractor may re-use BEST cabling and UPS. However, clean power varies from ship to ship, so contractor UPSs may be required.

QUESTION # 60

Is a modem that is in process to be certified for FIPS 140‐2 acceptable?

ANSWER # 60

Yes. For further guidance, please see revised SOO, Section 6.1.a.

QUESTION # 116

Section Number CLINs 0035-0063

RFP mandates that all equipment is to be delivered and priced in accordance with FAR 52.247-34, which includes shipping, taxes, customs, and other duties as applicable, which will depend on the FOB Destination required by the Govt.

The CLIN structure does not distinguish between OCONUS and CONUS for shipping.

Where are the equipment and parts shipped to by the offeror? How is pricing evaluated for equipment, parts, spares, etc.?

ANSWER # 116

Duplicate. Please see answer to Question 114.

QUESTION # 139

SOO, paragraph 6.1 a: The requirements for TRANSEC over the satellite infrastructure reference Federal Information Processing Standard (FIPS) 140-2 Level 2 and Advanced Encryption Standard (AES)-2. Please confirm if the Government requires all proposed devices implementing FIPS-140-2 and AES standards to have completed validation under the NIST Cryptographic Module Validation Program (CMVP) prior to award date.

ANSWER # 139

No. The Government plans to transition to a certified JIPM modem platform when one meeting MSC requirements is available. For further guidance, please see revised SOO, Section 6.1.a.

QUESTION # 198

Section Number: Section L, Subfactor 3 b.

Requirement: Transition Plan.

Question: With respect to “Government Resources Required for Transition,” can the Government please provide detail as to what resources are available to the Contractor?

ANSWER # 198

The offeror shall include Government coordination support resources required for the transition plan.

QUESTION # 199

Section Number: Section L, Appendix 8.

Requirement: Transition Plan.

Question: Will the Government provide transportation to support transition activities in remote areas not accessible by commercial transportation (i.e. transportation to Diego Garcia)?

ANSWER # 199

Please see Section L, Subfactor 3.d.