This statement of work outlines requirements for the installation of government furnished equipment lights and signs at King Abdullah II Airbase in Jordan. The scope of work includes physically and electrically installing 46 taxiway omni-directional inset lights, two taxiway hold signs, and integrating all lighting controls into the airfield lighting control system. The contractor must run and connect electrical cabling to base power, provide lighting design diagrams, conduct final testing and training, and meet all standards and regulations. The government will provide the equipment to be installed including lights, signs, wire, transformers, connectors, cans and lids. The performance period is 90 days from award. The contractor must follow all security and safety requirements and is responsible for disposal of waste, obtaining permits, and protecting airfield operations.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOCCENT/J4 JOR-23-015 Install GFE lights on KAIIAB Apron
STATEMENT OF WORK
Install GFE lights on KAIIAB Apron
JOR-23-015
Camp Xiphos, King Abdullah II Air Base, Jordan
As of 29 March 2023
Statement of Work
This Page Intentionally Left Blank
Points of Contact
Statement of Work Preparer:
CW2 Brian T. Wenning SOCCENT J4 Facility Planner
DSN: 700-786-2424
Email: brian.t.wenning.mil@socom.mil
Contracting Officer MAJ Amy A. Miranda SOCCENT FWD J4 Contracting
DSN: 318-486-3413
Email: amy.a.miranda.mil@socom.mil
This Page Intentionally Left Blank
PART I – General Contract Requirements
1. General Requirements.
1.1. For the purposes of this document, United States Government (USG) refers to the United States
Government and the Contracting Officer (KO) or their designated representative. Contractor refers to the Contractor, Sub contractor, Contractor and Sub contractor employees, personnel, tools, and equipment. This document provides a general overview of the scope of work to be performed in accordance with USG and Jordanian administrative codes, in addition to Jordanian and local government administration codes and generally accepted airfield practices.
1.2. The Contractor shall provide all management, tools, equipment, transportation, supervision, labor, and materials (beyond the Government Furnished Equipment (GFE)) necessary for the procurement, installation, and integration of airfield apron and taxiway lights and taxiway hold signs at King Abdullah II Airbase (KAIIAB), Jordan to provide a complete and fully functional lighting and sign system.
1.2.1. Contractor shall physically and electrically install 46 taxiway omni-directional inset lights around the apron and taxiway shown in PART II of this SOW to include all transformers, electrical connections, and system integration. All electrical cabling shall be run, as needed, connected electrically to KAIIAB base power, and integration into the ADB Safegate Reliance Standard Airfield Lighting Control System (ALCS) for KAIIAB.
Contractor shall determine the best location to connect to base power, coordinating exact locations with the Contracting Officer Representative (COR) and Royal Jordanian Air Force (RJAF) Airfield Manager. In-pavement light bases (cans) are currently installed to mount the lights at all 46 locations. The 46 lights are GFE as shown in PART IV of this
SOW.
1.2.2. Contractor shall physically and electrically install (2) two taxiway hold signs as shown in PART II of this SOW to include all transformers, electrical connections, and system integration. All electrical cabling shall be run, as needed, the system shall be connected electrically to KAIIAB base power, and integrated into the ADB Safegate Reliance Standard Airfield Lighting Control System (ALCS) for KAIIAB. Contractor shall determine the best location to connect to base power, coordinating exact locations with the COR and RJAF Airfield Manager. A light base is currently installed at both of the new sign locations. Contractor shall install (2) two concrete footers for the new signs. The signs are GFE as shown in PART IV of this SOW.
1.2.3. Contractor shall integrate the lighting controls into the ADB Safegate Reliance Standard Airfield Lighting Control System (ALCS) for KAIIAB to allow lights to operate in standard mode as well as NVG mode.
1.2.4. Contractor shall provide a lighting design diagram using the proposed apron lights and site plan included in parts II and III of this SOW.
1.2.5. Provide final test of the lighting system and operational training to the RJAF.
1.2.6. Contractor shall provide a one-time, hands-on training with Jordanian KAIIAB Air Traffic
Control (ATC) operators following the installation and testing of all items identified in this SOW. Provide detailed diagram and operating procedures for upgraded lighting controls systems.
1.2.7. Contractor shall be solely responsible for receiving any permits necessary for the completion of the facility to include connecting to city electrical, if applicable.
1.2.8. Contractor shall utilize the GFE listed in PART IV of this SOW. The Contractor shall provide any additional materials or supplies needed to perform this SOW at Contractor’s expense.
1.2.9. Installation, testing and commissioning. (travel expenses included)
1.2.10. All project close-out documents (as-builts, operating procedures, diagrams, training slides, etc.) will be provided in both English and Arabic.
1.2.11. Shipping (Customs clearance and taxes except from RJAF)
1.3. Contractor shall perform all work in accordance with this Statement of Work (SOW).
Contractor shall coordinate all work with the KO and is subject to the work schedule as stated in this document and the delivery schedule contained in the contract. Contractor shall be solely responsible for receiving any permits and customs clearance documents required for the import of supplies and materials necessary for the completion of the lighting system.
1.4. The Contractor shall be solely responsible for meeting all FAA and ICAO regulations.
1.5. All material and work stipulated in this SOW is to be delivered and installed at KAIIAB, Jordan, and remain under ownership of the contractor until the work has been accepted by the
KO.
1.6. The Contractor shall provide all labor, materials (beyond the Government Furnished Equipment
(GFE)), tools, equipment, transportation, expertise, supervision, communication, and all other items and services as necessary to complete the work described in this Statement of Work. The Contractor shall perform to the standards in the contract. The Contractor shall execute all work in a timely, safe and professional manner, in accordance with the applicable specifications, plans, drawings, and industry standard airfield practices and techniques.
1.7. All increases, decreases, or modifications to the requirements specified in this Statement of Work must be directed by the KO.
1.8. The USG will assign a Contracting Officer Representative (COR) to provide technical surveillance of the workmanship, inspection of the materials, and validation of Contractor compliance with the SOW. The assignment of a COR to oversee this project is done at the sole benefit of the USG. Furthermore, the designation of a COR in no way authorizes anyone other than the KO to commit the USG to changes in the terms and conditions of the SOW and contract. The Contractor shall be solely responsible for compliance with this SOW.
2. Period of Performance. The Contractor shall follow the Period of Performance (PoP) in the terms and conditions of the contract. All deviations from this timeline shall be approved by the KO. The Contractor shall provide any necessary documentation and evidence that pertains to reasons for not following the PoP. The USG reserves the right to negotiate an acceptable PoP.
2.1. Upon award, the successful offeror will have 15 days to complete the badging process and complete a pre-installation conference with the KO and the COR.
2.2. The total period of performance is 90 days.
3. Disposal and Hazardous Materials Requirements.
3.1. The Contractor is responsible for the collection and off-base disposal of all debris, rubble, residue, and non-salvageable, unusable, and waste material generated by the Contractor in the performance of work under this contract. All such materials shall be disposed of at an off-base landfill by the Contractor or at an on-base location specified by the KO, if approved. The Contractor is not permitted to deposit any such materials in the air base’s trash collection containers or at any other location on the air base without prior approval by the KO. Disposal of materials shall be in accordance with all applicable host nation and international laws. The Contractor shall exercise due diligence to ensure that their operations keep KAIIAB clean and free of trash and debris at all times. Loose materials must be secured at all times.
3.2. Hazardous Materials. Materials classified as hazardous by rules, regulations, laws, and/or the
Overseas Environmental Baseline Guidance Document (OEBGD) shall be handled and processed for disposal in accordance with those rules, regulations, laws, and/or OEBGD. The Contractor is responsible for all such materials that are residual from Contractor-furnished supplies and materials, which were brought to the job site by the Contractor as well as any such materials identified in this document or the drawings.
3.3. In the event the Contractor brings any hazardous material on to the project site, the Contractor shall notify the KO of the approximate quantities of the material to be used on the project and will supply a Material Safety Data Sheet (MSDS) of those materials in English.
3.4. The Contractor shall be responsible for the covering of open bodied vehicles transporting any material likely to create air pollution or become debris while on base.
3.5. All mud, dirt, debris, foreign objects, trash, or spills caused by the contractor (including Sub- Contractors and suppliers) on a street or parking lot, used as access to the work site or staging area shall be cleaned off the same day or as soon as practicable or requested by the CO.
3.6. The Contractor shall immediately report to the KO to discuss any issues or incidents which may indicate potential imminent risk to USG personnel or the environment. Following the notification, the Contractor shall be available to the KO for instructions regarding remediation of the release. Contractor should be aware of “you spill, you dig” policies, which means if you are the cause of the spill then you are responsible for cleanup, related to working on the project site and be prepared to respond to a release caused by the Contractor’s personnel. To report a release or spill, contact the USG escort immediately.
3.7. The Contractor shall only enter the KAIIAB Airfield Operations after receiving approval from
RJAF Air Traffic Controller.
4. Workplace Safety. The Contractor is responsible for the safety of their workers and the safety of all personnel in the vicinity of the project location. The Contractor shall ensure that vehicles are operated safely and professionally at all time. Spotters are required when backing up vehicles. The USG reserves the right to halt work if unsafe workplace practices are discovered. Work shall remain halted until the safety issue is resolved to the USG’s satisfaction.
4.1. Smoking is prohibited inside buildings and within 15 meters (50 feet) of flammable and combustible liquids. Smoking is permitted only in designated areas.
4.2. The prevention of fire is imperative during installation. The Contractor is responsible for enforcing fire safety in his work area. The Contractor shall have serviceable fire extinguishers readily available at all times. Extinguishers shall be supplied by the Contractor. The Contractor shall report all fires to the USG escort. Upon discovery of a fire, yell “Fire, Fire, Fire”, notify the USG escort and evacuate the area.
4.3. If any item is discovered that may be unexploded ordinance, immediately alert the USG escort.
The USG escort will contact appropriate agencies.
5. Contractor Furnished Items and Services. The Contractor shall furnish everything needed to perform all work under this statement of work and associated drawings, unless otherwise specified. All materials provided by the Contractor shall be new and match or exceed industry standard for projects of similar size and complexity. The Contractor’s equipment shall be in good repair and operate safely and efficiently. The USG reserves the right to inspect the Contractor’s equipment and/or tools. At no additional cost to the USG, the Contractor shall remove unsafe items from the job site. The Contractor shall provide any and all individual safety equipment necessary to comply with all local USG safety requirements.
6. The material specifications included in this Statement of Work include numerous references to U.S.
testing standards from organizations such as the American Society of Testing and Materials (ASTM).
If the Contractor proposes the use of a non-U.S. standard (e.g., British or European standard), a copy of the standard must be provided to the USG in English as a submittal for approval. Additionally, the submittal shall include a narrative comparing the key requirements (between the U.S. and the proposed standard) and justifying why any differences are acceptable.
7. Prohibited Material. The Contractor shall not use any products that contain mercury, lead, hexavalent chromium, toluene, chlorinated solvents, hydrolyzable chlorine derivatives, nor any ethylene based glycol ethers and their acetates. When tested, the lead content shall not exceed 0.06% by weight of the dry film and the test for chromium content shall be negative.
8. Security Requirements.
8.1. The Contractor shall follow existing security procedures and instructions applicable to KAIIAB. The Contractor is required to provide any and all materials as required by security personnel. The Contractor is responsible for providing required documents in a timely manner to maintain the submitted work schedule. Delays caused by documents not being submitted early enough are the responsibility of the Contractor.
8.2. The Contractor will need to submit their CV, identification of the business owner, identification of all employees that will be accessing the project site throughout the contract, and all vehicle registration documents for vehicles that will be used with pictures of the vehicle. This information will be compiled and sent at one time to the KO or designated representative no later than 20 days after contract award. Additionally, the Contractor shall provide additional personnel information on Foreign National (FN) and/or Local National (LN) personnel as requested by the KO.
8.3. Contractor and all associated sub-contractors employees shall provide all information required for background checks to meet installation access requirements to be accomplished by installation security office. Contractor workforce must comply with all personal identity verification as directed by installation policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the USG may require changes in Contractor security matters or processes.
8.4. Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (Army Directive 2014-05/AR 190- 13), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by the USG representative), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations.
8.5. The contractor shall adhere strictly to existing security procedures and instructions applicable to accessing the project location. Contractor personnel attempting to access the project location shall hold a current, valid identification (ID) and/or Driver’s License and shall be in possession of all necessary material delivery documentation including, but not limited to: material description, quantity, and source. The USG shall not be liable for delays resulting from pass coordination/approval. Contractor shall allot time into its schedule for obtaining base access.
9. Emergency Situations. Installation access may be restricted at any time. Restricted access is reserved for emergency actions, exercises, or increased installation security.
10. Contractor Responsibility.
10.1. The Contractor is responsible for the wellbeing of their workers. The USG will not be responsible for supplying food or water to workers. The Contractor should bring enough food and water for their workers to last the entire work day.
10.2. The Contractor shall provide an on-site manager that can make decisions for the Contractor and who is responsible for the performance of the work. The on-site manager shall be designated in writing when the contract is awarded, and must always be present during work hours. The on-site manager shall read, write, and speak fluent English. Additionally, the on-site manager shall have sufficient technical knowledge with regard to the requirements prescribed in this Statement of Work. The identified USG representative shall have the right to request for a replacement of any individual not deemed acceptable to the USG at any time.
10.2.1. If more than one supervisor/foreman is required for various phases, or if the supervisor/foreman is to be replaced, the Contractor shall provide the necessary documentation for each supervisor/foreman upon request of the KO. An approved supervisor and/or foreman will be on site at all times to oversee and supervise all aspects of installation.
10.3. All design and engineering work required to complete the scope of work outlined in the contract shall be performed under the supervision and review of a degreed and licensed engineer. This requirement applies to all calculations and drawings. All calculations and drawings shall be signed by the design engineer.
10.4. All product data shall be submitted in writing to the KO prior to purchase. A sample of the products shall be provided for review.
10.4.1. Product Data Sheets. All equipment being installed shall be submitted for approval and shall include manufacturers’ certificates, literature and technical data sheets. In the submittal it must be clear which product will be used if more than one product is shown on the page. Do NOT submit entire photocopied catalog unless every page is relevant to the product being considered. All copies must be legible. The Government may require physical material samples of some items at no additional cost to the Government.
10.4.2. Status Reports. The Contractor shall submit a weekly status report via email to the
Contracting Officer no later than Friday afternoon by 1700 Arabia Time Zone (ATZ) each week until the contract is complete. At a minimum, the weekly report shall include:
10.4.2.1. Contract Number
10.4.2.2. Name of project manager and contact information
10.4.2.3. Overall percentage Work in Place (Planned and Actual)
10.4.2.4. Estimated completion date (Planned and Actual)
10.4.2.5. Key task accomplished during the past week
10.4.2.6. Work expected to be accomplished during the upcoming week
10.4.2.7. Significant Issues/Events
10.5. Pre-Installation Meeting. The Contractor shall be required to meet with the KO, COR, and other RJAF personnel as required prior to the commencement of any work in order to coordinate the installation. Topics of discussion will include: airfield access procedures, hours of work; lay-down and storage areas; work area limits; safety compliance; emergency and routine evacuation of the work area; and any other topics deemed necessary by the KO or the
COR.
10.6. Site Measurements. The Contractor shall conduct a physical survey of the actual site to verify locations of existing objects, structures, and buildings, as well as existing utilities, to include but not limited to power cables, communication cables, sewer and water lines prior to installation of lighting and signs.
10.6.1. All site measurements and physical survey shall take place by Contractor after the award of the contract but prior to the start of installation.
10.6.2. It shall be the Contractor’s responsibility to identify and develop a complete list of all conflict locations. Project delays due to the Contractor’s failure to identify a conflict will not be grounds for additional time and/or equitable adjustment.
10.7. Standard Material & Workmanship. All materials and supply accessories shall be new and standard products regularly used for airfields. Workmanship shall be comparable to international requirements performed in Jordan and comply with standards contained in this SOW. The USG shall review materials and inspect work for compliance with these standards.
Work not in accordance with the SOW or approved submittals will be rejected at the discretion of the KO.
10.8. All materials used shall be new, free of defects, and in good condition. All materials shall conform to the specifications unless otherwise approved by the KO. The Contractor shall remove defective materials from the site at no additional cost to the USG. The facilities provided by the Contractor shall be of reasonable quality and durability as determined by the USG, suitable for constant use, with minimal maintenance for 10 years.
11. Final Inspection: To be performed by the Contractor in the presence of the Contracting Officer or designated representative. The Contractor shall provide the Contracting Officer a consolidated inventory of all installed equipment, operations manuals at the final inspection.
11.1. Parts, Service and Operation & Maintenance Manuals: Standard Parts, Service and Operation & maintenance manuals shall be submitted to the Contracting Officer in English for both hard copy and electronic PDF format to include the following:
11.1.1. Manufacturer’s technical catalogues, dimensional drawings and wiring diagrams for each and every type of equipment installed.
11.1.2. Operating instructions for various equipment and systems included in the installation work.
11.1.3. Parts, Service and Maintenance manuals for all equipment and systems included in the installation work, which require regular and specialized maintenance. These manuals shall include as a minimum, all scheduled service required and a suggested inventory of parts required for the maintenance of the units for a period of 1 years.
END OF SECTION
PART II – Site Location
LAT 32.0098; LON 36.22333
The installation site is located at the apron and taxiway at KAIIAB, Jordan
KAIIAB
Blue dots indicate the 46 light installation locations on the apron and taxiways. Red lines on the right taxiway indicate the two sign locations.
Statement of Work Install GFE lights on KAIIAB Apron
JOR-23-015
PART III – Specifications and Basis of Design
Taxiway hold sign installation example.
ZA292 | L-852E, L-852F, L-852T
Taxiway Omni-Directional Inset Light
Compliance
• FAA Certified: L-852T (AC 150/5345-46D)
• FAA Compliant: L-852E, L-852F (AC 150/5345-46D)
• ICAO Annex 14 circular guidance 5.3.6, 5.3.9.8, 5.3.9.9
• BS3224 Part 5, inset fittings
• IEC 61827
• STANAG 3316 Annex C fig 3, taxiway edge 5.3.18.7, 18.8 apron lights 5, 3, 27
Application The ZA292 is an omni-directional inset fixture for taxiway and apron edge applications. Suitable for use in 6.6A airfield lighting circuits normally supplied from 1 x 45W, 65W or 100W isolating transformer.
Features
• Body casting manufactured from aluminum alloy for lightness, strength and durability.
• Long life lamps (objective life of 1,500 hours at full brilliancy).
• Prism removal and replacement achieved without the need for adhesive or sealants.
• Color beam variations achieved by dichroic coated or colored glass.
• Lamp by-pass options available if required.
• Pre-focused optics to simplify maintenance procedures.
• Low profile .39" (10mm).
• Commonality of parts with the ZA181 and ZA280 inset fix-tures.
• Light channel within .2" (5mm) of grade.
• Natural anodized finish (as standard), powder coated NATO green or golden yellow (special order).
Electrical supply Suitable for use in 6.6A airfield lighting circuits normally sup-plied from 1 x 45W, 65W or 100W isolating transformer. 120V and 240V mains supply versions also available. Power consump-tion is either 30W, 36W, 40W, 49W or 105W depending upon type of lamp fitted.
Packaging
• Net weight: 6.6 lb. (3Kg)
• Gross weight: 7.7 lb. (3.5Kg)
• Box: 10" (254mm) (w) x 10" (254mm) (d) x 10" (254mm) (h)
Flight Light Inc., 2708 47th Ave.
Sacramento, CA, 95822, USA
Product specifications may be subject to change without prior notice. Verify current specifications when ordering. © Flight Light Inc. | 1/30/2023 www.flightlight.com sales@flightlight.com
+1.800.806.3548 USA
+1.916.394.2800 Worldwide +1.916.394.2809 Fax
TAXIWAY EDGE INSET LIGHTS
Specification TYPE: Blue omni-directional, taxiway, or low intensity taxiway edge and circular guidance.
The taxiway light shall comply with ICAO Annex 14 for use in category I, II and III all weather operations, CAP168, BS3224 Part 5, FAA and STANAG 3316. Fixtures shall be modular in design with the main casting manufactured in aluminum alloy, suitably protected against corrosion and finished in natural anodized or golden yellow or NATO green.
The optical system shall comprise of a 48 MRCS reflector lamp.
One glass prism refractor shall be accurately located in the main casting, without the need for additional adhesives or sealants, to direct the light beams such that no re-focusing is required on installation, maintenance or in service.
Lamp replacement shall be easily effected from the bottom of the fixture.
The light fixture shall have an upper surface forming a smooth sloping face projecting not more than .39" (10mm) above the pavement surface. The fixture shall resist all stresses imposed by impact, rollover and static loads of present day aircraft without damage to the fixture or to aircraft and vehicle tires.
Ordering Codes
FIXTURE COLOR LAMP WATTAGE*
80-ZA292A G: Green Y: Yellow R: Red B: Blue W: White
48: 48W, 6.6A (L852T, E) 105: 105W, 6.6A (L852F)
* Also available in voltage powered, please contact us.
Anodized finish fixtures (7.25" B.C.): Order with 30-AA122820 adapter ring if mounting on L868B base, sold separately. Golden yellow finish fixtures (7" B.C.): Order with 80-009090 adapter ring if mounting on L868B base, sold separately (golden yellow fixtures restricted to existing customers and replacements).
Components
1 Body Casting (Std) 2 Bottom Cover Casting 80-040206 3 Elkay Gland Set 80-021114/5/6 4 Bottom Cover Gasket 80-033080 6 Prism Clamp 80-021307 8 Bottom Cover Spinning Clamp 80-021311 15 Prism Clamp Gasket 80-021309 16 Prism Gasket 80-033090 18 Blue Prism Dome 80-019190 ALT White (Clear) Prism Dome 20-016080 ALT Green Prism Dome 80-019193 ALT Yellow Prism Dome 80-019191 ALT Red Prism Dome 80-019182 20 48W 6.6A Re�ector Lamp LA-008065 ALT 105W 6.6A Re�ector Lamp LA-008072 22 Lamp Gasket 80-033077 23 Lamp Retaining Spring 80-032039 24 B-Type Male Lead TRC-10518-114-DO2 25 Pressure Test Plug 80-021256 ALT Schrader Tank Valve 80-021327 31 120V/240V lamp holder 80-015057
Flight Light Inc., 2708 47th Ave.
Sacramento, CA, 95822, USA
Product specifications may be subject to change without prior notice. Verify current specifications when ordering. © Flight Light Inc. | 1/30/2023 www.flightlight.com sales@flightlight.com
+1.800.806.3548 USA
+1.916.394.2800 Worldwide
ZA292 IEC with FAA L-868 Base
1.
2. 12” mounting adapter
3. FAA L-868 base (one piece)
4. Outer earth terminal (optional)
5. Inner earth terminal (optional)
6. Isolating transformer
7. Secondary connection
8. Primary connection
9. Grommet
ZA292 General Arrangement
ZA292(I) �xture
8" (203).3 9"
(1 0)
2.
4"
(6 1)
.9 8"
(2 5)
5.31" (135)
7.25" (184) BC
.3 9"
(1 0)
12" (305) 11.25" (286)
12.36" (314) 2.
(6
4)
0)
Photometric Performance
Flight Light Inc., 2708 47th Ave.
Sacramento, CA, 95822, USA
Product specifications may be subject to change without prior notice. Verify current specifications when ordering. © Flight Light Inc. | 1/30/2023 www.flightlight.com sales@flightlight.com
+1.800.806.3548 USA
+1.916.394.2800 Worldwide
L-867 to 8" One Piece Adapter Ring (30-86712-25)
Ø8.187" +0.060
- 0.000
Ø7.250" BC
Ø11"
Ø10.25" BC
6X Ø7/16-16 UNC
THRU EQUALLY
SPACED
12X Ø3/8-16 UNC
THRU EQUALLY
SPACED
Ø6.560"
A A
Section AA
0.750
Flight Light Inc., 2708 47th Ave.
Sacramento, CA, 95822, USA
Product specifications may be subject to change without prior notice. Verify current specifications when ordering. © Flight Light Inc. | 1/30/2023 www.flightlight.com sales@flightlight.com
+1.800.806.3548 USA
+1.916.394.2800 Worldwide
TYPE OD1 BC1 OD2 ID1 BC2 ID2
30-AA122820 11.938" [303.2] 11.25" [285.8] 9.938" [252.4] 8.125" [206.4] 7.25" [184.2] 6.563" [166.7]
Add “M” to the end of the part number to note Metric Adapter Plate
[ ] = metric dimensions in mm
L-868B 8"-12" Adapter/Flange Ring
(30-AA122820)
1. Approved and Certified to FAA Advisory Circular
AC150/5345-42F. Size: B=12"
2. Adapter Plates are galvanized to ASTM-A123/A123M-02.
3. (6) 7/16" Ø equally spaced, thru holes with 1-1/8" Ø x 1/2" deep counter bore.
4. Standard Plate: (6) 3/8"-16 tapped holes.
Metric Plate: (6) M10-1.5 tapped holes.
5. Standard Adapter Plates are shipped with:
(2) 3/8"-16 x 1-1/4" SS hex head bolts (10650202)
(2) 3/8", 2 piece locking washers (10680607)
(1) Bolt Set (6100) containing:
(6) 3/8"-16 x 1" SS hex head bolts (10650198)
(6) 3/8", 2 piece locking washers (10680607)
Metric Adapter Plates are shipped with:
(2) M10x1.5x30mm SS hex head bolts (10652820)
(2) 3/8", 2 piece locking washers (10680607)
(1) Bolt Set (6100M) containing:
(6) M10x1.5x30mm SS hex head bolts (10652820)
(6) 3/8", 2 piece locking washers (10680607)
Flight Light Inc., 2708 47th Ave.
Sacramento, CA, 95822, USA
Product specifications may be subject to change without prior notice. Verify current specifications when ordering. © Flight Light Inc. | 1/30/2023 www.flightlight.com sales@flightlight.com
+1.800.806.3548 USA
+1.916.394.2800 Worldwide
APPLICATION:
Airport Lighting Cable is suitable for use with L-824 type underground lighting circuits at airports per FAA L-824 Type C and AC 150/5345-53 Appendix 3. They are for Non-UL use up to 5000 volts and temperatures up to 90°C wet or dry in conduit, duct, aerial, and direct burial installations.
CONDUCTORS:
• Stranded soft drawn bare copper conductor per ASTM B-3
& B-8
INSULATION:
• Cross-linked polyethylene (XLPE) insulation in accordance with ICEA S-96-659
• Available in black, blue, green, grey, orange, red, terra cotta, yellow, white, and purple
STANDARDS:
• FAA Advisory Circular 150/5345-7F
• ETL Certified
• ICEA S-96-659
• NEMA WC71
• Certified as 100% Buy American by the FAA
Airport Lighting Cable – FAA-L-824 Type C 5KV
-0
AI
RP
OR
T
LI
GH
TI
NG
C
AB
LE
1-800-945-5542 www.PriorityWire.com
Part Number Conductor
Size Stranding Insulation Thickness
Overall Diameter
Net Weight
AWG inches mm inches mm lbs/mft
8STRL824C5KV 8 7 0.110 2.79 0.375 9.53 92
6STRL824C5KV 6 7 0.110 2.79 0.410 10.41 129
4STRL824C5KV 4 7 0.110 2.79 0.460 11.68 185
All values are nominal and subject to correction
©2022 Priority Wire & Cable 04-2022
PART IV – Government Furnished Equipment (GFE)
1. Below is a list of Government Furnished Equipment at Camp Xiphos, KAIIAB, Jordan.
Line Item
Item Name Details ‐ Description UoM Qty
1 High Voltage Wire
4x Spools of ~5,000ft of "8 STR 5KV L‐824C Airport Cable"
42‐L824C#8 ‐ #8 Unshielded Cable FAA L824C price/foot Minimum of 5050' +/‐5% required. Standard roll is 5050'.
Manufacturer's Part Number: 42‐L824C#8
LF 20,500
2 Wire Connectors
Integro 11805‐01 kit
TRC‐11805‐01 ‐ L823 Primary Connector Complete Kit; #8 AWG Min OD 0.300"; Max OD 0.400" Manufacturer's Part Number: TRC‐11805‐01
EA 56
3 Transformer
2x Large Transformers for Signs ‐ Integro 11715 L‐831‐6
TR‐L831‐06 ‐ 200 Watt 6.6/6.6 50Hz L‐831 Transformer 0 Manufacturer's Part Number: TR‐L831‐06
EA 2
4 Transformer
Small Transformers ‐ Integro 11710 L‐831‐1
TR‐L831‐01 ‐ 30/45 Watt 6.6/6.6 50Hz L‐831 Manufacturer's Part Number: TR‐L831‐01
EA 46
5 6" Wide Can Extension
30‐AE3519X ‐ VEGA L868C EXTENSION
Manufacturer's Part Number: 30‐AE3519X
EA 2
6 Wide Cans
30‐AC35242Q23H303 ‐ VEGA L868C BASE 24"
2" FX @ 0‐180, 3/4" DRAIN HOLE
INT/EXT GROUND STRAPS
3/4" PLYWOOD COVER
Manufacturer's Part Number: 30‐
AC35242Q23H303
EA 7
7 Narrow Can Lids (Solid) EA 2
8 Wide Can Lids (Solid) 30‐5000‐12 ‐ L868C 3/4" Blank Cover 15" OD
14‐1/4" BC
Manufacturer's Part Number: 30‐5000‐12
EA 7
9 Wide Can Lids (Threaded) Kit EA 2
10 Narrow Cans EA 2
11 ~3.5" Rubber Ring Seals EA 14
12 Bag of 6x bolts & washers HHCS 3/8‐16x1" EA 2
13 Bolts & Nuts EA ~100
14 Ground Clamps BA‐AWS0919 ‐ Copper Ground Lug with Stainless Steel Hardware Manufacturer's Part Number: BA‐AWS0919
EA 88
15 Adapter Rings
30‐AA122820 ‐ Adapter Ring for 12" L868 Base to 8" Diameter, 7.25" BC inset fixture; Galvanized to ASTM‐ A123/A123M‐02. (6) Equally spaced, thru holes.
Manufacturer's Part Number: 30‐AA122820
EA 46
16 Apron Signs
I33H2.5DF ‐ I‐LuxTM Size 3 Style 3 LED Length
2.5 Double Face
(Requires 200W) (M1 31‐13 / APRON) Manufacturer's Part Number: I33H2.5DF
EA 2
17 ~3.5" Rubber Ring Seals Box Full EA ~150
18 Zip Ties 4x packages of 100 each EA 400
19 Cable Lube cans 2
20 Silicone Oil cans 1
21 Multi‐purpose Lubricant cans 1
22 Electrical Contact Dry Cleaner cans 8
23 PVC Cement 946 ml cans 2
24 Purple Primer ‐PVC 473 ml cans 2
25 Heat Shrink Assorted: .5"‐1" Dia. , 1M long EA 50
26 ~100 bolts, washers, nuts EA ~100
27 Rubber Can/lid Seals EA 75
28 Wire Connectors Integro‐ Installation Kit for FAA L823 EA 30
29 Wire Connectors Amerace 52SUPER B ED6‐ED6 kit EA 7
30 Wire Connectors ADB‐ primary connector kit (PRK) for FAA L823 EA 2
Taxiway Onmi‐directional Inset Lights
80‐ZA292A‐B48 ‐ L852T Inset Light Blue 48w 6.6A 8" diameter 7.25" BC Anodized Manufacturer's Part Number: 80‐ZA292A‐B48
EA 46
File details come from the government source that posted it. Updated .