Gov't_Responses_25Apr18_FINAL.XLSX

XLSX spreadsheet 24 KB Posted

Attached to
POTFF Federal contract opportunity
Solicitation number
H92222-18-R-0010
Issued by
United States Special Operations Command

About this file

Government answers to questions submitted after Amendment 0001

View the file

Other files for this federal contract opportunity

Other files attached to POTFF, newest first.
File Type Posted
Gov't_Responses_27Apr18_FINAL.XLSX XLSX spreadsheet
H92222-18-R-0010_Amd_1_Section_L_19_Apr18(Track_Changes).docx DOCX document
H92222-18-R-0010_Amd_1_Section_H__19_Apr18(Track_Changes).docx DOCX document
Atch_2_PWS_REV_1__Amd_1_19_Apr18_(Track_Changes).docx DOCX document
H92222-18-R-0010_Amd_1_Section_M__19_Apr18(Track_Changes).docx DOCX document
Atch_3_Price_Matrix_REV_1_Amd_1_19_Apr_18.xlsx XLSX spreadsheet
PWS_Appendix_3_REV_1_Amd_1_19_April_18.xlsx XLSX spreadsheet
H92222-18-R-0010_Conformed_as_of_Amd_1.pdf PDF
H92222-18-R-0010_Amendment_1.pdf PDF
Gov't_Responses_18Apr18_FINAL.XLSX XLSX spreadsheet
Atch_1_DD254_REV_1_16_Apr_18.pdf PDF
Atch_2_PWS_REV_1__Amd_1_19_Apr18.pdf PDF
POTFF_Recompete_ROE_Incumbents_20_Mar_18_FINAL.pdf PDF
PWS_Appendix_3_12_Mar_18_FINAL.xlsx XLSX spreadsheet
PWS_Appendix_2_12_Mar_18_FINAL.xlsx XLSX spreadsheet
Exhibit_A_CDRL_A001_12_Mar_18_FINAL.pdf PDF
Govt_Responses_Draft_RFP_12_Mar18_FINAL.XLSX XLSX spreadsheet
H92222-18-R-0010_FINAL_26_Mar_18.pdf PDF
Atch_4_QnA_Template_12_Mar_18_FINAL.XLSX XLSX spreadsheet
OCI_Assessment_MFR_SIGNED.pdf PDF
Atch_1_DD254_21_Feb_18_FINAL.pdf PDF
Atch_2_PWS_12_Mar_18_FINAL.pdf PDF
Atch_3_Price_Matrix_07_Mar_18_FINAL.xlsx XLSX spreadsheet
Exhibit_A_CDRL_A001__App_1_12_Mar_18_FINAL.pdf PDF
Show all 24

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DIRECTIONS

TAILORED COMMENT MATRIX

THIS DOCUMENT MUST BE RETURNED IN A MICROSOFT EXCEL FILE FORMAT. DO NOT RETURN YOUR RESPONSES IN ANY DIFFERENT FILE FORMAT.

Directions & Explanation of TAILORED COMMENT MATRIX
This Tailored Comment Matrix is provided in order for potential offerors to provide feedback, comments, and ask questions with regard to the released RFP.

The sheet labeled "DIRECTIONS" explains this document, and provides directions for its use.

The sheet labeled "MATRIX" contains a table with all labeled and numbered elements from the RFP. This table is where potential offerors may respond to the Government with feedback, comments, or ask questions.

Directions and explanation of sheet labeled "MATRIX"
The MATRIX sheet can be reached by clicking the "MATRIX" Tab at the bottom of this spreadsheet. Add rows as necessary under the applicable item.
MATRIX COLUMN DESCRIPTIONS:
Column A:Contains the Item reference number for this item. This number is used for organizational purposes, when referring to this document only.

Column B: Contains the section number that each element is labeled, within their respective documents. The section number relates directly to the item's location in the RFP.

Column C: Contains the written title for the corresponding item/section number.

Column D:Contains a drop down box for selecting the type of comment. Available options are "Critical" "Substantive" or "Administrative".
Critical: Violations of law -or- Unnecessary risks to safety, life & limb, or DOD Material; waste or abuse of DOD appropriations; unreasonable burden on resources.
Substantive: Appears or is potentially unnecessary, incorrect, misleading, confusing, or inconsistent with other sections; disagree with proposed responsibilities, requirements, and/or procedures.
Administrative: Address typographical, grammatical, and formatting errors (grammar, punctuation, style, etc.)

Column E: Contains a drop down box for selecting if the corresponding comments/questions/responses entered in column F contain proprietary information (Yes/No)

Column F: Contains space for potential offerors' comments/questions/responses. Include justification for why the information is considered proprietary if so indicated in Column E.

Column G: The responding Company's name should be entered in the in Column G for all questions

THIS DOCUMENT MUST BE RETURNED IN A MICROSOFT EXCEL FILE FORMAT. DO NOT RETURN YOUR RESPONSES IN ANY DIFFERENT FILE FORMAT.

MATRIX

ITEM #SECTION NUMBERNAME OF SECTIONCOMMENT TYPE
(Select from drop down)SOURCE SELECTION SENSITIVE INFORMATION IN QUESTIONS / COMMENTS?
(Yes/No)QUESTIONS / COMMENTS
(With justification of why considered source selection sensitive if applicable)Government Response
48LInstructions, Conditions and Notices to BiddersSubstantiveNoReference Question & Answer 14 issued with Amendment 0001 which clarified that provision DFARS 252.216-7002 Alternate A applies. The Government did not modify the Excel spreadsheets except for the Instructions. How are offerors to complete the pricing spreadsheets, as it appears implementing DFARS -7002 may break the links/calculations for the “Pre-Selected FTE” and ultimately the “Total Evaluated Price” worksheets. Based on the DFARS -7002 provision does the Government want us to insert columns in the OY 1-8 worksheets to identify if the rate applies to the Prime or to a subcontractor?The price matrix (Attachment 3) does not require modification because neither the TEP nor the resultant contract will include more than 1 rate per labor category (for each location/clearance requirement) as outlined in Attachment 3. Reference Section L.3.0, which outlines where offerors are to provide the information required by FAR 52.216-29. Which of the 3 rate structures authorized by 252.216-7002 Alt A offerors elect to propose within Attachment 3, is up to each offeror. For example, if a prime offeror plans to provide the Data Scientist I with S clearance at Camp Lejeune, NC both via subcontract and directly as a prime, then that should be explained in the executive summary IAW Section L.3.0 but only 1 rate input into Attachment 3 based upon the proposed strategy and/or degree of risk assumed. Continuing the example, if the prime rate for that category/location/clearance was $6.00, subcontractor A rate was $2.00 less than prime rate, and subcontractor B rate was $1.00 less than prime rate, some may elect to input the highest rate ($6.00), while others may elect to take on more risk and input the mid or lowest rate for that category. This would be repeated for all labor categories/locations/clearance requirements where more than 1 rate structure would apply.
49LInstructions, Conditions and Notices to BiddersCriticalNoRecommend considering waiving the DFARS provision and using just FAR 52.216-29. If that is not doable recommend the Primes submit a sheet with the Prime’s rates, and the Prime will submit a separate sheet for each subcontractor with fully-burdened labor rates by labor category and location. This will result in unfilled cells on the sheets but may make it easier to populate the Pre-Selected FTE and Total Evaluated Price sheets.Based on the answer outlined in item #48 above, the Government will not pursue a waiver to DFARS 252.216-7002 Alternate A at this time.