Exhibit_A_CDRL_A001__App_1_12_Mar_18_FINAL.pdf

PDF 69 KB Posted

Attached to
POTFF Federal contract opportunity
Solicitation number
H92222-18-R-0010
Issued by
United States Special Operations Command

About this file

CDRL A001 Appendix 1

View the file

Other files for this federal contract opportunity

Other files attached to POTFF, newest first.
File Type Posted
Gov't_Responses_27Apr18_FINAL.XLSX XLSX spreadsheet
Gov't_Responses_25Apr18_FINAL.XLSX XLSX spreadsheet
Gov't_Responses_18Apr18_FINAL.XLSX XLSX spreadsheet
Atch_1_DD254_REV_1_16_Apr_18.pdf PDF
Atch_2_PWS_REV_1__Amd_1_19_Apr18.pdf PDF
PWS_Appendix_3_REV_1_Amd_1_19_April_18.xlsx XLSX spreadsheet
H92222-18-R-0010_Conformed_as_of_Amd_1.pdf PDF
H92222-18-R-0010_Amendment_1.pdf PDF
H92222-18-R-0010_Amd_1_Section_L_19_Apr18(Track_Changes).docx DOCX document
H92222-18-R-0010_Amd_1_Section_H__19_Apr18(Track_Changes).docx DOCX document
Atch_2_PWS_REV_1__Amd_1_19_Apr18_(Track_Changes).docx DOCX document
H92222-18-R-0010_Amd_1_Section_M__19_Apr18(Track_Changes).docx DOCX document
Atch_3_Price_Matrix_REV_1_Amd_1_19_Apr_18.xlsx XLSX spreadsheet
OCI_Assessment_MFR_SIGNED.pdf PDF
Atch_1_DD254_21_Feb_18_FINAL.pdf PDF
Atch_2_PWS_12_Mar_18_FINAL.pdf PDF
Atch_3_Price_Matrix_07_Mar_18_FINAL.xlsx XLSX spreadsheet
Govt_Responses_Draft_RFP_12_Mar18_FINAL.XLSX XLSX spreadsheet
H92222-18-R-0010_FINAL_26_Mar_18.pdf PDF
Atch_4_QnA_Template_12_Mar_18_FINAL.XLSX XLSX spreadsheet
Exhibit_A_CDRL_A001_12_Mar_18_FINAL.pdf PDF
POTFF_Recompete_ROE_Incumbents_20_Mar_18_FINAL.pdf PDF
PWS_Appendix_3_12_Mar_18_FINAL.xlsx XLSX spreadsheet
PWS_Appendix_2_12_Mar_18_FINAL.xlsx XLSX spreadsheet
Show all 24

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CDRL A001 – Contractor Self-Assessment Report Preservation of the Force and Family (POTFF) - Quarterly Surveillance/Assessment Report

CONTRACTOR INSTRUCTIONS:

1. Per the POTFF QASP, please use the ratings and definitions defined below to complete this assessment.

2. All comment boxes may be expanded in order to capture relevant comments.

3. Contractor input shall identify the specific contract PWS/SOW requirement by paragraph and shall clearly identify how performance met or exceeded contractual requirements.

a. To justify an Exceptional rating, identify multiple significant events. A singular benefit, however, could be of such magnitude that it alone constitutes an Exceptional rating. NO significant weaknesses shall have been identified.

b. To justify a Very Good rating, identify a significant event. NO significant weaknesses shall have been identified.

c. To justify a Satisfactory rating, there should have been only minor problems, or major problems the Contractor recovered from without impact to the contract. NO significant weaknesses shall have been identified.

GOVERNMENT INSTRUCTIONS:

1. Per the POTFF QASP, please use the ratings and definitions defined below to complete this assessment.

2. All comment boxes may be expanded in order to capture relevant comments.

3. Government input shall identify the Government benefit received from Contractor performance that exceeded contractual requirements.

a. Government comments are required for ALL Exceptional and Very Good ratings and shall clearly explain the Government benefit received as it relates to task order requirements identified in the PWS/SOW.

b. Exceptional and Very Good ratings without Government input shall be automatically reduced to Satisfactory by the POTFF PCOR.

4. Per DoD policy, a fundamental principle of assigning ratings is that Contractor will not be assessed a rating lower than Satisfactory solely for not performing beyond the requirements of the contract.

a. To justify Marginal performance, identify a significant event in each category that the Contractor had trouble overcoming and state how it impacted the Government. A Marginal rating shall be supported by referencing the management tool that notified the Contractor of the contractual deficiency (e.g., management, quality, safety, or environmental deficiency report or letter) and a copy shall be on file with the Contracting Officer and POTFF PCOR.

b. To justify an Unsatisfactory rating, identify multiple significant events in each category that the Contractor had trouble overcoming and state how it impacted the Government. A singular problem, however, could be of such serious magnitude that it alone constitutes an unsatisfactory rating. An Unsatisfactory rating shall be supported by referencing the management tools used to notify the Contractor of the contractual deficiencies (e.g., management, quality, safety, or environmental deficiency report or letter) and a copy shall be on file with the Contracting Officer and POTFF PCOR.

PERFORMANCE RATING DEFINITIONS:

Exceptional Performance meets contractual requirements and exceeds many to the Government’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with few minor problems for which corrective actions taken by the Contractor were highly effective.

Very Good Performance meets contractual requirements and exceeds some to the Government’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with some minor problems for which corrective actions taken by the Contractor was effective.

Satisfactory Performance meets contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the Contractor appear or were satisfactory.

Marginal Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being assessed reflects a serious problem for which the Contractor has not yet identified corrective actions. The Contractor’s proposed actions appear only marginally effective or were not fully implemented.

Unsatisfactory Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains a serious problem(s) for which the Contractor’s corrective actions appear or were ineffective.

Quality of Service: Contractor performance for this rating period for this assessment factor was:

Contractor Self-Assessment Rating:

☐ Exceptional ☐ Very Good ☐ Satisfactory ☐ Marginal ☐ Unsatisfactory

Contractor Comments (required)

Government Assessment Rating:

☐ Concur with Contractor Assessment ☐ Non-concur with Contractor Assessment (please select new rating)

Government Comments (required for all ratings other than Satisfactory)

Schedule: Contractor performance for this rating period for this assessment factor was:

Contractor Self-Assessment Rating:

(please select new rating)

Cost Control: Contractor performance for this rating period for this assessment factor was: (N/A for FFP task orders) Contractor Self-Assessment Rating:

(please select new rating)

Business Relations/Subcontracting Management: Contractor performance for this rating period for this assessment factor was:

Contractor Self-Assessment Rating:

(please select new rating)

Management of Personnel: Contractor performance for this rating period for this assessment factor was:

Contractor Self-Assessment Rating:

(please select new rating)

Overall Assessment: Overall rating for all assessment factors for this period is:

Contractor Self-Assessment Rating:

(please select new rating)

Name of Authorized Contractor Personnel submitting the assessment Date Submitted

Name of Government Official completing the assessment Date Completed

File details come from the government source that posted it.