Attachment_03_-_Source_Selection_Test_Matrix_(11_June_2018).pdf
PDF 105 KB Posted
- Attached to
- Advanced Sniper Rifle (ASR)
- Solicitation number
- H92222-18-R-0004
- Issued by
-
United States Special Operations Command
About this file
This document outlines the test matrix and requirements for an Advanced Sniper Rifle solicitation from the United States Special Operations Command. The solicitation, number H92222-18-R-0004, seeks a rifle that will undergo verification and technical testing of major components, precision, barrels, and sound suppressors. Destructive drop testing is also required. The test matrix specifies a go/no-go sequence where failure of any test results in removal from further evaluation. Details are provided on measurement and verification requirements for size and weight, stock, magazines, finish, action, trigger, safety, muzzle device, workmanship, markings, field-stripping, chamber, sling, bipod, carrying cases, cleaning kit, and precision.
Please see attached Source Selection Test Matrix
View the file
Other files
| File | Type | Posted |
|---|---|---|
| H92222-18-R-0004_0008.pdf | ||
| ASR_Pricing_Workbook.xlsx | XLSX spreadsheet | |
| H92222-18-R-0004.pdf | ||
| H92222-18-0004_ASR_Official_RFP_Questios_29_June_18.docx | DOCX document | |
| H92222-18-R-0004_-_Conformed_Copy.pdf | ||
| H92222-18-R-0004_-_06.pdf | ||
| H92222-18-R-0004_ASR_Official_RFP_Quest_27June.docx | DOCX document | |
| H92222-18-R-0004_0005.pdf | ||
| Exhibit_A_-ASR_CDRLs-FINAL.pdf | ||
| H92222-18-R-0004_Official_RFP_Questions_18_June_2018.pdf | ||
| Attachment_02_-Statement_of_Work_(SOW).pdf | ||
| Vendor_question_response_-_11_June_2018.docx | DOCX document | |
| H92222-18-R-0004_0004.pdf | ||
| H92222-18-R-0004_0003.pdf | ||
| H92222-18-R-0004_ASR_Official_RFP_Questions_(002).docx | DOCX document | |
| H92222-18-R-0004_-0002.pdf | ||
| ASR_Combined_CDRLs-02072018.pdf | ||
| ASR_Synopsis_Final_20171121.pdf |
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Phase 1A - V/M/S Measurements Requirerment Description Section 3 Reference Section 4 Reference Verification Qty Major Components 3.4.1 4.4.1 3 Size and Weight 3.4.2 4.4.2 3 Stock 3.4.3 4.4.3 3 Ammunition magazines 3.4.4 4.4.4 5/cal Magazine Release 3.5.3 4.5.3 3 Sling Mounts 3.4.5 4.4.5 1 Surface Finish/Coating 3.4.6 4.4.6 3 Action 3.5.1 4.5.1 3 Trigger 3.5.2 4.5.2 3 Safety 3.5.4 4.5.4 3 Muzzle Device 3.5.5 4.5.5 3 Workmanship 3.5.6 4.5.6 3 Identification markings 3.5.7 4.5.7 3 Field Stripping 3.6.2 4.6.2 3
Caliber, Chamber, Headspace 3.7.1 4.7.1 3 Sling 3.9.1 4.9.1 1 Bipod 3.9.2 4.9.2 3 Hard Carrying Case 3.9.3 4.9.3 1 Soft Shell Carrying Case 3.9.4 4.9.4 1 Cleaning Kit 3.9.5 4.9.5 1
Phase 1B - Technical Testing Requirerment Description Section 3 Reference Section 4 Reference Verification Qty Precision 3.7.6 4.7.6 3 Barrel 3.6.1 4.6.1 3 Sound Suppressor 3.6.5 4.6.5 3
Phase 1C - Destructive Testing Requirerment Description Section 3 Reference Section 4 Reference Verification Qty Drop Test 3.7.10.b 4.7.10 3
Bid Sample Test Matrix - Go/No-Go In actual order of testing, see Performance Specification for further details. Failure to pass any test results in immediate expulsion from further testing.
Sheet1
File details come from the government source that posted it. Updated .