SURG_Attachment_05_Go_No_Go_Matrix.pdf
PDF 43 KB Posted
- Attached to
- Suppress Upper Receiver Group Federal contract opportunity
- Solicitation number
- H92222-17-R-0011
- Issued by
- United States Special Operations Command
About this file
SURG Attachment 05 Go_No Go Matrix
View the file
Other files for this federal contract opportunity
Show all 36
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
H92222-17-R-0011 Attachment 05: GO / NO GO Matrix
24 February 2017 Table I: Phase One Requirements / Verification References
Requirement Section 3 Requirements
Quantity First Article* Conformance Inspection*
Verification Methods
Section 5 Verification Procedures
Design Verification 3.1 5.2 Major Components 3.4.1 3 100% VL III Examination 5.5.1
Size/Weight 3.4.2 3 100% VL III Examination/Test 5.5.2 SURG Rail
Configuration
3.4.3 1 100% Examination 5.5.3
Suppressor Configuration
3.4.4 1 100% VL III Examination/Test 5.5.4
Charging Handle 3.4.5 1 100% Examination 5.5.5 Forward Assist 3.4.6 1 100% Examination 5.5.6 Surface Finish 3.4.8 3 100% Examination 5.5.7
Interface & Interoperability
Verification
3.5 100%
M4A1 LRG Interface 3.5.1 3 100% Examination/Test 5.6.1 Bolt Lock/Release 3.5.2 3 100% Examination/Test 5.6.2
Functional Performance Requirements
3.6
Fixture Fired Precision
3.6.2 3 3 100% Test 5.7.1
Cook Off Test 3.6.7 1 Test 5.7.2 Stress Test 3.6.1.i 1 Test 5.7.3
Unlubricated Weapon 3.6.1d 1 Test 5.7.4 Suppression 3.6.6 3 1 Test 5.7.5
Ergonomics / Toxic Fumes
3.6.7 1 Examination/Test 5.7.6
Safety 3.6.7 1 1 5 Test 5.7.6 Heat Control / Mirage
Reduction
3.6.8 1 Test 5.7.7
Support 3.8 Marking 3.8.1 3 100% VL III Examination 5.8.1
Workmanship 3.8.2 3 Examination 5.8.2 Requirements with 100% indicated for First Article or Conformance Inspection represents that all units of the test sample will be inspected. Integers listed will be the quantity of weapons tested.
Vendor sample weapons must pass 100% of thresholds in order to remain in the competitive range. Section requirements and procedures correlate to the performance specification.
Table 2: Phase One Test Details Requirement Testing
Sub- Section (A,B,C)
Requirements Quantity Weapon One*
Weapon Two*
Weapon Three*
Design Verification A 3.1 3 X X X
System Requirements 3.4
Major Components A 3.4.1 3 X X X
Size / Weight A 3.4.2 3 X X X SURG Rail
Configuration A 3.4.3 1 X Suppressor A 3.4.4 1 X
Surface Finish A 3.4.8 3 X X X Charging Handle A 3.4.5 1 X Forward Assist A 3.4.6 1 X
Interface & Interoperability
Req. 3.5
M4A1 Lower Receiver Group
Mounting A 3.5.1 3 X X X
Bolt Catch A 3.5.2 3 X X X Functional
Performance Requirements 3.6
Fixture Fired Precision B 3.6.2 3 X X X
Suppression B 3.6.6 3 X X X
Cook Off C 3.6.7 1 X Stress Test C 3.6.13 1 X
Unlubricated Weapon C 3.6.1 1 X
Heat Control / Mirage Reduction C 3.6.8 1 X
Toxic Fumes and Blowback C 3.6.7 1 X
Safety C 3.6.7 1 X Support 3.8 Marking A 3.8.1 3 X X X
Workmanship A 3.8.2 3 X X X
Phase One Testing is broken down into three sub-sections namely; Alpha (A), Bravo (B) and Charlie (C). The sections are A: cataloging and design verification, B: baseline measurements, C: destructive testing. *Note that weapons will be assigned identifiers one (1) through three (3) randomly at the beginning of testing.