Questions_and_Answers_5_for_H92222-17-R-0011.pdf

PDF 114 KB Posted

Attached to
Suppress Upper Receiver Group
Solicitation number
H92222-17-R-0011
Issued by

About this file

Questions and Answers are for clarification purposes only and do not alter the Governments requirement as provided in Solicitation H92222-17-R-0011, Attachment 1 and 3 or any associated CDRLs.

View the file

Other files

File Type Posted
Questions_and_Answers_4_for_H92222-17-R-0011.pdf PDF
DS-JXNN-C08-1621A_-_Ball,_Carbine,_Barrier,_MK318_MOD0.pdf PDF
SURG_Attachment_05_Go_No_Go_Matrix_170530.pdf PDF
Questions_and_Answers_3_for_H92222-17-R-0011.pdf PDF
NAVSEAINST_SS800-AG-MAN-010P-9290.pdf PDF
DS-JXNN-C08-1621_Rev_A_MK318_MOD1_Ammunition.pdf PDF
SURG_Attachment_02_Phase_Two_Testing__170224.pdf PDF
SURG_Attachment_01_PerfSpec___1700530.pdf PDF
ASTM_D3951_Standard_Practice_for_Commercial_Packaging.pdf PDF
DS-4083-C02-1273_Rev_A_-_MK262_MOD1_Ammunition.pdf PDF
ASTM_E1444__E1444M_Standard_Practice_for_Magnetic_Particle_Testing.pdf PDF
HS-4083-C01-1240_Rev_C_Frangible,_MK311_MOD_0.pdf PDF
SURG_Attachment_06_Past_Performance_Info_Sheet___170210.pdf PDF
HS-JXNN-C11-0008_Rev_1_MK_255_MOD_1_Reduced_Ricochet_Limited_Penetration.pdf PDF
ASTM_E1417__E1417M_Standard_Practice_for_Liquid_Penetrant_Testing_.pdf PDF
NATO_STANAG_4172ed2_5.56mm_Ammunition_(Linked_or_Otherwise).pdf PDF
HS-4083-C03-1351_Rev_1_5.56mm_Dim_Tracer_Performance_Specification.pdf PDF
H92222-17-R-0011_Amendment_03.pdf PDF
NAVSEAINST_System_Certification_Procedures_and_Criteria_Manual_for_Deep_Submergence_Systems.pdf PDF
SURG_Attachment_03_PhaseThreePrecedence__170530.pdf PDF
H92222-17-R-0011_Amendment_0001.pdf PDF
SURG_Exhibit_B_Provisioning_Parts_List.xls XLS spreadsheet
SURG_Exhibit_A_CDRLS_A001-A008.pdf PDF
SURG_Attachment_06_Past_Performance_Info_Sheet.pdf PDF
SURG_Attachment_03_PhaseThreePrecedence.pdf PDF
H92222-17-R-0011__SOLICITATION.pdf PDF
SURG_Attachment_02_Phase_Two_Testing.pdf PDF
SURG_Attachment_04_Flash_Test_Report.pdf PDF
SURG_Attachment_01_PerfSpec___170224_Parker_Comments.pdf PDF
SURG_Attachment_05_Go_No_Go_Matrix.pdf PDF
Questions_and_Answers_2__for_H92222-17-R-0011.pdf PDF
Additional_Point_of_Contact_H92222-17-R-0011__SURG.pdf PDF
Additional_Point_of_Contact_H92222-17-R-0011__SURG.pdf PDF
Questions_and_Answers_for_H92222-17-R-0011.pdf PDF
SURG_Synopsis_20161118.pdf PDF
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

202. 52.211-9, Section A references that contractors are to provide 68,575 units over lifetime of the contract; which is 13,715/year, and 1,142/month. Table A on page 17 references the contractor delivering 200 per month equating to 2,400/year. Would the USG please clarify if contractors are to adhere to delivery schedule (a) [2,400/year] or if we are to delivery, the max quantity of 1,142/month.

Answer 202. Federal Acquisition Regulation (FAR) clause 52.211-9 details the desired and required delivery rate and ship to address. The desired rate and time of delivery is as follows;

the first 200 due 60 days ARO, then 200 every 30 days thereafter until delivery order is complete. The required rate and time of delivery is as follows; The Contractor is required to meet the required delivery rate at a minimum per the delivery order. Keeping in mind the

Government can award multiple Delivery Orders (DO) / per year In Accordance with FAR clause 52.216-19 – Order Limitations.

233. States that it will send out a back brief to all vendors after industry day is completed.

Can USG provide industry with back brief?

Answer 233. No formal back brief was developed as a follow-up to the test site Industry Day.

This Q & A serves as the only Government communication post Industry Day activities.

236. The SURG precision fixture has yet to be evaluated concerning what optics will be used for precision. Q&A states that the information will be provided to the industry. Would the USG please provide industry with information regarding what optics will be used for precision or advice when this evaluation is to be conducted?

Answer 236. All precision will be tested utilizing a precision fixture mitigating the effect a scope would have on precision evaluation of vendor submittals. To ensure that each vendor is given the same degree of precision PAO confirmation between groups the same optic will be used on each submission.

253. Attachment 1 3.6.3 this requirement is an objective only, and listed under functional performance requirements. And this requirement is not listed on any testing phase or found on any table. Would the USG please confirm that this will not be tested, as it is only an objective and not included on other matrices for testing.

Answer 253. The objectives outlined in Attachment 1, 3.6.3, will be evaluated IAW

Attachment 3, Section 5.19.1.

276. Does an offeror submit the company and manufacturer of our complete SURG upper receiver? We are using a subcontractor manufacturer for the suppressor component of the

SURG. Which CAGE code should be the submitted? Is it the manufacturer of the suppressed upper receiver group or the CAGE code of the actual subcontracted suppressor manufacturer?

Answer 276. The Prime Offeror should submit the CAGE Code.

File details come from the government source that posted it. Updated .