H92222-17-R-0011 Attachment 05: GO / NO GO Matrix
30 May 2017 Table 1: Phase One Requirements / Verification References
Requirement Section 3 Requirements
Quantity First Article* Verification Methods
Section 5 Verification Procedures
Design Verification 3.1
5.2 Major Components 3.4.1 3 100% Examination 5.3.1
Size/Weight 3.4.2 3 100% Examination/Test 5.3.2 SURG Rail
Configuration
3.4.3 1 100% Examination 5.3.3
Suppressor Configuration
3.4.4 1 100% Examination/Test 5.3.4
Charging Handle 3.4.5 1 100% Examination 5.3.5 Forward Assist 3.4.6 1 100% Examination 5.5.7 Surface Finish 3.4.8 3 100% Examination 5.3.7
Interface & Interoperability
Verification
3.5 100%
M4A1 LRG Interface 3.5.1 3 100% Examination/Test 5.4.1 Bolt Lock/Release 3.5.2 3 100% Examination/Test 5.4.2
Functional Performance Requirements
3.6
Fixture Fired Precision
3.6.2 3 3 Test 5.5.1
Cook Off Test 3.6.7 1 Test 5.5.2 Stress Test 3.6.1.i 1 Test 5.5.3
Unlubricated Weapon 3.6.1d 1 Test 5.5.4 Suppression 3.6.6 3 1 Test 5.5.5
Ergonomics / Toxic Fumes
3.6.7 1 Examination/Test 5.5.6
Safety 3.6.7 1 1 Test 5.5.6 Heat Control / Mirage
Reduction
3.6.8 1 Test 5.5.8
Support 3.8
Marking 3.8.1 3 100% Examination 5.6.1
Workmanship 3.8.2 3 Examination 5.6.2
Vendor sample weapons must pass 100% of thresholds in order to remain in the competitive range. Section requirements and procedures correlate to the performance specification.
Table 2: Phase One Test Details Requirement Testing
Sub- Section (A,B,C)
Requirements Quantity Weapon One*
Weapon Two*
Weapon Three*
Design Verification A 3.1 3 X X X
System Requirements
3.4
Major Components A 3.4.1 3 X X X
Size / Weight A 3.4.2 3 X X X SURG Rail
Configuration A 3.4.3 1 X
Suppressor Configuration A 3.4.4 1 X
Surface Finish A 3.4.8 3 X X X Charging Handle A 3.4.5 1 X
Forward Assist A 3.4.6 1 X
Interface & Interoperability
Verification 3.5
M4A1 Lower Receiver Group
Mounting A 3.5.1 3 X X X
Bolt Catch/Release A 3.5.2 3 X X X Functional
Performance Requirements
3.6
Precision, Fixture Fired B 3.6.2 3 X X X
Suppression B 3.6.6 3 X X X
Cook Off C 5.5.2 1 X
Stress Test C 5.5.3 1 X
Unlubricated Weapon C 5.5.4 1 X
Heat Control / Mirage Reduction C 5.5.8 1 X
Toxic Fumes and Blowback C 5.5.6 1 X
Safety C 5.5.6 1 X Support 5.6
Marking A 5.6.1 3 X X X Workmanship A 5.6.2 3 X X X
Phase One Testing is broken down into three sub-sections namely; Alpha (A), Bravo (B) and Charlie (C). The sections are A: cataloging and design verification, B: baseline measurements, C: destructive testing. *Note that weapons will be assigned identifiers one (1) through three (3) randomly at the beginning of testing.