The file's text, extracted by GovTribe without its formatting.
Phase 1B & 1C Modernization
REQUEST FOR PROPOSALS
CONSTRUCTION MANANGEMENT SERVICES FOR
PHASE 1B & 1C MODERNIZATION OF THE
HARRY S TRUMAN BUILDING, WASHINGTON, DC
SOLICITATION NO. GS11P08MKC0038
PART I – THE SCHEDULE
SECTION B
SUPPLIES OR SERVICES AND PRICES/COSTS
SECTION B ‑ SUPPLIES OR SERVICES AND PRICES/COSTS
B.1.
General.
The Construction Manager (CM) shall provide all management, supervision, labor, materials, supplies, and equipment (except as otherwise provided), and shall plan, schedule, coordinate and assure effective performance of all services described herein.
The CM must have office space available within the GSA National Capital Region, and be able to respond to Government contacts/communications within 24 hours (one workday) during the day‑to‑day performance of this contract.
B.2.
Contract Executive.
The CM shall identify a Contract Executive responsible for the execution of each task, negotiating contract modifications for unforeseen requirements, coordinating the efforts of each Task team, and acting as the principal point of contact between the CM, Contracting Officer, and the Contracting Officer's Authorized Representative (COR). Monthly meetings between the Contract Executive and the GSA shall be required.
B.3.
Travel.
Travel shall not be reimbursed except as provided in the following paragraphs:
B.3.1 Projects requiring the services of the CM will be, or are expected to be, within the geographic boundaries of the GSA National Capital Region (NCR). The NCR includes the District of Columbia; the city of Baltimore, the counties of Montgomery, Prince Georges, Howard, Anne Arundel, and Baltimore in Maryland; the cities of Alexandria, Falls Church, Fairfax, and Manassas, and the counties of Arlington, Fairfax, Prince William and Loudoun in Virginia. There will be no reimbursement for travel within the GSA‑NCR.
B.3.2 Any travel to be allowed must be authorized by the CO in advance as a contract change order. The allowable travel reimbursement per visit to sites in cities or locations outside of the GSA‑NCR shall be fixed in negotiations by the COR and the CM. In negotiating the fixed price for such travel, the allowable per diem costs (such as hotel, transportation, meals, etc.) shall not exceed the rates set forth in Federal Travel Regulations in effect at the time the contract is negotiated. In addition, all travel by privately owned vehicle outside of the GSA‑NCR will be reimbursed based on Federal Travel Regulations mileage rates.
B.3.3 No travel reimbursement will be authorized by the CO unless the CM provides sufficient written evidence of costs incurred, including receipts, registers, or other information as may be required by the COR.
B.4.
Contract Effective Period(s). See Section‑F.
B.5.
Supplemental Services.
B.5.1 Additional work will be ordered on an as needed basis, and covered by the supplemental services man-hour rates provided in Section B. In arriving at the supplemental services man-hour rates, the Contractor will include all allowable overhead costs to include home office support, anticipated company-wide increases, fringe benefits, individual employee promotions, all direct labor costs, computer time, carrier/messenger services, printing and/or distribution of in-house drawings and/or other documents including any provided for subcontractors, local travel, materials, supplies, equipment, facilities, telephone services, furniture, delivery charges, etc., and profit associated with this contract.
B.5.2 The offeror must propose one Supplemental Services Man-Hour Rate Adjustment Factor that uniformly applies to all of the GSA Estimated Man-Hour Rates, and enter the resulting Supplemental Services Man-Hour Rates for each Discipline/Labor Category by either adding or subtracting any Adjustment Factors to the GSA estimated man-hour rates. Do not exceed two decimal places for the Adjustment Factors. The Offeror must insert the word “NET” at the adjustment factor entry if the billing rates are to be as listed, or insert the word "PLUS” or “MINUS” before any percentage increase or decrease applied to the GSA estimated rates (e.g. Plus 10%, Minus 10%). Do not enter rounded dollar figures in the Supplemental Services Man-Hour Rates column. The following example will illustrate the above:
GSA Estimated Man-hour Rate Proposed Adjustment Factor Supplemental Services Man-hour Rate
$100
Plus 10%
$100 * 1.10 = $110
$ 60
Minus 10%
$60 * 0.90 = $ 54 B.6.
Additional Instructions.
B.6.1 Offerors are cautioned that any offer may be rejected as unacceptable if it is materially unbalanced as to prices for the Base and the Option contract periods. An offer is unbalanced when it is based on prices which are significantly understated for some work and prices and significantly overstated for other work.
B.6.2 Neither the CM Contractor nor its employees will be required to prepare, sign or seal any construction documents nor specifications as part of the contract scope of work.
B.6.3 Offerors must propose prices for all labor categories in order to be considered for award. Offerors may not use pricing alternatives which differ from these instructions.
B.6.4 As outlined in Section C, the Contractor is required to provide its own hardware/computer equipment and software adequate to fully satisfy all operational requirements of this contract and task orders requiring field office operation requirements. This should be considered in developing the price proposal as no reimbursement is authorized for such items after award of the contract. This contract requires computerized capabilities of the Contractor.
B.7.
Firm Fixed Price.
You must quote a price for Phase 1B: Design Phase Services/Procurement Phase Services/Commissioning Phase Services/ Construction Phase Services/ Post-Construction Phase Services, and for Phase 1C: Design Phase Services/ Commissioning Phase Services/ Construction Phase Services/ Post-Construction Phase Services (Base Contract and Options 1 through 17) in order to be considered for award.
For award purposes, Phase 1B Design Phase Services (Bid Package 3 & 4), Procurement Phase Services, and Commissioning Design Phase Services (Bid Packages 3 &4 with Cafeteria & Kitchen and Security Pavilion) will initially be awarded. Such award shall constitute the Base Contract. Award of the remaining Phase 1B Options and Phase 1C Options may be exercised at later dates.
For the price evaluation, the Government will evaluate price proposals of offerors for award purposes by adding the total price for all options to the total price for the Base Contract. Award of options will not obligate the Government to exercise them.
Offerors must provide a firm fixed price for each Base and Option within each phase of the work that addresses all of the services/requirements as detailed in Section C. The phases of work are as follows:
B.7.1.
Bid Items for Phase 1B:
Design Phase Services
Base/Option
Offer
Bid Package – 1
Not Included
$ NA
Bid Package – 2
$ NA________
Bid Package – 3&4
Base
Procurement Phase Services
Option #1
Construction Phase Services
Option
$ NA________
Option #2
Option #3
Bid Package – 3&4, (Optional Cafeteria & Kitchen) Option #4
Bid Package – 3&4, (Optional Security Pavilion)
Option #5
Commissioning Phase Services
Design Phase (Bid Package 3 & 4 with Cafeteria &
Kitchen and Security Pavilion)
Base
Construction Phase (Bid Package 3 & 4)
Option #6
Construction Phase (Optional Cafeteria & Kitchen) Option #7
Construction Phase (Optional Security Pavilion)
Option #8
Post Construction Phase (Bid Package 2)
Option #9
Post Construction Phase (Bid Package 3 & 4)
Option #10
Post Construction Phase (Optional Cafeteria & Kit) Option #11
Post Construction Phase (Optional Security Pavilion) Option #12
Post Construction Phase Services
$_NA________
Option #13
Option #14
Bid Package – 3&4, (Optional Cafeteria & Kitchen) Option #15
Bid Package – 3&4, (Optional Security Pavilion)
Option #16
TOTAL BID ITEMS – Phase 1B-------------------------------------------------------- (includes Base Contract plus Options 1 through 16) B.7.2.
Bid Items for Phase 1C:
Design Phase & Commissioning Services
Option #17
Construction Phase & Commissioning Services
Option #18
Post Construction Phase & Commissioning Services
Option #19
TOTAL BID ITEMS – Phase 1C--------------------------------------------------------
(includes Option 17, 18, & 19)
| TOTAL BID ITEMS FOR PHASE 1B (INCLUDES BASE CONTRACT and OPTIONS 1 through 16) |
| $ |
| TOTAL BID ITEMS FOR PHASE 1C (INCLUDES OPTIONS (17 through 19) |
| $ |
B.8.1 PROCUREMENT PHASE SERVICES (Option 1) SUPPLEMENTAL SERVICES MAN-HOUR RATES (ESTIMATED VALUE OF SERVICES:$100,000.00. USED FOR EVALUATION PURPOSES ONLY.
ADJUSTMENT FACTOR.*( _ %)
*[e.g. Plus 10%, Minus 10%, Net]
LABOR CATEGORY
| GSA ESTIMATED MAN-HOUR RATES |
| SUPPLEMENTAL SERVICES |
MAN-HOUR RATES
| Construction Executive |
| $134 |
| $ |
| Quality Control Superintendent |
| $105 |
| $ |
| Project Architect-Manager |
| $ 98 |
| $ |
| Project Engineer-Manager |
| $ 98 |
| $ |
| Financial/Budget Control Officer |
| $ 65 |
| $ |
| Project Claims Analyst |
| $ 97 |
| $ |
| Mechanical Engineer – Sr. |
| $ 90 |
| $ |
| Electrical Engineer – Sr. |
| $ 90 |
| $ |
| Structural Engineer - Sr. |
| $ 92 |
| $ |
| Civil Engineer - Sr. |
| $ 86 |
| $ |
| Environmental Engineer – Sr. |
| $ 96 |
| $ |
| Testing Engineer - Sr. |
| $ 67 |
| $ |
| Engineer (any) – Jr. |
| $ 52 |
| $ |
| Specifications Writer |
| $ 69 |
| $ |
| Geotechnical Engr. |
| $ 74 |
| $ |
| Noise/Acoustical Engr |
| $ 91 |
| $ |
| Cultural Resources/Historic Preservationist |
| $ 74 |
| $ |
| Marketing/Business Assistant |
| $ 59 |
| $ |
| Architectural Inspector |
| $ 70 |
| $ |
| Mechanical Inspector |
| $ 78 |
| $ |
| Electrical Inspector |
| $ 76 |
| $ |
| Structural Inspector |
| $ 73 |
| $ |
| Safety/OSHA/Environmental Hygienist Inspector |
| $ 75 |
| $ |
| Concrete/Masonry Inspector |
| $ 61 |
| $ |
| Geotechnical Inspector |
| $ 57 |
| $ |
| Testing Technician |
| $ 47 |
| $ |
| Administrative Assistant |
| $ 38 |
| $ |
B.8.2 CONSTRUCTION PHASE SERVICES (Option 2) SUPPLEMENTAL SERVICES MAN-HOUR RATES (ESTIMATED VALUE OF SERVICES:$300,000.00. USED FOR EVALUATION PURPOSES ONLY.
LABOR CATEGORY
| GSA ESTIMATED MAN-HOUR RATES |
| SUPPLEMENTAL SERVICES |
| Construction Executive |
| $134 |
| $ |
| Quality Control Superintendent |
| $105 |
| $ |
| Project Architect-Manager |
| $ 98 |
| $ |
| Project Engineer-Manager |
| $ 98 |
| $ |
| Financial/Budget Control Officer |
| $ 65 |
| $ |
| Project Claims Analyst |
| $ 97 |
| $ |
| Mechanical Engineer – Sr. |
| $ 90 |
| $ |
| Electrical Engineer – Sr. |
| $ 90 |
| $ |
| Structural Engineer - Sr. |
| $ 92 |
| $ |
| Civil Engineer - Sr. |
| $ 86 |
| $ |
| Environmental Engineer – Sr. |
| $ 96 |
| $ |
| Testing Engineer - Sr. |
| $ 67 |
| $ |
| Engineer (any) – Jr. |
| $ 52 |
| $ |
| Specifications Writer |
| $ 69 |
| $ |
| Geotechnical Engr. |
| $ 74 |
| $ |
| Noise/Acoustical Engr |
| $ 91 |
| $ |
| Cultural Resources/Historic Preservationist |
| $ 74 |
| $ |
| Marketing/Business Assistant |
| $ 59 |
| $ |
| Architectural Inspector |
| $ 70 |
| $ |
| Mechanical Inspector |
| $ 78 |
| $ |
| Electrical Inspector |
| $ 76 |
| $ |
| Structural Inspector |
| $ 73 |
| $ |
| Safety/OSHA/Environmental Hygienist Inspector |
| $ 75 |
| $ |
| Concrete/Masonry Inspector |
| $ 61 |
| $ |
| Geotechnical Inspector |
| $ 57 |
| $ |
| Testing Technician |
| $ 47 |
| $ |
| Administrative Assistant |
| $ 38 |
| $ |
B.8.3 CONSTRUCTION PHASE SERVICES (Options 3) SUPPLEMENTAL SERVICES MAN-HOUR RATES (ESTIMATED VALUE OF SERVICES:$300,000.00. USED FOR EVALUATION PURPOSES ONLY.
LABOR CATEGORY
| GSA ESTIMATED MAN-HOUR RATES |
| SUPPLEMENTAL SERVICES |
| Construction Executive |
| $134 |
| $ |
| Quality Control Superintendent |
| $105 |
| $ |
| Project Architect-Manager |
| $ 98 |
| $ |
| Project Engineer-Manager |
| $ 98 |
| $ |
| Financial/Budget Control Officer |
| $ 65 |
| $ |
| Project Claims Analyst |
| $ 97 |
| $ |
| Mechanical Engineer – Sr. |
| $ 90 |
| $ |
| Electrical Engineer – Sr. |
| $ 90 |
| $ |
| Structural Engineer - Sr. |
| $ 92 |
| $ |
| Civil Engineer - Sr. |
| $ 86 |
| $ |
| Environmental Engineer – Sr. |
| $ 96 |
| $ |
| Testing Engineer - Sr. |
| $ 67 |
| $ |
| Engineer (any) – Jr. |
| $ 52 |
| $ |
| Specifications Writer |
| $ 69 |
| $ |
| Geotechnical Engr. |
| $ 74 |
| $ |
| Noise/Acoustical Engr |
| $ 91 |
| $ |
| Cultural Resources/Historic Preservationist |
| $ 74 |
| $ |
| Marketing/Business Assistant |
| $ 59 |
| $ |
| Architectural Inspector |
| $ 70 |
| $ |
| Mechanical Inspector |
| $ 78 |
| $ |
| Electrical Inspector |
| $ 76 |
| $ |
| Structural Inspector |
| $ 73 |
| $ |
| Safety/OSHA/Environmental Hygienist Inspector |
| $ 75 |
| $ |
| Concrete/Masonry Inspector |
| $ 61 |
| $ |
| Geotechnical Inspector |
| $ 57 |
| $ |
| Testing Technician |
| $ 47 |
| $ |
| Administrative Assistant |
| $ 38 |
| $ |
B.8.4 CONSTRUCTION PHASE SERVICES (Option 4) SUPPLEMENTAL SERVICES MAN-HOUR RATES (ESTIMATED VALUE OF SERVICES:$300,000.00. USED FOR EVALUATION PURPOSES ONLY.
LABOR CATEGORY
| GSA ESTIMATED MAN-HOUR RATES |
| SUPPLEMENTAL SERVICES |
| Construction Executive |
| $134 |
| $ |
| Quality Control Superintendent |
| $105 |
| $ |
| Project Architect-Manager |
| $ 98 |
| $ |
| Project Engineer-Manager |
| $ 98 |
| $ |
| Financial/Budget Control Officer |
| $ 65 |
| $ |
| Project Claims Analyst |
| $ 97 |
| $ |
| Mechanical Engineer – Sr. |
| $ 90 |
| $ |
| Electrical Engineer – Sr. |
| $ 90 |
| $ |
| Structural Engineer - Sr. |
| $ 92 |
| $ |
| Civil Engineer - Sr. |
| $ 86 |
| $ |
| Environmental Engineer – Sr. |
| $ 96 |
| $ |
| Testing Engineer - Sr. |
| $ 67 |
| $ |
| Engineer (any) – Jr. |
| $ 52 |
| $ |
| Specifications Writer |
| $ 69 |
| $ |
| Geotechnical Engr. |
| $ 74 |
| $ |
| Noise/Acoustical Engr |
| $ 91 |
| $ |
| Cultural Resources/Historic Preservationist |
| $ 74 |
| $ |
| Marketing/Business Assistant |
| $ 59 |
| $ |
| Architectural Inspector |
| $ 70 |
| $ |
| Mechanical Inspector |
| $ 78 |
| $ |
| Electrical Inspector |
| $ 76 |
| $ |
| Structural Inspector |
| $ 73 |
| $ |
| Safety/OSHA/Environmental Hygienist Inspector |
| $ 75 |
| $ |
| Concrete/Masonry Inspector |
| $ 61 |
| $ |
| Geotechnical Inspector |
| $ 57 |
| $ |
| Testing Technician |
| $ 47 |
| $ |
| Administrative Assistant |
| $ 38 |
| $ |
B.8.5 CONSTRUCTION PHASE SERVICES (Option 5) SUPPLEMENTAL SERVICES MAN-HOUR RATES (ESTIMATED VALUE OF SERVICES:$300,000.00. USED FOR EVALUATION PURPOSES ONLY.
LABOR CATEGORY
| GSA ESTIMATED MAN-HOUR RATES |
| SUPPLEMENTAL SERVICES |
| Construction Executive |
| $134 |
| $ |
| Quality Control Superintendent |
| $105 |
| $ |
| Project Architect-Manager |
| $ 98 |
| $ |
| Project Engineer-Manager |
| $ 98 |
| $ |
| Financial/Budget Control Officer |
| $ 65 |
| $ |
| Project Claims Analyst |
| $ 97 |
| $ |
| Mechanical Engineer – Sr. |
| $ 90 |
| $ |
| Electrical Engineer – Sr. |
| $ 90 |
| $ |
| Structural Engineer - Sr. |
| $ 92 |
| $ |
| Civil Engineer - Sr. |
| $ 86 |
| $ |
| Environmental Engineer – Sr. |
| $ 96 |
| $ |
| Testing Engineer - Sr. |
| $ 67 |
| $ |
| Engineer (any) – Jr. |
| $ 52 |
| $ |
| Specifications Writer |
| $ 69 |
| $ |
| Geotechnical Engr. |
| $ 74 |
| $ |
| Noise/Acoustical Engr |
| $ 91 |
| $ |
| Cultural Resources/Historic Preservationist |
| $ 74 |
| $ |
| Marketing/Business Assistant |
| $ 59 |
| $ |
| Architectural Inspector |
| $ 70 |
| $ |
| Mechanical Inspector |
| $ 78 |
| $ |
| Electrical Inspector |
| $ 76 |
| $ |
| Structural Inspector |
| $ 73 |
| $ |
| Safety/OSHA/Environmental Hygienist Inspector |
| $ 75 |
| $ |
| Concrete/Masonry Inspector |
| $ 61 |
| $ |
| Geotechnical Inspector |
| $ 57 |
| $ |
| Testing Technician |
| $ 47 |
| $ |
| Administrative Assistant |
| $ 38 |
| $ |
B.8.6 COMMISSIONING PHASE SERVICES (Option 6) SUPPLEMENTAL SERVICES MAN-HOUR RATES (ESTIMATED VALUE OF SERVICES:$300,000.00. USED FOR EVALUATION PURPOSES ONLY.
LABOR CATEGORY
| GSA ESTIMATED MAN-HOUR RATES |
| SUPPLEMENTAL SERVICES |
| Construction Executive |
| $134 |
| $ |
| Quality Control Superintendent |
| $105 |
| $ |
| Project Architect-Manager |
| $ 98 |
| $ |
| Project Engineer-Manager |
| $ 98 |
| $ |
| Financial/Budget Control Officer |
| $ 65 |
| $ |
| Project Claims Analyst |
| $ 97 |
| $ |
| Mechanical Engineer – Sr. |
| $ 90 |
| $ |
| Electrical Engineer – Sr. |
| $ 90 |
| $ |
| Structural Engineer - Sr. |
| $ 92 |
| $ |
| Civil Engineer - Sr. |
| $ 86 |
| $ |
| Environmental Engineer – Sr. |
| $ 96 |
| $ |
| Testing Engineer - Sr. |
| $ 67 |
| $ |
| Engineer (any) – Jr. |
| $ 52 |
| $ |
| Specifications Writer |
| $ 69 |
| $ |
| Geotechnical Engr. |
| $ 74 |
| $ |
| Noise/Acoustical Engr |
| $ 91 |
| $ |
| Cultural Resources/Historic Preservationist |
| $ 74 |
| $ |
| Marketing/Business Assistant |
| $ 59 |
| $ |
| Architectural Inspector |
| $ 70 |
| $ |
| Mechanical Inspector |
| $ 78 |
| $ |
| Electrical Inspector |
| $ 76 |
| $ |
| Structural Inspector |
| $ 73 |
| $ |
| Safety/OSHA/Environmental Hygienist Inspector |
| $ 75 |
| $ |
| Concrete/Masonry Inspector |
| $ 61 |
| $ |
| Geotechnical Inspector |
| $ 57 |
| $ |
| Testing Technician |
| $ 47 |
| $ |
| Administrative Assistant |
| $ 38 |
| $ |
B.8.7 COMMISSIONING PHASE SERVICES (Option7) SUPPLEMENTAL SERVICES MAN-HOUR RATES (ESTIMATED VALUE OF SERVICES:$300,000.00. USED FOR EVALUATION PURPOSES ONLY.
LABOR CATEGORY
| GSA ESTIMATED MAN-HOUR RATES |
| SUPPLEMENTAL SERVICES |
| Construction Executive |
| $134 |
| $ |
| Quality Control Superintendent |
| $105 |
| $ |
| Project Architect-Manager |
| $ 98 |
| $ |
| Project Engineer-Manager |
| $ 98 |
| $ |
| Financial/Budget Control Officer |
| $ 65 |
| $ |
| Project Claims Analyst |
| $ 97 |
| $ |
| Mechanical Engineer – Sr. |
| $ 90 |
| $ |
| Electrical Engineer – Sr. |
| $ 90 |
| $ |
| Structural Engineer - Sr. |
| $ 92 |
| $ |
| Civil Engineer - Sr. |
| $ 86 |
| $ |
| Environmental Engineer – Sr. |
| $ 96 |
| $ |
| Testing Engineer - Sr. |
| $ 67 |
| $ |
| Engineer (any) – Jr. |
| $ 52 |
| $ |
| Specifications Writer |
| $ 69 |
| $ |
| Geotechnical Engr. |
| $ 74 |
| $ |
| Noise/Acoustical Engr |
| $ 91 |
| $ |
| Cultural Resources/Historic Preservationist |
| $ 74 |
| $ |
| Marketing/Business Assistant |
| $ 59 |
| $ |
| Architectural Inspector |
| $ 70 |
| $ |
| Mechanical Inspector |
| $ 78 |
| $ |
| Electrical Inspector |
| $ 76 |
| $ |
| Structural Inspector |
| $ 73 |
| $ |
| Safety/OSHA/Environmental Hygienist Inspector |
| $ 75 |
| $ |
| Concrete/Masonry Inspector |
| $ 61 |
| $ |
| Geotechnical Inspector |
| $ 57 |
| $ |
| Testing Technician |
| $ 47 |
| $ |
| Administrative Assistant |
| $ 38 |
| $ |
B.8.8 COMMISSIONING PHASE SERVICES (Option 8) SUPPLEMENTAL SERVICES MAN-HOUR RATES (ESTIMATED VALUE OF SERVICES:$300,000.00. USED FOR EVALUATION PURPOSES ONLY.
LABOR CATEGORY
| GSA ESTIMATED MAN-HOUR RATES |
| SUPPLEMENTAL SERVICES |
| Construction Executive |
| $134 |
| $ |
| Quality Control Superintendent |
| $105 |
| $ |
| Project Architect-Manager |
| $ 98 |
| $ |
| Project Engineer-Manager |
| $ 98 |
| $ |
| Financial/Budget Control Officer |
| $ 65 |
| $ |
| Project Claims Analyst |
| $ 97 |
| $ |
| Mechanical Engineer – Sr. |
| $ 90 |
| $ |
| Electrical Engineer – Sr. |
| $ 90 |
| $ |
| Structural Engineer - Sr. |
| $ 92 |
| $ |
| Civil Engineer - Sr. |
| $ 86 |
| $ |
| Environmental Engineer – Sr. |
| $ 96 |
| $ |
| Testing Engineer - Sr. |
| $ 67 |
| $ |
| Engineer (any) – Jr. |
| $ 52 |
| $ |
| Specifications Writer |
| $ 69 |
| $ |
| Geotechnical Engr. |
| $ 74 |
| $ |
| Noise/Acoustical Engr |
| $ 91 |
| $ |
| Cultural Resources/Historic Preservationist |
| $ 74 |
| $ |
| Marketing/Business Assistant |
| $ 59 |
| $ |
| Architectural Inspector |
| $ 70 |
| $ |
| Mechanical Inspector |
| $ 78 |
| $ |
| Electrical Inspector |
| $ 76 |
| $ |
| Structural Inspector |
| $ 73 |
| $ |
| Safety/OSHA/Environmental Hygienist Inspector |
| $ 75 |
| $ |
| Concrete/Masonry Inspector |
| $ 61 |
| $ |
| Geotechnical Inspector |
| $ 57 |
| $ |
| Testing Technician |
| $ 47 |
| $ |
| Administrative Assistant |
| $ 38 |
| $ |
B.8.9 COMMISSIONING PHASE SERVICES (Option 9) SUPPLEMENTAL SERVICES MAN-HOUR RATES (ESTIMATED VALUE OF SERVICES:$300,000.00. USED FOR EVALUATION PURPOSES ONLY.
LABOR CATEGORY
| GSA ESTIMATED MAN-HOUR RATES |
| SUPPLEMENTAL SERVICES |
| Construction Executive |
| $134 |
| $ |
| Quality Control Superintendent |
| $105 |
| $ |
| Project Architect-Manager |
| $ 98 |
| $ |
| Project Engineer-Manager |
| $ 98 |
| $ |
| Financial/Budget Control Officer |
| $ 65 |
| $ |
| Project Claims Analyst |
| $ 97 |
| $ |
| Mechanical Engineer – Sr. |
| $ 90 |
| $ |
| Electrical Engineer – Sr. |
| $ 90 |
| $ |
| Structural Engineer - Sr. |
| $ 92 |
| $ |
| Civil Engineer - Sr. |
| $ 86 |
| $ |
| Environmental Engineer – Sr. |
| $ 96 |
| $ |
| Testing Engineer - Sr. |
| $ 67 |
| $ |
| Engineer (any) – Jr. |
| $ 52 |
| $ |
| Specifications Writer |
| $ 69 |
| $ |
| Geotechnical Engr. |
| $ 74 |
| $ |
| Noise/Acoustical Engr |
| $ 91 |
| $ |
| Cultural Resources/Historic Preservationist |
| $ 74 |
| $ |
| Marketing/Business Assistant |
| $ 59 |
| $ |
| Architectural Inspector |
| $ 70 |
| $ |
| Mechanical Inspector |
| $ 78 |
| $ |
| Electrical Inspector |
| $ 76 |
| $ |
| Structural Inspector |
| $ 73 |
| $ |
| Safety/OSHA/Environmental Hygienist Inspector |
| $ 75 |
| $ |
| Concrete/Masonry Inspector |
| $ 61 |
| $ |
| Geotechnical Inspector |
| $ 57 |
| $ |
| Testing Technician |
| $ 47 |
| $ |
| Administrative Assistant |
| $ 38 |
| $ |
B.8.10 COMMISSIONING PHASE SERVICES (Option 10) SUPPLEMENTAL SERVICES MAN-HOUR RATES (ESTIMATED VALUE OF SERVICES:$300,000.00. USED FOR EVALUATION PURPOSES ONLY.
LABOR CATEGORY
| GSA ESTIMATED MAN-HOUR RATES |
| SUPPLEMENTAL SERVICES |
| Construction Executive |
| $134 |
| $ |
| Quality Control Superintendent |
| $105 |
| $ |
| Project Architect-Manager |
| $ 98 |
| $ |
| Project Engineer-Manager |
| $ 98 |
| $ |
| Financial/Budget Control Officer |
| $ 65 |
| $ |
| Project Claims Analyst |
| $ 97 |
| $ |
| Mechanical Engineer – Sr. |
| $ 90 |
| $ |
| Electrical Engineer – Sr. |
| $ 90 |
| $ |
| Structural Engineer - Sr. |
| $ 92 |
| $ |
| Civil Engineer - Sr. |
| $ 86 |
| $ |
| Environmental Engineer – Sr. |
| $ 96 |
| $ |
| Testing Engineer - Sr. |
| $ 67 |
| $ |
| Engineer (any) – Jr. |
| $ 52 |
| $ |
| Specifications Writer |
| $ 69 |
| $ |
| Geotechnical Engr. |
| $ 74 |
| $ |
| Noise/Acoustical Engr |
| $ 91 |
| $ |
| Cultural Resources/Historic Preservationist |
| $ 74 |
| $ |
| Marketing/Business Assistant |
| $ 59 |
| $ |
| Architectural Inspector |
| $ 70 |
| $ |
| Mechanical Inspector |
| $ 78 |
| $ |
| Electrical Inspector |
| $ 76 |
| $ |
| Structural Inspector |
| $ 73 |
| $ |
| Safety/OSHA/Environmental Hygienist Inspector |
| $ 75 |
| $ |
| Concrete/Masonry Inspector |
| $ 61 |
| $ |
| Geotechnical Inspector |
| $ 57 |
| $ |
| Testing Technician |
| $ 47 |
| $ |
| Administrative Assistant |
| $ 38 |
| $ |
B.8.11 COMMISSIONING PHASE SERVICES (Option 11) SUPPLEMENTAL SERVICES MAN-HOUR RATES (ESTIMATED VALUE OF SERVICES:$300,000.00. USED FOR EVALUATION PURPOSES ONLY.
LABOR CATEGORY
| GSA ESTIMATED MAN-HOUR RATES |
| SUPPLEMENTAL SERVICES |
| Construction Executive |
| $134 |
| $ |
| Quality Control Superintendent |
| $105 |
| $ |
| Project Architect-Manager |
| $ 98 |
| $ |
| Project Engineer-Manager |
| $ 98 |
| $ |
| Financial/Budget Control Officer |
| $ 65 |
| $ |
| Project Claims Analyst |
| $ 97 |
| $ |
| Mechanical Engineer – Sr. |
| $ 90 |
| $ |
| Electrical Engineer – Sr. |
| $ 90 |
| $ |
| Structural Engineer - Sr. |
| $ 92 |
| $ |
| Civil Engineer - Sr. |
| $ 86 |
| $ |
| Environmental Engineer – Sr. |
| $ 96 |
| $ |
| Testing Engineer - Sr. |
| $ 67 |
| $ |
| Engineer (any) – Jr. |
| $ 52 |
| $ |
| Specifications Writer |
| $ 69 |
| $ |
| Geotechnical Engr. |
| $ 74 |
| $ |
| Noise/Acoustical Engr |
| $ 91 |
| $ |
| Cultural Resources/Historic Preservationist |
| $ 74 |
| $ |
| Marketing/Business Assistant |
| $ 59 |
| $ |
| Architectural Inspector |
| $ 70 |
| $ |
| Mechanical Inspector |
| $ 78 |
| $ |
| Electrical Inspector |
| $ 76 |
| $ |
| Structural Inspector |
| $ 73 |
| $ |
| Safety/OSHA/Environmental Hygienist Inspector |
| $ 75 |
| $ |
| Concrete/Masonry Inspector |
| $ 61 |
| $ |
| Geotechnical Inspector |
| $ 57 |
| $ |
| Testing Technician |
| $ 47 |
| $ |
| Administrative Assistant |
| $ 38 |
| $ |
B.8.12 COMMISSIONING PHASE SERVICES (Option 12) SUPPLEMENTAL SERVICES MAN-HOUR RATES (ESTIMATED VALUE OF SERVICES:$300,000.00. USED FOR EVALUATION PURPOSES ONLY.
LABOR CATEGORY
| GSA ESTIMATED MAN-HOUR RATES |
| SUPPLEMENTAL SERVICES |
| Construction Executive |
| $134 |
| $ |
| Quality Control Superintendent |
| $105 |
| $ |
| Project Architect-Manager |
| $ 98 |
| $ |
| Project Engineer-Manager |
| $ 98 |
| $ |
| Financial/Budget Control Officer |
| $ 65 |
| $ |
| Project Claims Analyst |
| $ 97 |
| $ |
| Mechanical Engineer – Sr. |
| $ 90 |
| $ |
| Electrical Engineer – Sr. |
| $ 90 |
| $ |
| Structural Engineer - Sr. |
| $ 92 |
| $ |
| Civil Engineer - Sr. |
| $ 86 |
| $ |
| Environmental Engineer – Sr. |
| $ 96 |
| $ |
| Testing Engineer - Sr. |
| $ 67 |
| $ |
| Engineer (any) – Jr. |
| $ 52 |
| $ |
| Specifications Writer |
| $ 69 |
| $ |
| Geotechnical Engr. |
| $ 74 |
| $ |
| Noise/Acoustical Engr |
| $ 91 |
| $ |
| Cultural Resources/Historic Preservationist |
| $ 74 |
| $ |
| Marketing/Business Assistant |
| $ 59 |
| $ |
| Architectural Inspector |
| $ 70 |
| $ |
| Mechanical Inspector |
| $ 78 |
| $ |
| Electrical Inspector |
| $ 76 |
| $ |
| Structural Inspector |
| $ 73 |
| $ |
| Safety/OSHA/Environmental Hygienist Inspector |
| $ 75 |
| $ |
| Concrete/Masonry Inspector |
| $ 61 |
| $ |
| Geotechnical Inspector |
| $ 57 |
| $ |
| Testing Technician |
| $ 47 |
| $ |
| Administrative Assistant |
| $ 38 |
| $ |
B.8.13 POST CONSTRUCTION PHASE SERVICES (Option 13) SUPPLEMENTAL SERVICES MAN-HOUR RATES (ESTIMATED VALUE OF SERVICES:$100,000.00. USED FOR EVALUATION PURPOSES ONLY.
LABOR CATEGORY
| GSA ESTIMATED MAN-HOUR RATES |
| SUPPLEMENTAL SERVICES |
| Construction Executive |
| $134 |
| $ |
| Quality Control Superintendent |
| $105 |
| $ |
| Project Architect-Manager |
| $ 98 |
| $ |
| Project Engineer-Manager |
| $ 98 |
| $ |
| Financial/Budget Control Officer |
| $ 65 |
| $ |
| Project Claims Analyst |
| $ 97 |
| $ |
| Mechanical Engineer – Sr. |
| $ 90 |
| $ |
| Electrical Engineer – Sr. |
| $ 90 |
| $ |
| Structural Engineer - Sr. |
| $ 92 |
| $ |
| Civil Engineer - Sr. |
| $ 86 |
| $ |
| Environmental Engineer – Sr. |
| $ 96 |
| $ |
| Testing Engineer - Sr. |
| $ 67 |
| $ |
| Engineer (any) – Jr. |
| $ 52 |
| $ |
| Specifications Writer |
| $ 69 |
| $ |
| Geotechnical Engr. |
| $ 74 |
| $ |
| Noise/Acoustical Engr |
| $ 91 |
| $ |
| Cultural Resources/Historic Preservationist |
| $ 74 |
| $ |
| Marketing/Business Assistant |
| $ 59 |
| $ |
| Architectural Inspector |
| $ 70 |
| $ |
| Mechanical Inspector |
| $ 78 |
| $ |
| Electrical Inspector |
| $ 76 |
| $ |
| Structural Inspector |
| $ 73 |
| $ |
| Safety/OSHA/Environmental Hygienist Inspector |
| $ 75 |
| $ |
| Concrete/Masonry Inspector |
| $ 61 |
| $ |
| Geotechnical Inspector |
| $ 57 |
| $ |
| Testing Technician |
| $ 47 |
| $ |
| Administrative Assistant |
| $ 38 |
| $ |
B.8.14 POST CONSTRUCTION PHASE SERVICES (Option 14) SUPPLEMENTAL SERVICES MAN-HOUR RATES (ESTIMATED VALUE OF SERVICES:$100,000.00. USED FOR EVALUATION PURPOSES ONLY.
LABOR CATEGORY
| GSA ESTIMATED MAN-HOUR RATES |
| SUPPLEMENTAL SERVICES |
| Construction Executive |
| $134 |
| $ |
| Quality Control Superintendent |
| $105 |
| $ |
| Project Architect-Manager |
| $ 98 |
| $ |
| Project Engineer-Manager |
| $ 98 |
| $ |
| Financial/Budget Control Officer |
| $ 65 |
| $ |
| Project Claims Analyst |
| $ 97 |
| $ |
| Mechanical Engineer – Sr. |
| $ 90 |
| $ |
| Electrical Engineer – Sr. |
| $ 90 |
| $ |
| Structural Engineer - Sr. |
| $ 92 |
| $ |
| Civil Engineer - Sr. |
| $ 86 |
| $ |
| Environmental Engineer – Sr. |
| $ 96 |
| $ |
| Testing Engineer - Sr. |
| $ 67 |
| $ |
| Engineer (any) – Jr. |
| $ 52 |
| $ |
| Specifications Writer |
| $ 69 |
| $ |
| Geotechnical Engr. |
| $ 74 |
| $ |
| Noise/Acoustical Engr |
| $ 91 |
| $ |
| Cultural Resources/Historic Preservationist |
| $ 74 |
| $ |
| Marketing/Business Assistant |
| $ 59 |
| $ |
| Architectural Inspector |
| $ 70 |
| $ |
| Mechanical Inspector |
| $ 78 |
| $ |
| Electrical Inspector |
| $ 76 |
| $ |
| Structural Inspector |
| $ 73 |
| $ |
| Safety/OSHA/Environmental Hygienist Inspector |
| $ 75 |
| $ |
| Concrete/Masonry Inspector |
| $ 61 |
| $ |
| Geotechnical Inspector |
| $ 57 |
| $ |
| Testing Technician |
| $ 47 |
| $ |
| Administrative Assistant |
| $ 38 |
| $ |
B.8.15 POST CONSTRUCTION PHASE SERVICES (Option 15) SUPPLEMENTAL SERVICES MAN-HOUR RATES (ESTIMATED VALUE OF SERVICES:$100,000.00. USED FOR EVALUATION PURPOSES ONLY.
LABOR CATEGORY
| GSA ESTIMATED MAN-HOUR RATES |
| SUPPLEMENTAL SERVICES |
| Construction Executive |
| $134 |
| $ |
| Quality Control Superintendent |
| $105 |
| $ |
| Project Architect-Manager |
| $ 98 |
| $ |
| Project Engineer-Manager |
| $ 98 |
| $ |
| Financial/Budget Control Officer |
| $ 65 |
| $ |
| Project Claims Analyst |
| $ 97 |
| $ |
| Mechanical Engineer – Sr. |
| $ 90 |
| $ |
| Electrical Engineer – Sr. |
| $ 90 |
| $ |
| Structural Engineer - Sr. |
| $ 92 |
| $ |
| Civil Engineer - Sr. |
| $ 86 |
| $ |
| Environmental Engineer – Sr. |
| $ 96 |
| $ |
| Testing Engineer - Sr. |
| $ 67 |
| $ |
| Engineer (any) – Jr. |
| $ 52 |
| $ |
| Specifications Writer |
| $ 69 |
| $ |
| Geotechnical Engr. |
| $ 74 |
| $ |
| Noise/Acoustical Engr |
| $ 91 |
| $ |
| Cultural Resources/Historic Preservationist |
| $ 74 |
| $ |
| Marketing/Business Assistant |
| $ 59 |
| $ |
| Architectural Inspector |
| $ 70 |
| $ |
| Mechanical Inspector |
| $ 78 |
| $ |
| Electrical Inspector |
| $ 76 |
| $ |
| Structural Inspector |
| $ 73 |
| $ |
| Safety/OSHA/Environmental Hygienist Inspector |
| $ 75 |
| $ |
| Concrete/Masonry Inspector |
| $ 61 |
| $ |
| Geotechnical Inspector |
| $ 57 |
| $ |
| Testing Technician |
| $ 47 |
| $ |
| Administrative Assistant |
| $ 38 |
| $ |
B.8.16 POST CONSTRUCTION PHASE SERVICES (Option 16) SUPPLEMENTAL SERVICES MAN-HOUR RATES (ESTIMATED VALUE OF SERVICES:$100,000.00. USED FOR EVALUATION PURPOSES ONLY.
LABOR CATEGORY
| GSA ESTIMATED MAN-HOUR RATES |
| SUPPLEMENTAL SERVICES |
| Construction Executive |
| $134 |
| $ |
| Quality Control Superintendent |
| $105 |
| $ |
| Project Architect-Manager |
| $ 98 |
| $ |
| Project Engineer-Manager |
| $ 98 |
| $ |
| Financial/Budget Control Officer |
| $ 65 |
| $ |
| Project Claims Analyst |
| $ 97 |
| $ |
| Mechanical Engineer – Sr. |
| $ 90 |
| $ |
| Electrical Engineer – Sr. |
| $ 90 |
| $ |
| Structural Engineer - Sr. |
| $ 92 |
| $ |
| Civil Engineer - Sr. |
| $ 86 |
| $ |
| Environmental Engineer – Sr. |
| $ 96 |
| $ |
| Testing Engineer - Sr. |
| $ 67 |
| $ |
| Engineer (any) – Jr. |
| $ 52 |
| $ |
| Specifications Writer |
| $ 69 |
| $ |
| Geotechnical Engr. |
| $ 74 |
| $ |
| Noise/Acoustical Engr |
| $ 91 |
| $ |
| Cultural Resources/Historic Preservationist |
| $ 74 |
| $ |
| Marketing/Business Assistant |
| $ 59 |
| $ |
| Architectural Inspector |
| $ 70 |
| $ |
| Mechanical Inspector |
| $ 78 |
| $ |
| Electrical Inspector |
| $ 76 |
| $ |
| Structural Inspector |
| $ 73 |
| $ |
| Safety/OSHA/Environmental Hygienist Inspector |
| $ 75 |
| $ |
| Concrete/Masonry Inspector |
| $ 61 |
| $ |
| Geotechnical Inspector |
| $ 57 |
| $ |
| Testing Technician |
| $ 47 |
| $ |
| Administrative Assistant |
| $ 38 |
| $ |
PHASE IC CM SERVICES
B.8.17 DESIGN PHASE SERVICES (Option 17) SUPPLEMENTAL SERVICES MAN-HOUR RATES (ESTIMATED VALUE OF SERVICES:$100,000.00. USED FOR EVALUATION PURPOSES ONLY.
LABOR CATEGORY
| GSA ESTIMATED MAN-HOUR RATES |
| SUPPLEMENTAL SERVICES |
| Construction Executive |
| $134 |
| $ |
| Quality Control Superintendent |
| $105 |
| $ |
| Project Architect-Manager |
| $ 98 |
| $ |
| Project Engineer-Manager |
| $ 98 |
| $ |
| Financial/Budget Control Officer |
| $ 65 |
| $ |
| Project Claims Analyst |
| $ 97 |
| $ |
| Mechanical Engineer – Sr. |
| $ 90 |
| $ |
| Electrical Engineer – Sr. |
| $ 90 |
| $ |
| Structural Engineer - Sr. |
| $ 92 |
| $ |
| Civil Engineer - Sr. |
| $ 86 |
| $ |
| Environmental Engineer – Sr. |
| $ 96 |
| $ |
| Testing Engineer - Sr. |
| $ 67 |
| $ |
| Engineer (any) – Jr. |
| $ 52 |
| $ |
| Specifications Writer |
| $ 69 |
| $ |
| Geotechnical Engr. |
| $ 74 |
| $ |
| Noise/Acoustical Engr |
| $ 91 |
| $ |
| Cultural Resources/Historic Preservationist |
| $ 74 |
| $ |
| Marketing/Business Assistant |
| $ 59 |
| $ |
| Architectural Inspector |
| $ 70 |
| $ |
| Mechanical Inspector |
| $ 78 |
| $ |
| Electrical Inspector |
| $ 76 |
| $ |
| Structural Inspector |
| $ 73 |
| $ |
| Safety/OSHA/Environmental Hygienist Inspector |
| $ 75 |
| $ |
| Concrete/Masonry Inspector |
| $ 61 |
| $ |
| Geotechnical Inspector |
| $ 57 |
| $ |
| Testing Technician |
| $ 47 |
| $ |
| Administrative Assistant |
| $ 38 |
| $ |
B.8.18 CONSTRUCTION PHASE SERVICES (Option 18) SUPPLEMENTAL SERVICES MAN-HOUR RATES (ESTIMATED VALUE OF SERVICES:$300,000.00. USED FOR EVALUATION PURPOSES ONLY.
LABOR CATEGORY
| GSA ESTIMATED MAN-HOUR RATES |
| SUPPLEMENTAL SERVICES |
| Construction Executive |
| $134 |
| $ |
| Quality Control Superintendent |
| $105 |
| $ |
| Project Architect-Manager |
| $ 98 |
| $ |
| Project Engineer-Manager |
| $ 98 |
| $ |
| Financial/Budget Control Officer |
| $ 65 |
| $ |
| Project Claims Analyst |
| $ 97 |
| $ |
| Mechanical Engineer – Sr. |
| $ 90 |
| $ |
| Electrical Engineer – Sr. |
| $ 90 |
| $ |
| Structural Engineer - Sr. |
| $ 92 |
| $ |
| Civil Engineer - Sr. |
| $ 86 |
| $ |
| Environmental Engineer – Sr. |
| $ 96 |
| $ |
| Testing Engineer - Sr. |
| $ 67 |
| $ |
| Engineer (any) – Jr. |
| $ 52 |
| $ |
| Specifications Writer |
| $ 69 |
| $ |
| Geotechnical Engr. |
| $ 74 |
| $ |
| Noise/Acoustical Engr |
| $ 91 |
| $ |
| Cultural Resources/Historic Preservationist |
| $ 74 |
| $ |
| Marketing/Business Assistant |
| $ 59 |
| $ |
| Architectural Inspector |
| $ 70 |
| $ |
| Mechanical Inspector |
| $ 78 |
| $ |
| Electrical Inspector |
| $ 76 |
| $ |
| Structural Inspector |
| $ 73 |
| $ |
| Safety/OSHA/Environmental Hygienist Inspector |
| $ 75 |
| $ |
| Concrete/Masonry Inspector |
| $ 61 |
| $ |
| Geotechnical Inspector |
| $ 57 |
| $ |
| Testing Technician |
| $ 47 |
| $ |
| Administrative Assistant |
| $ 38 |
| $ |
B.8.19 POST CONSTRUCTION SERVICES (Option 19) SUPPLEMENTAL SERVICES MAN-HOUR RATES (ESTIMATED VALUE OF SERVICES:$100,000.00. USED FOR EVALUATION PURPOSES ONLY.
LABOR CATEGORY
| GSA ESTIMATED MAN-HOUR RATES |
| SUPPLEMENTAL SERVICES |
| Construction Executive |
| $134 |
| $ |
| Quality Control Superintendent |
| $105 |
| $ |
| Project Architect-Manager |
| $ 98 |
| $ |
| Project Engineer-Manager |
| $ 98 |
| $ |
| Financial/Budget Control Officer |
| $ 65 |
| $ |
| Project Claims Analyst |
| $ 97 |
| $ |
| Mechanical Engineer – Sr. |
| $ 90 |
| $ |
| Electrical Engineer – Sr. |
| $ 90 |
| $ |
| Structural Engineer - Sr. |
| $ 92 |
| $ |
| Civil Engineer - Sr. |
| $ 86 |
| $ |
| Environmental Engineer – Sr. |
| $ 96 |
| $ |
| Testing Engineer - Sr. |
| $ 67 |
| $ |
| Engineer (any) – Jr. |
| $ 52 |
| $ |
| Specifications Writer |
| $ 69 |
| $ |
| Geotechnical Engr. |
| $ 74 |
| $ |
| Noise/Acoustical Engr |
| $ 91 |
| $ |
| Cultural Resources/Historic Preservationist |
| $ 74 |
| $ |
| Marketing/Business Assistant |
| $ 59 |
| $ |
| Architectural Inspector |
| $ 70 |
| $ |
| Mechanical Inspector |
| $ 78 |
| $ |
| Electrical Inspector |
| $ 76 |
| $ |
| Structural Inspector |
| $ 73 |
| $ |
| Safety/OSHA/Environmental Hygienist Inspector |
| $ 75 |
| $ |
| Concrete/Masonry Inspector |
| $ 61 |
| $ |
| Geotechnical Inspector |
| $ 57 |
| $ |
| Testing Technician |
| $ 47 |
| $ |
| Administrative Assistant |
| $ 38 |
| $ |
B.9 EVALUATED SUPPLEMENTAL SERVICE PRICING
B.9.1 OPTION #1 – PROCUREMENT PHASE EVALUATED SUPPLEMENTAL
SERVICES PRICE (ONE (PLUS OR MINUS) THE SUPPLEMENTAL SERVICES
MAN-HOUR RATES ADJUSTMENT FACTOR X $100,000.00)
B.9.2 OPTION #2 – CONSTRURCTION PHASE EVALUATED SUPPLEMENTAL
SERVICES PRICE (ONE (PLUS OR MINUS) THE SUPPLEMENTAL SERVICES
MAN-HOUR RATES ADJUSTMENT FACTOR X $300,000.00)
B.9.3 OPTION #3 – CONSTRURCTION PHASE EVALUATED SUPPLEMENTAL
SERVICES PRICE (ONE (PLUS OR MINUS) THE SUPPLEMENTAL SERVICES
MAN-HOUR RATES ADJUSTMENT FACTOR X $300,000.00)
B.9.4 OPTION #4 – CONSTRURCTION PHASE EVALUATED SUPPLEMENTAL
SERVICES PRICE (ONE (PLUS OR MINUS) THE SUPPLEMENTAL SERVICES
MAN-HOUR RATES ADJUSTMENT FACTOR X $300,000.00)
B.9.5 OPTION #5 – CONSTRURCTION PHASE EVALUATED SUPPLEMENTAL
SERVICES PRICE (ONE (PLUS OR MINUS) THE SUPPLEMENTAL SERVICES
MAN-HOUR RATES ADJUSTMENT FACTOR X $300,000.00)
B.9.6 OPTION #6 – COMMISSIONING PHASE EVALUATED SUPPLEMENTAL
SERVICES PRICE (ONE (PLUS OR MINUS) THE SUPPLEMENTAL SERVICES
MAN-HOUR RATES ADJUSTMENT FACTOR X $300,000.00)
B.9.7 OPTION #7 – COMMISSIONING PHASE EVALUATED SUPPLEMENTAL
SERVICES PRICE (ONE (PLUS OR MINUS) THE SUPPLEMENTAL SERVICES
MAN-HOUR RATES ADJUSTMENT FACTOR X $300,000.00)
B.9.8 OPTION #8 – COMMISSIONING PHASE EVALUATED SUPPLEMENTAL
SERVICES PRICE (ONE (PLUS OR MINUS) THE SUPPLEMENTAL SERVICES
MAN-HOUR RATES ADJUSTMENT FACTOR X $300,000.00)
B.9.9 OPTION #9 – COMMISSIONING PHASE EVALUATED SUPPLEMENTAL
SERVICES PRICE (ONE (PLUS OR MINUS) THE SUPPLEMENTAL SERVICES
MAN-HOUR RATES ADJUSTMENT FACTOR X $300,000.00)
B.9.10 OPTION #10 – COMMISSIONING PHASE EVALUATED SUPPLEMENTAL
SERVICES PRICE (ONE (PLUS OR MINUS) THE SUPPLEMENTAL SERVICES
MAN-HOUR RATES ADJUSTMENT FACTOR X $300,000.00)
B.9.11 OPTION #11 – COMMISSIONING PHASE EVALUATED SUPPLEMENTAL
SERVICES PRICE (ONE (PLUS OR MINUS) THE SUPPLEMENTAL SERVICES
MAN-HOUR RATES ADJUSTMENT FACTOR X $300,000.00)
B.9.12 OPTION #12 – COMMISSIONING PHASE EVALUATED
SUPPLEMENTAL SERVICES PRICE (ONE (PLUS OR MINUS) THE
SUPPLEMENTAL SERVICES MAN-HOUR RATES ADJUSTMENT
FACTOR X $100,000.00)
B.9.13 OPTION #13 – POST CONSTRURCTION PHASE EVALUATED
SUPPLEMENTAL SERVICES PRICE (ONE (PLUS OR MINUS) THE
B.9.14 OPTION #14 – POST CONSTRURCTION PHASE EVALUATED
SUPPLEMENTAL SERVICES PRICE (ONE (PLUS OR MINUS) THE
B.9.15 OPTION #15 – POST CONSTRURCTION PHASE EVALUATED
SUPPLEMENTAL SERVICES PRICE (ONE (PLUS OR MINUS) THE
B.9.16 OPTION #16 – POST CONSTRURCTION PHASE EVALUATED
SUPPLEMENTAL SERVICES PRICE (ONE (PLUS OR MINUS) THE
B.9.17 OPTION #17 – DESIGN & COMMISSIONING PHASE EVALUATED
SUPPLEMENTAL SERVICES PRICE (ONE (PLUS OR MINUS) THE
B.9.18 OPTION #18 – CONSTRUCTION & COMMISSIONING PHASE
EVALUATED SUPPLEMENTAL SERVICES PRICE (ONE (PLUS OR
MINUS) THE SUPPLEMENTAL SERVICES MAN-HOUR RATES
ADJUSTMENT FACTOR X $300,000.00)
B.9.19 OPTION #19 – POST CONSTRUCTION & COMMISSIONING PHASE
EVALUATED SUPPLEMENTAL SERVICES PRICE (ONE (PLUS OR
MINUS) THE SUPPLEMENTAL SERVICES MAN-HOUR RATES
ADJUSTMENT FACTOR X $100,000.00)
TOTAL EVALUATED SUPPLEMENTAL SERVICE PRICE: $_____________________________
(B.9.1. + B.9.2. + B.9.3. + B.9.4. + B.9.5. + B.9.6. + B.9.7 + B.9.8 + B.9.9 + B.9.10 + B.9.11 + B.9.12 + B.9.13 + B.9.14 +
B.9.15 + B.9.16 + B.9.17 + B.9.18 + B.9.19)
TOTAL FIRM FIXED PRICE :
(INCLUDES BASE CONTRACT + OPTIONS 1 THROUGH 19 +
SUPPLEMENTAL PRICES OPTIONS 1 THROUGH 19).
I-B-1
GS11P08MKC0038