AMENDMENT 3 - SF30.doc
DOC document 59 KB Posted
- Attached to
- Construction Management (CM) Services for the Phase 1B/1C Modernization of the Harry S Truman Building
- Solicitation number
- GS11P08MKC0038
About this file
Amendment 3 - SF30
View the file
Other files
| File | Type | Posted |
|---|---|---|
| AMENDMENT 5 - SF30.doc | DOC document | |
| Amendment 5 - Revised Page I-C-3.doc | DOC document | |
| Revised Supplemental Sheets _ Amendment 5.doc | DOC document | |
| AMENDMENT 4 - SF30.doc | DOC document | |
| Revised Section B_ Amendment 3.doc | DOC document | |
| Amendment 3 - Questions and Answers.doc | DOC document | |
| AMENDMENT 2 - SF30.doc | DOC document | |
| Amendment 2 - Questions and Answers.doc | DOC document | |
| Revised Section B_ Amendment 2.doc | DOC document | |
| AMENDMENT 1.doc | DOC document | |
| Section L.doc | DOC document | |
| Section G.doc | DOC document | |
| Section E.doc | DOC document | |
| Section F.doc | DOC document | |
| Section B.doc | DOC document | |
| Section C.doc | DOC document | |
| Section A.doc | DOC document | |
| Section M.doc | DOC document | |
| Section A-SF33.doc | DOC document | |
| Section I.doc | DOC document | |
| Section D.doc | DOC document | |
| Section K.doc | DOC document | |
| Coverpage.doc | DOC document | |
| Section J.doc | DOC document | |
| Section H.doc | DOC document |
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
PAGE OF
PAGES
2. AMENDMENT/MODIFICATION NO.
Amendment 3
3. EFFECTIVE DATE
08/12/2008
REQUISITION/PURCHASE REQ. NO.
PROJECT NO. (If applicable)
| 6. ISSUED BY |
| CODE |
| 7. ADMINISTERED BY (If other than Item 6) |
| CODE |
General Services Administration, NCR
Property Development Division (WPC)
7th & D Streets, SW, Room 2002
Washington, DC 20407
| 8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) |
| (X) |
| 9.A. AMENDMENT OF SOLICITATION NO. |
GS-11P-08-MKC-0038
| Prospective Offeror's |
| X |
9B. DATED (SEE ITEM 11)
07/18/2008
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
| CODE |
| FACILITY CODE |
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning 4_ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegraph which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS
IT MODIFIES THE CONTRACT/ORDER NO. DESCRIBED IN ITEM 14.
| (x) |
| A. |
THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
c.
THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D.
OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not x is required to sign this document and return __7__ copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible).
This amendment is being issued electronically using the Federal Business Opportunity website (www.fbo.gov).
1. The proposal submission due date is hereby changed from Tuesday, August 19, 2008 to Wednesday, August 20, 2008. The bid deposit location and submission time remain unchanged.
2. Remove Section B in its entirety and replace with the attached Revised Section B.
End of Amendment No. 3 Except as provided herein, all terms and conditions of the document reference in item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print) Vincent E. Matner, P.E., Contracting Officer
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
| 15C. DATE SIGNED |
| 16B. UNITED STATES OF AMERICA |
BY
(Signature of Contracting Officer)
16C. DATE SIGNED
NSN 7540-01-152-8070
PREVIOUS EDITION UNUSABLE
30-105
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
SOLICITATION NO. GS11P08MKC0038
Amendment 3
3. The first sentence of Section C.3.3.2.d, page I-C-21 is changed from: Constructability Review. The CM is responsible for conducting the constructability reviews at the mid-point & 95% Construction Document stages.
To now read: Constructability Review. The CM is responsible for conducting the constructability reviews at the design completion percentages listed in the table below.
4. Section C, C.7.1.3, Page I-C-39 is changed deleting the requirement of LEED 2.2 NC.
5. Section C, C.7.2.2, Page I-C-39 is changed deleting the requirement LEED 2.1 (or Current Version).
6. The page allowance in Section L, L.12.2.5, Page IV-L-9, is changed from 80 to now read 85.
7. Section L, Evaluation Factor 2- Experience and Qualifications of Key Personnel, L.13.2.(b) is changed from:
Key personnel shall be those persons who will have major project responsibilities and/or who will provide unusual or unique capabilities and whose availability is considered critical to the accomplishment of required services. At a minimum, the Government considers the Construction Executive (CEx), the Project Manager (PM) (if different that the CEx), the Commissioning Agent (CxA), the Lead Construction Inspector (LCI), and the Quality Control Superintendent (QCS) to be key personnel. These key persons must be identified by names and titles with proposed specific duties and responsibilities clearly assigned in the proposal. Their experience and qualifications are appropriate to the duties and responsibilities. All key personnel must possess sufficient professional credentials and education for the positions to which they will be assigned. A minimum of one key person noted above must be currently certified by the Construction Management Association of America. (CMAA).
To now read:
Key personnel shall be those persons who will have major project responsibilities and/or who will provide unusual or unique capabilities and whose availability is considered critical to the accomplishment of required services. At a minimum, the Government considers the Construction Executive (CEx), the Project Manager (PM)- Design Phase, the Project Manager (PM)- Construction Phase (if different that the CEx), the Commissioning Agent (CxA), the Lead Construction Inspector (LCI), and the Quality Control Superintendent (QCS) to be key personnel. These key persons must be identified by names and titles with proposed specific duties and responsibilities clearly assigned in the proposal. Their experience and qualifications are appropriate to the duties and responsibilities. All key personnel must possess sufficient professional credentials and education for the positions to which they will be assigned. A minimum of one key person noted above must be currently certified by the Construction Management Association of America. (CMAA).
8. Section L, Evaluation Factor 4- Past Performance Of the Firm and Key Personnel, L.13.5.(a) is changed from:
Provide the following information on the projects identified under the Past Experience of Firm on Similar Projects evaluation factor, demonstrating acceptable past performance as evidenced by satisfaction of performance requirements, quality and budget controls, effective management, and customer satisfaction.
To now read:
Provide the following information on the projects identified under the Past Experience of Firm on Similar Projects evaluation factor, demonstrating acceptable past performance as evidenced by satisfaction of performance requirements, quality and budget controls, effective management, and customer satisfaction. In addition, provide at least two references for each project.
SOLICITATION NO. GS11P08MKC0038
Amendment 3
9. Section L, Evaluation Factor 4- Past Performance Of the Firm and Key Personnel, L.13.5.(b) is changed from:
Please provide at least two references from similarly complex projects for the Construction Executive (CEx), Project Manager (PM), Commissioning Agent (CxA), Lead Construction Inspector (LCI), and the Quality Control Superintendent (QCS), regarding past performance in their respective positions, as appropriate, in the areas of performance requirements, quality and budget controls, effective management, and customer satisfaction.
To now read:
Please provide at least two references from similarly complex projects for the Construction Executive (CEx), Project Manager (PM) – Design Phase, Project Manager (PM) – Construction Phase, Commissioning Agent (CxA), Lead Construction Inspector (LCI), and the Quality Control Superintendent (QCS), regarding past performance in their respective positions, as appropriate, in the areas of performance requirements, quality and budget controls, effective management, and customer satisfaction.
10. See attached list of Questions and Answers.
END OF AMENDMENT 3.
rerwrwwerwerwrexxx� EMBED WordPad.Document.1 ����
X x
_1027145955.rtf X
File details come from the government source that posted it. Updated .