Phase 1B & 1C Modernization
Section B- Revised Supplemental Pricing Sheets, Amendment 5 August 14, 2008
B.8.1 PROCUREMENT PHASE SERVICES (Option 1) SUPPLEMENTAL SERVICES MAN-HOUR RATES (ESTIMATED VALUE OF SERVICES:$100,000.00. USED FOR EVALUATION PURPOSES ONLY.
ADJUSTMENT FACTOR.*( _ %)
*[e.g. Plus 10%, Minus 10%, Net]
LABOR CATEGORY
| GSA ESTIMATED MAN-HOUR RATES |
| SUPPLEMENTAL SERVICES |
MAN-HOUR RATES
| Construction Executive |
| $161 |
| $ |
| Quality Control Superintendent |
| $125 |
| $ |
| Project Architect-Manager |
| $ 118 |
| $ |
| Project Engineer-Manager |
| $ 118 |
| $ |
| Financial/Budget Control Officer |
| $ 78 |
| $ |
| Project Claims Analyst |
| $116 |
| $ |
| Mechanical Engineer – Sr. |
| $ 108 |
| $ |
| Electrical Engineer – Sr. |
| $ 108 |
| $ |
| Structural Engineer - Sr. |
| $ 110 |
| $ |
| Civil Engineer - Sr. |
| $ 103 |
| $ |
| Environmental Engineer – Sr. |
| $ 115 |
| $ |
| Testing Engineer - Sr. |
| $ 80 |
| $ |
| Engineer (any) – Jr. |
| $ 62 |
| $ |
| Specifications Writer |
| $ 83 |
| $ |
| Geotechnical Engr. |
| $ 89 |
| $ |
| Noise/Acoustical Engr |
| $ 109 |
| $ |
| Cultural Resources/Historic Preservationist |
| $ 89 |
| $ |
| Marketing/Business Assistant |
| $ 71 |
| $ |
| Architectural Inspector |
| $ 84 |
| $ |
| Mechanical Inspector |
| $ 93 |
| $ |
| Electrical Inspector |
| $ 91 |
| $ |
| Structural Inspector |
| $ 88 |
| $ |
| Safety/OSHA/Environmental Hygienist Inspector |
| $ 90 |
| $ |
| Concrete/Masonry Inspector |
| $ 73 |
| $ |
| Geotechnical Inspector |
| $ 69 |
| $ |
| Testing Technician |
| $ 57 |
| $ |
| Administrative Assistant |
| $ 46 |
| $ |
| Commissioning Agent |
| $101 |
| $ |
| Construction Inspector |
| $101 |
| $ |
| Sr. Fire Protection Engineer |
| $105 |
| $ |
| Fire Protection Engineer |
| $71 |
| $ |
B.8.2 CONSTRUCTION PHASE SERVICES (Option 2) SUPPLEMENTAL SERVICES MAN-HOUR RATES (ESTIMATED VALUE OF SERVICES:$300,000.00. USED FOR EVALUATION PURPOSES ONLY.
LABOR CATEGORY
| GSA ESTIMATED MAN-HOUR RATES |
| SUPPLEMENTAL SERVICES |
MAN-HOUR RATES
| Construction Executive |
| $161 |
| $ |
| Quality Control Superintendent |
| $125 |
| $ |
| Project Architect-Manager |
| $ 118 |
| $ |
| Project Engineer-Manager |
| $ 118 |
| $ |
| Financial/Budget Control Officer |
| $ 78 |
| $ |
| Project Claims Analyst |
| $116 |
| $ |
| Mechanical Engineer – Sr. |
| $ 108 |
| $ |
| Electrical Engineer – Sr. |
| $ 108 |
| $ |
| Structural Engineer - Sr. |
| $ 110 |
| $ |
| Civil Engineer - Sr. |
| $ 103 |
| $ |
| Environmental Engineer – Sr. |
| $ 115 |
| $ |
| Testing Engineer - Sr. |
| $ 80 |
| $ |
| Engineer (any) – Jr. |
| $ 62 |
| $ |
| Specifications Writer |
| $ 83 |
| $ |
| Geotechnical Engr. |
| $ 89 |
| $ |
| Noise/Acoustical Engr |
| $ 109 |
| $ |
| Cultural Resources/Historic Preservationist |
| $ 89 |
| $ |
| Marketing/Business Assistant |
| $ 71 |
| $ |
| Architectural Inspector |
| $ 84 |
| $ |
| Mechanical Inspector |
| $ 93 |
| $ |
| Electrical Inspector |
| $ 91 |
| $ |
| Structural Inspector |
| $ 88 |
| $ |
| Safety/OSHA/Environmental Hygienist Inspector |
| $ 90 |
| $ |
| Concrete/Masonry Inspector |
| $ 73 |
| $ |
| Geotechnical Inspector |
| $ 69 |
| $ |
| Testing Technician |
| $ 57 |
| $ |
| Administrative Assistant |
| $ 46 |
| $ |
| Commissioning Agent |
| $101 |
| $ |
| Construction Inspector |
| $101 |
| $ |
| Sr. Fire Protection Engineer |
| $105 |
| $ |
| Fire Protection Engineer |
| $71 |
| $ |
B.8.3 CONSTRUCTION PHASE SERVICES (Options 3) SUPPLEMENTAL SERVICES MAN-HOUR RATES (ESTIMATED VALUE OF SERVICES:$300,000.00. USED FOR EVALUATION PURPOSES ONLY.
LABOR CATEGORY
| GSA ESTIMATED MAN-HOUR RATES |
| SUPPLEMENTAL SERVICES |
| Construction Executive |
| $161 |
| $ |
| Quality Control Superintendent |
| $125 |
| $ |
| Project Architect-Manager |
| $ 118 |
| $ |
| Project Engineer-Manager |
| $ 118 |
| $ |
| Financial/Budget Control Officer |
| $ 78 |
| $ |
| Project Claims Analyst |
| $116 |
| $ |
| Mechanical Engineer – Sr. |
| $ 108 |
| $ |
| Electrical Engineer – Sr. |
| $ 108 |
| $ |
| Structural Engineer - Sr. |
| $ 110 |
| $ |
| Civil Engineer - Sr. |
| $ 103 |
| $ |
| Environmental Engineer – Sr. |
| $ 115 |
| $ |
| Testing Engineer - Sr. |
| $ 80 |
| $ |
| Engineer (any) – Jr. |
| $ 62 |
| $ |
| Specifications Writer |
| $ 83 |
| $ |
| Geotechnical Engr. |
| $ 89 |
| $ |
| Noise/Acoustical Engr |
| $ 109 |
| $ |
| Cultural Resources/Historic Preservationist |
| $ 89 |
| $ |
| Marketing/Business Assistant |
| $ 71 |
| $ |
| Architectural Inspector |
| $ 84 |
| $ |
| Mechanical Inspector |
| $ 93 |
| $ |
| Electrical Inspector |
| $ 91 |
| $ |
| Structural Inspector |
| $ 88 |
| $ |
| Safety/OSHA/Environmental Hygienist Inspector |
| $ 90 |
| $ |
| Concrete/Masonry Inspector |
| $ 73 |
| $ |
| Geotechnical Inspector |
| $ 69 |
| $ |
| Testing Technician |
| $ 57 |
| $ |
| Administrative Assistant |
| $ 46 |
| $ |
| Commissioning Agent |
| $101 |
| $ |
| Construction Inspector |
| $101 |
| $ |
| Sr. Fire Protection Engineer |
| $105 |
| $ |
| Fire Protection Engineer |
| $71 |
| $ |
B.8.4 CONSTRUCTION PHASE SERVICES (Option 4) SUPPLEMENTAL SERVICES MAN-HOUR RATES (ESTIMATED VALUE OF SERVICES:$300,000.00. USED FOR EVALUATION PURPOSES ONLY.
LABOR CATEGORY
| GSA ESTIMATED MAN-HOUR RATES |
| SUPPLEMENTAL SERVICES |
| Construction Executive |
| $161 |
| $ |
| Quality Control Superintendent |
| $125 |
| $ |
| Project Architect-Manager |
| $ 118 |
| $ |
| Project Engineer-Manager |
| $ 118 |
| $ |
| Financial/Budget Control Officer |
| $ 78 |
| $ |
| Project Claims Analyst |
| $116 |
| $ |
| Mechanical Engineer – Sr. |
| $ 108 |
| $ |
| Electrical Engineer – Sr. |
| $ 108 |
| $ |
| Structural Engineer - Sr. |
| $ 110 |
| $ |
| Civil Engineer - Sr. |
| $ 103 |
| $ |
| Environmental Engineer – Sr. |
| $ 115 |
| $ |
| Testing Engineer - Sr. |
| $ 80 |
| $ |
| Engineer (any) – Jr. |
| $ 62 |
| $ |
| Specifications Writer |
| $ 83 |
| $ |
| Geotechnical Engr. |
| $ 89 |
| $ |
| Noise/Acoustical Engr |
| $ 109 |
| $ |
| Cultural Resources/Historic Preservationist |
| $ 89 |
| $ |
| Marketing/Business Assistant |
| $ 71 |
| $ |
| Architectural Inspector |
| $ 84 |
| $ |
| Mechanical Inspector |
| $ 93 |
| $ |
| Electrical Inspector |
| $ 91 |
| $ |
| Structural Inspector |
| $ 88 |
| $ |
| Safety/OSHA/Environmental Hygienist Inspector |
| $ 90 |
| $ |
| Concrete/Masonry Inspector |
| $ 73 |
| $ |
| Geotechnical Inspector |
| $ 69 |
| $ |
| Testing Technician |
| $ 57 |
| $ |
| Administrative Assistant |
| $ 46 |
| $ |
| Commissioning Agent |
| $101 |
| $ |
| Construction Inspector |
| $101 |
| $ |
| Sr. Fire Protection Engineer |
| $105 |
| $ |
| Fire Protection Engineer |
| $71 |
| $ |
B.8.5 CONSTRUCTION PHASE SERVICES (Option 5) SUPPLEMENTAL SERVICES MAN-HOUR RATES (ESTIMATED VALUE OF SERVICES:$300,000.00. USED FOR EVALUATION PURPOSES ONLY.
LABOR CATEGORY
| GSA ESTIMATED MAN-HOUR RATES |
| SUPPLEMENTAL SERVICES |
| Construction Executive |
| $161 |
| $ |
| Quality Control Superintendent |
| $125 |
| $ |
| Project Architect-Manager |
| $ 118 |
| $ |
| Project Engineer-Manager |
| $ 118 |
| $ |
| Financial/Budget Control Officer |
| $ 78 |
| $ |
| Project Claims Analyst |
| $116 |
| $ |
| Mechanical Engineer – Sr. |
| $ 108 |
| $ |
| Electrical Engineer – Sr. |
| $ 108 |
| $ |
| Structural Engineer - Sr. |
| $ 110 |
| $ |
| Civil Engineer - Sr. |
| $ 103 |
| $ |
| Environmental Engineer – Sr. |
| $ 115 |
| $ |
| Testing Engineer - Sr. |
| $ 80 |
| $ |
| Engineer (any) – Jr. |
| $ 62 |
| $ |
| Specifications Writer |
| $ 83 |
| $ |
| Geotechnical Engr. |
| $ 89 |
| $ |
| Noise/Acoustical Engr |
| $ 109 |
| $ |
| Cultural Resources/Historic Preservationist |
| $ 89 |
| $ |
| Marketing/Business Assistant |
| $ 71 |
| $ |
| Architectural Inspector |
| $ 84 |
| $ |
| Mechanical Inspector |
| $ 93 |
| $ |
| Electrical Inspector |
| $ 91 |
| $ |
| Structural Inspector |
| $ 88 |
| $ |
| Safety/OSHA/Environmental Hygienist Inspector |
| $ 90 |
| $ |
| Concrete/Masonry Inspector |
| $ 73 |
| $ |
| Geotechnical Inspector |
| $ 69 |
| $ |
| Testing Technician |
| $ 57 |
| $ |
| Administrative Assistant |
| $ 46 |
| $ |
| Commissioning Agent |
| $101 |
| $ |
| Construction Inspector |
| $101 |
| $ |
| Sr. Fire Protection Engineer |
| $105 |
| $ |
| Fire Protection Engineer |
| $71 |
| $ |
B.8.6 COMMISSIONING PHASE SERVICES (Option 6) SUPPLEMENTAL SERVICES MAN-HOUR RATES (ESTIMATED VALUE OF SERVICES:$300,000.00. USED FOR EVALUATION PURPOSES ONLY.
LABOR CATEGORY
| GSA ESTIMATED MAN-HOUR RATES |
| SUPPLEMENTAL SERVICES |
| Construction Executive |
| $161 |
| $ |
| Quality Control Superintendent |
| $125 |
| $ |
| Project Architect-Manager |
| $ 118 |
| $ |
| Project Engineer-Manager |
| $ 118 |
| $ |
| Financial/Budget Control Officer |
| $ 78 |
| $ |
| Project Claims Analyst |
| $116 |
| $ |
| Mechanical Engineer – Sr. |
| $ 108 |
| $ |
| Electrical Engineer – Sr. |
| $ 108 |
| $ |
| Structural Engineer - Sr. |
| $ 110 |
| $ |
| Civil Engineer - Sr. |
| $ 103 |
| $ |
| Environmental Engineer – Sr. |
| $ 115 |
| $ |
| Testing Engineer - Sr. |
| $ 80 |
| $ |
| Engineer (any) – Jr. |
| $ 62 |
| $ |
| Specifications Writer |
| $ 83 |
| $ |
| Geotechnical Engr. |
| $ 89 |
| $ |
| Noise/Acoustical Engr |
| $ 109 |
| $ |
| Cultural Resources/Historic Preservationist |
| $ 89 |
| $ |
| Marketing/Business Assistant |
| $ 71 |
| $ |
| Architectural Inspector |
| $ 84 |
| $ |
| Mechanical Inspector |
| $ 93 |
| $ |
| Electrical Inspector |
| $ 91 |
| $ |
| Structural Inspector |
| $ 88 |
| $ |
| Safety/OSHA/Environmental Hygienist Inspector |
| $ 90 |
| $ |
| Concrete/Masonry Inspector |
| $ 73 |
| $ |
| Geotechnical Inspector |
| $ 69 |
| $ |
| Testing Technician |
| $ 57 |
| $ |
| Administrative Assistant |
| $ 46 |
| $ |
| Commissioning Agent |
| $101 |
| $ |
| Construction Inspector |
| $101 |
| $ |
| Sr. Fire Protection Engineer |
| $105 |
| $ |
| Fire Protection Engineer |
| $71 |
| $ |
B.8.7 COMMISSIONING PHASE SERVICES (Option7) SUPPLEMENTAL SERVICES MAN-HOUR RATES (ESTIMATED VALUE OF SERVICES:$300,000.00. USED FOR EVALUATION PURPOSES ONLY.
LABOR CATEGORY
| GSA ESTIMATED MAN-HOUR RATES |
| SUPPLEMENTAL SERVICES |
| Construction Executive |
| $161 |
| $ |
| Quality Control Superintendent |
| $125 |
| $ |
| Project Architect-Manager |
| $ 118 |
| $ |
| Project Engineer-Manager |
| $ 118 |
| $ |
| Financial/Budget Control Officer |
| $ 78 |
| $ |
| Project Claims Analyst |
| $116 |
| $ |
| Mechanical Engineer – Sr. |
| $ 108 |
| $ |
| Electrical Engineer – Sr. |
| $ 108 |
| $ |
| Structural Engineer - Sr. |
| $ 110 |
| $ |
| Civil Engineer - Sr. |
| $ 103 |
| $ |
| Environmental Engineer – Sr. |
| $ 115 |
| $ |
| Testing Engineer - Sr. |
| $ 80 |
| $ |
| Engineer (any) – Jr. |
| $ 62 |
| $ |
| Specifications Writer |
| $ 83 |
| $ |
| Geotechnical Engr. |
| $ 89 |
| $ |
| Noise/Acoustical Engr |
| $ 109 |
| $ |
| Cultural Resources/Historic Preservationist |
| $ 89 |
| $ |
| Marketing/Business Assistant |
| $ 71 |
| $ |
| Architectural Inspector |
| $ 84 |
| $ |
| Mechanical Inspector |
| $ 93 |
| $ |
| Electrical Inspector |
| $ 91 |
| $ |
| Structural Inspector |
| $ 88 |
| $ |
| Safety/OSHA/Environmental Hygienist Inspector |
| $ 90 |
| $ |
| Concrete/Masonry Inspector |
| $ 73 |
| $ |
| Geotechnical Inspector |
| $ 69 |
| $ |
| Testing Technician |
| $ 57 |
| $ |
| Administrative Assistant |
| $ 46 |
| $ |
| Commissioning Agent |
| $101 |
| $ |
| Construction Inspector |
| $101 |
| $ |
| Sr. Fire Protection Engineer |
| $105 |
| $ |
| Fire Protection Engineer |
| $71 |
| $ |
B.8.8 COMMISSIONING PHASE SERVICES (Option 8) SUPPLEMENTAL SERVICES MAN-HOUR RATES (ESTIMATED VALUE OF SERVICES:$300,000.00. USED FOR EVALUATION PURPOSES ONLY.
LABOR CATEGORY
| GSA ESTIMATED MAN-HOUR RATES |
| SUPPLEMENTAL SERVICES |
MAN-HOUR RATES
| Construction Executive |
| $161 |
| $ |
| Quality Control Superintendent |
| $125 |
| $ |
| Project Architect-Manager |
| $ 118 |
| $ |
| Project Engineer-Manager |
| $ 118 |
| $ |
| Financial/Budget Control Officer |
| $ 78 |
| $ |
| Project Claims Analyst |
| $116 |
| $ |
| Mechanical Engineer – Sr. |
| $ 108 |
| $ |
| Electrical Engineer – Sr. |
| $ 108 |
| $ |
| Structural Engineer - Sr. |
| $ 110 |
| $ |
| Civil Engineer - Sr. |
| $ 103 |
| $ |
| Environmental Engineer – Sr. |
| $ 115 |
| $ |
| Testing Engineer - Sr. |
| $ 80 |
| $ |
| Engineer (any) – Jr. |
| $ 62 |
| $ |
| Specifications Writer |
| $ 83 |
| $ |
| Geotechnical Engr. |
| $ 89 |
| $ |
| Noise/Acoustical Engr |
| $ 109 |
| $ |
| Cultural Resources/Historic Preservationist |
| $ 89 |
| $ |
| Marketing/Business Assistant |
| $ 71 |
| $ |
| Architectural Inspector |
| $ 84 |
| $ |
| Mechanical Inspector |
| $ 93 |
| $ |
| Electrical Inspector |
| $ 91 |
| $ |
| Structural Inspector |
| $ 88 |
| $ |
| Safety/OSHA/Environmental Hygienist Inspector |
| $ 90 |
| $ |
| Concrete/Masonry Inspector |
| $ 73 |
| $ |
| Geotechnical Inspector |
| $ 69 |
| $ |
| Testing Technician |
| $ 57 |
| $ |
| Administrative Assistant |
| $ 46 |
| $ |
| Commissioning Agent |
| $101 |
| $ |
| Construction Inspector |
| $101 |
| $ |
| Sr. Fire Protection Engineer |
| $105 |
| $ |
| Fire Protection Engineer |
| $71 |
| $ |
B.8.9 COMMISSIONING PHASE SERVICES (Option 9) SUPPLEMENTAL SERVICES MAN-HOUR RATES (ESTIMATED VALUE OF SERVICES:$300,000.00. USED FOR EVALUATION PURPOSES ONLY.
LABOR CATEGORY
| GSA ESTIMATED MAN-HOUR RATES |
| SUPPLEMENTAL SERVICES |
| Construction Executive |
| $161 |
| $ |
| Quality Control Superintendent |
| $125 |
| $ |
| Project Architect-Manager |
| $ 118 |
| $ |
| Project Engineer-Manager |
| $ 118 |
| $ |
| Financial/Budget Control Officer |
| $ 78 |
| $ |
| Project Claims Analyst |
| $116 |
| $ |
| Mechanical Engineer – Sr. |
| $ 108 |
| $ |
| Electrical Engineer – Sr. |
| $ 108 |
| $ |
| Structural Engineer - Sr. |
| $ 110 |
| $ |
| Civil Engineer - Sr. |
| $ 103 |
| $ |
| Environmental Engineer – Sr. |
| $ 115 |
| $ |
| Testing Engineer - Sr. |
| $ 80 |
| $ |
| Engineer (any) – Jr. |
| $ 62 |
| $ |
| Specifications Writer |
| $ 83 |
| $ |
| Geotechnical Engr. |
| $ 89 |
| $ |
| Noise/Acoustical Engr |
| $ 109 |
| $ |
| Cultural Resources/Historic Preservationist |
| $ 89 |
| $ |
| Marketing/Business Assistant |
| $ 71 |
| $ |
| Architectural Inspector |
| $ 84 |
| $ |
| Mechanical Inspector |
| $ 93 |
| $ |
| Electrical Inspector |
| $ 91 |
| $ |
| Structural Inspector |
| $ 88 |
| $ |
| Safety/OSHA/Environmental Hygienist Inspector |
| $ 90 |
| $ |
| Concrete/Masonry Inspector |
| $ 73 |
| $ |
| Geotechnical Inspector |
| $ 69 |
| $ |
| Testing Technician |
| $ 57 |
| $ |
| Administrative Assistant |
| $ 46 |
| $ |
| Commissioning Agent |
| $101 |
| $ |
| Construction Inspector |
| $101 |
| $ |
| Sr. Fire Protection Engineer |
| $105 |
| $ |
| Fire Protection Engineer |
| $71 |
| $ |
B.8.10 COMMISSIONING PHASE SERVICES (Option 10) SUPPLEMENTAL SERVICES MAN-HOUR RATES (ESTIMATED VALUE OF SERVICES:$300,000.00. USED FOR EVALUATION PURPOSES ONLY.
LABOR CATEGORY
| GSA ESTIMATED MAN-HOUR RATES |
| SUPPLEMENTAL SERVICES |
| Construction Executive |
| $161 |
| $ |
| Quality Control Superintendent |
| $125 |
| $ |
| Project Architect-Manager |
| $ 118 |
| $ |
| Project Engineer-Manager |
| $ 118 |
| $ |
| Financial/Budget Control Officer |
| $ 78 |
| $ |
| Project Claims Analyst |
| $116 |
| $ |
| Mechanical Engineer – Sr. |
| $ 108 |
| $ |
| Electrical Engineer – Sr. |
| $ 108 |
| $ |
| Structural Engineer - Sr. |
| $ 110 |
| $ |
| Civil Engineer - Sr. |
| $ 103 |
| $ |
| Environmental Engineer – Sr. |
| $ 115 |
| $ |
| Testing Engineer - Sr. |
| $ 80 |
| $ |
| Engineer (any) – Jr. |
| $ 62 |
| $ |
| Specifications Writer |
| $ 83 |
| $ |
| Geotechnical Engr. |
| $ 89 |
| $ |
| Noise/Acoustical Engr |
| $ 109 |
| $ |
| Cultural Resources/Historic Preservationist |
| $ 89 |
| $ |
| Marketing/Business Assistant |
| $ 71 |
| $ |
| Architectural Inspector |
| $ 84 |
| $ |
| Mechanical Inspector |
| $ 93 |
| $ |
| Electrical Inspector |
| $ 91 |
| $ |
| Structural Inspector |
| $ 88 |
| $ |
| Safety/OSHA/Environmental Hygienist Inspector |
| $ 90 |
| $ |
| Concrete/Masonry Inspector |
| $ 73 |
| $ |
| Geotechnical Inspector |
| $ 69 |
| $ |
| Testing Technician |
| $ 57 |
| $ |
| Administrative Assistant |
| $ 46 |
| $ |
| Commissioning Agent |
| $101 |
| $ |
| Construction Inspector |
| $101 |
| $ |
| Sr. Fire Protection Engineer |
| $105 |
| $ |
| Fire Protection Engineer |
| $71 |
| $ |
B.8.11 COMMISSIONING PHASE SERVICES (Option 11) SUPPLEMENTAL SERVICES MAN-HOUR RATES (ESTIMATED VALUE OF SERVICES:$300,000.00. USED FOR EVALUATION PURPOSES ONLY.
LABOR CATEGORY
| GSA ESTIMATED MAN-HOUR RATES |
| SUPPLEMENTAL SERVICES |
| Construction Executive |
| $161 |
| $ |
| Quality Control Superintendent |
| $125 |
| $ |
| Project Architect-Manager |
| $ 118 |
| $ |
| Project Engineer-Manager |
| $ 118 |
| $ |
| Financial/Budget Control Officer |
| $ 78 |
| $ |
| Project Claims Analyst |
| $116 |
| $ |
| Mechanical Engineer – Sr. |
| $ 108 |
| $ |
| Electrical Engineer – Sr. |
| $ 108 |
| $ |
| Structural Engineer - Sr. |
| $ 110 |
| $ |
| Civil Engineer - Sr. |
| $ 103 |
| $ |
| Environmental Engineer – Sr. |
| $ 115 |
| $ |
| Testing Engineer - Sr. |
| $ 80 |
| $ |
| Engineer (any) – Jr. |
| $ 62 |
| $ |
| Specifications Writer |
| $ 83 |
| $ |
| Geotechnical Engr. |
| $ 89 |
| $ |
| Noise/Acoustical Engr |
| $ 109 |
| $ |
| Cultural Resources/Historic Preservationist |
| $ 89 |
| $ |
| Marketing/Business Assistant |
| $ 71 |
| $ |
| Architectural Inspector |
| $ 84 |
| $ |
| Mechanical Inspector |
| $ 93 |
| $ |
| Electrical Inspector |
| $ 91 |
| $ |
| Structural Inspector |
| $ 88 |
| $ |
| Safety/OSHA/Environmental Hygienist Inspector |
| $ 90 |
| $ |
| Concrete/Masonry Inspector |
| $ 73 |
| $ |
| Geotechnical Inspector |
| $ 69 |
| $ |
| Testing Technician |
| $ 57 |
| $ |
| Administrative Assistant |
| $ 46 |
| $ |
| Commissioning Agent |
| $101 |
| $ |
| Construction Inspector |
| $101 |
| $ |
| Sr. Fire Protection Engineer |
| $105 |
| $ |
| Fire Protection Engineer |
| $71 |
| $ |
B.8.12 COMMISSIONING PHASE SERVICES (Option 12) SUPPLEMENTAL SERVICES MAN-HOUR RATES (ESTIMATED VALUE OF SERVICES:$300,000.00. USED FOR EVALUATION PURPOSES ONLY.
LABOR CATEGORY
| GSA ESTIMATED MAN-HOUR RATES |
| SUPPLEMENTAL SERVICES |
| Construction Executive |
| $161 |
| $ |
| Quality Control Superintendent |
| $125 |
| $ |
| Project Architect-Manager |
| $ 118 |
| $ |
| Project Engineer-Manager |
| $ 118 |
| $ |
| Financial/Budget Control Officer |
| $ 78 |
| $ |
| Project Claims Analyst |
| $116 |
| $ |
| Mechanical Engineer – Sr. |
| $ 108 |
| $ |
| Electrical Engineer – Sr. |
| $ 108 |
| $ |
| Structural Engineer - Sr. |
| $ 110 |
| $ |
| Civil Engineer - Sr. |
| $ 103 |
| $ |
| Environmental Engineer – Sr. |
| $ 115 |
| $ |
| Testing Engineer - Sr. |
| $ 80 |
| $ |
| Engineer (any) – Jr. |
| $ 62 |
| $ |
| Specifications Writer |
| $ 83 |
| $ |
| Geotechnical Engr. |
| $ 89 |
| $ |
| Noise/Acoustical Engr |
| $ 109 |
| $ |
| Cultural Resources/Historic Preservationist |
| $ 89 |
| $ |
| Marketing/Business Assistant |
| $ 71 |
| $ |
| Architectural Inspector |
| $ 84 |
| $ |
| Mechanical Inspector |
| $ 93 |
| $ |
| Electrical Inspector |
| $ 91 |
| $ |
| Structural Inspector |
| $ 88 |
| $ |
| Safety/OSHA/Environmental Hygienist Inspector |
| $ 90 |
| $ |
| Concrete/Masonry Inspector |
| $ 73 |
| $ |
| Geotechnical Inspector |
| $ 69 |
| $ |
| Testing Technician |
| $ 57 |
| $ |
| Administrative Assistant |
| $ 46 |
| $ |
| Commissioning Agent |
| $101 |
| $ |
| Construction Inspector |
| $101 |
| $ |
| Sr. Fire Protection Engineer |
| $105 |
| $ |
| Fire Protection Engineer |
| $71 |
| $ |
B.8.13 POST CONSTRUCTION PHASE SERVICES (Option 13) SUPPLEMENTAL SERVICES MAN-HOUR RATES (ESTIMATED VALUE OF SERVICES:$100,000.00. USED FOR EVALUATION PURPOSES ONLY.
LABOR CATEGORY
| GSA ESTIMATED MAN-HOUR RATES |
| SUPPLEMENTAL SERVICES |
MAN-HOUR RATES
| Construction Executive |
| $161 |
| $ |
| Quality Control Superintendent |
| $125 |
| $ |
| Project Architect-Manager |
| $ 118 |
| $ |
| Project Engineer-Manager |
| $ 118 |
| $ |
| Financial/Budget Control Officer |
| $ 78 |
| $ |
| Project Claims Analyst |
| $116 |
| $ |
| Mechanical Engineer – Sr. |
| $ 108 |
| $ |
| Electrical Engineer – Sr. |
| $ 108 |
| $ |
| Structural Engineer - Sr. |
| $ 110 |
| $ |
| Civil Engineer - Sr. |
| $ 103 |
| $ |
| Environmental Engineer – Sr. |
| $ 115 |
| $ |
| Testing Engineer - Sr. |
| $ 80 |
| $ |
| Engineer (any) – Jr. |
| $ 62 |
| $ |
| Specifications Writer |
| $ 83 |
| $ |
| Geotechnical Engr. |
| $ 89 |
| $ |
| Noise/Acoustical Engr |
| $ 109 |
| $ |
| Cultural Resources/Historic Preservationist |
| $ 89 |
| $ |
| Marketing/Business Assistant |
| $ 71 |
| $ |
| Architectural Inspector |
| $ 84 |
| $ |
| Mechanical Inspector |
| $ 93 |
| $ |
| Electrical Inspector |
| $ 91 |
| $ |
| Structural Inspector |
| $ 88 |
| $ |
| Safety/OSHA/Environmental Hygienist Inspector |
| $ 90 |
| $ |
| Concrete/Masonry Inspector |
| $ 73 |
| $ |
| Geotechnical Inspector |
| $ 69 |
| $ |
| Testing Technician |
| $ 57 |
| $ |
| Administrative Assistant |
| $ 46 |
| $ |
| Commissioning Agent |
| $101 |
| $ |
| Construction Inspector |
| $101 |
| $ |
| Sr. Fire Protection Engineer |
| $105 |
| $ |
| Fire Protection Engineer |
| $71 |
| $ |
B.8.14 POST CONSTRUCTION PHASE SERVICES (Option 14) SUPPLEMENTAL SERVICES MAN-HOUR RATES (ESTIMATED VALUE OF SERVICES:$100,000.00. USED FOR EVALUATION PURPOSES ONLY.
LABOR CATEGORY
| GSA ESTIMATED MAN-HOUR RATES |
| SUPPLEMENTAL SERVICES |
| Construction Executive |
| $161 |
| $ |
| Quality Control Superintendent |
| $125 |
| $ |
| Project Architect-Manager |
| $ 118 |
| $ |
| Project Engineer-Manager |
| $ 118 |
| $ |
| Financial/Budget Control Officer |
| $ 78 |
| $ |
| Project Claims Analyst |
| $116 |
| $ |
| Mechanical Engineer – Sr. |
| $ 108 |
| $ |
| Electrical Engineer – Sr. |
| $ 108 |
| $ |
| Structural Engineer - Sr. |
| $ 110 |
| $ |
| Civil Engineer - Sr. |
| $ 103 |
| $ |
| Environmental Engineer – Sr. |
| $ 115 |
| $ |
| Testing Engineer - Sr. |
| $ 80 |
| $ |
| Engineer (any) – Jr. |
| $ 62 |
| $ |
| Specifications Writer |
| $ 83 |
| $ |
| Geotechnical Engr. |
| $ 89 |
| $ |
| Noise/Acoustical Engr |
| $ 109 |
| $ |
| Cultural Resources/Historic Preservationist |
| $ 89 |
| $ |
| Marketing/Business Assistant |
| $ 71 |
| $ |
| Architectural Inspector |
| $ 84 |
| $ |
| Mechanical Inspector |
| $ 93 |
| $ |
| Electrical Inspector |
| $ 91 |
| $ |
| Structural Inspector |
| $ 88 |
| $ |
| Safety/OSHA/Environmental Hygienist Inspector |
| $ 90 |
| $ |
| Concrete/Masonry Inspector |
| $ 73 |
| $ |
| Geotechnical Inspector |
| $ 69 |
| $ |
| Testing Technician |
| $ 57 |
| $ |
| Administrative Assistant |
| $ 46 |
| $ |
| Commissioning Agent |
| $101 |
| $ |
| Construction Inspector |
| $101 |
| $ |
| Sr. Fire Protection Engineer |
| $105 |
| $ |
| Fire Protection Engineer |
| $71 |
| $ |
B.8.15 POST CONSTRUCTION PHASE SERVICES (Option 15) SUPPLEMENTAL SERVICES MAN-HOUR RATES (ESTIMATED VALUE OF SERVICES:$100,000.00. USED FOR EVALUATION PURPOSES ONLY.
LABOR CATEGORY
| GSA ESTIMATED MAN-HOUR RATES |
| SUPPLEMENTAL SERVICES |
| Construction Executive |
| $161 |
| $ |
| Quality Control Superintendent |
| $125 |
| $ |
| Project Architect-Manager |
| $ 118 |
| $ |
| Project Engineer-Manager |
| $ 118 |
| $ |
| Financial/Budget Control Officer |
| $ 78 |
| $ |
| Project Claims Analyst |
| $116 |
| $ |
| Mechanical Engineer – Sr. |
| $ 108 |
| $ |
| Electrical Engineer – Sr. |
| $ 108 |
| $ |
| Structural Engineer - Sr. |
| $ 110 |
| $ |
| Civil Engineer - Sr. |
| $ 103 |
| $ |
| Environmental Engineer – Sr. |
| $ 115 |
| $ |
| Testing Engineer - Sr. |
| $ 80 |
| $ |
| Engineer (any) – Jr. |
| $ 62 |
| $ |
| Specifications Writer |
| $ 83 |
| $ |
| Geotechnical Engr. |
| $ 89 |
| $ |
| Noise/Acoustical Engr |
| $ 109 |
| $ |
| Cultural Resources/Historic Preservationist |
| $ 89 |
| $ |
| Marketing/Business Assistant |
| $ 71 |
| $ |
| Architectural Inspector |
| $ 84 |
| $ |
| Mechanical Inspector |
| $ 93 |
| $ |
| Electrical Inspector |
| $ 91 |
| $ |
| Structural Inspector |
| $ 88 |
| $ |
| Safety/OSHA/Environmental Hygienist Inspector |
| $ 90 |
| $ |
| Concrete/Masonry Inspector |
| $ 73 |
| $ |
| Geotechnical Inspector |
| $ 69 |
| $ |
| Testing Technician |
| $ 57 |
| $ |
| Administrative Assistant |
| $ 46 |
| $ |
| Commissioning Agent |
| $101 |
| $ |
| Construction Inspector |
| $101 |
| $ |
| Sr. Fire Protection Engineer |
| $105 |
| $ |
| Fire Protection Engineer |
| $71 |
| $ |
B.8.16 POST CONSTRUCTION PHASE SERVICES (Option 16) SUPPLEMENTAL SERVICES MAN-HOUR RATES (ESTIMATED VALUE OF SERVICES:$100,000.00. USED FOR EVALUATION PURPOSES ONLY.
LABOR CATEGORY
| GSA ESTIMATED MAN-HOUR RATES |
| SUPPLEMENTAL SERVICES |
| Construction Executive |
| $161 |
| $ |
| Quality Control Superintendent |
| $125 |
| $ |
| Project Architect-Manager |
| $ 118 |
| $ |
| Project Engineer-Manager |
| $ 118 |
| $ |
| Financial/Budget Control Officer |
| $ 78 |
| $ |
| Project Claims Analyst |
| $116 |
| $ |
| Mechanical Engineer – Sr. |
| $ 108 |
| $ |
| Electrical Engineer – Sr. |
| $ 108 |
| $ |
| Structural Engineer - Sr. |
| $ 110 |
| $ |
| Civil Engineer - Sr. |
| $ 103 |
| $ |
| Environmental Engineer – Sr. |
| $ 115 |
| $ |
| Testing Engineer - Sr. |
| $ 80 |
| $ |
| Engineer (any) – Jr. |
| $ 62 |
| $ |
| Specifications Writer |
| $ 83 |
| $ |
| Geotechnical Engr. |
| $ 89 |
| $ |
| Noise/Acoustical Engr |
| $ 109 |
| $ |
| Cultural Resources/Historic Preservationist |
| $ 89 |
| $ |
| Marketing/Business Assistant |
| $ 71 |
| $ |
| Architectural Inspector |
| $ 84 |
| $ |
| Mechanical Inspector |
| $ 93 |
| $ |
| Electrical Inspector |
| $ 91 |
| $ |
| Structural Inspector |
| $ 88 |
| $ |
| Safety/OSHA/Environmental Hygienist Inspector |
| $ 90 |
| $ |
| Concrete/Masonry Inspector |
| $ 73 |
| $ |
| Geotechnical Inspector |
| $ 69 |
| $ |
| Testing Technician |
| $ 57 |
| $ |
| Administrative Assistant |
| $ 46 |
| $ |
| Commissioning Agent |
| $101 |
| $ |
| Construction Inspector |
| $101 |
| $ |
| Sr. Fire Protection Engineer |
| $105 |
| $ |
| Fire Protection Engineer |
| $71 |
| $ |
PHASE IC CM SERVICES
B.8.17 DESIGN PHASE SERVICES (Option 17) SUPPLEMENTAL SERVICES MAN-HOUR RATES (ESTIMATED VALUE OF SERVICES:$100,000.00. USED FOR EVALUATION PURPOSES ONLY.
LABOR CATEGORY
| GSA ESTIMATED MAN-HOUR RATES |
| SUPPLEMENTAL SERVICES |
| Construction Executive |
| $161 |
| $ |
| Quality Control Superintendent |
| $125 |
| $ |
| Project Architect-Manager |
| $ 118 |
| $ |
| Project Engineer-Manager |
| $ 118 |
| $ |
| Financial/Budget Control Officer |
| $ 78 |
| $ |
| Project Claims Analyst |
| $116 |
| $ |
| Mechanical Engineer – Sr. |
| $ 108 |
| $ |
| Electrical Engineer – Sr. |
| $ 108 |
| $ |
| Structural Engineer - Sr. |
| $ 110 |
| $ |
| Civil Engineer - Sr. |
| $ 103 |
| $ |
| Environmental Engineer – Sr. |
| $ 115 |
| $ |
| Testing Engineer - Sr. |
| $ 80 |
| $ |
| Engineer (any) – Jr. |
| $ 62 |
| $ |
| Specifications Writer |
| $ 83 |
| $ |
| Geotechnical Engr. |
| $ 89 |
| $ |
| Noise/Acoustical Engr |
| $ 109 |
| $ |
| Cultural Resources/Historic Preservationist |
| $ 89 |
| $ |
| Marketing/Business Assistant |
| $ 71 |
| $ |
| Architectural Inspector |
| $ 84 |
| $ |
| Mechanical Inspector |
| $ 93 |
| $ |
| Electrical Inspector |
| $ 91 |
| $ |
| Structural Inspector |
| $ 88 |
| $ |
| Safety/OSHA/Environmental Hygienist Inspector |
| $ 90 |
| $ |
| Concrete/Masonry Inspector |
| $ 73 |
| $ |
| Geotechnical Inspector |
| $ 69 |
| $ |
| Testing Technician |
| $ 57 |
| $ |
| Administrative Assistant |
| $ 46 |
| $ |
| Commissioning Agent |
| $101 |
| $ |
| Construction Inspector |
| $101 |
| $ |
| Sr. Fire Protection Engineer |
| $105 |
| $ |
| Fire Protection Engineer |
| $71 |
| $ |
B.8.18 CONSTRUCTION PHASE SERVICES (Option 18) SUPPLEMENTAL SERVICES MAN-HOUR RATES (ESTIMATED VALUE OF SERVICES:$300,000.00. USED FOR EVALUATION PURPOSES ONLY.
LABOR CATEGORY
| GSA ESTIMATED MAN-HOUR RATES |
| SUPPLEMENTAL SERVICES |
| Construction Executive |
| $161 |
| $ |
| Quality Control Superintendent |
| $125 |
| $ |
| Project Architect-Manager |
| $ 118 |
| $ |
| Project Engineer-Manager |
| $ 118 |
| $ |
| Financial/Budget Control Officer |
| $ 78 |
| $ |
| Project Claims Analyst |
| $116 |
| $ |
| Mechanical Engineer – Sr. |
| $ 108 |
| $ |
| Electrical Engineer – Sr. |
| $ 108 |
| $ |
| Structural Engineer - Sr. |
| $ 110 |
| $ |
| Civil Engineer - Sr. |
| $ 103 |
| $ |
| Environmental Engineer – Sr. |
| $ 115 |
| $ |
| Testing Engineer - Sr. |
| $ 80 |
| $ |
| Engineer (any) – Jr. |
| $ 62 |
| $ |
| Specifications Writer |
| $ 83 |
| $ |
| Geotechnical Engr. |
| $ 89 |
| $ |
| Noise/Acoustical Engr |
| $ 109 |
| $ |
| Cultural Resources/Historic Preservationist |
| $ 89 |
| $ |
| Marketing/Business Assistant |
| $ 71 |
| $ |
| Architectural Inspector |
| $ 84 |
| $ |
| Mechanical Inspector |
| $ 93 |
| $ |
| Electrical Inspector |
| $ 91 |
| $ |
| Structural Inspector |
| $ 88 |
| $ |
| Safety/OSHA/Environmental Hygienist Inspector |
| $ 90 |
| $ |
| Concrete/Masonry Inspector |
| $ 73 |
| $ |
| Geotechnical Inspector |
| $ 69 |
| $ |
| Testing Technician |
| $ 57 |
| $ |
| Administrative Assistant |
| $ 46 |
| $ |
| Commissioning Agent |
| $101 |
| $ |
| Construction Inspector |
| $101 |
| $ |
| Sr. Fire Protection Engineer |
| $105 |
| $ |
| Fire Protection Engineer |
| $71 |
| $ |
B.8.19 POST CONSTRUCTION SERVICES (Option 19) SUPPLEMENTAL SERVICES MAN-HOUR RATES (ESTIMATED VALUE OF SERVICES:$100,000.00. USED FOR EVALUATION PURPOSES ONLY.
LABOR CATEGORY
| GSA ESTIMATED MAN-HOUR RATES |
| SUPPLEMENTAL SERVICES |
| Construction Executive |
| $161 |
| $ |
| Quality Control Superintendent |
| $125 |
| $ |
| Project Architect-Manager |
| $ 118 |
| $ |
| Project Engineer-Manager |
| $ 118 |
| $ |
| Financial/Budget Control Officer |
| $ 78 |
| $ |
| Project Claims Analyst |
| $116 |
| $ |
| Mechanical Engineer – Sr. |
| $ 108 |
| $ |
| Electrical Engineer – Sr. |
| $ 108 |
| $ |
| Structural Engineer - Sr. |
| $ 110 |
| $ |
| Civil Engineer - Sr. |
| $ 103 |
| $ |
| Environmental Engineer – Sr. |
| $ 115 |
| $ |
| Testing Engineer - Sr. |
| $ 80 |
| $ |
| Engineer (any) – Jr. |
| $ 62 |
| $ |
| Specifications Writer |
| $ 83 |
| $ |
| Geotechnical Engr. |
| $ 89 |
| $ |
| Noise/Acoustical Engr |
| $ 109 |
| $ |
| Cultural Resources/Historic Preservationist |
| $ 89 |
| $ |
| Marketing/Business Assistant |
| $ 71 |
| $ |
| Architectural Inspector |
| $ 84 |
| $ |
| Mechanical Inspector |
| $ 93 |
| $ |
| Electrical Inspector |
| $ 91 |
| $ |
| Structural Inspector |
| $ 88 |
| $ |
| Safety/OSHA/Environmental Hygienist Inspector |
| $ 90 |
| $ |
| Concrete/Masonry Inspector |
| $ 73 |
| $ |
| Geotechnical Inspector |
| $ 69 |
| $ |
| Testing Technician |
| $ 57 |
| $ |
| Administrative Assistant |
| $ 46 |
| $ |
| Commissioning Agent |
| $101 |
| $ |
| Construction Inspector |
| $101 |
| $ |
| Sr. Fire Protection Engineer |
| $105 |
| $ |
| Fire Protection Engineer |
| $71 |
| $ |
B.9 EVALUATED SUPPLEMENTAL SERVICE PRICING
B.9.1 OPTION #1 – PROCUREMENT PHASE EVALUATED SUPPLEMENTAL
SERVICES PRICE (ONE (PLUS OR MINUS) THE SUPPLEMENTAL SERVICES
MAN-HOUR RATES ADJUSTMENT FACTOR X $100,000.00)
B.9.2 OPTION #2 – CONSTRURCTION PHASE EVALUATED SUPPLEMENTAL
SERVICES PRICE (ONE (PLUS OR MINUS) THE SUPPLEMENTAL SERVICES
MAN-HOUR RATES ADJUSTMENT FACTOR X $300,000.00)
B.9.3 OPTION #3 – CONSTRURCTION PHASE EVALUATED SUPPLEMENTAL
SERVICES PRICE (ONE (PLUS OR MINUS) THE SUPPLEMENTAL SERVICES
MAN-HOUR RATES ADJUSTMENT FACTOR X $300,000.00)
B.9.4 OPTION #4 – CONSTRURCTION PHASE EVALUATED SUPPLEMENTAL
SERVICES PRICE (ONE (PLUS OR MINUS) THE SUPPLEMENTAL SERVICES
MAN-HOUR RATES ADJUSTMENT FACTOR X $300,000.00)
B.9.5 OPTION #5 – CONSTRURCTION PHASE EVALUATED SUPPLEMENTAL
SERVICES PRICE (ONE (PLUS OR MINUS) THE SUPPLEMENTAL SERVICES
MAN-HOUR RATES ADJUSTMENT FACTOR X $300,000.00)
B.9.6 OPTION #6 – COMMISSIONING PHASE EVALUATED SUPPLEMENTAL
SERVICES PRICE (ONE (PLUS OR MINUS) THE SUPPLEMENTAL SERVICES
MAN-HOUR RATES ADJUSTMENT FACTOR X $300,000.00)
B.9.7 OPTION #7 – COMMISSIONING PHASE EVALUATED SUPPLEMENTAL
SERVICES PRICE (ONE (PLUS OR MINUS) THE SUPPLEMENTAL SERVICES
MAN-HOUR RATES ADJUSTMENT FACTOR X $300,000.00)
B.9.8 OPTION #8 – COMMISSIONING PHASE EVALUATED SUPPLEMENTAL
SERVICES PRICE (ONE (PLUS OR MINUS) THE SUPPLEMENTAL SERVICES
MAN-HOUR RATES ADJUSTMENT FACTOR X $300,000.00)
B.9.9 OPTION #9 – COMMISSIONING PHASE EVALUATED SUPPLEMENTAL
SERVICES PRICE (ONE (PLUS OR MINUS) THE SUPPLEMENTAL SERVICES
MAN-HOUR RATES ADJUSTMENT FACTOR X $300,000.00)
B.9.10 OPTION #10 – COMMISSIONING PHASE EVALUATED SUPPLEMENTAL
SERVICES PRICE (ONE (PLUS OR MINUS) THE SUPPLEMENTAL SERVICES
MAN-HOUR RATES ADJUSTMENT FACTOR X $300,000.00)
B.9.11 OPTION #11 – COMMISSIONING PHASE EVALUATED SUPPLEMENTAL
SERVICES PRICE (ONE (PLUS OR MINUS) THE SUPPLEMENTAL SERVICES
MAN-HOUR RATES ADJUSTMENT FACTOR X $300,000.00)
B.9.12 OPTION #12 – COMMISSIONING PHASE EVALUATED
SUPPLEMENTAL SERVICES PRICE (ONE (PLUS OR MINUS) THE
SUPPLEMENTAL SERVICES MAN-HOUR RATES ADJUSTMENT
FACTOR X $100,000.00)
B.9.13 OPTION #13 – POST CONSTRURCTION PHASE EVALUATED
SUPPLEMENTAL SERVICES PRICE (ONE (PLUS OR MINUS) THE
B.9.14 OPTION #14 – POST CONSTRURCTION PHASE EVALUATED
SUPPLEMENTAL SERVICES PRICE (ONE (PLUS OR MINUS) THE
B.9.15 OPTION #15 – POST CONSTRURCTION PHASE EVALUATED
SUPPLEMENTAL SERVICES PRICE (ONE (PLUS OR MINUS) THE
B.9.16 OPTION #16 – POST CONSTRURCTION PHASE EVALUATED
SUPPLEMENTAL SERVICES PRICE (ONE (PLUS OR MINUS) THE
B.9.17 OPTION #17 – DESIGN & COMMISSIONING PHASE EVALUATED
SUPPLEMENTAL SERVICES PRICE (ONE (PLUS OR MINUS) THE
B.9.18 OPTION #18 – CONSTRUCTION & COMMISSIONING PHASE
EVALUATED SUPPLEMENTAL SERVICES PRICE (ONE (PLUS OR
MINUS) THE SUPPLEMENTAL SERVICES MAN-HOUR RATES
ADJUSTMENT FACTOR X $300,000.00)
B.9.19 OPTION #19 – POST CONSTRUCTION & COMMISSIONING PHASE
EVALUATED SUPPLEMENTAL SERVICES PRICE (ONE (PLUS OR
MINUS) THE SUPPLEMENTAL SERVICES MAN-HOUR RATES
ADJUSTMENT FACTOR X $100,000.00)
TOTAL EVALUATED SUPPLEMENTAL SERVICE PRICE: $_____________________________
(B.9.1. + B.9.2. + B.9.3. + B.9.4. + B.9.5. + B.9.6. + B.9.7 + B.9.8 + B.9.9 + B.9.10 + B.9.11 + B.9.12 + B.9.13 + B.9.14 +
B.9.15 + B.9.16 + B.9.17 + B.9.18 + B.9.19)
TOTAL FIRM FIXED PRICE :
(INCLUDES BASE CONTRACT + OPTIONS 1 THROUGH 19 +
SUPPLEMENTAL PRICES OPTIONS 1 THROUGH 19).