Exhibit_8B_Project_Development_Study_905_BPA_LB_Elevator_Cost_Opinion_2.26.13.xlsx
XLSX spreadsheet 104 KB Posted
- Solicitation number
- GS-10P-15-LT-R-9000
About this file
Exhibit 8B Project Development Study 905 BPA LB Elevator Cost Opinion 2.26.13
View the file
Other files
Show 40 more
Latest 50 of 58 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Summary U
| PROJECT COST SUMMARY | Area (GSF) | 701,185 | Federal Building | Repair & Alteration | Feasibility Study | GSA Cost Mgt | A-E | Feasibility Study - 50% Submission | Feasibility Study | |||||||
| PROJECT TITLE | Elevator Modernization | PROJECT TYPE: | Port of Entry | New Construction | PDS | GSA Project Mgt | Cost Eng | Feasibility Study - 90% Submission | PDS | |||||||
| LOCATION: CITY, STATE | Portland, Oregon | Courthouse | Modernization | Design Phase | GSA Portfolio Mgt | GSA | Feasibility Study - 100% Submission | Design Phase | ||||||||
| BUILDING: | 905 / BPA | OR0058 | Other | Other | Other | CM | Feasibility Study | |||||||||
| Estimate Prepared By: | S. Neumiller, R10 | PROGRAM AREA: | Federal Building | Other | PDS - 50% Submission | |||||||||||
| WBS CODE | UNIFORMAT SYSTEM ELEMENTS | ECC COST | ECC COST/GSF | Other | ||||||||||||
| A11 | Foundations | Foundtions | $0 | $0 | $0.00 | 0.00% | ||||||||||
| A12 | Basement Construction | Basement Construction | $0 | $0 | $0.00 | 0.00% | ||||||||||
| A21 | Superstructure | $0 | $0 | $0.00 | 0.00% | |||||||||||
| B11 | Exterior Walls | $0 | $0 | $0.00 | 0.00% | |||||||||||
| B12 | Exterior Glazing & Doors | $0 | $0 | $0.00 | 0.00% | |||||||||||
| B13 | Roofing | $0 | $0 | $0.00 | 0.00% | |||||||||||
| C11 | Partitions, Doors & Specialties | $0 | $0 | $0.00 | 0.00% | |||||||||||
| C12 | Access/Platform Floors | $0 | $0 | $0.00 | 0.00% | |||||||||||
| C13 | Interior Finishes | $0 | $0 | $0.00 | 0.00% | |||||||||||
| D11 | Conveyance Systems | $2,779,635 | $4,045,863 | $5.77 | 100.00% | |||||||||||
| D21 | Plumbing | $0 | $0 | $0.00 | 0.00% | |||||||||||
| D22 | HVAC | $0 | $0 | $0.00 | 0.00% | |||||||||||
| D31 | Fire Protection/Alarm | $0 | $0 | $0.00 | 0.00% | |||||||||||
| D41 | Electrical Service, Distribution & Emerg. Power | $0 | $0 | $0.00 | 0.00% | |||||||||||
| D42 | Lighting and Branch Wiring | $0 | $0 | $0.00 | 0.00% | |||||||||||
| D43 | Communications, Security & Other Electrical Systems | $0 | $0 | $0.00 | 0.00% | |||||||||||
| E11 | Equipment & Furnishings | $0 | $0 | $0.00 | 0.00% | |||||||||||
| F11 | Special Construction | $0 | $0 | $0.00 | 0.00% | |||||||||||
| F12 | Building Demolition and Abatement | $0 | $0.00 | 0.00% | ||||||||||||
| G11 | Sitework - Building Related | $0 | $0 | $0.00 | 0.00% | |||||||||||
| General Requirements | 0.00% | |||||||||||||||
| G12 | Other Sitework - Project Related | $0 | $0 | $0.00 | 0.00% | |||||||||||
| A | Sub Total | A | $2,779,635 | $4,045,863 | $5.77 | 100.00% | ||||||||||
| B | Contingency - Unknown Site/Design: | 8% | B | $222,371 | $0.32 | |||||||||||
| C | Subtotal | A + B | $3,002,005 | $4.28 | ||||||||||||
| D | General Conditions and Profit: | 20% | D | $600,401 | $0.86 | |||||||||||
| E | Subtotal | C + D | $3,602,406 | $5.14 | ||||||||||||
| F | Special Use Tax (Gross Receipts Tax, etc) | 0.00% | E | $0 | $0.00 | |||||||||||
| G | Current Estimated Construction Award Cost | E + F | $3,602,406 | $5.14 | ||||||||||||
| H | Escalation to Construction Award | 2.1% | G | $75,651 | $0.11 | |||||||||||
| Estimated Cost of Construction at Award | ||||||||||||||||
| I | ECCA | G+H | $3,678,057 | $5.25 | ||||||||||||
| M+N | Construction Contingency & Reservation | 10.0% | I | $367,806 | $0.52 | |||||||||||
| Estimated Construction Cost | ||||||||||||||||
| O | ECC | I + M + N | $4,045,863 | $5.77 | ||||||||||||
| S | EDRC | 0.00% | O | $0 | $0.00 | |||||||||||
| W | EMIC | 11.00% | O | $445,045 | $0.63 | |||||||||||
| X | ESC (Est. Site Cost) | $0 | $0.00 | |||||||||||||
| Y | ETPC | O+S+W+X | $4,490,908 | $6.40 |
| [Link to Location Factors & Escalation] | Escalation Rate Used: | |||||
| RCurtisSmith: Use latest escalation rate from Locations&Escal worksheet, unless otherwise mandated. | 2.1% | |||||
| Current Date: | 26-Feb-13 | Basis Date of Estimate: | 30-Sep-12 | Const. Mid-Point Date: | 30-Sep-13 | |
| Dec-08 | Project Cost Estimate Form |
Lookup
OFFICE OF DESIGN AND CONSTRUCTION LOOKUP TABLES
PROJECT DELIVERY BY TRADITIONAL APPROACH
SUMMARY SHEET
| TOTAL PROJECT COST ($000) -- TRADITIONAL DELIVERY | |
| CURRENT ESTIMATED CONSTRUCTION AWARD COST (CECA): | 3,602 |
WilliamHHunt: WilliamHHunt:
To be inputted as ECC. ECC includes CECA plus Escalation, Contingency, Reservation Items and Art-in-Architecture
| ESCALATION TO CONSTRUCTION AWARD DATE: | ANN. % | CUM % | ECC (k) | To LMI Table | DAE | DCM | DVE | DCMx | DGSA OT | CAE | CCM | CVE | CCMx | CGSA OT | ||||
| FROM: | 41182.0 | TO: | 41547.0 | 2.1% | 2.1% | 76 | $50 | 24.76% | 12.61% | 6.83% | 0.00% | 0.0037580625 | 1.96% | 2.12% | 13.22% | 0.00% | ||
| ESTIMATED CONSTRUCTION CONTRACT AWARD AMOUNT (ECCA): | 3,678 | $100 | 24.04% | 12.56% | 6.29% | 0.00% | 0.0037580625 | 2.00% | 1.96% | 12.26% | 0.00% | |||||||
| CONTINGENCIES: | BASE: | ECCA | PERCENT: | 10.0% |
WilliamHHunt: WilliamHHunt:
| Not Required if cell I9 is inputted as ECC | 368 | $200 | 22.55% | 11.68% | 5.99% | 0.00% | 0.0037580625 | 1.09% | 1.64% | 11.69% | 0.00% | ||||||||||
| OTHER RESERVATIONS ($$$): | 0 | $500 | 21.73% | 11.12% | 5.89% | 0.00% | 0.0037580625 | 0.63% | 1.49% | 10.76% | 0.00% | ||||||||||
| ESTIMATED CONSTRUCTION COST' (ECC') (Before Art-In-Architecture): | 4,046 | $1,000 | 18.68% | 10.02% | 4.55% | 0.00% | 0.0037580625 | 0.42% | 1.35% | 9.82% | 0.00% | ||||||||||
| ART-IN-ARCH. (25% TO DESIGN): | BASE: | ECC' | PERCENT: | 0.0% |
WilliamHHunt: WilliamHHunt:
| Not Required if cell I9 is inputted as ECC | 0 | $2,500 | 16.89% | 9.32% | 2.69% | 1.12% | 0.0037580625 | 0.21% | 1.28% | 8.83% | 0.00% | ||||||||||
| ESTIMATED CONSTRUCTION COST (ECC): | 4,046 | $5,000 | 15.40% | 8.81% | 2.54% | 0.60% | 0.0037580625 | 0.15% | 1.21% | 8.65% | 0.00% | ||||||||||
| SITE COST: | $10,000 | 14.12% | 8.29% | 2.17% | 0.46% | 0.0037580625 | 0.08% | 1.15% | 8.58% | 0.00% | |||||||||||
| TOTAL SITE AND CONSTRUCTION*: | 4,046 | $25,000 | 12.07% | 7.65% | 1.44% | 0.19% | 0.0037580625 | 0.04% | 1.08% | 8.36% | 0.00% | ||||||||||
| PROJECT-FUNDED D&C SERVICES:* | ART-IN-ARCH. | ALL OTHER | $50,000 | 8.95% | 7.13% | 1.30% | 0.15% | 0.0037580625 | 0.03% | 0.95% | 7.48% | 0.00% | |||||||||
| DESIGN: | - 0 | 0 | 0 | $100,000 | 6.61% | 0.91% | 0.10% | 0.0037580625 | 0.02% | 0.82% | 5.08% | 0.00% | |||||||||
| M&I: | 445 | $150,000 | 7.25% | 6.08% | 0.72% | 0.07% | 0.0037580625 | 0.02% | 0.69% | 3.72% | 0.00% | ||||||||||
| TOTAL PROJECT FUNDING REQUIRED*: | 4,491 |
WilliamHHunt: WilliamHHunt:
| Funded from FBF Project Accounts (BA 51 & BA 55) or Reimbursable (BA 80). | $250,000 | 0.060129 | 0.0070595827 | 0.0007289258 | 0.0037580625 | 0.0001666667 | 0.0068107 | 0.0360746326 | 0.0045093291 | 0 | ||||||||
| PROJECT SUPPORT:** | D&C | GSA PC&B: | $400,000 | 0.060129 | 0.0070595827 | 0.0007289258 | 0.0037580625 | 0.0001666667 | 0.0068107 | 0.0360746326 | 0.0045093291 | |||||||
| SERVICES | GSA TRAVEL: | $650,000 | 0.060129 | 0.0070595827 | 0.0007289258 | 0.0037580625 | 0.0001666667 | 0.0068107 | 0.0360746326 | 0.0045093291 | ||||||||
| OTHER PROJECT SUPPORT: |
WilliamHHunt: WilliamHHunt:
'Funded from FBF Real Property Operations (BA 61) or Reimbursable (BA 80).
WilliamHHunt: WilliamHHunt:
Lookup Table revised to:
1) Include A-E and CM services for projects with an ECC from $50,000 and above.
2) Previous versions included only projects greater than an ECC of $2,500,000.
3) This version is also updated to a baseline labor rate of 2009 rates.
WilliamHHunt: WilliamHHunt:
Not Required if cell I9 is inputted as ECC WilliamHHunt: WilliamHHunt:
Not Required if cell I9 is inputted as ECC WilliamHHunt: WilliamHHunt:
| Funded from FBF Project Accounts (BA 51 & BA 55) or Reimbursable (BA 80). | 0 | $1,000,000 | 0.060129 | 0.0070595827 | 0.0007289258 | 0.0037580625 | 0.0001666667 | 0.0068107 | 0.0360746326 | 0.0045093291 | |||||||
| REIMBURSABLE OVERHEAD CHARGE - BA80 ONLY - SEE BELOW FOR DATA ENTRY: | - 0 | ||||||||||||||||
| ESTIMATED TOTAL PROJECT COST: | 4,491 | ||||||||||||||||
| PROJECT: | BUDGET | REGION | DATE | ||||||||||||||
| BUILDING: | FY | NO. | PREPARED | ||||||||||||||
| CITY/STATE: | WASHINGTON | DC | 2013 | 11 | 41331.0 | ||||||||||||
| (Type CITY and 2-letter STATE CODE in all caps.) | |||||||||||||||||
| (Check table at Sheet B, AD6:AF160 to verify correct Locality Index.) | |||||||||||||||||
| BREAKDOWN - GSA FUNDED vs. REIMBURSABLE | REIM- | GSA | A-E* | 0.060129 | 60137.06203515 | 0.0068107 | |||||||||||
| TOTAL | BURSABLE | FUNDED | CM | 0.0070595827 | 7059.5827165562 | 0.0360746326 | |||||||||||
| ESTIMATED CONSTRUCTION CONTRACT AWARD AMOUNT (ECCA): | 3,678 | - 0 | 3,678 | VE | 0.0007289258 | 728.925790767 | (N/A) | ||||||||||
| PERCENTAGE BREAKDOWN: | 100.00% | 0.00% | 100.00% | Comm | 0.0037580625 | 3758.5663771969 | 0.0045093291 | ||||||||||
| GSA OTH | 0.0001666667 | 166.6666666667 | 0 | ||||||||||||||
| CONTINGENCIES: | 368 | - 0 | 368 | ||||||||||||||
| ART-IN-ARCH. (CONST.): | - 0 | - 0 | - 0 | ||||||||||||||
| OTHER RESERVATIONS: | - 0 | - 0 | |||||||||||||||
| ESTIMATED CONSTRUCTION COST (ECC):* | 4,046 | - 0 | 4,046 | ||||||||||||||
| SITE COST: | - 0 | - 0 | |||||||||||||||
| ART-IN-ARCH. (DESIGN): | - 0 | - 0 | - 0 | ||||||||||||||
| ALL OTHER DESIGN: | - 0 | - 0 | - 0 | ||||||||||||||
| M&I: | 445 | - 0 | 445 | ||||||||||||||
| TOTAL PROJECT FUNDING REQUIRED*: | 4,491 | - 0 | 4,491 | ||||||||||||||
| GSA PC&B:** | - 0 | - 0 | - 0 | ||||||||||||||
| TRAVEL:** | - 0 | - 0 | - 0 | ||||||||||||||
| OTHER PROJECT SUPPORT:** | - 0 | - 0 | |||||||||||||||
| TOTAL WITHOUT RWA OVERHEAD: | 4,491 | - 0 | 4,491 | ||||||||||||||
| REIMBURSABLE OVERHEAD CHARGE: | - 0 | - 0 | (N/A) | ||||||||||||||
| ESTIMATED TOTAL PROJECT COST: | 4,491 | - 0 | 4,491 | ||||||||||||||
| * | Funded from FBF Project Accounts (BA 51 & BA 55) or Reimbursable (BA 80). | ||||||||||||||||
| ** | Funded from FBF Real Property Operations (BA 61) or Reimbursable (BA 80). |
&F Printed: &D Page &P of &N
Elev D11
| INDEPENDENT GOVERNMENT ESTIMATE | |||||||||||||
| Modernize Elevator | BPA Building 905 | Estimated By: | S. Neumiller, GSA R10 | ||||||||||
| Portland, Oregon | OR0058 | Pricing Date: | 13-Sep-10 | ||||||||||
| DESCRIPTION OF WORK | MATERIAL / EQUIP. | LABOR | TOTALS | Unit | LABOR | ||||||||
| D11 | Conveying Equipment | QTY | UOM | Unit | Subtotals | Unit | Subtotals | Cost | Years | Material | Labor | ||
| 1 | Drives, Motors, Governors, Door Operator | 9.0 | EA | 64,460.00 | 580,140 | 6,906.00 | 62,154 | $ 642,294 | 71,366 | - 0 | |||
| 2 | Micro-Processor Controls (micro-processor controls, shaft wiring, leveling systems, traveling cables, fixtures and cab interiors) |
Jim Bell: Jim Bell:
| 9.0 | EA | 124,315.00 | 1,118,835 | 5,986.00 | 53,874 | $ 1,172,709 | 130,301 | 2010 | 1.00 | 1 | - 0 | 450.00 | |||||
| 3 | Related Work | 1.0 | EA | 15,000.00 | 15,000 | 45,000.00 | 45,000 | $ 60,000 | 60,000 | 2011 | 2.1% | 1.02 | 1.02 | - 0 | - 0 | 25,000.00 | |
| 4 | - 0 | - 0 | $ - 0 | ERROR:#DIV/0! | 2012 | 2.1% | 1.02 | 1.04 | 4.24% | 500.00 | - 0 | ||||||
| 5 | Destination Dispatch Controls Option 1 | 1.0 | EA | 52,500.00 | 52,500 | 52,500.00 | 52,500 | $ 105,000 | 105,000.00 | 2013 | 2.1% | 1.02 | 1.02 | 3,500.00 | 8,000.00 | ||
| 6 | Regeneratvie Drives Concept Option 2 | 1.0 | EA | 11,250.00 | 11,250 | 11,250.00 | 11,250 | $ 22,500 | 22,500.00 | 2014 | 0.0% | 1.00 | 1.02 | 2.10% | 200.00 | ||
| 7 | New AC Gearless Machines Concept Option 3 | 1.0 | EA | 45,000.00 | 45,000 | 45,000.00 | 45,000 | $ 90,000 | 90,000.00 | 200.00 | |||||||
| 8 | Stainless Steel Hoistway Doors and Frame Cladding | 1.0 | EA | 135,000.00 | 135,000 | 135,000.00 | 135,000 | $ 270,000 | 270,000.00 | ||||||||
| 9 | Complete Hydraulic Modernization Concept Option | 1.0 | EA | - 0 | - 0 | $ - 0 | - 0 | ||||||||||
| 10 | - 0 | - 0 | - 0 | $ - 0 | ERROR:#DIV/0! | ||||||||||||
| 11 | - 0 | - 0 | - 0 | $ - 0 | ERROR:#DIV/0! | ||||||||||||
| 12 | - 0 | - 0 | - 0 | $ - 0 | ERROR:#DIV/0! | ||||||||||||
| 13 | - 0 | - 0 | - 0 | $ - 0 | ERROR:#DIV/0! | ||||||||||||
| 14 | - 0 | - 0 | - 0 | $ - 0 | ERROR:#DIV/0! | ||||||||||||
| 15 | - 0 | - 0 | - 0 | $ - 0 | ERROR:#DIV/0! | ||||||||||||
| 16 | - 0 | - 0 | - 0 | $ - 0 | ERROR:#DIV/0! | ||||||||||||
| 17 | - 0 | - 0 | - 0 | $ - 0 | ERROR:#DIV/0! | ||||||||||||
| 18 | - 0 | - 0 | - 0 | $ - 0 | ERROR:#DIV/0! | ||||||||||||
| 19 | - 0 | - 0 | - 0 | $ - 0 | ERROR:#DIV/0! | ||||||||||||
| 20 | |||||||||||||||||
| -------------- | -------------- | -------------- | 580136.98630137 | 62157.5342465753 | |||||||||||||
| Subtotal | 1,957,725 | 404,778 | $ 2,362,503 | 1118835.61643836 | 53869.8630136986 | ||||||||||||
| Small Tools | 5.0% | 20,239 | $ 20,239 | ||||||||||||||
| Shift Differential | 30.0% | 121,433 | $ 121,433 | 2,428.7 | |||||||||||||
| -------------- | -------------- | ||||||||||||||||
| Subtotal | $ 2,504,175 | 2,428.7 | |||||||||||||||
| Subcontractor OH&P | 11.0% | $ 275,459 | |||||||||||||||
| -------------- | |||||||||||||||||
| Conveying Equipment Direct Cost Subtotal | $ 2,779,635 |
&"Arial Black,Regular"GSA REGION 10 - Independant Government Estimate
&F Printed: &D Page &P of &N image1.jpeg image2.png