Exhibit_0_Read_Me_First_-_SBU_Document.docx

DOCX document 17 KB Posted

Attached to
Bonneville Power Administration (BPA) 905 Bldg Outside Air Intake Relocation & Elevator Design Build Modernization
Solicitation number
GS-10P-15-LT-R-9000
Issued by

About this file

Exhibit 0 Read Me First - SBU Document

View the file

Other files

File Type Posted
Amendment_06_-_905_DB_RFP_6.24.15.docx DOCX document
Exhibit_7_DBA_WD_OR150029_(Mod_4)_06.12.15_-_Amendment_06.pdf PDF
Exhibit_5_905_BPA_DB_SOW_6.12.15_-_Amendment_05.docx DOCX document
Amendment_05_-_905_DB_RFP_6.12.15.docx DOCX document
BPA_Structural_Files_(061215).zip ZIP file
BPA_Draft_Schedule_6.15.15_-_Amendment_05.pdf PDF
GS-10P-15-LT-R-9000_DB_AGREEMENT_6.5.15_-_Amendment_04.docx DOCX document
Amendment_04_-_905_DB_RFP_6.5.15.docx DOCX document
VFA_Facility_Assessment_Report_2004_Elevator_Main_-_Amendment_03.pdf PDF
Amendment_03_-_905_DB_RFP_6.3.15.docx DOCX document
GS-10P-15-LT-R-9000_DB_SOLICITATION_6.3.15_Amendment_3.docx DOCX document
Exhibit_5_905_BPA_DB_SOW_6.3.15_-_Amendment_03.docx DOCX document
Amendment_02_-_905_DB_RFP_6.1.15.docx DOCX document
905_Air_Intakes_ _Elevators_Site_Visit_Attendee_List.docx DOCX document
GS-10P-15-LT-R-9000_DB_SOLICITATION_5.20.15.docx DOCX document
GS-10P-15-LT-R-9000_DB_AGREEMENT_5.20.15.docx DOCX document
GS-10P-15-LT-R-9000_Cover_Page_ _1442.docx DOCX document
Amendment_01_-_905_DB_RFP_5.18.15.docx DOCX document
Amendment_01_-_Exhibit_10_Pre-Proposal_Conference_-_905_Elevators_Air_Intakes.docx DOCX document
Exhibit_8_Project_Development_Study_905_BPA_LB_Elevator_Report_2.26.13.pdf PDF
Exhibit_8D_BPA_Glumac_Study_2002.pdf PDF
GSA_Region_10_-_Fire_Alarm_Design _Installation_and_Testing_Policy.pdf PDF
Exhibit_6A_Security_Clearance_Desk_Guide-External_Contractor.pdf PDF
Exhibit_6C_Optional_Form_OF306.pdf PDF
OR0058PE_-_10.zip ZIP file
Exhibit_4_Performance_Evaluation_Form_-_Commercial_Client.docx DOCX document
Exhibit_8E_VFA_Facility_Assessment_Report_2004.pdf PDF
Exhibit_6E_How_Contractors_Obtain_a_GSA_Access_Card.pdf PDF
GSA_Region_10_-_Wet_Sprinkler_System_Guidelines.pdf PDF
OR0058PE_-_2.zip ZIP file
Exhibit_5A_905_BPA_Cx_SOW__5.6.15.docx DOCX document
GSA_Region_10_-_Dry_Sprinkler_System_Guidelines.pdf PDF
Exhibit_6D_Optional_Form_OF306_Addendum.pdf PDF
Exhibit_7A_Reps_and_Certs_C301_April_2015.doc DOC document
Exhibit_6_Contractor_Information_Worksheet.docx DOCX document
OR0058PE_-_5.zip ZIP file
Exhibit_5_905_BPA_DB_SOW_5.6.15.docx DOCX document
Exhibit_7_DBA_WD_OR150029_(Mod_3)_04.15.15.pdf PDF
Exhibit_8F_OR0058-AggregateThematic-20150305.pdf PDF
Exhibit_8C_Lerch_Bates_Elevator_Modernization_Survey_2010.pdf PDF
Exhibit_1_Price_ _Services_Schedule.docx DOCX document
OR0058PE_-_3.zip ZIP file
Exhibit_10_Pre-Proposal_Conference_-_905_Elevators_Air_Intakes.docx DOCX document
Exhibit_9_905_BPA_Owners_Project_Requirements_19_MAR_2015.docx DOCX document
Autocads.zip ZIP file
OR0058PE_-_6.zip ZIP file
OR0058PE_-_7.zip ZIP file
OR0058PE_-_8.zip ZIP file
OR0058PE_-_9.zip ZIP file
Exhibit_8B_Project_Development_Study_905_BPA_LB_Elevator_Cost_Opinion_2.26.13.xlsx XLSX spreadsheet
Show 40 more

Latest 50 of 58 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NOTICE TO PROSPECTIVE BIDDERS/OFFERORS

Please read, sign and return this document to include the items listed under 2(a) – 2(d) below with your proposal submission.

This solicitation includes Sensitive but Unclassified (SBU) building information. SBU documents provided under this solicitation are intended for use by authorized users only. In support of this requirement, GSA requires bidders/offerors to exercise reasonable care when handling documents relating to SBU building information per the solicitation.

REASONABLE CARE:

1. Limiting dissemination to authorized users. Dissemination of information shall only be made upon determination that the recipient is authorized to receive it. The criterion to determine authorization is need-to-know. Those with a need-to-know are those who are specifically granted access for the conduct of business on behalf of or with GSA. This includes all persons or firms necessary to do work at the request of the Government, such as architects and engineers, consultants, contractors, sub-contractors, suppliers, and others that the contractor deems necessary in order to submit an offer/bid or to complete the work or contract, as well as maintenance and repair contractors and equipment service contractors.

NOTE: It is the responsibility of the person or firm disseminating the information to assure that the recipient is an authorized user and to keep records of recipients.

Authorized users shall provide identification as set forth below:

2. Valid identification for non-Government users. Authorized non-Government users shall provide valid identification to receive SBU building information. The identification shall be presented and verified for each dissemination. Valid identification shall be all items (a) through (c), below, and including item (d), as necessary:

(a) A copy of a valid business license or other documentation granted by the state or local jurisdiction to conduct business. The license at a minimum shall provide the name, address, phone number of the company, state of incorporation, and the name of the individual legally authorized to act for the company. The business must be of the type required to do the work. A general contractor's license may be substituted for the business license in states that issue such licenses. In the rare cases where a business license is not available from the jurisdiction, the information shall be provided and testified to by the submitter; and

(b) Verification of a valid DUNS Number against the company name listed on the business license or certification. Verification may be obtained through http://www.fpdc.gov, or by calling Dun & Bradstreet at 703-807-5078 to set up an account; and

(c) A Valid IRS Tax ID Number of the company requesting the information; and, as necessary,

(d) A Valid picture state driver's license shall be required of person(s) picking up SBU documents. Phone verification must be made to a previously validated authorized user that the individual(s) picking up the documentation is authorized to do so by the company obtaining the documents. SBU documents will not be released to any individual or firm who has not, either previously or at the time of pickup, supplied the required documentation as outlined in paragraphs (a) through (c), above.

3. Retaining and destroying documents. The efforts required above shall continue throughout the entire term of the contract and for whatever specific time thereafter as may be necessary. Necessary record copies for legal purposes (such as those retained by the architect, engineer, or contractor) must be safeguarded against unauthorized use for the term of retention. Documents no longer needed shall be destroyed (such as after contract award, after completion of any appeals process or completion of the work). Destruction shall he done by burning or shredding hardcopy, and/or physically destroying CD's, deleting and removing files from the electronic recycling bins, and removing material from computer hard drives using a permanent erase utility or similar software.

4. Term of Effectiveness. The efforts required above shall continue throughout the entire term of contract and for what specific time thereafter as may be necessary, as determined by the Government. Necessary record copies for legal purposes (such as those retained by the architect, engineer, or contractor) must be safeguarded against unauthorized use for the term of retention.

5. Written agreement of disposal. For all contracts using SBU building information, the contractor shall provide a written statement that he and his subcontractors have properly disposed of the SBU building documents, with the exception of the contractor's record copy, at the time of Release of Claims to obtain final payment. Documents no longer needed shall be destroyed (such as after contract award, after completion of any appeals process or completion of the work). Destruction shall be done by burning or shredding hardcopy, and/or physically destroying CDs, deleting and removing files from the electronic recycling bins, and removing material from computer hard drives using a permanent erase utility or similar software.

The recipient acknowledges the requirement to use reasonable care, as outlined above, to safeguard the documents and, if not awarded, the contract (and at the completion of any protest/appeal process) will make every reasonable and prudent effort to destroy or render useless all SBU information received during the solicitation.

I agree that I will abide by this agreement and will only disseminate Sensitive but Unclassified (SBU) building information to other authorized users under the conditions set forth above.

Signature:

Title:

Date:

Copy of business license attached DUNS Number:

Verified: ____Yes _____No

)IRS Tax lD Number

File details come from the government source that posted it. Updated .