Amendment_01_-_905_DB_RFP_5.18.15.docx

DOCX document 41 KB Posted

Attached to
Bonneville Power Administration (BPA) 905 Bldg Outside Air Intake Relocation & Elevator Design Build Modernization
Solicitation number
GS-10P-15-LT-R-9000
Issued by

About this file

Amendment 01 - 905 DB RFP 5.18.15

View the file

Other files

File Type Posted
Amendment_06_-_905_DB_RFP_6.24.15.docx DOCX document
Exhibit_7_DBA_WD_OR150029_(Mod_4)_06.12.15_-_Amendment_06.pdf PDF
Exhibit_5_905_BPA_DB_SOW_6.12.15_-_Amendment_05.docx DOCX document
Amendment_05_-_905_DB_RFP_6.12.15.docx DOCX document
BPA_Structural_Files_(061215).zip ZIP file
BPA_Draft_Schedule_6.15.15_-_Amendment_05.pdf PDF
GS-10P-15-LT-R-9000_DB_AGREEMENT_6.5.15_-_Amendment_04.docx DOCX document
Amendment_04_-_905_DB_RFP_6.5.15.docx DOCX document
VFA_Facility_Assessment_Report_2004_Elevator_Main_-_Amendment_03.pdf PDF
Amendment_03_-_905_DB_RFP_6.3.15.docx DOCX document
GS-10P-15-LT-R-9000_DB_SOLICITATION_6.3.15_Amendment_3.docx DOCX document
Exhibit_5_905_BPA_DB_SOW_6.3.15_-_Amendment_03.docx DOCX document
Amendment_02_-_905_DB_RFP_6.1.15.docx DOCX document
905_Air_Intakes_ _Elevators_Site_Visit_Attendee_List.docx DOCX document
GS-10P-15-LT-R-9000_DB_SOLICITATION_5.20.15.docx DOCX document
GS-10P-15-LT-R-9000_DB_AGREEMENT_5.20.15.docx DOCX document
GS-10P-15-LT-R-9000_Cover_Page_ _1442.docx DOCX document
Amendment_01_-_Exhibit_10_Pre-Proposal_Conference_-_905_Elevators_Air_Intakes.docx DOCX document
Exhibit_8_Project_Development_Study_905_BPA_LB_Elevator_Report_2.26.13.pdf PDF
Exhibit_8D_BPA_Glumac_Study_2002.pdf PDF
GSA_Region_10_-_Fire_Alarm_Design _Installation_and_Testing_Policy.pdf PDF
Exhibit_6A_Security_Clearance_Desk_Guide-External_Contractor.pdf PDF
Exhibit_6C_Optional_Form_OF306.pdf PDF
OR0058PE_-_10.zip ZIP file
Exhibit_4_Performance_Evaluation_Form_-_Commercial_Client.docx DOCX document
Exhibit_8E_VFA_Facility_Assessment_Report_2004.pdf PDF
Exhibit_6E_How_Contractors_Obtain_a_GSA_Access_Card.pdf PDF
GSA_Region_10_-_Wet_Sprinkler_System_Guidelines.pdf PDF
OR0058PE_-_2.zip ZIP file
Exhibit_5A_905_BPA_Cx_SOW__5.6.15.docx DOCX document
GSA_Region_10_-_Dry_Sprinkler_System_Guidelines.pdf PDF
Exhibit_6D_Optional_Form_OF306_Addendum.pdf PDF
Exhibit_7A_Reps_and_Certs_C301_April_2015.doc DOC document
Exhibit_0_Read_Me_First_-_SBU_Document.docx DOCX document
Exhibit_6_Contractor_Information_Worksheet.docx DOCX document
OR0058PE_-_5.zip ZIP file
Exhibit_5_905_BPA_DB_SOW_5.6.15.docx DOCX document
Exhibit_7_DBA_WD_OR150029_(Mod_3)_04.15.15.pdf PDF
Exhibit_8F_OR0058-AggregateThematic-20150305.pdf PDF
Exhibit_8C_Lerch_Bates_Elevator_Modernization_Survey_2010.pdf PDF
Exhibit_1_Price_ _Services_Schedule.docx DOCX document
OR0058PE_-_3.zip ZIP file
Exhibit_10_Pre-Proposal_Conference_-_905_Elevators_Air_Intakes.docx DOCX document
Exhibit_9_905_BPA_Owners_Project_Requirements_19_MAR_2015.docx DOCX document
Autocads.zip ZIP file
OR0058PE_-_6.zip ZIP file
OR0058PE_-_7.zip ZIP file
OR0058PE_-_8.zip ZIP file
OR0058PE_-_9.zip ZIP file
Exhibit_8B_Project_Development_Study_905_BPA_LB_Elevator_Cost_Opinion_2.26.13.xlsx XLSX spreadsheet
Show 40 more

Latest 50 of 58 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MODIFICATION SCHEDULE

Item No.
Supplies/Services
Quantity
Unit
Unit Price
Amount
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. Contract ID Code
Page of Pages
1
3
2. Amendment/Modification No.
3. Effective Date
4. Requisition/Purchase Req. No.
5. Project No. (if applicable)
01
May 18, 2015

6. Issued By

7. Administered By (If other than Item 6)
Code
GSA PBS Design & Construction Division
See Block 6

400 15th St SW Auburn, WA 98001 Richard Risso, 253-931-7309

8. Name and Address of Contractor (No., Street, County, and Zip Code)
(X)
9A. Amendment of Solicitation No.
X
GS-10P-15-LT-R-9000

9B. Date (See Item 11)

May 5 , 2015

10A. Modification of Contract/Order No.

10B. Date (See Item 13)

Code
Facility Code

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers
is extended
X
is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning
1
copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer

submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDG-

MENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT

IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. Accounting and Appropriation Data (if required)

1. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACT/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

(x)
A. This change order is issued pursuant to: (Specify authority) The changes set forth in item 14 are made in the Contract Order No. in item 10A.

B. The above numbered Contract/Order is modified to reflect the administrative changes (such as changes in paying office, appropriation date, etc.)

Set fourth item 14, pursuant to the authority of FAR 43.103 (b)

C. This supplemental agreement is entered into pursuant to authority of:

D. Other (Specify type of modification and authority)

E. IMPORTANT: Contractor
is not,

is required to sign this document and return 3 copies to the issuing office.

14. Description of Amendment/Modification (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

BPA (905 BLDG) OUTSIDE AIR INTAKE RELOCATION &

ELEVATOR DESIGN BUILD MODERNIZATION

The purpose of this amendment is to provide a modified and conformed copy of Exhibit 10 – Pre-Proposal Conference – 905 Elevators Air Intakes, dated 18 May 15. Changes appear in red.

Pre-Proposal Conference BPA (905 Bldg) Outside Air Intake Relocation & Elevator Design Build Modernization Solicitation: GS-10P-15-LT-R-9000

Date:
May 27, 2015

Time:

9:00am – 1:00pm

Location:

905 NE 11th Ave Portland, OR 97232

Attendees shall bring a valid photo I.D. in order to pass through Security.

A pre-proposal site visit will be conducted in conjunction with the pre-proposal conference. Attendance at the pre-proposal conference is mandatory for participation in the site visit. The intent of the meeting is to discuss the Solicitation, Proposal requirements and general questions related to the Request for Proposal (RFP). A tour of the facility will follow immediately after.

NOTE: Due to limited space within the occupied facility, no more than five (5) individuals per DB/CMa/Cx team (including the Prime Contractor and any sub-consultants) will be permitted on the tour, regardless of company affiliation. Sub-contractors must identify which Design Build or CMa/Cx team they are associated with in order to attend the site visit tour; individual sub-contractors will not be permitted on the site visit.

More than one representative from each company (as well as more than five individuals per design-build team) may attend the initial pre-proposal conference discussion in the morning. All parties interested in attending the pre-proposal conference and/or site visit shall register not later than 3:00 p.m. on Thursday, May 21, 2015, prior to the scheduled Site Visit. Parties not registered by this deadline will not be permitted to attend the pre-proposal conference/site visit tour.

To register, each Offeror shall submit, in writing via email, to the Contracting Officer (richard.risso@gsa.gov) and the Project Manager at shawn.duffee@gsa.gov), a list of attendees. Information submitted shall include the following:

· Attendee Name (First, Middle, Last)

· Attendee Email

· Company Name and Designation if Prime or Sub (if Sub, indicate to which Prime)

· Company Address

· Company Phone Number

· Designation if the attendee is attending the tour of the facility

POST SITE VISIT QUESTIONS: Questions raised during the site visit shall be submitted in writing to the Contracting Officer (richard.risso@gsa.gov) and Project Manager (shawn.duffee@gsa.gov) within five (5) workdays following the site visit. Offerors shall submit all other inquires related to this RFP in writing to the CO and the PM.

NOTE: This solicitation will remain unchanged unless it is specifically amended in writing. All amendments will be posted to the FBO website. If an amendment is issued, an offeror will be required to acknowledge the amendment by acknowledging the amendment in Block 19, on the SF 1442.

Interested parties must notify the Contracting Officer for further information about attendance and to confirm location, time, and date. Only those parties who have notified the Contracting Officer and provided necessary information in advance of the meeting will be allowed to attend. To request a reasonable accommodation due to a disability, contact the Contracting Officer.

Authorized Representatives

The following individuals are designated as the authorized GSA representatives under this Solicitation:

Contracting Officer

Name:
Richard Risso
Address:
400 15th Street SW, Auburn, WA 98001
Telephone:
(253) 931-7309
Email:
richard.risso@gsa.gov

Technical Point of Contact

Name: Shawn Duffee, Project Manager
Address:400 15th Street SW, Auburn, WA 98001
Telephone:(415) 264-3167

Email: shawn.duffee@gsa.gov

The time set for receipt of proposals remains unchanged at Monday, 22 June 2015 at 1:00PM PST.

SF30 Continuation of Block Narrative
Page
2
of

All other terms and conditions remain unchanged.

Except as provided herein, all terms and conditions of the document referenced in item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. Name and Title of Signer (Type or Print)
16A. Name and title of Contracting Officer (Type or Print)
15B. Contractor/Offeror
15C. Date Signed
16B. United States of America

(Signature of Contracting Officer) 16C. Date Signed

_____________________________________________(Signature of person authorized to sign)

NSN 7540-01-152-8070
30-105

STANDARD FORM 30 (REV. 10-83)

PREVIOUS EDITIONS UNUSABLE

Prescribed by GSA FAR (48 CFR) 53.243

File details come from the government source that posted it. Updated .