Amendment_03_-_905_DB_RFP_6.3.15.docx
DOCX document 41 KB Posted
- Solicitation number
- GS-10P-15-LT-R-9000
About this file
Amendment 03 - 905 DB RFP 6.3.15
View the file
Other files
Show 40 more
Latest 50 of 58 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MODIFICATION SCHEDULE
| Item No. |
| Supplies/Services |
| Quantity |
| Unit |
| Unit Price |
| Amount |
| AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT |
| 1. Contract ID Code |
| Page of Pages |
| 1 |
| 2 |
| 2. Amendment/Modification No. |
| 3. Effective Date |
| 4. Requisition/Purchase Req. No. |
| 5. Project No. (if applicable) |
| 03 |
| June 3, 2015 |
6. Issued By
| 7. Administered By (If other than Item 6) |
| Code |
| GSA PBS Design & Construction Division |
| See Block 6 |
400 15th St SW Auburn, WA 98001 Richard Risso, 253-931-7309
| 8. Name and Address of Contractor (No., Street, County, and Zip Code) |
| (X) |
| 9A. Amendment of Solicitation No. |
| X |
| GS-10P-15-LT-R-9000 |
9B. Date (See Item 11)
May 5 , 2015
10A. Modification of Contract/Order No.
10B. Date (See Item 13)
| Code |
| Facility Code |
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
| X |
| The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers |
| is extended |
| X |
| is not extended. |
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
| (a) By completing items 8 and 15, and returning |
| 1 |
| copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer |
submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDG-
MENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT
IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. Accounting and Appropriation Data (if required)
1. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACT/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
| (x) |
| A. This change order is issued pursuant to: (Specify authority) The changes set forth in item 14 are made in the Contract Order No. in item 10A. |
B. The above numbered Contract/Order is modified to reflect the administrative changes (such as changes in paying office, appropriation date, etc.)
Set fourth item 14, pursuant to the authority of FAR 43.103 (b)
C. This supplemental agreement is entered into pursuant to authority of:
D. Other (Specify type of modification and authority)
| E. IMPORTANT: Contractor |
| is not, |
is required to sign this document and return 3 copies to the issuing office.
14. Description of Amendment/Modification (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
BPA (905 BLDG) OUTSIDE AIR INTAKE RELOCATION &
ELEVATOR DESIGN BUILD MODERNIZATION
The purpose of this amendment:
a. Provide reponses to questions.
b. Provide revised Exhibit 5 905 BPA DB SOW 6.3.15
1. Do you know or can you share who the current elevator maintenance contract is with in this building?
Elevator maintenance is currently contracted through Kone.
2. In the technical proposal requirements pdf page 18 (5) Project Superintendent, states “The PS shall possess (or have the necessary experience and education to possess) an Electrician, General Supervising (S) License from the state of Oregon, as of the closing date of the RFP”.
As this project consists mostly of Elevator, and HVAC with limited electrical, is it the intention of the government to have the KTR provide a superintendent who possesses an electrical general supervising license?
This special licensing requirement will be retracted since the switchgear replacement phase of the project was not funded and was subsequently deleted for this project.
5) Project Superintendent (PS) - The PS shall possess (or have the necessary experience and education to possess) an Electrician, General Supervising (S) License from the state of Oregon, as of the closing date of the RFP. Credentials (i.e. current active license numbers and date(s) issued) substantiating all licensures shall be provided. The PS shall have no less than ten (10) years experience as a project superintendent on construction projects of similar size and dollar value to the project in this solicitation. The experience should demonstrate building construction knowledge, the ability to manage complex projects and coordination between multiple subcontractors, as well as be consistent with the type of construction provided for in this solicitation. The PS shall be on the site at all times during construction. Clearly state in your proposal the number of years experience that this proposed team member has served as a Project Superintendent.
3. Page 6, Section 1.1, last paragraph of the OPR states that this is not a registered landmark, but GSA does not condone the alteration of the existing façade….
For example, could infilling areas on the south side of the building to match the existing façade as close as possible be considered as alterating the façade?
Yes we will consider proposals in this area that depart from the typical matching of the marble. We can't allow the facade to be altered on the street side, or in any other area.
The time set for receipt of proposals remains unchanged at Monday, 22 June 2015 at 1:00PM PST.
All other terms and conditions remain unchanged.
Attachments:
1. Exhibit 5 905 BPA DB SOW 6.3.15
2. VFA Facility Assessment Report 2004 Elevator Main Excerpt
3. GS-10P-15-LT-R-9000 DB SOLICITATION 6.3.15 Amendment 03
| SF30 Continuation of Block Narrative |
| Page |
| 2 |
| of |
| 2 |
Except as provided herein, all terms and conditions of the document referenced in item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
| 15A. Name and Title of Signer (Type or Print) |
| 16A. Name and title of Contracting Officer (Type or Print) |
| 15B. Contractor/Offeror |
| 15C. Date Signed |
| 16B. United States of America |
(Signature of Contracting Officer) 16C. Date Signed
_____________________________________________(Signature of person authorized to sign)
| NSN 7540-01-152-8070 |
| 30-105 |
STANDARD FORM 30 (REV. 10-83)
PREVIOUS EDITIONS UNUSABLE
Prescribed by GSA FAR (48 CFR) 53.243
File details come from the government source that posted it. Updated .