Exhibit_3_Sample_Key_Personnel_Resume_Format_-_FINAL.docx

DOCX document 15 KB Posted

Attached to
Bonneville Power Administration (BPA) 905 Bldg Outside Air Intake Relocation & Elevator Design Build Modernization
Solicitation number
GS-10P-15-LT-R-9000
Issued by

About this file

Exhibit 3 Sample Key Personnel Resume Format - FINAL

View the file

Other files

File Type Posted
Amendment_06_-_905_DB_RFP_6.24.15.docx DOCX document
Exhibit_7_DBA_WD_OR150029_(Mod_4)_06.12.15_-_Amendment_06.pdf PDF
Exhibit_5_905_BPA_DB_SOW_6.12.15_-_Amendment_05.docx DOCX document
Amendment_05_-_905_DB_RFP_6.12.15.docx DOCX document
BPA_Structural_Files_(061215).zip ZIP file
BPA_Draft_Schedule_6.15.15_-_Amendment_05.pdf PDF
GS-10P-15-LT-R-9000_DB_AGREEMENT_6.5.15_-_Amendment_04.docx DOCX document
Amendment_04_-_905_DB_RFP_6.5.15.docx DOCX document
VFA_Facility_Assessment_Report_2004_Elevator_Main_-_Amendment_03.pdf PDF
Amendment_03_-_905_DB_RFP_6.3.15.docx DOCX document
GS-10P-15-LT-R-9000_DB_SOLICITATION_6.3.15_Amendment_3.docx DOCX document
Exhibit_5_905_BPA_DB_SOW_6.3.15_-_Amendment_03.docx DOCX document
Amendment_02_-_905_DB_RFP_6.1.15.docx DOCX document
905_Air_Intakes_ _Elevators_Site_Visit_Attendee_List.docx DOCX document
GS-10P-15-LT-R-9000_DB_SOLICITATION_5.20.15.docx DOCX document
GS-10P-15-LT-R-9000_DB_AGREEMENT_5.20.15.docx DOCX document
GS-10P-15-LT-R-9000_Cover_Page_ _1442.docx DOCX document
Amendment_01_-_905_DB_RFP_5.18.15.docx DOCX document
Amendment_01_-_Exhibit_10_Pre-Proposal_Conference_-_905_Elevators_Air_Intakes.docx DOCX document
Exhibit_8_Project_Development_Study_905_BPA_LB_Elevator_Report_2.26.13.pdf PDF
Exhibit_8D_BPA_Glumac_Study_2002.pdf PDF
GSA_Region_10_-_Fire_Alarm_Design _Installation_and_Testing_Policy.pdf PDF
Exhibit_6A_Security_Clearance_Desk_Guide-External_Contractor.pdf PDF
Exhibit_6C_Optional_Form_OF306.pdf PDF
OR0058PE_-_10.zip ZIP file
Exhibit_4_Performance_Evaluation_Form_-_Commercial_Client.docx DOCX document
Exhibit_8E_VFA_Facility_Assessment_Report_2004.pdf PDF
Exhibit_6E_How_Contractors_Obtain_a_GSA_Access_Card.pdf PDF
GSA_Region_10_-_Wet_Sprinkler_System_Guidelines.pdf PDF
OR0058PE_-_2.zip ZIP file
Exhibit_5A_905_BPA_Cx_SOW__5.6.15.docx DOCX document
GSA_Region_10_-_Dry_Sprinkler_System_Guidelines.pdf PDF
Exhibit_6D_Optional_Form_OF306_Addendum.pdf PDF
Exhibit_7A_Reps_and_Certs_C301_April_2015.doc DOC document
Exhibit_0_Read_Me_First_-_SBU_Document.docx DOCX document
Exhibit_6_Contractor_Information_Worksheet.docx DOCX document
OR0058PE_-_5.zip ZIP file
Exhibit_5_905_BPA_DB_SOW_5.6.15.docx DOCX document
Exhibit_7_DBA_WD_OR150029_(Mod_3)_04.15.15.pdf PDF
Exhibit_8F_OR0058-AggregateThematic-20150305.pdf PDF
Exhibit_8C_Lerch_Bates_Elevator_Modernization_Survey_2010.pdf PDF
Exhibit_1_Price_ _Services_Schedule.docx DOCX document
OR0058PE_-_3.zip ZIP file
Exhibit_10_Pre-Proposal_Conference_-_905_Elevators_Air_Intakes.docx DOCX document
Exhibit_9_905_BPA_Owners_Project_Requirements_19_MAR_2015.docx DOCX document
Autocads.zip ZIP file
OR0058PE_-_6.zip ZIP file
OR0058PE_-_7.zip ZIP file
OR0058PE_-_8.zip ZIP file
OR0058PE_-_9.zip ZIP file
Show 40 more

Latest 50 of 58 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

KEY PERSONNEL RESUME FORMAT

Provide information, listed below, on separate sheets showing qualifications of each key personnel individual. NOTE: Resumes shall only be provided for positions identified on the list of key personnel identified in the Solicitation.

(a) Name:

(b) Current Position/Title:

(c) Proposed Assignment on this Project, including specific duties proposed to be performed on this Project while in this proposed role: __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

(d) No. of Years in Same Assignment as Proposed on the Project__________________________

(e) Name of Your Firm___________________________________________________________

(f) No. of Years: With this Firm__________ With other Firms____________

(g) Education:

Degree(s) earned: _______________________________________________________________ School attended: ________________________________________________________________ Year Degree granted: ____________________________________________________________ Degree field/specialization: ________________________________________________________ Specialized Training: ____________________________________________________________

(h) Active Registration, if any:

Type: _______ No.____________, State(s) __________, First Year/ Current Year ______/_____

(i) Describe Your Specific Experience and Qualifications Relevant to this Project: __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

(j) Up to three (3) relevant project examples:

Project Title: ___________________________________________________________________ Project Location: ________________________________________________________________ Project Dollar Value:_____________________________________________________________ Project Size (SF): _______________________________________________________________ Delivery Method (i.e. D/B, DBB, CMc, etc.): _________________________________________ Position Held: __________________________________________________________________ Duties performed: _______________________________________________________________ Company employed with during Project: _____________________________________________ GS-10P-14-LT-R-0900/EXHIBIT 3 Page 1

File details come from the government source that posted it. Updated .