Exhibit_2_Project_Experience_Form_-_FINAL.docx

DOCX document 14 KB Posted

Attached to
Bonneville Power Administration (BPA) 905 Bldg Outside Air Intake Relocation & Elevator Design Build Modernization
Solicitation number
GS-10P-15-LT-R-9000
Issued by

About this file

Exhibit 2 Project Experience Form - FINAL

View the file

Other files

File Type Posted
Amendment_06_-_905_DB_RFP_6.24.15.docx DOCX document
Exhibit_7_DBA_WD_OR150029_(Mod_4)_06.12.15_-_Amendment_06.pdf PDF
Exhibit_5_905_BPA_DB_SOW_6.12.15_-_Amendment_05.docx DOCX document
Amendment_05_-_905_DB_RFP_6.12.15.docx DOCX document
BPA_Structural_Files_(061215).zip ZIP file
BPA_Draft_Schedule_6.15.15_-_Amendment_05.pdf PDF
GS-10P-15-LT-R-9000_DB_AGREEMENT_6.5.15_-_Amendment_04.docx DOCX document
Amendment_04_-_905_DB_RFP_6.5.15.docx DOCX document
VFA_Facility_Assessment_Report_2004_Elevator_Main_-_Amendment_03.pdf PDF
Amendment_03_-_905_DB_RFP_6.3.15.docx DOCX document
GS-10P-15-LT-R-9000_DB_SOLICITATION_6.3.15_Amendment_3.docx DOCX document
Exhibit_5_905_BPA_DB_SOW_6.3.15_-_Amendment_03.docx DOCX document
Amendment_02_-_905_DB_RFP_6.1.15.docx DOCX document
905_Air_Intakes_ _Elevators_Site_Visit_Attendee_List.docx DOCX document
GS-10P-15-LT-R-9000_DB_SOLICITATION_5.20.15.docx DOCX document
GS-10P-15-LT-R-9000_DB_AGREEMENT_5.20.15.docx DOCX document
GS-10P-15-LT-R-9000_Cover_Page_ _1442.docx DOCX document
Amendment_01_-_905_DB_RFP_5.18.15.docx DOCX document
Amendment_01_-_Exhibit_10_Pre-Proposal_Conference_-_905_Elevators_Air_Intakes.docx DOCX document
Exhibit_8_Project_Development_Study_905_BPA_LB_Elevator_Report_2.26.13.pdf PDF
Exhibit_8D_BPA_Glumac_Study_2002.pdf PDF
GSA_Region_10_-_Fire_Alarm_Design _Installation_and_Testing_Policy.pdf PDF
Exhibit_6A_Security_Clearance_Desk_Guide-External_Contractor.pdf PDF
Exhibit_6C_Optional_Form_OF306.pdf PDF
OR0058PE_-_10.zip ZIP file
Exhibit_4_Performance_Evaluation_Form_-_Commercial_Client.docx DOCX document
Exhibit_8E_VFA_Facility_Assessment_Report_2004.pdf PDF
Exhibit_6E_How_Contractors_Obtain_a_GSA_Access_Card.pdf PDF
GSA_Region_10_-_Wet_Sprinkler_System_Guidelines.pdf PDF
OR0058PE_-_2.zip ZIP file
Exhibit_5A_905_BPA_Cx_SOW__5.6.15.docx DOCX document
GSA_Region_10_-_Dry_Sprinkler_System_Guidelines.pdf PDF
Exhibit_6D_Optional_Form_OF306_Addendum.pdf PDF
Exhibit_7A_Reps_and_Certs_C301_April_2015.doc DOC document
Exhibit_0_Read_Me_First_-_SBU_Document.docx DOCX document
Exhibit_6_Contractor_Information_Worksheet.docx DOCX document
OR0058PE_-_5.zip ZIP file
Exhibit_5_905_BPA_DB_SOW_5.6.15.docx DOCX document
Exhibit_7_DBA_WD_OR150029_(Mod_3)_04.15.15.pdf PDF
Exhibit_8F_OR0058-AggregateThematic-20150305.pdf PDF
Exhibit_8C_Lerch_Bates_Elevator_Modernization_Survey_2010.pdf PDF
Exhibit_1_Price_ _Services_Schedule.docx DOCX document
OR0058PE_-_3.zip ZIP file
Exhibit_10_Pre-Proposal_Conference_-_905_Elevators_Air_Intakes.docx DOCX document
Exhibit_9_905_BPA_Owners_Project_Requirements_19_MAR_2015.docx DOCX document
Autocads.zip ZIP file
OR0058PE_-_6.zip ZIP file
OR0058PE_-_7.zip ZIP file
OR0058PE_-_8.zip ZIP file
OR0058PE_-_9.zip ZIP file
Show 40 more

Latest 50 of 58 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT EXPERIENCE FORM (SIMILAR PROJECTS)

Project Title:

Contract Type: _____FFP _____Cost _____ Other (Specify) Delivery Method: ____DB ____DBB ____CMc ____Other

Location:

Period of Performance/Date Completed:
Design Contract Amount

(if applicable)

Percentage Complete:

D/B Contract Amount
$

Total Gross Square Footage

Function on Contract (i.e. Prime or Subcontractor)

Owner Contact (Name)

Owner Contact (Title)

Owner Contact (Address)

Owner Contact (Phone)

Owner Contact (EMAIL)

Summary of Actual Performance Under Scope

GS-10P-14-LT-R-0900/EXHIBIT 2 Page 1

File details come from the government source that posted it. Updated .