GOB_Drawings_Attachment_1_compressed.pdf

PDF 3 MB Posted

Attached to
EXT REC | CON26-0011 Geneva Office Ext - MLBE
Solicitation number
SFGOV-0000011112
Issued by
San Francisco County, San Francisco City, California

About this file

This document set comprises architectural drawings and project specifications for the City and County of San Francisco's exterior improvements project at the Geneva Office Building, located at 2301 San Jose Avenue, San Francisco, California. The project scope encompasses four primary work categories: brick cleaning and repair on the San Jose and Geneva Avenue facades, including removal of graffiti, improper paint coatings, and biological growth with selective replacement and repointing of masonry; installation of new gutters and downspouts around the entire building perimeter; in-kind repair of four bay windows along the San Jose Avenue facade and a wood turret on the Geneva Avenue facade; and replacement of entry door protection systems and vents on plywood panels along the San Jose Avenue facade. A non-mandatory pre-bid meeting is scheduled for Wednesday, October 1, 2025, at 2:00 pm at the Power House adjacent to the Office Building. All project-related questions must be submitted by Wednesday, October 8, 2025, at 5:00 pm to sanjana.appachu@sfgov.org with a copy to bridget.webster@sfgov.org. Sealed bids are due by Wednesday, October 15, 2025, at 2:30 pm via email to bridget.webster@sfgov.org. The overall contract period extends through January 1, 2027, with an Addendum #1 posted on October 9, 2025, that does not modify the bid due date.

This solicitation requires a California Class B contractor license and carries a cost estimate of $153,000 for the complete scope of exterior improvements. The project is designated as a Minority/Local Business Enterprise (MLBE) set-aside, restricting qualified bidding to certified minority and local business enterprises as defined by San Francisco procurement policies. Prospective bidders must demonstrate compliance with all licensing requirements and provide evidence of MLBE certification status to be considered for award. The project is managed by the San Francisco Recreation and Parks Department's Capital and Planning Division.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Original Sheet Size: 36" x 24"

Sheet No.

Drawing Title

Project No.

DAC

Proj. Mgr.

Project

Scale:

Drawn

COVER SHEET

G 0.0

RP10042254

Checked by

49 Van Ness Ave., Suite 1200, San Francisco, CA 94102

NO SCALE

GENEVA OFFICE BUILDING

EXTERIOR IMPROVEMENTS PROJECT

2301 San Jose Avenue, San Francisco, CA 94112

LOCATION MAP

SCOPE OF WORK

I. Brick

• Cleaning brick on the San Jose and Geneva Ave facades

• Removal of gra�ti, improper paint coatings and biological growth from existing brick

• Selective replacement/patching of existing brick and pointing/repointing of masonry

II. Gutters and Downspouts

• Installation of new gutters and downspouts around the entire building to match existing

III. Wood

• In kind repair of four bay windows along San Jose Ave façade, and wood turret on Geneva

Ave façade

IV. Windows and Doors

• Northernmost entry doors on west elevation (San Jose Ave) to be protected with a plywood system similar to the one at the southernmost entrance located between the bay windows

• Replacement of vents on plywood panels along San Jose Ave facade

SHEET INDEX

G 0.0 COVER SHEET

A1 SITE PLAN

A1.1 ENLARGED SITE PLAN

A2 SCOPE OF WORK

A2.1 FIRST FLOOR PLAN

A3 EAST AND WEST ELEVATIONS

A4 NORTH AND SOUTH ELEVATIONS

CAPITAL AND PLANNING DIVISION

100% SUBMITTAL

No. Date Revisions

DATE

Project Location 2301 San Jose Avenue, San Francisco, CA 94112

GENEVA OFFICE BUILDING EXTERIOR IMPROVEMENTS

A RECREATION AND PARKS DEPARTMENT PROJECT

PROJECT I.D. NO. RP10042254

Drawing Title

Project No.

DAC

Proj. Mgr.

Project

Scale:

Drawn

DAC CHECK LIST

G 1.0

RP10042254

Checked by

49 Van Ness Ave., Suite 1200, San Francisco, CA 94102

NO SCALE

GENEVA OFFICE BUILDING

EXTERIOR IMPROVEMENTS PROJECT

2301 San Jose Avenue, San Francisco, CA 94112

CAPITAL AND PLANNING DIVISION

100% SUBMITTAL

No. Date Revisions

DATE

Drawing Title

Project No.

DAC

Proj. Mgr.

Project

Scale:

Drawn

DAC PROJECT REVIEW

G 1.1

RP10042254

Checked by

49 Van Ness Ave., Suite 1200, San Francisco, CA 94102

NO SCALE

GENEVA OFFICE BUILDING

EXTERIOR IMPROVEMENTS PROJECT

2301 San Jose Avenue, San Francisco, CA 94112

CAPITAL AND PLANNING DIVISION

100% SUBMITTAL

No. Date Revisions

DATE

GENEVA OFFICE BUILDING

ARCHITECTURAL STABILIZATION

SITE PLAN

A1

A4

SITE PLAN

Limits of Project Site

SCALE 1/32"=1'-0"

ENLARGED SITE PLAN

A1.1

A4

ENLARGED SITE PLAN

10 - THE MUNI STREET CAR YARD EAST OF

THE OFFICE BUILDING,

VIEW FROM THE NORTH

11 - THE NORTHEAST CORNER OF THE

OFFICE BUILDING

1 - THE NORTHWEST CORNER OF THE

OFFICE BUILDING

2 - THE NORTH ELEVATION AND TOWER

OF THE OFFICE BUILDING

3 - SITE ADJACENT TO THE WEST

ELEVATION OF THE OFFICE BUILDING

4 - THE WEST ELEVATION OF THE POWERHOUSE 5 - POWERHOUSE ADJACENT TO OFFICE BUILDING 6 - SITE ADJACENT TO THE WEST OF THE

POWERHOUSE

SCALE

1/16"=1'-0"

SCOPE OF WORK

A2

A4

A

DC C

B

C C C

A

E

Brick cleaning, removal of gra�ti, improper paint coatings and biological growth on existing brick on west and north facades

B Installation of new gutters and downspouts around entire building

C In kind repair/replacement of four bay windows and wood turret

D Entry door to be protected with a plywood system similar to the one at the southernmost entrance located between the Bay windows

E Replacement of vents on window plywood panels on west facadeNorthernmost entry door Weathering of brick and rusted downspout Deteriorated bay window

West elevation

Missing vents in window plywood

FIRST FLOOR PLAN

A2.1

A4

FIRST FLOOR PLAN

SCALE 1/8"=1'-0"

CCCCC D

Installation of new gutters and downspouts around entire building

In kind repair/replacement of four bay windows and wood turret

Entry door to be protected with a plywood system similar to the one at the southernmost entrance located between the Bay windows

Replacement of vents on window plywood panels on west facade

A

B

C

D

E

Brick cleaning, removal of gra�ti, improper paint coatings and biological growth on existing brick on west and north facades

46'

EAST ELEVATION

SCALE 1/8"=1'-0"

WEST ELEVATION

28'-2"

SCALE 1/8"=1'-0"

GENEVA OFFICE BUILDING

ARCHITECTURAL STABILIZATION

EAST & WEST ELEVATIONS

A3

(N) GALVANIZED STEEL, PAINTED DOWNSPOUTS INTO

(E) DRAIN BOOTS. VERIFY BOOT LOCATIONS

(N) GALVANIZED STEEL, PAINTED DOWNSPOUTS INTO

(E) DRAIN BOOTS. VERIFY BOOT LOCATIONS

NOTE: NUMBERS INDICATE WINDOW PROTECTION TYPE - SEE SHEET A4

LETTERS A,B,C & D INDICATE SCOPE OF WORK FOR RESPECTIVE AREAS - SEE SHEET A2

A4

C D C C

B BB B

B

NORTH & SOUTH ELEVATIONS

A4

A4

NORTH ELEVATION

SCALE 1/8"=1'-0"

SOUTH ELEVATION

TYPICAL WINDOW PROTECTION PANELS

SCALE 1/8"=1'-0"

SCALE 1/2"=1'-0"

GOB_Drawings_Attachment 1.pdf
Cover Sheet_Geneva Office Building Exterior Improvements.pdf
DAC Checklist.pdf
DAC Project Review.pdf
GOB_Drawings_Attachment 1
GOB_Drawings.pdf
A1.pdf
A1.1.pdf
A2.pdf
A2.1.pdf
A3.pdf
A4.pdf

File details come from the government source that posted it. Updated .