This document is a Questions and Answers (Q&A) file for a Security System Upgrade project at the International Boundary and Water Commission (IBWC) Nogales Field Office in Rio Rico, Arizona. The Q&A provides detailed facility information, including the site's construction history (originally built in 1951, with upgrades in 1972, 1992, 2009, and latest security upgrades in 2017), total area of 543,388 square yards, and specific building details. Key technical specifications include existing cable infrastructure, power stability, wall types, and current security system components (BOSCH IDS system).
The associated federal contract opportunity is a 100% small business set-aside solicitation (FY254361002) for a security systems upgrade with a budget of approximately $900,000. Quotes are due by June 25, 2025, at 3:00 pm MST, with a 90-day quote validity period. The contract will be awarded using a lowest price technically acceptable (LPTA) method, evaluating technical acceptability, technical approach, and past performance. Interested contractors must have an active Unique Entity Identifier (UEI) and can submit questions via email until June 18, 2025. A site visit is recommended and can be arranged with the Contracting Officer Representative, Jason Oliver.
Text of this file
Q&As 5/29/25 How old is the facility?
Varies based on rendition of expansion. Originally built in 1951, upgraded and expanded in 1972, upgraded in 1992, upgraded in 2009, with the latest physical security upgrades occurring in 2017.
How much square footage is in the facility?
Total Plant Perimeter 3,503 yd Area 543,388 yd²
Lab Building 101 1,830 ft²
Lab Building 102 748 ft²
IBWC Admin Building 4,792 ft²
Chlorine Building 609 ft² How stable is the power?
Power is stable. No know issues.
Is there a dropped ceiling in all areas of installation?
Yes.
What type of walls are in the perimeter areas?
Lab Building 101 Cinder block inside with brick facade
Lab Building 102 Cinder block inside with brick facade
IBWC Admin Building Sheetrock inside with stucco outside
Chlorine Building Sheet metal Do we need to drill between the walls, to run our cable infrastructure?
Existing cable infrastructure in acceptable condition so can re-use with little drilling.
Do we need to use conduit? If yes, what do you estimate the total conduit footage will be?
Conduit would be for cable from the Chlorine Building to the new Security Pole/Gate Controller. See conceptual drawing for detail. ~200-300ft
Are the door frames metal and concrete filled?
Metal frames
Please provide a comprehensive list of quantities of all IDS items needed (e.g. total number of motion sensors, glass breaks, etc.) per location.
Listed in conceptual drawings.
Do you currently have existing IDS Sensors in your doors? Please specify which doors.
Refer to conceptual drawings. Labeled and identified.
What is the manufacturer of the existing IDS system?
BOSCH
Will we be able to reuse the existing cable? If so, what type of cable is there currently?
YES, Cat5(e), Cat(6), fiber, etc.?
Are Ceilings Suspended? Or Hard Lid?
Yes suspended. One case of Hard Lid in Lab Bldg 102
Are there existing Cable Trays for wiring above ceilings?
Yes in some areas.
Can Existing Wiring be utilized?
Yes, in the majority of cases.
Is a “UPS” required? If so, What Time/Power Duration is required?
Yes, 15 min -30 min duration depending on system.
re “Or Equal” Equipment substitutions allowed?
Yes on case by case basis and as long as meet minimum requirements per PWS.
Is “Plenum Wire” acceptable?
Yes, In areas where air is circulating. No in areas where air is not circulating due to cost.
Is “After Hours Access” for said work, available to contractor at no add’l cost to the Gov’t?
No work is authorized after hours with exception made by plant manager or if conducting a light study.
What is the height of Exterior Cameras? (If any)
15ft at the various security poles. 12-15ft on buildings.
Please provide/post other “Q & A” requests.
TBD
Please provide a list of equipment and parts # that are to be installed.
IGE has the number of each specific type of physical security equipment. Part number TBD based on solution.
Are there pipe chases between floors?
No. All single story buidings.
What is the range of the budget for this project, and is it already appropriated?
900K
Because of the high cost of the parts can we bill when parts arrive on site, or in the alternative are progress payments allowed?
Parts delivered and accepted may be billed. Keep in mind that once invoice is submitted via IPP, it may take up to 30 days for payment to be submitted.
How many feet of new wire will have to be run?
200-300 for gate controller and security pole. Unknown in other parts of plant due to using existing cable/wire.
What kind of cipher lock and quantities are required e.g. X-10
NO X-10 required. Doors should have Mechanical Push Button Locksets such as those from Schlage, KABA, or Simplex.
Locks shall be weather resistant and vandal proof.
Please post the sign in sheet and Q&A's from the site visit.
TBD
Please post the drawings and the key for the drawings.
Need to sign NDA before releasing.
Other files
| File | Type | Posted |
|---|---|---|
| Updated WD 2015-5481_Rev. 27_5.20.25.pdf | ||
| QAs 6-23-25.odt | ODT document | |
| QA 6-22-25.odt | ODT document | |
| QAs 6-13-25.odt | ODT document | |
| NIWTP - Physical Security SPECS.xlsx | XLSX spreadsheet | |
| PWS-CIP-Physical Security Enhancements Project-NIWTP (2025).docx | DOCX document | |
| Conceptual Design-Physical Security Project-NIWTP (2025).pdf | ||
| Wage Determination.pdf | ||
| CLIN Structure.docx | DOCX document | |
| APPENDIX A - NIWTP - System_Hardening_Requirements.docx | DOCX document | |
| PWS-CIP-Physical Security Enhancements Project-NIWTP (2025).docx | DOCX document | |
| Clauses and Provisions.docx | DOCX document |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .