About this file
The file is a Scope of Work and Request for Bid (RFB) document from the Clay County Board of County Commissioners in Florida for the Fire Station 18 parking lot renovation project. The project involves the removal of approximately 4,525 square feet of existing asphalt parking lot and base materials at Fire Station 18, located at 207 Blanding Blvd in Orange Park, and the installation of a new concrete parking lot matching the current layout. A mandatory pre-bid meeting is scheduled for July 08, 2025, at 1:00 PM, and the project requires a Florida-licensed contractor to complete all work within 45 days after the Notice to Proceed (NTP), with the fire station remaining fully operational during construction.
The project specifications include detailed requirements for permits, site preparation, utility coordination, demolition, concrete installation (4500 PSI fiber-reinforced concrete), site restoration, and quality control measures. The bid process includes strict communication guidelines prohibiting bidders from contacting county employees during the bid period, with all inquiries to be submitted through the RFB's Question and Answer tab. The county has a local preference policy and Buy American policy, and the final bid award will be posted on the county's procurement website. Bidders must comply with safety standards, OSHA regulations, and provide site-specific safety training, with the county reserving the right to reject any and all bids without cause.
Text of this file
FS 18 parking lot scope of work
| From |
| Daniel Loos |
| To |
| Karen Smith; Alyssa Pierson |
| Cc |
| Gene Price |
| Recipients |
| Karen.Smith@claycountygov.com; Alyssa.Pierson@claycountygov.com; gene.price@claycountygov.com |
Good Morning please find the scope of work for FS 18 parking lot bid, thank you for what you do.
PRJ100810 – FS 18 parking lot
CC 1169 Rescue Services
Daniel Loos
Clay County Construction Manager
Facilities Division
Cell 904-806-9777
Daniel.loos@claycountygov.com
FS 18 Scope of work.docx Clay County Facilities
477 Houston St, Green Cove Springs, Florida 32043
Quote Request for Demolition of Existing Asphalt Parking Lot and Installation of New Concrete Parking Lot at Fire Station 18, 207 Blanding Blvd Orange Park, FL 32073
Clay County Board of County Commissioners is seeking a qualified Florida-licensed contractor to perform the removal of approximately 4,525 SF of asphalt and base from the existing parking lot and install a new concrete parking lot, ensuring the site matches the existing parking lot layout.
Scope of Work (General)
Work shall begin immediately after the issuance of the Notice to Proceed (NTP). The scope includes, but is not limited to:
1. Permits and Coordination:
· Obtain all locates and permits through the appropriate regulatory agencies.
· Coordinate with the Construction Manager to avoid conflicts with ongoing property operations.
· Provide a schedule agreed upon before commencing demolition.
2. Site Preparation and Safety:
· Mobilization, work site barrier setup, and safety measures.
· Implement structural integration and any incidental work needed to complete the project.
· Develop and follow a stormwater pollution prevention plan (BMPs).
3. Utility Coordination:
· Coordinate with utility providers for locates, removal, and capping of all utilities as required.
· Ensure all demolition activities are carried out in a manner that mitigates potential adverse health impacts to the public.
4. Demolition Requirements:
· Remove all asphalt and base material to a minimum depth of 6".
· Ensure proper disposal of demolition debris per environmental regulations.
5. Concrete Installation:
· Install a minimum 4500 PSI fiber-reinforced concrete to a 6” depth per FDOT specifications with a certified mix design.
· Install 6x6 welded wire mesh on chairs per FDOT specifications.
· Wet cure the concrete for a minimum of 5 days using an approved wet cure method.
· Make relief cuts as per FDOT specifications.
6. Site Restoration:
· Retain all bollards around the perimeter of the parking lot.
· Return parking lot striping with thermoplastic striping in the current layout.
7. Traffic and Site Security:
· Prepare and submit Maintenance of Traffic (MOT) plans necessary to obtain permits from FDOT.
· Secure the site during inclement weather or emergencies.
8. Quality Control:
· Ensure inspections are conducted at critical milestones.
· Maintain documentation of quality control measures throughout the project.
9. Project Completion:
· All work to be completed and invoiced no later than 45 days after the NTP date.
Additional Requirements
1. Safety Measures:
· Ensure compliance with all applicable safety standards, including OSHA regulations.
· Provide site-specific safety training for workers as needed.
FS 18 Parking Lot Final.png
Other files
| File | Type | Posted |
|---|---|---|
| Fire_Station_18_Parking_Lot_(RE-BID).pdf | ||
| FS_18_Parking_Lot.png | PNG image | |
| FS_18_Parking_Lot_Final_.png | PNG image | |
| Where_to_Park_for_Non-Mandatory_Pre-Bid.png | PNG image | |
| Chapter_8_Section_I.pdf | ||
| FS_18_Parking_Lot_Final.png | PNG image | |
| EFT_FORM.pdf | ||
| W-9_(2024).pdf | ||
| Certificate_of_partial_payment.pdf | ||
| RE__Site_Modification_Review_for_Fire_Station_18_Parking_Lot_-_PRJ100615_-_1.29.2025.msg | MSG file | |
| Warranty_Letter_.pdf | ||
| Certificate_of_final_payment.pdf | ||
| FS_18_Scope_of_work.docx | DOCX document | |
| Performance_&_Paymt_Bond.doc | DOC document | |
| Owner_Direct_Purchase_Program.pdf |
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .