Form_5_-_Relevant_Experience.docx

DOCX document 15 KB Posted

Attached to
Rehab campground water system, Olympic NP, WA
Solicitation number
140P8322R0008
Issued by

About this file

This document contains a request for proposals for rehabilitation of a public water system in Olympic National Park, Washington. The solicitation seeks a firm-fixed-price contract to replace the well pump and control system, electrical conduit and wiring, water treatment building, chlorine storage and feed system, steel water storage tank interior and piping, backflow prevention, and install pipe under Ennis Creek through horizontal directional drilling. Additives may include hydro-jetting and inspecting sewer piping and manholes, replacing septic and pump tanks with a combination tank, and replacing the electrical panel and lift station pumps. The work must be substantially completed by June 24, 2023. Responses are due approximately 30 days after posting to the System for Award Management. The acquisition is set aside for small businesses with a North American Industry Classification System code of 237110 and size standard of $39.5 million average annual gross receipts. The contractor must comply with limitations on subcontracting and pay prevailing wages.

View the file

Other files

File Type Posted
Attachment_4b_Revised_Wage_Determination_WA20220022_Building_6-24-22_0002.pdf PDF
Attachment_5a_Revised_Wage_Determination_WA20220044_Heavy_6-24-22_0002.pdf PDF
Attachment_8_Clarifications_14-18_140P8322R0008_0002.pdf PDF
Attachment_9_Revised_Electrical_Specification_Sections_0002.pdf PDF
Sol_140P8322R0008_Amd_0002.pdf PDF
Attachment_7_Site_Visit_Notes_and_Clarifications_1-13__0001.pdf PDF
Attachment_4a_Revised_Wage_Determination_WA20220022_Building_6-17-22_0001.pdf PDF
Sol_140P8322R0008_Amd_0001.pdf PDF
Attachment_5_Wage_Determination_WA20220044_Heavy_2-25-22.pdf PDF
Form_2_-_Price_Schedule.docx DOCX document
Attachment_1_Specifications__Rehabilitate_Heart_o__the_Hills_Water_and_Wastewater_Systems_(May_2022).pdf PDF
Form_4_-_Limitations_on_Subcontracting_compliance_worksheet.xlsx XLSX spreadsheet
Form_3_-_FAR_representations.docx DOCX document
Attachment_2_Drawings__Rehabilitate_Heart_o__the_Hills_Water_and_Wastewater_System.pdf PDF
Sol_140P8322R0008.pdf PDF
FAQs_for_RFP_140P8322R0008.pdf PDF
Form_1_-_SF1442_140P8322R0008.pdf PDF
Attachment_3_Heart_O__the_Hills_Well_Log_-_Abandoned_(for_decommissioning).pdf PDF
Attachment_4_Wage_Determination_WA20220022_Building_2-25-22.pdf PDF
Form_6_-_General_References.docx DOCX document
Attachment_6_Notice_and_Certification_of_Vaccination_Form_(exp_2-28-25).pdf PDF
Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation #140P8322R0008, Rehabilitate Public Water System Olympic NP

Relevant Experience READ CAREFULLY: The purpose of this form is for the offeror to list construction projects (preferably performed during the past five (5) years) that are similar to the work described in this solicitation and from whom the government may gather past performance information. Work performed as prime or subcontractor may be included. The number of projects listed shall not exceed ten (10) and shall be numbered consecutively, beginning with the most recent project. Use this form to address your familiarity with the Scope of Work described in the plans and specifications and with the capability criteria described in the Request for Proposal.

It is especially important that the offeror disclose instances in which their past performance may be considered by others to be less than fully satisfactory. The offeror should tell their side of the story and describe remedial corrective action that has been taken or will be taken to correct the deficiency. Failure to do so may result in a determination that an offeror has been less than candid with the Government, which could result in an unfavorable assessment of the offeror’s past performance record.

NAME OF CONTRACTOR/OFFEROR:

On this project the offeror was a ☐ Prime or ☐ Subcontractor.

(If applicable) Pipe installation was accomplished by ☐ Offeror’s direct employees or by ☐ subcontractors supervised by the Offeror.

PROJECT NAME:

Project Location:

Name of Owner:

Address of Owner:

Telephone Number:

Project Value:

Dates of Construction:

DESCRIPTION OF THE PROJECT AND SCOPE OF OFFEROR’S WORK:

PERFORMANCE REMARKS:

File details come from the government source that posted it. Updated .